Loading...
B-2016-1673CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO: B-2016-1673 10209 BYERLY CT CUPERTINO, CA 95014-5647 (342 12 081) SLINGSHOT POWER INC LOS ALTOS, CA 94022 OWNER'S NAME: GODBOLE ANIL V AND MADHUMATI A DATE ISSUED: 04/01/2016 OWNER'S PHONE: 650-387-1117 PHONE NO: (650) 308-9055 LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: License Class CT Lic. #984488 Contractor SLINGSHOT POWER INC Date 06/30/2017 X BLDG _ELECT _PLUMB MECH X RESIDENTIAL COMMERCIAL I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. JOB DESCRIPTION: INSTALL 13 (N) SOLAR PANELS 3.9 KW, (N) ELECT SUB PANEL 125 I hereby affirm under penalty of perjury one of the following two declarations: AMPS 1. I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the REVISION #1 - CHANGE LOCATION OF PANELS - ISSUED 4/11/16 erformance of the work for which this permit is issued. f have and will maintain Worker's Compensation Insurance, as provided for by <2. c ection 3700 of the Labor Code, for the performance of the work for which this Sq. Ft Floor Area: Valuation: $14820.00 permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above Number: Occupancy Type: information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize 3 42 42 12 081 representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue against said City in consequence of the granting of this permit. WITHIN 180 DAYS OF PERMIT ISSUANCE OR Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. 180 DAYS FROM LAST CALLED INSPECTION. Signatur c ��---��-� Date 4 11 2016 Issued by: Abby Avende Date:04/01/2016 OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is following two reasons: 1. I, as owner of the property, or my employees with wages as their sole installed without first obtaining an inspection, I agree to remove all new materials for compensation, will do the work, and the structure is not intended or offered for inspection. sale (Sec.7044, Business & Professions Code) 2. I, as owner of the property, am exclusively contracting with licensed Signature of Applicant: contractors to construct the project (See.7044, Business & Professions Code). Date: 4 11 2016 I hereby affirm under penalty of perjury one of the following three declarations: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER 1. I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance, as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code, for the performance of the work for which this California Health & Safety Code, Sections 25505, 25533, and 25534. I will permit is issued. maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the s. I certify that in the performance of the work for which this permit is issued, I Health & Safety Code, Section 25532(a) should I store or handle hazardous shall not employ any person in any manner so as to become subject the material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I ti Worker's Compensation laws of California. If, after making this certificate of will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and exemption, I become subject to the Worker's Compensation provisions of the the Health & Safety Code, Sections 25505, 25533, and 25534. Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked. �'vner or authorized ages'---'7 APPLICANT CERTIFICATION ate: 4 11 2016 1 certify that I have read this application and state that the above information is CONSTRUCTION LENDING AGENCY correct. I agree to comply with all city and county ordinances and state laws I hereby affirm that there is a construction lending agency for the performance relating to building construction, and hereby authorize representatives of this city of work's for which this permit is issued (Sec. 3097, Civ C.) to enter upon the above mentioned property for inspection purposes. (We) agree Lender's Name to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in Lender's Address consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal ARCHITECT'S DECLARATION Code, Section 9.18. 1 understand my plans shall be used as public records. - Licensed Signature Date 4 11/20 6 Professional CUPERTINO ALTERNATIVE ENERGY PERMIT APPLICATION COMMUNITY DEVELOPMiEN T DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPER T INO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • building a cuoertino.ora R-701(p'q,70 PROJECT ADDPMS 0 APN m Nl- a— j o OWNcRNAM 6 0 .3& Pi ?� �tgo '1 E-MfiA.IL STREET ADDRESS �o I G Y, STATE, ZIP I FA-X t CONTACTSao �7 N,I PI01� '��aJ L. I L-D�iA.II STREET ADDR=SSA \ � --d � Ci , STATE, ZI? FAX ❑ Old 1Z ❑ OWT cR-3LLDER ❑ OVT=RAG=vi ❑ coi\rr A=OR ❑ CONFIRACTORAG=N' ❑ .kRC:1T=CT ❑ ENGiT•__R ❑ DE\•_LO?ER ❑ i_I ANT CONTR4Cr0RNAME I-MENSENL ` -. LICENSE TY?P I BUS. LIC n C01.4PANY NAh, IC MI s FA i DR"� t '� j I CITY, STA =, ZIP (y - I PnOIT- P.RCHITECTrNGJNEER NAh4E I LICENSE NUh,BER BUS. LIC COMTANY MIJ R E-MAIL PAX STREET ADDRESS I CITY, STATE, ZIP PHONE USE of ❑ SFD or Duplex ❑ Multi -Family PROJECT LN WILDLAND PROJECT IN STRUCTURE: ❑ Commercial URBAN INTERFACE ARE A ❑ Yes ❑ No FLOOD ZONE ❑ Yes ❑ No SOLAR PANELS I ❑ ELECTRIC VEMCLE CHLI RGING STATION ❑ SOLAR WATER wEATING I ❑ OT:I:R; FOR SOLAR PlIVELS. N`U1, 3 E R/O F .FLS/CTNITS: s� KILOwAT?S ( ki? i CI.kL ONLY): I TOTAL U .7I N: DESCRIPTION. OF WORK I C.), a SAGA By my signature below, I ce ify to each of the follo;ving: I am the prope;tY o;;mer or authorized agent to act on the propertyo\\ne.r's behalf.I have ; ead this cppllCatlOA and the information e provided is correct. I have read the Description of ��fork and verify it is accurate. I agree to comply with all applicable local ordinances and state lati5 re.lati t. "ilding ' ction. I author r entatives of Cupertino to enter the above-identi i-d