Loading...
16010038_PW COMMENTSN' Public Works Plan Check Comments Projectkddress: IOUbL JC)NNS0�1 pr��, AC10 t✓icl`oT Gk"C--z , ConbT Project Scope: New ttYdJ GPsYLPr��i Developer/Owner (circle one): Architect/Engineer (cifole one) pt6P 91rht, a LPrm J- (G N APN: �,Z�-28-oo1S Building Permit#: l(pQ=58 Phone Number: MI5-Col-4251` Phone Number: �1t7'220-{ PW File # co3& 7tpb ,C5C) The following marked items are required by Public Works Department. Provide written responses with resubmittals. If you have specific questions regarding these comments, contact Chad Mosley at (408) 777-7604. Please provide project address whencalling. Required X Pay Public Works Plan Check & Inspection Fee: $ CDbS® (#1 10-4531) X Copy of Grant Deed and Current Title Report W X Development Agreement for Public Works improvements' Required work in the public right-of-way. Clearly show and dimension on site or improvement plan. Include applicable City standard details on the plans: Description Standard Detail Unit Price Quantity curb and gutter 1-16 $ ILF LF curb ramp 1-24 $ as driveway approach 1-20; 1-21 $ /SF SF sidewalk 1-19 /SF streetlight 5-2; 5-4; 5-8; $ as 5-10; 5-12; 5-22 (verity w/ John street tree Ferrante) $ ea sign poles 2-20 $ as $ Submit 1 Engineer's Cost estimate listing all improvements within the attached form). If grading permit is required.lsubmilk ZRoixAr's cost work and/or retaining wall. SF Date Complete O�b I 0$ I lip c Y(use dte ng 6,�,boo, � ( Contact Jo Anne Johnson at (408) 777-3245 for encroachment requirements and permit. All encroachment permits require a certificate of liability insurance and a separate endorsement _ naming the City of Cupertino as.additional insured. o ;6(o611 4rA- ' No Fee permit Encroachment permit fee: 3-1(13 _ (-110-4540) Oahb 1(.0 �1 Encroachment bond: S. I O(D� _ (#110-2211) 3 3�t1 Page 1 of 4 Revised 08111112010 , Required Public Works Plan Check Comments Date Completed Street Improvement Plan. Submit 3 sets of plans. S 1000.00 plan check fee is required, Plans must be prepared by a licensed civil engineer. (Fee must be collected at time of plan submittal) (#110-4538) Improvement Misc, Deposit: $1,000.00 (7-1110-2211) Provide Faithful Performance Bond: Provide Labor and Material Bond: Pay Storm Drain Fee: Pay Park Fee: $ 521 AG (#215-407) X Quitclaim Deed for Underground Water Rights bJ IL\ 15y Grant of Real Property for Roadway or Sidewalk Purposes', b Easement for street light power undergrounding', b Maintenance Agreement Strearnside Modification Permit & fee: 5397.00 Elevation Certificate (Required for parcels in FEMA flood zones A, AE or AO). A hold on Rough Framing Inspection will be placed on the project until an Elevation Certificate (prepared by a licensed land surveyor or authorized civil engineer) has been completed and provided to the Public Works Department for approval. Zone _-D_.p2? q44 Grading Plan. Submit 3 sets of plans, $ 1000.00 plan check deposit is required. Plans must be prepared by a licensed civil engineer and soils engineer. (Fee must be collected at time of plan submittal) (#110-453__) Residential Grading Permit (#110-4533) Commercial Grading Permit $ (41110-4534) Grading Misc Deposit $1,000 (#110-2211) Grading Bond: $ _ (#110-2211) Free-Standina Retaining Walls (retaining wall fees to be collected orior to oroiect review): Free-standing retaining walls: provide 3 sets of the following: soils (geotechnical engineering) report, retaining wall details and calculations: Review fees to be assessed for retaining wall review; unused portion to be refunded: Geotechnical review fee: $2,000.00 (#110-2211) Structural reiainingwall review fee: $2,000.00 (#110-2211) Page 2 of a Revised 08/1t/2010 Public Works Plan Check Comments Required Data Complete( Storm Water Pollution Prevention (submit 2 oriainals): Stormwater Management Plane, Third party certification is required. Consultant list available at h=iDli/NNJ�N.scyurDDD-N2k.comlDdfs10607/aoDroyed consultantslSCVURPPP List of Qualined Consultants for HMP.odf Stormwater Management Facility Easement Agreement8' ° Stormwater Management Facilities Operation and Maintenance Agreemnte, b NPDES General Permit Requirements (SWPPP' and Notice of Intent) Hydromodification Management Plan Footnotes; (a) Submit 3 originals. (b) Plat and legal description are required and to be prepared by a licensed surveyor, or a licensed civil engineer with registration number prior to 33966. Clearly show the following on the clan: y, Onsite drainage (with arrows and slope percentagz). No concentrated flood across the right-o' O3I I t� the right-of-way. No drainage onto neighboring properties. All drainage to landscape. X Clearly shoed all utilities from the house/project site to the street (electric, electric panel, gas, water, sewer). Indicate as new (N) or existing (E), lao,�yN (5,) WolL Underground all new electrical service (power, phone, and/or cable). X Add these notes to the plan:. e� 1) Approval of these plans does not release the Owner and/or Contractor of the responsibility for the corrections of mistakes, errors, or omissions contained therein. If during the course of construction improvements, public interest requires a modification of/or a departure from the City of Cupertino specification or these improvement plans, the City Engineer shall have the authority to require such modification or departure and to specify the manner In which the same is to be completed, at the sole expense of the Owner and/or Contractor. 