Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
15110116
CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 8136 PARK VILLA CIR CONTRACTOR: FOUR SEASONS PERMIT NO: 15110116 ROOFING OWNER'S NAME: LEE JOONG SEOK AND HWANG SUN HEE PO BOX 1668 DATE ISSUED: 11/17/2015 OWNER'S PHONE: SAN JOSE, CA 95109 PHONE NO: (408)278-0330 LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL EJ COMMERCIAL ❑ �~ UNITS #8136, #8138, #8140 - REMOVE (E) ROOF TILES License Class Lic. # AND UNDERLAYMENT, INSTALL 2 LAYERS OF 40# FELT AND Contract Date (N) BORAL OS CLAY "S" TILE - 16 SQUARE'S I hereby of irm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the Sq. Ft Floor Area: Valuation: $6405 _performance of the work for which this permit is issued. I faloq and will maintain Worker's Compensation Insurance, as provided for by on 3700 of the Labor Code, for the performance of the work for which this APN Number: 35610015.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct. I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save 180 DAYS FROM LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and exp nses which may accrue against said City in consequence of the Issued by: Vl Date: 't k7l<— granting of thi permit. dditionally, th applicant understands and will comply withallnon-int sourc regulations p the Cupertino Municipal Code, Section RE-ROOFS: 9.18. Signatur Date 1 All roofs shall be inspected or to any/0 mg terial being installed. If a roof is installed without first obt ' g an ins c on, I ree to remove all ne N materials for inspection. I r ❑ OWNER-BUILDER DECLARATION Signature App \ 1, I hereby affirm that I am exempt from the Contractor's License Law for one of of cant: the following two reasons: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project (Sec.7044, Business & Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the declarations: Health & Safety Code, Section 25532(a) should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally, should I use equipment or devices which emit hazardous Compensation, as provided for by Section 3700 of the Labor Code, for the air contaminants as defined by Ve Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with ,/he Cupertino Municipal Code, Chapter 9.12 and I have and will maintain Worker's Compensation Insurance, as provided for by the Health & Safety Code,;Sions5533 nd 25534. Section 3700 of the Labor Code, for the performance of the work for which this Owner or authorized a Date permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code, I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit. Additionally, the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code, Section Licensed Professional 9.18. Signature Date RER OF PERMIT APPLICA1104N CONIMUNI I Y DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 950.14-3255 (493) 777-3228 - FAX (408) 777-3333 - building �cupertino.o[g 1511011 � By my signature below=, I certify to eae r of the follo%vcng.- I am the property mvner or authorized agent to act on the property oi\ier s behalf. I have read this application and the: information I have provided is correct_ I have read the Description of Work and vi:tify it is accurate. I agree to comply with all applicable local ordinance.; and state la%t3 relating to building constriction I authorize representatives of Cupertino to enter the above -i tified p operty for inspection purposes. Signature of ApplicantlAgent. �"� - C ' �-- Date: SUPPLEMENTAL INFOR.