prope-i for inspection purposes. SignatureofApplicant'Agent: Date: SUPPLEI;TEAITAL I1�iFORMATION REQUIRED T. = OFFICEcEO;ZY:_ = L4RGF - a P1!4pp_2011.doc revised 03116111 WATER -CON PLUMBING FIXTURES OWNER CERTIFICATE OF COMPLIANCE COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION CUPE,RTINO 10300 TORRE AVENUE - CU:PERTINO, CA 95014-3255 (408) 777-3228 s FAX (408) 777-3333 < bddinc�Pcupertino ora O�vfm► Ntr 6 )3 (6�� � pertii i t�ia 2.C) 1 - — ltldrvs _ 'D ° ej P q e'f ,y �, c -r (-� v10 , c-A So 11s your real property a registered historical site? ❑ Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the N No Go to Question 2. form and sign bottom of form, Does your real property have a licensed plumber certifying that, due to the age or configuration of the property or its Plumbing, installation of water -conserving plumbing fixtures is not technically feasible? ❑ Yes Civil Code Sections 1101.1 through 1101.8 do not apply. The licensed plumber's certification has been provided to the Building Division. Skip the rest of the form and sign bottom of form. No. Go to Question 3. Is water service permanently disconnected for your building? Cl Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form, 1P No Go'to Question 4. €g Is your real property built and available for use or occupancy on or before January 1, 1994?' No My real property is built and available for use or occupancy after January 1, 1994. Civil Code Sections 1101.1 through 11018 do not apply. Skip the rest of the form and sign bottom of form. Yes My real property is built and available for use or occupancy on or before January1, 1994. Civil Code Sections 1101.1 through 1101.8 apply. Check one of the three following statements and sign bottom of form.. Please check ONE of the following: My property is a single-family residential real property. See Civil Code Section I"101 A. On and after January 1 2014, building alterations or improvements shall require all non -compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures throughout the building. On or before January 1, 2017, all non- compliant plumbing fixtures shall be replaced with water -conserving plumbing fixtures (regardless of viliether property undergoes alterations or improvements). ❑ My property is a multifamily residential real property. See Civil Code Section 1101.5. On and after January 1, 2014, specified building alterations or improvements shall require non- compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures. On or before January 1, 2019, all non -compliant plumbing fixtures shall be replaced with water conserving plumbing fixtures throughout the building (regardless of whether property undergoes alterations or improvements). Nly property is a commercial real property. See Civil Code Section 1101.5. On and after January 1, 2014, specified building alterations or improvements shall require non- compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures. On or before January 1, 2019, all non -compliant plumbing fixtures shall be replaced with water- conserving plumbing fixtures throughout the building (regardless of whether property undergoes alterations or improvements). 1, as the owner or owner's agent of this property, certify under penalty of perjury that non -compliant plumbing fixtures will be replaced prior to date specified above with water -conserving plumbing fixtures in accordance with Civil Code Sections 1101.1 through 1101.8, the current California Plumbing Code and California Green Building Standards Code, and manufacturer's installation requirements, and that the water -conserving plumbing fixtures comply with the requirements as indicated in the table on the following gage. Owner or C7 n r A iei�t st ianafurc n to i a / i T_ if Upon completing and signing this Certificate, please return it to the Building Division in order to final vour building hermit SB4072015.doerevised 0812611 SMOKE I CARBON MONOXWE ALARMS OWNER CERTIFICATE OF COMPLIANCE COMMUNITY DEVELOPMENT DEPARTMENT a BUILDING DIVISION CUPEi TINO 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 - FAX (408) 777-3333 buofng�7a cupert"rno ocq df t cy l CA it tir .i" d.41�c inl•; ICE PERMIT CANNOT BE TI NALED AND CUMPLE'CGD UNTIL THIS CERI'II+'[CATE HAS :BEEN . G ;,j3 AND R j,TIT12NT n TO "iHE T3i1ILDiN(T i)IVISION PURPOSE This affidavit is a self -certification for the installation of all required Smoke and Carbon Monoxide Alarms for compliance with 2013 CRC Section R314 2013 CBC Sections 420.6 and 907.2.11.2 where no interior access for inspections are required.. GENERAL INFORMATION Existing single-family and multi -family dwellings shall be provided with Smoke Alarms and Carbon Monoxide alarms. When the valuation of additions, alterations, or repairs to existing dwelling units exceeds $1000 00, CRC Section R314 and CBC Sections 907.211.5 and 420.6 require that Smoke Alarms and/or Carbon Monoxide Alarms be installed in the following locations: AREA SMOKE ALARM COALARM Outside of each separate sleeping area in the immediate vicinity of the bedroom(s) X X On every level of a dwelling unit including basements X X Within each sleeping room X Carbon Monoxide alarms are not required in dwellings which do not contain fuel -burning appliances and that do not have an attached garage. Carbon monoxide alarms combined with smoke alarms shall comply with CBC Section 420.6 and shall be approved by the Office of the .State Fire Marshal. Power Supply: In dwelling units with no commercial power supply, alarm(s) may be solely battery operated. In existing dwelling units, alarms are permitted to be solely battery operated where repairs or alterations do not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl space. Refer to CRC Section R314 and CBC Sections 907.2.11.4 and 420.6.2. An electrical permit is required :for alarms which -must be connected to the building wiring. As owner of the above -referenced property, I hereby certify that the alarrri(s) referenced above has/have been installed in accordance with the manufacturer's instructions and in compliance with the California Building and California Residential Codes. The alarms have been tested and are operational, as of the elate signed below. I have read and agree to comply .with the terms and conditions of this staternent Ov�Aer (car O_W,_eT_A�en �s}�Na a t..