B-2016-1165 APPROVED PLANE
0
0
Q)
0
0
T
0
3
0
10399 Rivercrest Ct, Cupertino, CA 95014
Owner: Roya Mojtahedi
1— All ceiling joists are parallel to the structure
2— Remove Free standing non —load bearing fireplace
3— Install new ceiling joists to follow existing pitch
4— Install new Roof Joists to follow existing pitch
5— Install new floor joists to follow existing pitch
6— Cover Roof with Plywood and install new roof tiles
7— Cover the floor with plywood
8— Cover the ceiling with sheetrock
9— Use Joist hangers and other hardware as needed
COMMUNITY DEVELOPMENZVEaQ R T NIENT
BUILDING DMSION - CUPERTINO
APPROVED
This set of plans and specifications MUST be kept at the
Job site during construction. It is unlawful to make any
changes or alterations on same, or to deviate
t'nerefrorn, withcut approval from the Building Official.
The Starnolnn of this plan and spec fca;ions SHALL NOT
of any prcv ns of any C�v?r r State Law.
DATE
PERMIT # /3
Kitchen
FFICE COPS'
l unundry and 3athroom