-MA HON REQUIRED If building is associated widt a Home (hvner s Association, provide letter of approloal from I IOA. — Provide Planning approval to verify if there any restric;tiolls. Provide copy of Manufacturer's Installation Specilicatiolls. Provide sighed copy of Cupertino's Tear -Off Pot icy. PIAN CItL' 'KTYPE Rota!' NG Stdy u ()Vk i--rt#E-C4XMER Q BUILuvic, PLAN ltk.viuXv E j BXPREsL% ❑ PLANNING PLAN REVIEW Si'ANDARU C1 ME DWF 12eroof.4pp__201 Ldoc revised 03/16/11 " PROJECT ADlxtESs 3j A, l/ LJ Jo©r E-MAIL' i Stp�ci ennoe:« cl-ry co,N 'ACr N_LmE. PHONE t {TY- STATr% ZIP F I AX OXVtvL`St. ❑ (AMER-BUILDER 13 OWNER AGENT CONTRAACTo R Q CONTRACTOR AGGAI; d ARCHrrECr © MIMEER 1j DEVELOPER 1:1 TENANT CON {RAC {nR )IT ME LICENSE t+tt.'MBERuCki`iSE TY - ft BUS. ice # 7. (--Oj'vIPAL\.Y NAME I Mi Att. FAX # STREEt A sa Gr{ Y;,g rA { { � 1iv' BUS- LIC. is ARCI{rTF"MI-34GINFER NAME t� ,t --- - I_ICI�SL MiXIBER COMPANY (NAME t .{AI{. FAX k STRFT-T ADDRESS CI FY, x'rA'rl:, ZIP Pttch�iE !' USE OF n SFD or Duplex Multi -Fatuity ROOIz AREA VAI. X1101V - j STRUCIAIRE: d Commercial yy F?tl4i'tNG ROOT: •TYPE: Cl MILT=IIP ROOF 13 ASPHALT SHINGLES Q 1Vtx)D SI{AKES ❑ VY00iJ SHfiVtit.I:.; OTtifJt (S{'iCtt Y) 71e REMOVE (REPLACE PLUS If NO. PLY%V(K)D Q 'ii'❑ _._.. _. PLY11't) ❑ (-)SB PITCH: � ROOF Q NOirt.�lYi'RS T '�EF,SS: TYPE CDX - --12 CLASS: A J` --ES REPORT A MOPOSED ROOD "1-YI-E, 0 BUILT-UP ROOF ❑ AS141"MA- SHINGLE:$ ❑ 13'OOD SHAKES ❑ t;'O{�U Sfitt�fil.t_$ 10 (yj 11EX � 1 �e ICC DM-RIPTION OF LURK_ A/z -11e ,L > �% /z / / CJU /" A/ lezz- By my signature below=, I certify to eae r of the follo%vcng.- I am the property mvner or authorized agent to act on the property oi\ier s behalf. I have read this application and the: information I have provided is correct_ I have read the Description of Work and vi:tify it is accurate. I agree to comply with all applicable local ordinance.; and state la%t3 relating to building constriction I authorize representatives of Cupertino to enter the above -i tified p operty for inspection purposes. Signature of ApplicantlAgent. �"� - C ' �-- Date: SUPPLEMENTAL INFOR.-MA HON REQUIRED If building is associated widt a Home (hvner s Association, provide letter of approloal from I IOA. — Provide Planning approval to verify if there any restric;tiolls. Provide copy of Manufacturer's Installation Specilicatiolls. Provide sighed copy of Cupertino's Tear -Off Pot icy. PIAN CItL' 'KTYPE Rota!' NG Stdy u ()Vk i--rt#E-C4XMER Q BUILuvic, PLAN ltk.viuXv E j BXPREsL% ❑ PLANNING PLAN REVIEW Si'ANDARU C1 ME DWF 12eroof.4pp__201 Ldoc revised 03/16/11 CITY OF CUPERTINO FEE ESTIMATOR — BUILDING DIVISION ADDRESS: 8136 Park Villri Cir DATE: 11/17/2015 REVIEWED BY: Phuong APN: 356-10-015 1 BP#: 'EVALUATION: 1$6,405 ^'PERMIT TYPE: Minor Building Permit I PLAN CHECK TYPE: Re -roof PRIMARY Multi -Family Dwelling Buildina is PENTAMATION 1 R2ROOF USE: 1 >3 Stories O Yes O No PERMIT TYPE: WORK UNITS #8136 #8138 #8140 - REMOVE E ROOF TILES AND UNDERLAYMENT INSTALL 2 SCOPE LAYERS OF 40# FELT AND (N) BORAL OS CLAY "S" TILE - 16 SQUARE'S FEE ID ROOF AREA s.f. 1 REROOFMRES 1,600 NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School Dictrirt_ vtr_ )_ Thv.vv fnav aro havod an thn nrnliminary infnrmatinn availahln and are nnly an n.ctimate_ rnntart thn Aunt fnr addn'l infra_ FEE ITEMS fFee Resolution 11-053 F,f /7,1/"13,) ec h. ilhn C. he s t' i%1i%I3. 