�-vl Sr fia`Eure .... .: . Vate ..._ ................ GociFa�tor�t�a�rte•� Sinatured ....... ._................... Date ................ Srnioke and W fbmi.doc revised 03118114 ABBREVIATIONS A AC ART BLDG CONIC DC EGC (E) EMT GALV GEC GND HDG Icont Imp Isc kVA kW LBW MAX MIN N NEC NTS (N) OC PL POI PTC PV PVC SCH SS STC TYP UPS V Vmp Voc W AMPERE ALTERNATING CURRENT ARTICLE BUILDING STRUCTURE CONCRETE DIRECT CURRENT EQUIPMENT GROUNDING CONDUCTOR EXISTING ELECTRIC METALLIC TUBING GALVANIZED GROUNDING ELECTRODE CONDUCTOR GROUND HOT DIPPED GALVANIZED CURRENT CONTINOUS CURRENT MAX POWER CURRENT SHORT CIRCUIT CURRENT KILOVOLT AMPERE KILOWATT LOAD BEARING WALL MAXIMUM MINIMUM NEUTRAL NATIONAL ELECTRIC CODE NOT TO SCALE NEW ON CENTER PROPERTY LINE POINT OF INTERCONNECTION PVUSA TEST CONDITIONS PHOTOVOLTAIC r� POLYVINYL CHLORIDE SCHEDULE STAINLESS STEEL Tr STANDARD TES CONDITION�ob TYPICAL the UNINTERRUPTIPLE POWER Thr SUPPLY be VOLT of MAX POWER VOLTAGE BY DA OPEN CIRCUIT VOLTAGE PE WATT ELECTRICAL NOTES 1. A NATIONALLY RECOGNIZED TESTING LABORATORY SHALL LIST ALL EQUIPMENT IN COMPLIANCE WITH ART 110.3 2. ALL EXTERIOR EQUIPMENT SHALL BE RAIN TIGHT AND APPROVED FOR USE IN WET CONDITIONS 3. BACKFEED BREAKER MUST BE LOCATED AT THE OPPOSITE END OF BREAKER OR LUGS PROVIDING POWER FROM THE UTILITY 4. DC CONDUCTORS ENTERING A BUILDING WILL BE RUN IN METALLIC RACEWAYS TO THE FIRST ACCESSIBLE MEANS OF DISCONNECTION PER ART 690.31(E) 5. ALL CONDUCTORS SHALL BE PROVIDED WITH STRAIN RELIEF UPON ENTRY INTO ENCLOSURES. 6. EACH UNGROUNDED CONDUCTOR SHALL BE IDENTIFIED BY PHASE AND SYSTEM PER ART 210.5 7. WHERE ALL TERMINALS OF THE DISCONNECTING MEANS SHALL REMAIN ENERGIZED IN THE OPEN POSITION, A WARNING SIGN SHALL BE PROVIDED PER ART 690.17 8. THE DC GROUNDING ELECTRODE CONDUCTOR SHALL BE SIZED PER ART 690.47 AND 250.66(B) 9. MODULE FRAMES SHALL BE GROUNDED AT THE UL-LISTED LOCATION PROVIDED BY THE MANUFACTURER r SI'NGAJULTSTEt DWARE,�NT A. ALLVP_TJQ_LK�CcompoNIENTS SHALL BLAPRB VIA ELECTRIC V oY��`ttidris �nlFs�a�lotE via te efrom, without approval from the Building Official. Stamping of this plan and specifications SHALL NOT field to permit or to be an approval of the violation ny provisions of any City Ordinance or State Law. TE RMIT# GENERAL NOTES 1. THIS SYSTEM IS GRID -TIED WITH A UL LISTED POWER CONDITIONING INVERTER 2. THIS SYSTEM HAS NO BATTERIES. NO UPS 3. ALL WORK SHALL COMPLY WITH THE 2013 CALIFORNIA BUILDING CODE AND THE 2013 CALIFORNIA RESIDENTIAL CODE 4. ALL WORK SHALL COMPLY WITH THE 2011 NATIONAL ELECTRIC CODE AS AMENDED BY THE 2013 CALIFORNIA ELECTRIC CODE 5. LOCAL UTILITY SHALL BE CONTACTED PRIOR TO ENERGIZATION OF THE SYSTEM P T PLA S CHECKED B`r' DATE i/ U PLANNING DEPT CUPERTINO ION #® �EVIS SCOPE OF WORK SLINGSHOT POWER IS TO INSTALL A% ROOF MOUNTED PV ARRAY. kvm Vo CONTRACTOR ADDRESS SLINGSHOT POWER 164 MAIN ST LOS ALTOS, CA 94022 800.887.9414 CA LIC #13984488 AHJ: CITY OF CUPERTINO UTILITY: PG&E HOA: N/A CUPERTINO �91'9,}p�SuildInj APR 1 1 2016 REVIEWED FOR CODE COMPLIANCE Reviewed By: SHEET INDEX 1. COVER SHEET 2. SITE PLAN 3. ARRAY DETAILS 4. LINE DIAGRAM 5. LABELS 6. DATA SHEETS ,�_ M4 VICINITY W U) U) n 0 rn co W Z LU LL] J m O (D Z Q O U Lij m rn 0 N 0 J Q J Ln N Q (n o c� Uj CC) 2 Y W C U)� >o>aww aoz=�� co — n- W W _l a- W W W # REVISION DATE p Original 3/22/16 lAl As -Built 4/8/2016 C JOB #. 12120583 DESIGN: RDELGADO PAGE: COVER PAGE PAGE NUMBER PVo 1 A DC CONDUIT RUN ON THE ROOF IN COMPLIANCE WITH 20 CEC ART. 690.31 & 2013 CRC R 31.3 (EXACT RUN TBD AT INSTAL MIN 3FT CLEARANCE BETWEEN GAS RISER AND (N) SUB -PANEL PER PG&E GREEN BOOK SECTION 2.4.2 (D) LOCKED GATE UNLOCKED GAT MP1 Pitch: 5 :12 ( 23 °) AZI: 180 ° Mat.: Comp Shingle 2 Stories MP2 Pitch: 5 :12 ( 23 °) AZI: 270 ° Mat.: Comp Shingle 2 Stories FRONT OF THE HOUSE I,A CUI`-ERIItVO air r�4' Building Department 4PPR112016 REVIEWED FOR CODE COMPLIANCE Review d By: DRIVEWAY — MAI N SERVICE PANEL N) SUB PANEL L-GAS MAIN A SITE PLAN O 0 Q ®L co 0) C W U wWlzo I-0DU) U) Z73 0 G) r,- >- w U Q C/) Q 0 J IJJ a- Oco UOw z co O Q W � LO �0MLu 0 N rn c�iJ�U Z Q Q ui OY W � � Z > Q W W O Z of of W W J d W W W # REVISION DATE 0 Original 3122116 A As -Built 4/8/2016 B - ---- ---- D JOB #: 12120583 DESIGN: RDELGADO PAGE: SITE PLAN PAGE NUMBER PV02 a `1 v1 v-vvix 2 X 4 RAFTERS @ 24 O.C. TOTAL SYSTEM WEIGHT (Ibs) TOTAL AREA (SQFT): Array roof coverage (%): LBS / SQFT: LBS/STANDOFF: STANDOFF MAX SPAN (ft): 652.013 228.374 10% 2.85503 20.3754 6 La 13'-1 " 14'-2" MAIN SERVICE PANEL N) SUB PANEL L-GAS MAIN A ARRAY PLAN Scale: 3/16" = 1' N) SOLAR MODULE WITH VEREST CLAMPS N) SOLAR RAIL VEREST CR-48S N) L-FOOT VEREST N) EVEREST COMP VERFLASH 1 kN) 5/16" SS LAG SCREW 2 1/2" EMBED. MIN (E) 2x RAFTER B ARRAY DETAIL . A ~, CUPERTINO 130ding pepartment �... t, pp, 1 1 2016 Lu Z I— LJ F-0Z)LO LJ Q,-' o Cf)Z5Omti >- C/) w 0 U Q 0 U pmml-o � C) crj � 0W O (2) —j J w o o o � a- :) cQ00 Z Q i REVIEWED FOR CODE COMPLIANCE Reviewed By: J Q ry D O O co O0 Y � w U � Z 2 > o j Q W W n o Z = Q� Q� -� co — n- W LiJ �J d. W W W REVISION DP Original 3/2: As -Built 4/8/; 0 A B D E JOB #: 12120583 DESIGN. RDELGADO PAGE: ARRAY DETAILS PAGE NUMBER PV03 # CONDUCTORS A (1) ENGAGE CABLE, (1) #6 BARE EGC B # H - 1 (1 E GE (2) #6 THWN-2, (1) #6 N, (1) #8 EGC/GEC (E) MAIN SERVICE 200A, 240/120V, 1 �, 3W CROUSE HINDS JA900CW Multiple Main breakers - 6 or less Underground Service Feed / Meter No.: 1006136301 60A/2P T A B A W i 240/120V _ UTILITY SERVICE GEC BONDED DIRECTLY TO (E) GROUNDING ELECTRODE. ALL AVAILABLE ELECTRODES SHOULD BE USED PER CEC 250.50 CONDUIT N/A n/An rnAT 1" EMT TO (E) LOADS LENGTH PROPERTIES 5' DC: Vmax=39.7, Vmp=32.5, Imax=9.7, Imp=9.26 C: V=240, BRANCH #1: 1=13A 5' (N) SUB PANEL 125A, 240/120V, 1 �, 3W A B 1 60A/2P 20A/2P 0 L1 L2 N EGC GEC NOTES BRANCH TERMINATOR ENGAGE CABLE LLJ U W Lu rz o �- L0 U OCY)ti >- w U Q U)r1�U� J UJwO �o~o � m �0CY)Lu o o a. N 5 CD (y) C) Z ... U , 1.,up Building Degarkmeni EGC :.