D-2016-0361CITY OF
10200 EMPIRE AVE CUPERTINO, CA 95014 (326 23 045)
OWNER'S NAME:
OWNER'S PHONE:
III (It em a] 1XV-91cm ym.Kim Klivau_ s�
License Class Lic. # P) q sy�I _
Contractor ( BEYOND BUILDERS ) Date I,I Zj I ( /w
I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing
with Section 7000) of Division 3 of the Business & Professions Code and that my
license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
1. I have and will maintain a certificate of consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
Performance of the work for which this permit is issued,
pp jj z I have and will maintain Worker's Compensation Insurance, as provided for
ov`r by Section 3700 of the Labor Code, for the performance of the work for which
this permit is issued.
APPLICANT CERTIFICATION
certify that I have read this application and state that the above
nformation is correct. I agree to comply with all city and county
xdinances and state laws relating to building construction, and hereby
sulhorize representatives of this city to enter upon the above mentioned
nrpery for inspection purposes. (We) agree to save indemnify and keep
mmaless the City of Cupertino against liabilities, judgments, costs, and
expenses which may accrue against saA City In consequence of the
granting of this permit. Additionally, t pplicant understands and will
=ply with all non-poTource rag aaj erns per the Cupertino Municipal
:ode. Section 9.1 E. �i l
Date I 21 1 I o
I hereby affirm that I am exempt from the Contractor's License Law for one of the
following two reasons:
1. 1, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered
for sale (Scc.7044, Business & Professions Code)
z. I, as owner of the properig am exclusively contracting with licensed
contractors to construct the project (Sec.7044, Business & Professions Code).
I hereby affirm under penalty of perjury one of the following three declarations:
r. I have and will maintain a Certificate of Consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Cade, for the
performance of the work for which this permit is issued.
z. I have and will maintain Worker's Compensation Insurance, as provided for
by Section 3700 of the Labor Code, for the performance of the work for which
this permit is issued.
a. I certify that in the performance of the work for which this permit is issued, I
shall not employ any person in any manner so as to become subject to the
Worker's Compensation laws of California. If, after making this certificate of
exemption, I become subject to the Worker's Compensation provisions of the
Labor Code, I must forthwith comply with such provisions or this permit shall
be deemed revoked.
APPLICANT CERTIFICATION
ertify that I have read this application and state that the above information is
tract. I agree to comply with all city and county ordinances and state laws
sting to building construction, and hereby authorize representatives of this city
enter upon the above mentioned property for inspection purposes. (We) agree
save indemnify and keep harmless the City of Cupertino against liabilities,
Igments, costs, and expenses which may accrue against said City in
nsequence of the granting of this permit. Additionally, the applicant
iderstands and will comply with all non -point source regulations per the
ipertino Municipal Code, Section 9.18.
Date
BUILDING PERMIT
CONTRACTOR: PERMIT NO: D-2016-0361
( BEYOND BUILDERS)
SAN MATEO, CA 94401
DATE ISSUED: 01/21/2016
PHONE NO:
BUILDING PERMIT INFO:
_ BLDG —ELECT -PLUMB
_ MY CH X RESIDENTIAL _ COMMERCIAL
JOB DESCRIPTION:
DEMO (E) 1,008 S.F. SFD
Sq. Ft Floor Area: Valuation: $10000.00
APN Number: Occupancy Type:
326 23 045 R-3 (Custom)
PERMIT EXPIRES IF WORK IS NOT STARTED
WITHIN 180 DA F PERMIT ISSUANCE OR
180 DAYS $-�LED INSPECTION.
/ / ZC P
RE -ROOFS
All roofs shall be inspected prior to any roofing material being installed. If a roof is
installed without first obtaining an inspection, I agree to remove all new materials for
inspection.
"A" OR BETTER
HAZARDOUS MATERIALS DISCLOSURE
I have read fire hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. I will
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
Health & Safety Code, Section 25532(a) should I store or handle hazardous
material. Additionally, should I use equipment or devices which enry hazardous
air contaminants as defined by the Bay Area Air Quality Mannin fit District I
will maintain compliance with the Cupertino Municipal Code
the 9.12 and
the Health & Safety Code.Stkktfons 2540k 25533, it 5534.
>wner or authorized agent: K--�ZfA /J!/"tiI/liln�
)ate: 11 Z( // L tO CONST CE ON LENDING AGENCY
hereby affirm.that there is a construction lending agency for the performance
f work's for which this permit is issued (Sec. 3097, Civ C.)
