B-2016-1289 (2)DISTRICT MANAGER -ENGINEER
MARK THOMAS 8 COMPANY, INC.
RICHARD K. TANAKA
DISTRICT COUNSEL
ATKINSON . FARASYN, I.J.P.
MARC HYNES
February 1, 2016
aQ!;N SAHII,gR`o��n
C�
S�
��raQIISHEO �9h�
A0863 STEVENS CREEK BOULEVARD, SUITE 100
CUPERTINO, CALIFORNIA 9501"154
(408) £133.7863 PHONE . (408) R53.5173 FAX
www.CUP errioosanilarydistrict.arg
City of Cupertino
Building Department
10300 Torre Ave,
Cupertino, CA 9501.4-3202
Subj ect; New Property Line Cleanout — Approved
Name:
Address: 10924 Barranca Drive
APN: - 326-02-002
Permit No. NA -- Over The Counter
BOARD OF DIRECTORS
ANGELA S. CHIEN
JOHN M. GATTo
STEVE C. ANDREWS
WILLIAM A. BOSWORTH
PATRICK S. KWOK
Pile: CSD — MOP #16-019
Building Dept. — Cupertino
Approved For Issuing
Building/ Plumbing Permits
The Cupertino Sanitary District has reviewed the plans for the subject proiect:
• Sanitary sewer is available and the existing building is connected to sanitary sewer, see
conditions/requirements listed below.
The following Conditions/Requirements are made:
• Cupertino Sanitary District plan review and inspection fee ($250) is required for the
subject improvements. Please do not issue any Building Permits. (O.C. 5203)
Install new property line cleanout to District's standards or locate and raise to grade
an existing property line cleanout. Property line cleanout must be within 5 feet of the
property line. Cleanout shall be the same diameter as the street portion of the service
lateral. Gravity lateral is 41' diameter minimum. (O.C. 4101)
Closed-circuit video of the existing/new property lime cleanout, point of colullection
and. District lateral isrequired prior to clearance for City of Cupertino Final
Inspection. Owner to call District at least 48 hours prior to video inspection to
schedule a District Inspector. District to provide Building Department with written
notification upon completion of inspection. (O.C. 5104)
Subject: New Property Line Clearout — Approved Page 2
Name:
Address: 10924 Barranca. Drive
APN: 326-02-002
Permit No. NA — Over The Counter
Fees can be paid at the District office located at 20863 Stevens Creek Boulevard,
Suite 1.00 in Cupertino, CA by cash or check (Payable to "Cupertino Sanitary
District").
All conditions, requirements and recommendations are to be completed at the
(owner/developer)'s expense.
Storm water from surface or roof drains, Other general surface runoff water or condensate from.
any residential I-IVAC equipment shall not be discharged to the sanitary sewer.
Yours very truly,
MARK THOMAS & COMPANy, INC.
District Manager- ngineer
Richard K. Tanaka
If you have any questions or need additional information, please call Ivy To at
408-2534071..
LI;\A(Inlhlltitl'nllpll\(:011'G91)(10[VHGO-CiL'n(:I'OI\LL'lIL`I',C\2(IIG\LCItcrAlh-(119 C'nperlino euildinp Dcparuneni NA Over The C'ounl�h (1canuul.-10924 13nnnnca Di_Suh 1_02-01-2016,dou —New
SUPPLYING SANITARY SEWERAGE SERVICES FOR: CITY OF CUPERTINO, PORTIONS OF THE CITIES OF SARATOGA, SUNNYVALE, LOS ALTOS AND SURROUNDING UNINCORPORATED AREAS