�4., 1 1 2016 REVIEWED FOR CODE COMPLI NICE (13) PV MODULES A 300W, 273.41k'f'At ' ay. LG300N1 K-G4 J o a (13) ENPHASE M250 � mot' � N � 0 w o MICROINVERTERS ° Y � Uj �- F- 250W,48Vmp aoz=LUUj (1) JUNCTION BOX CANTEX 4x4x4 r> — o- w w J d W W W #1 REVISION DATE 0 Original 3/22/16 A As -Built 4/8/2016 B O _.. D E - JOB #: 12120583 DESIGN: RDELGADO PAGE. LINE DIAGRAM PAGE NUMBER PV04 REQ. BY NEC 650.17 1 APPLY TO: DISCONNECTS PV LOAD CENTERS COMBINER BOXES SOLAR AC DISCONNECT REQ. BY NEC 690.1 4 C 2 5 APPLY TO: AC DISCONNECT REQ. BY NEC 690.5 3 9 APPLY TO: INVERTER LABELS PHOTOVOLTAIC POWER SOURCE REQ. BY NEC 690.31 E 3 2 APPLY TO: EXPOSED RACEWAYS, CABLE TRAYS COVERS OR ENCLOSURES OF JUNCTION BOXES SOLAR DC DISCONNECT REQ. BY 690.1 3 B 2 6 APPLY TO: DC DISCONNECT REQ. BY NEC 690.35 F 10 APPLY TO: JUNCTION BOXES, COMBINER BOXES, DC DISCONNECTS, INVERTERS REQ. BY NEC 705.1 2 D 4 REQ. BY NEC 705.1 2 D 7 APPLY TO: 3 APPLY TO: E MAIN SERVICE PANEL REQ. BY NEC 690.5 C 7 APPLY TO: INVERTER PV SYSTEM BREAKER TF• CUPERTINO BUiIding Department REQ. BY NEC 690.5 4 APPLY TO: 8` 1 1 2016 PV SYSTEM DISCONNECT � iEWED FOR CODE COMPL! REQ. BY CRC R331.7 11 APPLY TO: MAIN SERVICE DISCONNECTS Reviewed By: SIGNAGE REQUIREMENTS: 1. RED BACKGROUND 2. WHITE LETTERING 3. MIN. 3/8" LETTER HEIGHT 4. ALL CAPITAL LETTERS 5. ARIAL OR SIMILAR FONT 6. WEATHER RESISTANT MATERIAL, PER UL 969 DC: Vmax=500, Vmp=350, Imax=15, Imp=10.8 AC: V=240, 1=12.5 Lu U W 0 w Lu O m 0 O CD Z Q NCF O U J W m 0 N O Ir- G) Q U O~ Z 00 � o ry Lo w (D U J a »Lo �(�� oc?W:vim OY W U) u >o>QWW �oza-ww J 0- W W W # REVISION DATE ol Original 1, 22l16 A As -Built OI8I2016 JOB #: 12120583 DESIGN: RDELGADO PAGE: LABELS PAGE NUMBER LBLS (8 LG Life's Good LG . Block LG300N1K-G4 LGs new module, LG NeONT" 2 Black, adopts Cello technology. Cello technology replaces 3 busbars with rAPPROVED 1>:- 12 thin wires to enhance power output and reliability. pVE Ej'/ 5 1 �0 Ce�� LG NeON" 2 Black demonstrates LG's efforts to increase C E VVVV l customer's values beyond efficiency. It features enhanced Inrerrek warranty, durability, performance under real environment, and aesthetic design suitable for roofs. Enhanced Performance Warranty LG NeCIN— 2 Black has an enhanced performance warranty. The annual degradation has fallen from-0.70/./yr to-0.6%/yr Even after 25 years, the cell guarantees 2.4%p more output than the previous LG NeONt" modules Aesthetic Roof LG NeONT" 2 Black has been designed with aesthetics on in mind; thinner wires that appear all black at a distance The product may increase the value of a property with its modern design. �•� Better Performance on a Sunny Day • LG NeON" 2 Black now performs better on sunny days thanks to its improved temperature coefficiency. About LG Electronics •• High Power Output Compared with previous models, the LG Ne0Nt 2 Black has been designed to significantly enhance its output efficiency, thereby making it efficient even in limited space. ® Outstanding Durability With its newly reinforced frame design, LG has extended the warranty of the LG NeON" 2 Black for an additional 2 years. Additionally, LG NeON— 2 Black can endure a front load up to 6000 Pa, and a rear load up to 5400 Pa. Double -Sided Cell Structure The rear of the cell used in LG NeON" 2 Black will contribute _ to generation, just like the front; the light beam reflected from the rear of the module is reabsorbed to generate a great amount of additional power. LG Electronics is a global player who has been committed to expanding its capacity, based on solar energy business as its future growth engine. We embarked on a solar energy source research program to 1985, supported by LG Group's rich experience in semi -conductor, LCD, chemistry, and materials industry. We successfully released the first Mono X0 series to the market in 2010, which were exported to 32 countries in the following 2 years, thereafter. In 2013, LG NeON- (previously known as Mono Xw NeON) won "Intersolar Award" which proved LG is the leader of innovation in the industry . LG300N 1 K-G4 Mechanical Properties Cells Cell Vendor Cell Type Cell Dimensions u of Busbar Dimensions (L x W x H) Front Load Rear Load Weight Connector Type Junction Box Length of Cables Glass Frame 6x10 LG Monocrystalline / N-type _ 156.75 x 156.75 mm / 6 inches -- - --- 12 (Mufti Wire Busbar) 1640 x 1000 x 40 min 64.57 x 39.37 x 1.57 inch 6000 Pa! 125 psf 5100 Pa ! 