1'3,"t ti% €_.fiz'i'+� .: t.:£;.. jlsdY.' £.. i?e"' I. A. ii. 1'ern t ° . f,e I'iti}Y?l3. I'c 1 I'�l£'f;, .l ertriii I' Oiher ,,We h. h7 s f?. 06 r t'hij)'b IY:S ', Other t.;iK't:'. Ir sp, s NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School Dictrirt_ vtr_ )_ Thv.vv fnav aro havod an thn nrnliminary infnrmatinn availahln and are nnly an n.ctimate_ rnntart thn Aunt fnr addn'l infra_ FEE ITEMS fFee Resolution 11-053 F,f /7,1/"13,) FEE QTY/FEE MISC ITEMS i )/Iat'tyj2(T..lsiec, K fi, c.'e Pen -nit Fee: $272.00 Permit ]I 'ee: i F-1 Work Without Permit? Yes No $0.00 I Strong Motion Fee: I BSEISMICR $0.83 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $1.00 SUBTOTALS: 1 $273.83 $0.00 TOTAL FEE: 1 $273.83 Revised: 10/01/2015 I COMMUNI-I Y DAVE-5..01-3MEN'I" DEPA[�TMEN-l' - 1UILDING DIVISION- ALBERT SALVADOR, RE., C.S.O., BUILDING OI=I=ICIAL 10300 TORRZE AVENUE • CUPERTINO. CA 95014-3255 1:L1la4_;RTIN0 (403) 777-3228 • FAX (408) 777-.3333 a huildiny�a),c.upertii�olorg I) PROJECT ADDRESS lei STRIIsT AI)I�RfiSS� i CONTRACTOR N COMPANY NAME, f RTRi r;� A?DR[ S l APN f1 V LICIiNSE NUMBER i S- H -MAIL &MAIL I UNDERSTAND AND AGREE TO THE FOLLOWING BUS. L K..l r•'�•�.f�:.ljs. .. P[ [ONl%J'���� 1. The re -roof project shall comply with all applicable provisions of the 2013 California Codes. 2. An inspection request can be scheduled LiLg to ogee lb usiaess d�a� before the rr�c;���c �d it ction<d ate. Please schedule inspections online or call (408) 777-.3228 from 7:30-3:30pm (Mon.-Thurs) or 7:30- 2:30pm (Friday) to schedule inspection. For Tear -,Off and Nailing Inspections, you must also call on the day of the inspection only after that phase of the work is completed. 'rhe building inspector will be available within one hour. "rhe hours for this service are: 7:30, 0-.30aaaaa and 12:30-3.30 (Mfon.-Tl1IlIluIr•s) and, '/.-3040:30.gwi and 112:30-2:30 (Friday). Final Inspections will be given a two hour- window. 3. Tear --o 'f.11its eei�®rIa is '�"�flIlll6°fie ,l-1,ny and all dry -rotted wood shall be replaced prior to this inspection. if less new plywood roof sheathing is proposed throughout, alh the nails/fasteners s,-fll all be eitheir eo>rau��aleILehy 2ollocked-blow a oir re rnove(l prior to this inspection. 4. If plywood is installed, a plywood Naanllai� z1(><�sp�cx®na is rrr�ul�Ili � Wil. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. A Final! Insvection an(l aa>«�r®vaa)1 ��aaal)1 be obtaaivaq�j„from the building inspector when the re -roofing is completed. '1'o receive a final sign --off, the following items will be verified: a. Flat roofs shall have a minimum of per foot of slope and demonstrate there is no podding;. b. Listings from approved testing agencies for all pre -manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. 7. NOTE: If you call for a tear -off or plywood nailing inspection and the work is not complete; you will be charged a re -inspection fee. The fe--inspection fee shalll foe.-Loai_d before another insloection Can _be schned�Illlede By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf: I understand and agree to comply with the re -roof policy stated above. I also understand that smol�e detectors and carbon monoxide detectors are required to be installed in accordance with Sections R314 and R3 IS of the 2013 California Residential Code. Signature of Applicant/Agent: Date:J JJ RerogMolicy_2014.doc revised 0111S114 WESTMONT PARK VILLAS HOMEOWNERS ASSOCLATION WESTMONT PARK VILLAS 110A c/o COMMUNITY MANAGEMENT SERVICES 1935 DRY CREEK ROAD CAMPBELL, CA 95009 (408) 559 - 1977 8/1/2015 City of Cupertino Building Department To the City of Cupertino; Please note, the Westmont Park Villas HOA has contracted and approved Four Seasons Roofing to perform 57 re -roofs of our homes, replacing the current Tile Roofing system -Mth new BORAL U.S. TILE ONE PIECE MISSION "S" CLAY TILE SYSTEM. We have selected the color CLAY RED to match our existing roofs. Sincerelv, Diana k. Johnson Vice -President Community Management Services