.ender's Name
ARCHITECT'S DECLARATION
I understand my plans shall be used as public records.
Licensed
Professional
64
U-C
ormf lCl
Scope,a��srepiZ��V�°��r��tq
sl�td
1 P nl 3 Llo - Z?i 0`4 S
(;Op ■ r ��
Y
l�
10100 erylplre- Ave-
CO'TQ-o- ylo 6Ar °ision}
-I5(� I I, 60 $ SqFi-
®C-VLA-b Gam)
5F-D
�jE,
Ls R
c"t 7a n(..nc
CUPERTINO
Building Department
JAM 2 12016
FOR CODE COMPLIANCE
'-d By. r�
usr�,4 0 P'r
7 !^ trrl r70 _ L4e
or .., 4ny
front
` PA! o
Im
DEMOLITION PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • buildina ouoertino.orq
LJ
Pt OJECT ADD SS
�
APN #
jj ((��
OWNERNAME �� Llsl,O
[,
PH N - 4[tI.... 9 1 ILK
tti�
I
L IIL.. e) F.tV_CJL '�'l LCa
STREETADDR- S
i Sid v4 � � l� t-�t✓,wtat�
C ,STATE, ZIP
WL d1 3
FAX
5t'}-4�S�-aavt�
t
CONTACT NAMEFM �ll�(rn `^
STFvcTAnna cR ATE.
cT� r¢rY-(vs 0% I o---M(O--g
61
❑ OWNER ❑ OWNER -BUILDER ❑ OWNERAGENT CONTRACTOR ❑ CONTRACTOR AGENT ❑ ARCHITECT ❑ ENGINEER Cl DEVELOPER ❑ TENANT
CONTRACTOR NAME
Sri
LICH SE NUMBER
LICENSE TYPE '�
BUS. LIC #
i
COMPANYNAME
E-MAIL
FAX
60rA
NIA
STI f ADD SS ^,,.
CI94C, STAT IP
PHONE-
'` `T��
�°'
� r 10
DPSCRHTIONOPWORK
RESIDENTIAL
R
#DWE.LLING
`
FLOOR AREA OO V tJ
UNITS
r 5
;�n;g � ( � R
COMMERCIAL
FLOOR AREA
TYPE OFCONSTRUCTION #STORIES
-1 —
"AQMDJOHNUMEER -_--_-_-��l
TOTALVALUAnON:
�qr�
J #: a Q
ca 6
By my signature below, I certify to each of the following: 1 am tho property oth gen act on perty owner's behalf. r have read this
o
application and the information I have provided is correct. 1 have read the D I�SCt'pdon Work an it' s`:urata. I agree to comply with all applicable local
ordinances and state laws relating to builds g construction. I authorize representatives of Cupertino to enter the above -identified property for inspection purposes.
Signature of ApplicantlAgent: Date:
SUPPLEMENTAL INFORMATION REQUIRED PRIOR TO ISSUANCE OF DEMOLITION PERMIT
' 3 -
_ Provide Job Number from Bay Area Air Quality Management District www baagmd ore @ 415-749-4762.
Provide three copies (Residential) or six copies (Commerical) of a site plan showing protection for any trees 10
in diameter or more at 3' above grade.
#+ FF 4
Provide letter from PG&E (408-725-3325) stating all gas and electric has been disconnected.
_ Provide a letter of inspection, tests, and abatement of any Hazardous Materials. Letter to be initiated by person(s)
certified in asbestos, mercury and/or hazardous material examination.
Planning Dept clearance to verify building is not considered an historical landmark. Allow 10 business days.
Provide letter of clearance of all vermin from a licensed pest control contractor.
Applicant shall call the Public Works Department at 408-777-3104 and schedule a "habitable dwelling' inspection.
-
Provide signed Debris Bin and Recyclable Materials form.
Lc
DemoApp_2013.doc revised 02113113
CITY OF CUPERTINO
FEE ESTIMATOR - BUILDING DIVISION
10200 EMPIRE AVE DATE: 01/2112016
REVIEWED BY: MELISSA
kirADDRESS:
APN: 326 23 045 — — — 7BPH,,
*VALUATION:
*PERMIT TYPE: Demolition Permit
PRIMARY SFD or Dup
PENTAMATION lSFDWL-DEM
USE:
PERMIT TYPE:lex
WORK
DEMO (E) 1,008 S.F. SFD
SCOPE
FEE ID FIR AREA
(S-f-)
IDEMORES 1,008
Vach Plan Chrck
I'lurid, Plan
Nwi Check
IPe"la I ee:
I Pluplh Permit
—I—
I kige. jlcrw0 kee
0zh-"r.Wth hup. El--L-
0i,'Wr!'h1m,5jnq' E—j
offle, ln.a). Ej I
1.1fech. In'sp. I'(,.