113 psf 17.0±0.5kg/37.48±1.1 Ibs Certifications and Warranty MC4, MC4 Compatible, IP67 IP67 with 3 Bypass Diodes 2x1000mm/2x3937inch High Transmission Tempered Glass Anodized Aluminum Certifications IEC 61215, IEC 61730-1/-2 IEC 62716 (Ammonia Test) IEC 61701 (Salt Mist Corrosion Test) - ISO 9001 UL 1703 Module Fire Performance (USA) Type 2 (UL 1703) Fire Rating (for CANADA) Class C (ULC/ORD C1703) -- -- -- Product Warranty 12years 0 - Output Warranty of Pmax Linear warranty* . . - ,••. Ir ye r 0.6`5p ann, i. de9radatwn, 3) A3.694 for 25 years Temperature Characteristics NOCT 46 t 3 °C -- -- Pmpp -0.38 "/o/°C 0 Voc -0.28 %/°C Isc 0.03 %/*C Characteristic Curves 3 ,oro� l000w r---------------- eoove 0.00 600 600W ,.00 ------- aoow mow 2.00 __ .. .,.. we.P M ODO 5D0 10.00 15D0 00.00 05.00 WM 35.00 ,0.00 ,5.00 8 so 4D a a I yr .x O E so n W ® L/� North America Solar Business Team u LG Electronics USA Inc Lifers Good 1000 sylvan Ave, Englewood Cliffs, NJ 07632 Contact: Ig.solar@a Ige coin www.lgsolarusacom ti.P.e.,,° K1 Electrical Properties (STC *) Module Type 300 W MPP Voltage (Vmpp) 32.5 MPP Current (Impp) _ 9.2F Open Circuit Voltage (Voc) -----. -...._ ---_ 39.: --------_..__-- Short Circuit Current (Isc) 9.70 Module Efficiency (%) 18.3 Operating Temperature ("C) 40 - *90 Maximum System Voltage (V) 1000 Maximum Series Fuse Rating (A) 20 Power Tolerance (%) 0 f3 STC ;Ste +lord Test Cuod&w ):Irradiance 100016 , Mudule Ternperature 251E, AM 1 S The nameplate power output is measumd and determined by LG Rectrorks at its %W and absokn:e d,s The typical change m rnnduEv erficiency at ?00 wim' m mlatron m 1000 wim' rs 3.0% Electrical Properties (NOCT*) Module Type 300W� /'� Maximum Power (Pm rar'vv, -----_�. U P r' J I �J -.. MPP Voltage (Vmpp) vi%' y ~� c#inc,� 4:3r�artmen, MPP Current (Impp) 7.36 Open Circuit Voltage ( fi`G '� 36.5 Short Circuit Current (P. mn A 7 3 ' N,:J`: t M 'final OGt _. ng Cet; A00 cox, am ' . tenlFlerature 20'C, weld 511eed 1 rtvs Dimensions (mmniVIEWED FOR CODE COMPLIF, Reviewe w."x wr• owrr Ranee. ae,..a. u.... The distanm between the center of the mtwnt3rW9! und,, hots=. Product specifications are subject to charge without notice. DS-N 2 -60-K-G-F-EN-50427 Copyright 0 2015 LG Electronics. All rights reserved. Innovation for a Better Life 01/04/2015 LU U LLI LU ct�_ [] L0 �/� >- U)[}-U�— W U Q a- c) �OoWco CY) cY)z,U J 0 (D CIE LU O 000 L !_ 7 Q J_ Q J O Q U) �C�WU00 v Y LIJ w U) U) U) Zo > Q W W d O Z = co—n W W T J d W W W # REVISION DATE JOB #: 12120583 DESIGN: RDELGADO PAGE: DATASHEETS PAGE NUMBER DS01 Enphase' Microinverters Enphase M250 e The Enphase` M250 Microinverter delivers increased energy harvest and reduces design and installation complexity with its all -AC approach. With the M250, the DC circuit is isolated and insulated from ground, so no Ground Electrode Conductor (GEC) is required for the microinverter. This further simplifies installation, enhances safety, and saves on labor and materials costs. The Enphase M250 integrates seamlessly with the Engage' Cable, the Envoy" Communications GatewayTM, and Enlighten, Enphase's monitoring and analysis software. PRODUCTIVE - Optimized for higher -power modules - Maximizes energy production - Minimizes impact of shading, dust, and debris [e] enphase¢ E N E R G Y SIMPLE - No GEC needed for microinverter - No DC design or string calculation required - Easy installation with Engage Cable RELIABLE 4th-generation product - More than 1 million hours of testing and millions of units shipped - Industry -leading warranty, up to 25 years C us w 3 oW /1 4 (1t)) U T 7 � Enphase"' M250 Microinverter // DATA L u V U) INPUT DATA (DC) M250-60-2LL-S22 Recommended input power (STC) 210 - 310 W C Maximum input DC voltage 48 V Peak power tracking voltage 27 V - 39 V Operating range 16 V - 48 V Min/Max start voltage 22 V / 48 V Max DC short circuit current 15 A OUTPUT DATA (AC) Cc�208 VAC 4240 VAC w Peak output power 250 w 250 V G z F-- �- Rated (continuous) output power 240 W 240 W W LLI 0 CD0 Nominal output current 1.15 A (A rms at nominal duration) 1.0 A (A rms at nominal duration) � L0 0 a)} Nominal voltage/range 208 V / 183-229 V 240 V / 211-264 V 7) l` W U Q Nominal frequency/range 60.0 / 57-61 Hz 60.0 / 57-61 Hz U) U Extended frequency range' 57-62.5 Hz 57-62.5 Hz > J Power factor >0.95 >0.95 0000 J WZ 0 Maximum units per 20 A branch circuit 24 (three phase) 16 (single phase) C) >- Z Maximum output fault current 850 mA rms for 6 cycles 850 mA rms for 6 cycles O 0 m Cr LO � 0 0 W co 0 (V a? EFFICIENCY t - rl IDY�C?Tlt�lf"1 CEC weighted efficiency 96.5% i� Building Departmen Peak inverter efficiency 96.5% ENV% ';., I J O rms, co 0 Static MPPT efficiency (weighted, reference EN50530) v a 99.4 2016 Q - Night time power consumption 65 mW max CE MECHANICAL DATA REVIEWED FOR CODE Q 0 M P LIAN — Ambient temperature range -40°C to +65°C Reviewed By:{� Operating temperature range (internal) -40°C to +85°C Dimensions (WxHxD) 171 mm x 173 mm x 30 mm (without mounting bracket) Weight 2.0 kg Cooling Natural convection - No fans Enclosure environmental rating Outdoor - NEMA 6 U) J Q FEATURES Z) " N O W compatibility Compatible with 60-cell PV modules 0 0 w g U 00 Communication Power line Y W F- (- Integrated ground The DC circuit meets the requirements for ungrounded PV arrays in > Zo > Q W W NEC 690.35. Equipment ground is provided in the Engage Cable. No o Z a- W W M — additional GEC or ground is required. Ground fault protection (GFP) is (D > Z > > integrated into the microinverter. _j IL W W W # REVISION DATE Monitoring Free lifetime monitoring via Enlighten software 0 Original 3/22/18 Compliance UL1741/IEEE1547, FCC Part 15 Class B, CAN/CSA-C22.2 NO. 0-M91, A As -Built 4i8i2016 B - - 0.4-04, and 107.1-01 C - - Frequency ranges can be extended beyond nominal if required by the utility D F JOB #: 12120583 DESIGN: RDELGADO To learn more about Enphase Microinverter technology, f 1 enphase� PAGE: DATASHEETS L J visit enphase.com E N E R G Y PAGE NUMBER 0 2015 Enphase Energy. All rights reserved. All trademarks or brands in this document are registered by their respective owner. MKT-00070 Rev 1.0 1 DSO 2 y 0 0 Everest Solar Systems