Loading...
15120042 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 871 LILY AVE CONTRACTOR:'SUNRUN INC PERMIT NO:15120042 OWNER'S NAME: WANG-MENDEZ TIAN AND MENDEZ TYRONE 775 FIERO LN STE 200 DATE ISSUED:12/07/2015 OWNER'S PHONE: 4087399938 SAN LUIS OBISPO,CA 93401 PHONE NO:(888)657-6527 (� LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL ❑ COMMERCIAL ( INSTALL(N)ROOFTOP MOUNTED SOLAR PV-17 PANELS License Class C4 kc, Lie,# -%Zt f (4.6 KW) Contra "� Date I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the erflormance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$9600 have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:35903018.00 Occupancy Type:: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FROM LAST CALLED INSPECT ON. indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the L ' granting of this permit. Additionally,the applicant understands and will comply Issued by: Date: with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. /0 , t RE-ROOFS: Signa e Date ( All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. OWNER-BUILDER DECLARATION Signature of Applicant: Date:. I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reason's: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(See.7044, Business&Professions Code) 1,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505;25533,and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Section 25505,25533,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized grcr cis""""".._ Date: permit is issued. I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to.the Worker's CONSTRUCTION LENDING AGENCY Compensation laws of California. If,after making this certificate of exemption,I become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.18. Signature Date - CITY OF CUPERTINO FEE ESTIMATOR—BUILDING DIVISION ADDRESS: 871 Lily Ave DATE: 12/0712015 REVIEWED BY: PAUL APN: 359 03 018 BP#: *VALUATION: 1$9,600 PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration I Repair PRIMARY SFD or Duplex PENTAMATION SOLAR-RES USE: PERMIT TYPE: WORK Install N rooftop mounted solar PV- 17 panels 4.6 K SCOPE NOTE:This estimate does not include fees due to other Departments(i.e.Planning,Public Works,Fire,Sanitary Sewer District,School District,etc . These.fees are based on the prelimina information available and are onL an estimate. Contact the Dept for addn'l into. FEE ITEMS (Fee,Resolution 11-053 Ff. 7/7/13) FEE QTY/FEE MISC ITEMS Plan Check Fee: $0.00 1 # Alternative Energy System Suppl.PC-Fee: Reg., 0 OT Q.0 hrs $0.00 $236.00 1PxOTOVREs Photovoltaic System PME Plan Check: $0.00 Permit Fee: $0.00 Suppl. Insp.Feer Reg. 0 OT 0,0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Work Without Permit? C) Yes (j) No $0.00 Advanced Planning Fee: Select a Non-Residential $0.00 Building or Structure 0 Strong;Motion Fee: IBSEISMICR $1.25 ' Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $1.00 SfTBTUTALS $2.25 $236.00 T(ITAL $23$.25 Revised: 10/01/2015