Loading...
15050010 RECEIVED 6 q7 TESTING ENGINEERS, INC. AUG 2 8 2015 2811 Teagarden St. 510-835-3142 aj4j— San Leandro,CA 94577 800-660-3142 San Leandro • San Jose • Martinez INSPECTION REPORT Week Ending: 6/26/15 PROJECT#61468 TYPE OF INSPECTION: Visual Welding PROJECT: PLACE OF INSPECTION: 10460 Brandley Drive Jobsite Apple BA03 Cupertino,CA Permit#15050010 DATE 6/22/15 6/24/15 HOURS 8 3 pr INSPECTOR S.Nickerson D.Watanabe 6 5 Reported to Devcon Construction at the jobsite as requested. Checked welder qualification papers(Carlos Ramirez,ID#0982,Sean Massey,ID#7285). Checked WPSs and verified welding parameters. Verified proper electrode storage. Verified proper preheat. Visually inspected joint fit-up. Performed continuous visual inspection of the in-progress welding performed by two qualified welders using the FCAW process with E71T-8 wire electrode. Weldments consist of fillet welds joining HSS 4"x 4"x 1/4"to 5/8"x 6-3/4"Glu-lam plate and 3/4'x 12"base plate on lines 3 and 4 from A to D at 111 level. The preceding work was,to the best of my knowledge,in compliance with approved plans and specifications,including revisions by engineer and Drawings S4,Details 2 and 1 and AB1 and E01,dated 5/26/15. 6/24/15 Reported to John Cortez of Lee's Imperial at the shop as requested. Collected certified mill test reports and verified against material heat numbers. Checked welder qualification papers(Lucio Ramirez,ID#3762,Gaspar Salazar,ID#8688,Saul Medina,ID#6456). Checked WPSs and verified welding parameters. Verified proper electrode storage. Verified proper preheat. Visually inspected joint preparation and fit-up. Performed continuous visual inspection of the in-progress welding performed by three qualified welders using the FCAW process with E71T-8 wire electrode. Weldments consist of fillet welds and flare bevel groove welds joining 6"x 6"x 3/8"tube to A36 plates and tabs;and 8"x 6"x 3/8" tube to A36 plates and tabs. The preceding work was,to the best of my knowledge,in compliance with approved plans and specifications,including revisions by engineer and shop drawing 05-15-028,#4,Details 4A2,4A1,4A3,4A4,4A5 and 4A6,dated 5/26/15. Reviewed by: lcc: Apple Computer Inc./ R.Chua avidppero Devcon Construction Special Inspection Division Manager City of Cupertino/ Bldg.Inspection Dept. This report can be reproduced only in its entirety unless written permission from TEI is obtained. Page 1 of 1