Y Everest Solar Systems Y CrossRad 48-S CrossRail 48-S co 0) U) Technical data: 48-S Rail Connector 48-S Rail Profile W CrossRail 48-S is the latest addition to our residential product line. It has been Material: corrosion resistant aluminum and -- 1.811 in 1.535 in 1 [39 min] U optimized for installations with low to moderate snow loads, and can be used as a stainless steel 146 mm] letters —Vfl Z more economical solution for these markets. Engineering: stamped engineering available for all solar states uJ W [— OL0 Warranty: 12 years (n (� 0 (- Certification: UL 2703 Listed System for W (� Q Cost effective effective solution for areas with snow loads under 40 psf _. — bonding and fire 2.028 in y 1.890 in _y [48 min) � U r- 6' spans achieved under 10 psf snow load [52 min] W _J UL 2703 Listed System J 0 ap Available in mill or dark anodized finish Compatible with existing CrossRail hardware C) 0 W Zco CU�ERTINO o CO ¢I E?ui din D �`:.. Department 0 M W p New rail connector uses only two bolts. Roof Slope 7 27 Degrees �fp;fiop2 27 ? 45 Degrees 0 N O Load Rail Spans Zone 1, Exp B Snars Zone 1, Exp B 20 5 J co _ U Snow ( sf) Wind (mph) 4' 6' 8' 4'- 6' 8' i Z 110 130 REVIEWED E OMPLI NC 0 150 170 CR 48 S -le 11111ill _! 110 10 130 150 170 110 130 CR 48-S CR 48 20 150 CR 48 170 110 130 U Q W o a (Y � d Lo (n 30 0 0 Lu � U 00 / 150 0 Y W 170 110 >Z�QW W W (70 W W 130 1G 150 BCD>Z>> �J W W W W 170 110 KEY KEY # REVISION DATE o Odglnai Y22/16 50 130 48-S 48-S A As -Built 4i8i2016 B ---- ---- 150 170 48 48 80 80 c ---- ---- Note: Spans based on Exposure Category B. Consult CrossRail Engineering Letters for detailed span charts and information ° ---- —' CrossRail 48-S shown with EverFlash roof attachment E Table 1: Rail Selection Chart crossitaa 48-5 1 ust 10615 Product images are for illustrative purposes VpE only. Specifications are subject to cha0e C5T13 CSTB 6ERT -., .. .. . without notice. All sales Of out pfOdOC[5 5hdi L - REG-W E524 Everest Solar Systems, LLC 3809 Ocean Ranch Blvd., Suite 111 Oceanside, CA92056 / ��• V� `S � Q CSTB E„RT VDE JOB #: 12120583 DESIGN: O ETS PAGE DATASHEETS PAGE NUMBER subject to Everest Solar Systems terms and CEIAB (fr) Pass'Innovatior TUV Rheinland VDE Certificate conditions, including the exclusive limited 2011-128 (fr) - ISO (de) +1.760.301.5300 REG-w E524 REG Nr. E524 info@everest-solarsystems.com VDE CEIAB (fr) Pass'Innovatior TUV Rheinland VDE Cercrhrace 1 h , 900:2008 20150618-03 m v.everest-solarswems.com eciarar,on of -ISO (de) LISTED g02011-128 (fr)01;20:'- 20150618-03 D S 0 3 Mounting systems for solar technology CE GENERAL GUIDELINES Always refer to roofing manufacturer's instructions prior to starting work. Refer to the American Wood Council's guidelines for Lag pull-out capacities (NDS 2005, Table 11.24 Everest Solar recommends consulting a professional roofer prior to beginning work. Installer is responsible for verifying the structural integrity of the roof prior to installation. ASSEMBLY: STEP BY STEP ®Locate the rafters and snap horizontal and vertical lines to mark the installation position for each EverFlash flashing. Materials required: Tape measure, string line 0 Drill a pilot hole (1/4" diameter) for the lag bolt. Remove any saw dust and fill the hole with the roofing manufacturer's recommended sealant. Materials required: Drill 0 Insert the flashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when tourqued. Materials required: EverFlash flashing — CUPERT11 Building Depar 0 Line up pilot hole with EverFlash flashing hole. Insert the lag bolt throug .6 bjcled washer, the L-Foot, the gasketed hole in the flashing and into the rafter. �` i ,1 P? i 20 LU U wWIYo 0 ::) L0 U)�75Ocy)I` >- LLJ < 0 U J UJWD0M0 I) m � O o CO O C1 (D C:)w ten N _J�U Z Q REVIEWED FOR LODE 4OMFLIANCE ®Reviewed Bv: Torque: The range is between 8.3 - 11.6 lb-ft depending on the type of wood and time of year. The visual indicator for proper torque is when the EPDM on the underside of the bonded EVEREST SOLAR SYSTEMS washer begins to push out the sides as the washer compresses. If using an impact wrench to EverFlash 4000367 I EverFlash Comp Kit, 1 OX 12 " Mil COMP SHINGLE ROOF ATTACHMENT 4000366 I EverFlash Comp Kit, 10X12" Black EverFlash Flashing, 10" x 12" 5/16" Sealing Washer Material: aluminum Material: stainless steel, EPDM insert install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to finish the install. ® Install Everest Mounting System (refer to CrossRail 48/80 installation manual) ' J w o J CO 0 (D W N O U O Y W LLJ L a o z = � � co-0-ww Co >z>> J 0- uJ Lu Lu Finish: mill, dark # REVISION DP 0 Original 312. A As -Built 4/8/. B EverFlash L-Foot and Hardware 5/16" Lag Bolt Material: aluminum Material: stainless steel Finish: mill, dark Everest Solar Systems, LLC The EverFlash is simple and fast to 3809 Ocean Ranch Blvd., Suite 111 install. Please contact us for further Oceanside, CA 92056 D — --- assistance: Service-Hotline+1.760.301.5300 info®everest-solarsystems.com SERVICE -HOTLINE + 1 760.301.5300 www.everest-solarsystems.com JOB# 12120583 DESIGN: RDELGADO PAGE DATA SHEETS PAGE NUMBER DSO4 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO: B-2016-1673 10209 BYERLY CT CUPERTINO, CA 95014-5647 (342 12 081) SLINGSHOT POWER INC LOS ALTOS, CA 94022 OWNER'S NAME: GODBOLE ANIL V AND MADHUMATI A DATE ISSUED: 04/01/2018 OWNER'S PHONE: 650-387-1117 PHONE NO: (650) 308-9055 LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: License Class SOLAR Lic. #2 4$ 488 Contractor SLINGSHOT POWER INC Date 06/30/2017 X BLDG _ELECT _PLUMB MECH X RESIDENTIAL COMMERCIAL I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing _ with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. JOB DESCRIPTION: 94, - FC e INSTALL 13 (N) SOLAR PANELS 3.9 KW, (1) ELECT I L 125 I hereby affirm under penalty of perjury one of the following two declarations: AMPS 1. I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. -�;2. