B-2016-1153 SANITARYDISTRICT MANAGER -ENGINEER
MARK THOMAS & COMPANY, INC.
RICHARD K. TANAKA
DISTRICT COUNSEL
ATKINSON • FARASYN, LLP.
MARC HYNES
February 2,2016
City of Cupertino
Building Department
10300 Torre Ave.
tt.�~`gyp SAN 17Ag�.Q �
s
F�rA8(ISNEo 4°jh�
20863 STEVENS CREEK BOULEVARD, SUITE 100
CUPERTINO, CALIFORNIA 95014,2154
(408) 253-7863 PHONE • (408) 253-5173 FAX
wwvi.cupertinosanitarydistric1.org
Cupertino, CA 95014-3202
Subject: Addition and Remodel — Submittal #1
Name: Shannon Residence
Address: 11163 Wilkinson Ave. Cupertino, CA 95014-4734
APN: 356-17-044
Permit No. B-2016-1153
BOARD OF DIRECTORS
ANGELA S. CHEN
JOHN M. GATTO
STEVE C. ANDREWS
WILLIAM A, BOSWORTH
PATRICK S. KWOK
File: CSD — MOP #16-024
Building Dept. — Cupertino
The Cupertino Sanitary District has reviewed the plans for the subject project:
Sanitary sewer is available and the existing building is connected to sanitary sewer, see
conditions/requirements listed below.
The following Conditions/Requirements are made:
• Cupertino Sanitary District plan review and inspection fee ($250) is required for the
subject improvements. Please do not issue any Building Permits. (O.C. 5203)
Install new property line cleanout to District's standards or locate and raise to grade
an existing property line cleanout. Property line cleanout must be within 5 feet of the
property line. Cleanout shall be the same diameter as the street portion of the service
lateral. Gravity lateral is 4" diameter minimum. (O.C. 4101)
Closed-circuit video of the existing/new property line cleanout, point of connection
and District lateral is required prior to clearance for City of Cupertino Final
Inspection. Owner to call District at least 48 hours prior to video inspection to
schedule a District Inspector. District to provide Building Department with written
notification upon completion of inspection. (O.C. 5104)
An approved backflow device (IAPMO or UPC approved) is required since the
lowest finished floor with plumbing is less than (1') foot above the rim of the nearest
upstream manhole. (O.C. 4105) The backflow device will be inspected to verify
existence and serviceability by a District Inspector at the time of video inspection.
Page 2
Subject: Addition and Remodel — Submittal #1
Name: Shannon Residence
Address: 11163 Wilkinson Ave. Cupertino, CA 95014-4734
APN: 356-17-044
Permit No. B-2016-1153
District to provide Building Department with written notification upon completion
of inspection. (O.C. 5104)
Show upstream sanitary sewer manhole, main and lateral on plans. If street
dedication is required, street portion of existing sanitary sewer lateral is to be
extended by permit from the District to the new property line. (O. C. 4104)
Fees can be paid at the District office located at 20863 Stevens Creek Boulevard,
Suite 100 in Cupertino, CA by cash or check (payable to "Cupertino Sanitary
District").
All conditions, requirements and recommendations are to be completed at the
(owner/developer)'s expense.
Storm water from surface or roof drains, other general surface runoff water or condensate from
any residential HVAC equipment shall not be discharged to the sanitary sewer.
Yours very truly,
MARK THOMAS & COMPANY, INC.
District Manager -Engineer
Richard K.Tanaka
If you have any questions or need additional information, please call Ivy To at
408-253-7071.
Fi:.A�iruiuE.+lratioukC;orr pondence - Cienctll (.otters\.>,01 {-Latter diH 02/1 C-ulserdD0 BUddirL; Bepa MMIC_B2016..
11.53 :Addition and Remodel 11 101 Vdilt:imon Axe. Sub I 's 2 N I O.do^,
SUPPLYING SANITARY SEWERAGE SERVICES FOR: CITY OF CUPERTINO, PORTIONS OF THE CITIES OF SARATOGA, SUNNYVALE, Los ALTOS AND SURROUNDING UNINCORPORATED AREAS