Afnmb, 11mv, j,",
k!"(" lasp, tire: I
NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Kre, Sanitary Sewer District, School
IRviriet.elp-h These fees are hased on the nreliminary information available and are only an estimate. Contact the Dept for (uldn'l info.
FEE ITEMS fL,'ge Resolution 11-053 Ej� 3
FEE
QTY/FEE
MISC ITEMS
Phan Check Fee:
Supl)L N."I'(11le
Permit Fee:
$574.00
Suppl. hisp. Fee:(D Reg. 0 OT
FO—OT-11—fs
$0.00
kce:
Conswuclion 7kiw;
Jhrfinivrofhv Tee.
if"ork Without PernO,,
Fees:
TraiW Documentation beew.
Strong Motion Fee: IBSEISMICR
$1.30
Select an Administrative Item
Bldg Stds Commission Fee: IBCBSC
$1.00
SUBTOTALS:
$576.30
T,,
$ 0. 0 01 ":, ' -, T-LEE;-L576.30
Revised: 01/01/2016
CUPERTINO
PURPOSE
PROCEDURE CHECKLIST FOR DEMOLITION PERMITS
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
ALBERTSALVADOR, PE., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE + CUPERTINO, CA 95014-3255
(408)777-3228 • FAX (408) 777-3333 • buildingNcupeflino.org
The demolition application should be applied for before or at the same time as the new construction
permit application (these are separate permit applications and fees). Permit fees are due at the time of
the application/plan submittal. The new construction permit will not be issued until the demolition
permit is issued, unless a -letter obtained from the Building Department is submitted stating that "The
existing house will not be demolished until the new construction permit is issued". The letter needs to
be signed by both the property owner and general contractor.
REQUIREMENTS
To obtain a demolition permit in the City of Cupertino, please complete a Derolition errnit
application along with each of the following requirements as it applies to your specific project.
1. Three (3) copies of a Site (Demolition) plan for Residential or six (6) copies for
-Cmumeivial will M mquacd shuRM6 any lees inches in diameter at feet
above grade on the subject property, and what means will be taken to protect
these trecs. /Q+
C- - 2. PG&E must be contacted AS EARLY AS POSSIBLE prior to demolition to t^
schedule the abandorunent. Contact PG&E at (408) 725-3325, A letter from
PG&E shall be provided to the City, stating that all gas and electric has been
disconnected. (This step can be time consuming, so it is important to begin the
process inumd ately)
3. Provide Job Number from Bay Area Air Quality Management District
rir i.,www.baaamd.aovCup, 415-749-4762.
1 �G' 4. 'Check to see if the building is considered an historical landmark, Obtain Clearance
!4 ✓f "e from the Community DevelopmentPlaruring Department. Allow.10 working wo
days.
5. Provide a letter of clearance of all vermhi from a licensed pest control contractor. YW W-
6. Important: Prior to the issuance of the demolition permit, the applicant must call14AX
01L the Public Works Department at (408) 777 3104 and arrange -a "habitable dwelling"�t " inspection 1t� O OYt_SVtkVv �L P Ot�4Jty J O l
7. Debris bin and Recycling sheet, read, sign and date. The sheet will remain in the
project's building perrnitfile for the duration of the project,
8, Commercial only -prior to issuance of the demolition permit, the Fire Department;
must review the plans for fire suppression/alarm systems that shall remain hi
service or be modified during Demolition, or that shall be replaced with the new
construction.