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this Sq. Ft Floor Area: Valuation: $14820.00 permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above Number: Occupancy Type: information is correct. I agree to comply with all city and county ordinances 3 42 12 081 42 and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue against said City in consequence of the granting of this permit. WITHIN 180 DAYS OF PERMIT ISSUANCE OR Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. 180 DAYS FROM LAST CALLED INSPECTION. SignatureA 7� ` i Date 4 1 20 Issued by: ABBY AYENDE � Date:4/1/2016 e OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is following two reasons: 1. I, as owner of the property, or my employees with wages as their sole installed without first obtaining an inspection, I agree to remove all new materials for compensation, will do the work, and the structure is not intended or offered for inspection. sale (Sec.7044, Business & Professions Code) 2. I, as owner of the property, am exclusively contracting with licensed Signature of Applicant: contractors to construct the project (Sec.7044, Business & Professions Code). Date: 41112016 I hereby affirm under penalty of perjury one of the following three declarations: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER 1. I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance, as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code, for the performance of the work for which this California Health & Safety Code, Sections 25505, 25533, and 25534. I will permit is issued. maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the s. I certify that in the performance of the work for which this permit is issued, I Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous shall not employ any person in any manner so as to become subject to the air contaminants as defined by the Bay Area Air Quality Management District I Worker's Compensation laws of California. If, after making this certificate of will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and exemption, I become subject to the Worker's Compensation provisions of the the Health & Safety Code, Sections 25505, 25533, and 25534. Labor Code, I must forthwith comply with such provisions or this permit shall e _ be deemed revoked. Owner or authorized agent APPLICANT CERTIFICATION Date: 4/1/2016 I certify that I have read this application and state that the above information is CONSTRUCTION LENDING AGENCY correct. I agree to comply with all city and county ordinances and state laws I hereby affirm that there is a construction lending agency for the performance relating to building construction, and hereby authorize representatives of this city of work's for which this permit is issued (Sec. 3097, Civ C.) to enter upon the above mentioned property for inspection purposes. (We) agree Lender's Name to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in Lender's Address consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal ARCHITECT'S DECLARATION Code, Section 9.18. 1 understand my plans shall be used as public records. Licensed Signature Date 411/2016 Professional CUPERTINO ALTERNATIVE ENERGY PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • building ..cupertino.g b- zol co -1c�3 PROJECT ADDRESS G' I APN R �% j ^ I� -0' 04 OWI`iRNA1,4E CicAhc� "Nso yl 1 E-MAIL e_ -I - I' STREET ADDRESS CITY, C.ATE,ZIP I FAX CONTACT NA?`4� � � PHO` � y�V i 1 ` � �C 1 l E-MLAII. STREET ADDRESS CI-- STATE, ZIP - FAX ❑ 01+'! ER ❑ 011•i,7.ER-Bu7DBR ❑ OVWERAGE-17 ❑ CONTRACTOR ❑ CONTR4CTORAGF-NZ• ❑ ARan-jECT ❑ ENGiNTER ❑ DEV=LOPER ❑ i�1 ANT CONTRACTOR NAM' %V �_OyjeJ LICEI:SENi _ LICE3\SETYPE BUS. LICR —9-1 CON,PANYNAMS E- r^ry FAX _ STREET ADDRES- S CITY, STAT' ZIP Q I ci PHONE' HOh_'E _5 - N vY ARCHITECT/ENGINEER NAME LICENSE NU1h4BER BUS. LIC R COMPANY NAME I !!-MAIL FAX STREET ADDRESS CITY, STATE, ZIP PHONE USE OF ❑ SFD or Duplex ❑ Multi -Family PROJECT IN WILDLAND PROJECT IN STRUCTURE: ❑ Commercial U•RB.A-N INTERFACE AREA ElYes —E{? NO FLOOD ZONE ❑ Yes O OLAR PANELS ❑ ELECTP.IC VEHICLE CY 4P,GING STATION ElSOLAR WATER HEATING El_EsOTHER: FOR SOLAR PAA'ELS: NUMBER OF PANELS/L'NITS: r I KILOWATTS CCOMI4ERCI.AL ONLIO: `� - TOTAL V .LU TI N: D£SCRIPTION OF WORK e - 13 3-q i---Vl i noels I nu) s Av N11- f.2_!�'� w - { By my signature below, I certiij to each of the followine: I am the property owner or authorized agent to act on the property o�Vner s behalf. I have read this application and the information I have provided is correct. I have read the Description of Work and verity' it is accurate. I agree to comply With all applicable local ordinances and state laws re-lat•. g buildina construction. I authorize representatives of Cupertino to enter the above -identified property for inspection purposes. S i_nature of ApplicanJAgent: — Date: SUPPLEMENTAL R�JFOR-MATION REQUIRED ti,• .D 50��'F1tTH1= COUICTEI2� `',� US tr t7r -sA%DARD a T. t _ _ 2.E _ .