Loading...
14100064-CALGREEN CFang's N�`FGNATURE DECLARATIONS nceProject Name:ProjectAddresewS uare, Cupertino, CA Project Descripft addition CEO W SECTION 1 — DESIGN VERIFICATION Complete all lines of Section 1 —"Design Verification" and submit the completed checklist (Columns 1 and 2)with the plans and building permit application to the Building Department. The owner and design professional responsible for compliance with CalGreen Standards have revised the plans and certify that the items checked above are hereby incorporated into the project plans and will be implemented into the project in accordance with the requirements set forth in the 2013 California Green Building Standards Code as adopted by the City of Cupertino. 10/07/2014 Owner's �arng ature Date Xiang Owned Na e Print) 10/07/2014 Design Professional's Signature Date Michael Tsao Z Prof ssi s Name (Please Print) E 10/07/2014 Signature of License Professional responsible for CalGreen compliance Date Michael Tsao 650-676-7882 Name of License Professional responsible for CalGreen compliance(Please Print) Phone miketsao@hotmail.com Email Address for License Professional responsible for CalGreen compliance SECTION 2 — IMPLEMENTATION VERIFICATION Complete, sign and submit the competed checklist, including column 3, together with all original signatures on Section 2 to the Building Department prior to Building Department final inspection. I have inspected the work and have received sufficient documentation to verify and certify that the project identified above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of the 2013 Qalifort3ieQ a Building Standards Code as adopted by the City of Cupertino. Signature oficense Professional responsible for CalGreen compliance Date Name of License Professional�XW-1� ble for CalGreen compliance (Please Print) Phone 44.11-CG�sl ow � CON k Email Address for License Professional responsible for CalGreen compliance Page 5 of 5 CalGreen 2014.doc revised 0/115//4