2) Contact Public Works, (408) 777-3104, for inspection of grading, storm drainage, and public improvements. 3) All public improvements must be completed prior to occupancy. 4) Contractor is responsible for dust control and ensuring the area adjacent to the work FIX NOi —pis left in a clean condition. bw FLsN�D 5) Contractor shall review City Detail 6-4 on tree protection prior to accomplishing any 'bit)IIly work or removing any trees. 6) Utilize Best Management Practices (BMP's), as required by the State Water Resources Control Board, for ANY activity, which disturbs the soil. Awork sc dul or grading a`hd`Erosion &'dime fControhPlan shall 5e provided to the City Engineer by August 15, No hillside grading shall be performed between October 1 to April15. g) 'To initiate release of bonds, contact the Public Works Inspector for Final Inspection. 10) All downspouts to be released to the ground surface, directed away from building foundations and directed to landscaped areas. 12) Prior to beginning any work within the Public Right of Way, the Contractor will be responsible for pulling an encroachment permit from the Public Works Department, Page 3 of 4 Pevis d gait v2olo Project Address: Standard Conditions xx Additional Comments Lot dimensions are incorrectly shown on sheet Al. 1. North boundary right of way line is 1 103.37 ft. and south boundary right of way line is 106.01 ft. Johnson Ave right of way line is 9.5 ft. from back of curb. Ensure building improvements meet city set back requirements (front setback = 20 ft min., Side Setback = 5ft. min) The ownerwill have the option to upgrade the rolled curb to a modified driveway approach. Indicate on plan whether existing rolled curb will remain or a new driveway approach is 2 proposed. if proposed, show the correct driveway approach with 6' transition on each side of driveway per City Standard Details 1- 21. Also, indicate the on -site driveway shall match new grades at back of sidewalk. Edge of driveway shall be minimum 6' from the property line. Show Detail 1-21 on plan. 3 Driveway approach shall not exceed 16' width for a single car garage or 22' for a two -car garage. Date Completed o3(o2,IILp Q�P' oaIos11(0 � 0'6/081L�o ._NN� Remove and replace broken and settled sidewalk, driveway, curb and gutter as directed by the Public Works Inspector. Ensure curb and gutter provides for a positive drainage. Saw 4 cut 1' of existing AC pavement along the curb & gutter (or driveway) to be removed and replaced and plug with min. 12" AC deep lift. An encroachment permit will be required for any work on the public right-of-way. 261Z) t'L�AMJ3\u b t OD& fZQ t0oV (JLp�1)40 6U tt0l.lt •t) Show all down spouts from the roof on the Site Plan. Install splash blocks at all down spouts 5 to ensure roof water is directed away from the foundation and any existing downspouts that connects directly to the storm drain system shall be disconnected and drained towards landscaping. 2 (D; l A Lte Show existing and new drainage patterns on the plan using arrows, slope percentages, and 6 flowlines. The ground immediately adjacent to the foundation shall be sloped away from the building. Direct on -site drainage through landscaped swales to the public right-of-way. Cross lot drainage is not permitted. ©d v°p� I lP o1�1e Plans shall show existing street tree in conflict with proposed improvements. Add note to indicateatreet Tree to be installed by the City. Show location of anew Street Tree. 7 Consider sewer lateral and other utilities for the new tree location. Upon project completion, the property owner shall prepare an adequate planting area and contact the City at at 408- 777-3269to arrange for the installation:714�— PeOD QucE) -M BL S II6It1p Clearly show all utilities from the house/project site to the street (electric, electric panel, gas, 8 water, sewer). Indicate as new (N) or existing (E). New private water shall not be installed in public right of way. S1 VAI (f,,) LAT1 It "ft) ?)�d WNN 1 tq Co 1st Submittal �t, �t,(/y t t� 01 2(.e l Not Approved Public Works Signature Date ❑ Fees / Bonds Only FOR BUILDING PERMIT APPROVAL 02)/081 2nd Submittal -_c ) t� Approved /Not Approved Public Works S a Signature Date ❑ Fees / Bonds Only FOR BUILDING PERMIT APPROVAL 3rd Submittal Approved / Not Approved Public Works Staff Signature Date 1-1 /Bonds Only FOR FOR BUILDING PERMIT APPROVAL