D¢moProeedure:docrevised 2113113
PJE
Pacific Gas and
Electric Company'
DATE: I I S^ 16
CITY OF CUPERTINO
10300 TORRE AVE
CUPERTINO CA 95014
10900 No. Blaney Avenue
Cupertino, CA 95014
SUBJECT: REMOVAL OF GAS SERVICES (CUT @ MAIN IN THE STREET) ON:
0106 Ewn(
(2-1 �l I /s'
SUBJECT: ELECTRIC SERVICES WAS CUT AT POLE ON:
10zC)0 Gvtlm,,
I / CG
If you have any further questions, please contact me at (408) 725-3325
Sincerely,
L,w Aafl ,
Pacific Gas & Electric Company
DeAnza Service Planning
408/725-3325
_ I_
y ® Peae d , 9 c A 4Y
!ltiiP 'Y Wqf 1fCK
Killroy Pest Control 1175 Dell Avenue, Campbell, CA 95008 408-378-0441
To Whore It May Concern,
Killroy .Pest Control: has inspected the property at 10200 Empire Ave.,
Cupertino for pest infestation.
No infestations werefound during the inspection.
If you have any questions please call me at (408) 378.0441 vm 105.
Sincerely,
a�Lo
Andrews Gibson
Pest Management Professsional
Killroy Pest Control, Inc.
www.killroy.com
City of Cupertino
NIS Public works Department
®� Environmental Programs Division
10300 Torre Ave
! Cupertino, CA 95014
CUPEREWOOREEN
PrO910m (408) 777-3354
Construction and Demolition Recycling Diversion
Requirements and Instructions
Covered projects, or all construction, demolition and renovation projects that are 3,000 square feet or more
are required to complete a Waste Management Plan for the City of Cupertino demonstrating that 60% of the
-material generated is recycled, in compliance with ordinance CMC 163Z,050. At the conclusion .of the project
a Construction Recycling Report must be tiled with the Public Works Department/Environmental Division
showing the tons recycled and disposed by material type, Use tomrage information from weight tags provided
by facilities to quantity total estimated waste and percentages for materials. Weight Tags of all material
recycled and disposed must be submitted with the final report in order to receive a Final Building
Inspection.
Debris from -a project 3,000 square feet or more in Cupertino can be collected and
disposed by using:
Pleas check all that apply:
//rI am not using a Recology debris bin, however, the project is less than 3,000 s.%, e.g. buildings, patios;
sidewalks, driveways.
0 I will use a Recology debris bin. By Agreement with the City, Recology will prepare my required
Waste Management Plan & Recycling Report. Contact Recology: (408) 725-4020.
13 I am not using a Reoology debris bin. I will provide the following submittals to the City's Public
Works Department, showing that I have recycled at least 60% of all construction demolition material:
Ask for the Construction & Demolition Recycling Packet from the Building Department and
complete the following:
✓ Submit a Construction and Demolition Waste Management Plan -with your buildingpermis
application. No feefor this plan. Forms are available at the BuildinglPublic YVorks counter and online
at wu+w.enapertino.orglenviroirmental. Report the tonnage recycled and disposed by material €ype.
Recyalingfacilities must beselecteelfrom the City's approved list of Recycling Resources.
✓ Submit a Construction Recycling Report forn. The report is required before the Building
Department will schedule aft inspection. The reportform is available at the BuildinglPublic
Works Counter W. online cut7erturoorrleraviron rental
Signature:
Name: (pridi6d) IY \1 r l (A M
Title: a _
Phone:
Project Address: i 62 n_ C 1 K
Thisform to remain in the project's building permit file for'die duration of the project.
Revised 317112 1
Date:
Slog
gulation 11, Rule 2
=; COMPLIANCE &
ENFORCEMENT Acknowledgement of
B A. Y AREA Notification and
ArRCZuAUTY DIVISION Payment of Fees
MAN AG rim r N"f
D I S "r K 1 C l'
Peninsula Hauling & Demolition
839 Cherry Lane
San Carlos, CA 94070
1/13/2016
Job No: 4S283
Invoice No: 3SN95
The Bay Area Air Quality Management District (BAAQMD) acknowledges receipt of your payment and
your Asbestos Removal or Demolition Plan described as: Demolition
Site address 10200 Empire Ave
Cupertino, CA 95014
Start Date February 8, 2016
Completion Date Febntary 28, 2016
Removal amounts of friable ACM 0 linear feet 0 square feet 0 cubic feet
Should it become necessary to revise this plan, please do so in the spaces provided below and immediately
copy the District by fax or by mail.
REGULATION 11-2 REVISION BAAQMD J# 4S283^�
REVISION # START DATE COMPLETION DATE
1
2 /
3 _
4
5 --I
NOTE: This form is not intended as a verification of either the completeness ofyour original notification
or of its compliance with BA4QMD Regulation 11-2. If you have any questions about this
acknowledgment, please call our office at (415) 749-4762.