Loading...
15040059 (3) TCO4_6k� tAto1 vs" I___ - — — — - __ - — . am TcluDnDADV eGaTiFir_ATP nF nrrl IPANCY INFORMATION BOND TYPE: ❑ SURETY BOND ® CHECK ❑ CASH BOND 1 Ennii-VI'CART I,CrC I Irll,Hl C Vr w%o%.#ur/-%v4%o i r%j ivi CODE EDITION: COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION 13 ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL Lab 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 CUPERTINO (408) 777-3228 • FAX (408) 777-3333 • build ing(cDcupertino.org APN AG „ 0?_ _ ( d BP #: 15040059 DATE: 9/2/15 PROJECT $ $500,000 VALUATION: SITE ADDRESS: 6 Infinite Loop, Cupertino, CA 94015 OWNER'S NAME: PHONE #: 650-421-1832 Apple, Inc FAX #: MAILING ADDRESS (if different from site address): 1 Infinite Loop, Cupertino, CA 94015 CONTRACTOR: Novo Construction PHONE #: 650-399-5449 FAX #: CONTACT: Michael DiMonaco PHONE #: 650-399-5449 FAX #: TcluDnDADV eGaTiFir_ATP nF nrrl IPANCY INFORMATION BOND TYPE: ❑ SURETY BOND ® CHECK ❑ CASH BOND AMOUNT (1% VALUATION5,000 LDBONDS OF BOND: 5Kmin-10Kmax $ CODE EDITION: OCC LOAD LEVEL COMMENT Lab V13 TCO EXPIRATION DATE (6 MONTHS MAX): Z 3 1 [ - FEE: $286.00/mo TOTAL FEE: $ 5� s [1TEMPOCCJ USE TYPE OF CONSTR FLOOR AREA OCC LOAD LEVEL COMMENT Lab V13 2555 Public Works ❑APPROVED APPROVED WITH CONDITIONS Signature:.................................0....................... Date:...................... t er: 11 APPROVED El APPROVED WITH CONDITIONS ......................................................... Date:...................... nTueo MCOADTUCAIT I Ar-Cnlry ADDOnVA1 C - Planning ❑ APPROVED ❑ APPROVED WITH CONDITIONS Signature: .................................... .. .......... Date:. ire �l�l Signature: ................/."` p A,i lei 1 6 �n� O Da e:,,..-_1--� 0 ❑APPROVED El APPROVED WITH CONDITIONS' Public Works ❑APPROVED APPROVED WITH CONDITIONS Signature:.................................0....................... Date:...................... t er: 11 APPROVED El APPROVED WITH CONDITIONS ......................................................... Date:...................... CONDITIONS OF COMPLETION - Attach a letter signed by the contractor and owner of the property stating the list of items required to be completed for each individual Department before final occupancy can be granted. Include approximate completion dates for each item. The undersigned covenant and agree as a condition to the approval of the above request for temporary occupancy to have the building or buildings complete and in compliance with all building codes, ordinances and regulations and ready for inspection prior to the expiration date specified. If this Temporary Certificate of Occupancy expires, the total amount of the bond may be forfeited and the non-compliance may result in an enforcement action. IF F Owner (CES 11 I Contractor Signatu t Z....... Date: .12��.5..... Signature: ......... Date: .a .�s.... This temporary certificateFnses that all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the speci f the di specified above to provide a reasonable degree of safety to the occupants from fire and similar emergencies. j Building Officia Print:. ...... r 4... `..................... Date:..... ...... . `.• DEPARTMENT ACTION: After determination, copies to: 1) applicant, 2) permit file TempOccForm_1013.doc revised 717114 3