Loading...
13020154 TCOK4 CUPERTINO TEMPORARY CERTIFICATE OF OCCUPANCY FORM COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • building aacupertino.org V_160,1 115 APN BP#: 13020154 DATE: 09/18/14 PROJECT $ 1, 232, 112.00 VALUATION: SITE 10097 S. Blaney Ave. ADDRESS: OWNER'S NAMErometheus PHONE#:650.931.3457 Real Estate Group P p FAX#: 650.931.3657 MAILING ADDRESS (if different from site address): 1900 S. Norfolk Street, Suite 150 San Mateo, CA 94403 CONTRACTOR: Johnstone Moyer Inc. PHONE #:650-570-6161 FAX#: 650-570-6144 CONTACT: Brice Schillling PHONE#: 650-762-4486 Cell Date:..... ....z FAX #: TEMPORARY CERTIFICATE OF OCCUPANCY INFORMATION BOND TYPE: ❑ SURETY BOND AMOUNT (1% VALUATIONCODE ❑ CHECK ❑ CASH BOND OF BOND: 5K min -10K max $ (BLDBONDSJ EDITION: TCO EXPIRATION DATE (ti MONTHS MAX): FEE: $2$6.00/1'110 TOTAL FEE: $ [1TEMPOCC] USE TYPE OF CONSTR FLOOR AREA OCC LOAD LEVEL COMMENT �^� Date:...... .L.R...I.`{ []APPROVED APPROVED WITH CONDITIONS' u is WorKsflL (l ❑ APPROVED APPROVED WITH CONDITIONS- Signature :............... ..... .............. .. Date:..... ....z Other: Date:....'L!:.�..� ❑APPROVED r)T411=R nFPARTMFNT I ArFNCY APPROVALS - Planning Signature:..... �� %� .. ate:....y.-.Z�._ ly ❑APPROVED APPROVED WITH CONDITIONS" ire Signature :...... ...... ............... ,. �^� Date:...... .L.R...I.`{ []APPROVED APPROVED WITH CONDITIONS' u is WorKsflL (l ❑ APPROVED APPROVED WITH CONDITIONS- Signature :............... ..... .............. .. Date:..... ....z Other: Date:....'L!:.�..� ❑APPROVED � APPROVED WITH CONDITIONS - Signature: ............ ................................ *CONDITIONS OF COMPLETION - Attach a letter signed by the contractor and owner of the property stating the list of items required to be completed for each individual Department before final occupancy can be granted. Include approximate completion dates for each item. The undersig a covenant and agree as a condition to the approval of the above request for temporary occupancy to have the building or buildings co 1 to and in compliance with all building codes, ordinances and regulations and ready for inspection prior to the expiration date specifift this Temporary Certificate of Occupancy expires, the total amount of the bond may be forfeited and the non-compliance may result 14 a forcement action. Owner ��rr.� Contractor 09/18/14 Signature:.. .c. .............................................. Dater .�? gnature:...BriCe...D......Schillirn9...Date:...................... Si This temporary r ificate ensures that all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the specific area of the building specified above to provide a reasonable degree of safety to the occupants from fire and similar emergencies. S 1100J.— Buildina Official: ....................Y............................................. Print:..l'�'../ ..S n... ........................ Date:.... ....:.......... �`i ... DEPARTMENT ACTION: Aftef determination, copies to: 1) applicant, 2)/permit file TempOccForm_2013.doc revised 717114