�z �= < � emu❑ hlA70R z PV4P.P_2011.doc revised 03116111 ABBREVIATIONS A AMPERE AC ALTERNATING CURRENT ART ARTICLE BLDG BUILDING STRUCTURE CONC CONCRETE DC DIRECT CURRENT EGC EQUIPMENT GROUNDING CONDUCTOR (E) EXISTING EMT ELECTRIC METALLIC TUBING GALV GALVANIZED GEC GROUNDING ELECTRODE CONDUCTOR GND GROUND HDG HOT DIPPED GALVANIZED I CURRENT Icont CONTINOUS CURRENT Imp MAX POWER CURRENT Isc SHORT CIRCUIT CURRENT kVA KILOVOLT AMPERE kW KILOWATT LBW LOAD BEARING WALL MAX MAXIMUM MIN MINIMUM N NEUTRAL NEC NATIONAL ELECTRIC CODE NTS NOT TO SCALE (N) NEW OC ON CENTER PL PROPERTY LINE POI POINT OF INTERCONNECTION PTC PVUSA TEST CONDITIONS PV PHOTOVOLTAIC PVC POLYVINYL CHLORIDE SCH SCHEDULE SS STAINLESS STEEL STC STANDARD TES CONDITIONS TYP TYPICAL UPS UNINTERRUPTIPLE POWER SUPPLY V VOLT Vmp MAX POWER VOLTAGE Voc OPEN CIRCUIT VOLTAGE W WATT ELECTRICAL NOTES 1. A NATIONALLY RECOGNIZED TESTING LABORATORY SHALL LIST ALL EQUIPMENT IN COMPLIANCE WITH ART 110.3 2. ALL EXTERIOR EQUIPMENT SHALL BE RAIN TIGHT AND APPROVED FOR USE IN WET CONDITIONS 3. BACKFEED BREAKER MUST BE LOCATED AT THE OPPOSITE END OF BREAKER OR LUGS PROVIDING POWER FROM THE UTILITY 4. DC CONDUCTORS ENTERING A BUILDING WILL BE RUN IN METALLIC RACEWAYS TO THE FIRST ACCESSIBLE MEANS OF DISCONNECTION PER ART 690.31(E) 5. ALL CONDUCTORS SHALL BE PROVIDED WITH STRAIN RELIEF UPON ENTRY INTO ENCLOSURES. 6. EACH UNGROUNDED CONDUCTOR SHALL BE IDENTIFIED BY PHASE AND SYSTEM PER ART 210.5 7. WHERE ALL TERMINALS OF THE DISCONNECTING MEANS SHALL REMAIN ENERGIZED IN THE OPEN POSITION, A WARNING SIGN SHALL BE PROVIDED PER ART 690.17 8. THE DC GROUNDING ELECTRODE CONDUCTOR SHALL BE SIZED PER ART 690.47 AND 250.66(B) 9. MODULE FRAMES SHALL BE GROUNDED AT THE UL-LISTED LOCATION PROVIDED BY THE MANUFACTURER USING UL-LISTED HARDWARE 10. ALL METALLIC COMPONENTS SHALL BE GROUNDED VIA ELECTRIC GROUNDING CONDUCTORS AND GROUNDED AT THE MAIN SERVICE GENERAL NOTES 1. THIS SYSTEM IS GRID -TIED WITH A UL LISTED POWER CONDITIONING INVERTER 2. THIS SYSTEM HAS NO BATTERIES. NO UPS 3. ALL WORK SHALL COMPLY WITH THE 2013 CALIFORNIA BUILDING CODE AND THE 2013 CALIFORNIA RESIDENTIAL CODE 4. ALL WORK SHALL COMPLY WITH THE 2011 NATIONAL ELECTRIC CODE AS AMENDED BY THE 2013 CALIFORNIA ELECTRIC CODE 5. LOCAL UTILITY SHALL BE CONTACTED PRIOR TO ENERGIZATION OF THE SYSTEM COMMUNJTY DEVELOPME'NT,DEPARTMENT BUyLDING .DIVISION - CUPERTINO APPROVED This set pf plans and specifications MUST be kept at the job site wring construction. It is unlawful to make any, changes or alterations on same, or to deviate therefrom, without approval from the Building Official. The Stamping of this plan and specifications. SHALL NOT be heid,to' permit or to be an approval of the violation of any pr visions ofanyCity Ordinance or State Law. BY ixAI DATE. 1V PER MIT ## i� - 2C`l6 J G :4-3 w SCOPE OF WORK SLINGSHOT POWER IS TO INSTALL A ROOF MOUNTED PV ARRAY. CONTRACTOR ADDRESS SLINGSHOT POWER 164 MAIN ST LOS ALTOS, CA 94022 800.887.9414 CA LIC #B984488 LAM LASM AHJ: CITY OF CUPERTINO UTILITY: PG&E HOA: N/A SHEET INDEX 1. COVER SHEET 2. SITE PLAN 3. ARRAY DETAILS 4. LINE D IAG RA1V1=.-= 5. LABELS s 6. DATA SHEE�fS :-�P ERTINO Buii Ing Department r, 00 1 2016 REVIEWED FOR CODE COMP Reviewed By: VICINITY LU U W F-0::) U)U)O0r` >- U) DOOmI--O S �Uo5 CY) W WUQ� W J 0w(0 O IY >_ J W rn Oa- o U-) OZ 00 M Q U) a IAE W 04 o U4 > o > Q co W acMZaW W M CA>z>> �J CL W W W # REVISION DATE 0 Original 3122116 A — — B — E _ _ JOB #: 12120583 DESIGN: RDELGADO PAGE: COVER PAGE PAGE NUMBER PVO1 N MP bC YONDUIT RUN ON �N,-COMPLIANCE WIT[ ART. 690.31 & 2013 C (EXACT RUN TBD AT MIN 3FT CLEARANCE GAS RISER AND (N) PER PG&E GREEN B(..... SECTION 2.4.2 (D) MP1 Pitch: 5 :12 (23 °) AZI: 180 ° Mat.: Comp Shingle 2 Stories MP2 Pitch: 5 :12 (23 °) AZI: 270 ° Mat.: Comn Shinale 2 Stories W U d- W W 0 0 ::) o Lo U)U)O�t` IL 000ml—o �Oo5 (yi W J 0 O J U J W M o0- T- Q O w U M LO Z a J_ w O d N0() �(Dw�U 0 > o > Q w w am-0-W W �'�0>Z» J d W W W 1#1 REVISION DATE JOB #: 12120583 DESIGN: RDELGADO PAGE: SITE PLAN PAGE NUMBER PV02 MP M P2 0 0 0 16'-4" o 3'-3" o MP1 0 c 1 ° JB Fj� 0 0 ] 1 0 W N) J-BOX c 2 X 4 RAFTERS @ 24 O.C. ��X I r► 5P� --f U TOTAL SYSTEM WEIGHT (Ibs): 639.453 TOTAL AREA (SQFT): 228.374 Array roof coverage (%) : 10% LBS / SQFT: 2.80003 LBS/STANDOFF: 26.6439 STANDOFF MAX SPAN (ft): 6 05 13'-1" 0 x7 5'-6" 0 1 5`5" N) SOLAR MODULE WITH VEREST CLAMPS N) SOLAR RAIL VEREST CR-48S N) L-FOOT VEREST N) EVEREST COMP VERFLASH N) 5/1611 SS -AG SCREW 1/2" EMBED. MIN (E) 2x RAFTER B ARRAY DETAIL Scale: 1-1/2" = 1' MAIN SERVICE PANEL L-(N) SUB PANEL S MAIN A ARRAY PLAN Scale: 3/16" = 1' W U �t W W C)f o LO Cnu)-Omt` Cf) �mml—o 1 WUQ�. W J 0 W rn p N C)U O W O_ 5 00 cyi Z Q Q 'tWN0(n o(?w2�� >o;aww aMZaww 1 0- W W W # REVISION DATE 10 Original 3/22116 (A — IB — — Ic ID — — I E — -- JJOB #: 12120583 1DESIGN: RDELGADO [PAGE: ARRAY DETAILS PAGE NUMBER PV03 # I CONDUCTORS CONDUIT LENGTH PROPERTIES A (1) ENGAGE CABLE, (1) #6 BARE EGC N/A 5' DC: Vmax=39.7, Vmp=32.5, Imax=9.7, Imp=9.26 g (2) #10 THWN-2, (1) #10 N, (1) #8 EGC/GEC 3/4" EMT 50' AC: V=240, BRANCH #1: 1=13A C (2) #10 THWN-2, (1) #10 N, (1) #8 EGC/GEC 3/4" EMT 5' (E) MAIN SERVICE 200A, 240/120V, 1 �, 3W CROUSE HINDS JA900CW Multiple Main breakers - 6 or less Underground Service Feed / Meter No.: 1006136301 60A/2P ,A B M F 240/120V SINGLE PHASE UTILITY SERVICE GEC BONDED DIRECTLY TO (E) GROUNDING ELECTRODE. ALL AVAILABLE ELECTRODES SHOULD BE USED PER CEC 250.50 TO (E) LOADS TO (E) LOADS (N) SUB PANEL 125A, 240/120V, 1 �, 3W MEA (ND 20A/2 NOTES ENGAGE1 F_ L1 CABLE L2 N EGC EGC GECL---,.-- U— - BRANCH T 01'01�Z B ANCH #1 MODULE U W F- W 0 0 o U) >- a. p �0�wc�o �0C)a- ch=�CU W -j m U J W CO N Q O 5 M o Q I L (13) PV MODULES GEC g A 300W, 273AW PTC J LG30ON 1 K-G4 J a (13) ENPHASE M250 � �d Q'N U) 0 0 W � o MICROINVERTERS � Y X Uj F- F- 250W, 48Vmp a o > = x x cMZa-W W MCA>Z» J (L W W W # REVISION DATE (1) JUNCTION BOX CANTEX 4x4x4 JOB #: 12120583 DESIGN: RDELGADO PAGE: LINE DIAGRAM PAGE NUMBER REQ. BY NEC 650.17 � APPLY TO: DISCONNECTS PV LOAD CENTERS COMBINER BOXES REQ. BY NEC 690.1 4 C 2 5 APPLY TO: AC DISCONNECT REQ. BY NEC_ 690.5 3 APPLY TO: U INVERTER LABELS REQ. BY NEC 690.31 E 3 2 APPLY TO: EXPOSED RACEWAYS, CABLE TRAYS COVERS OR ENCLOSURES OF JUNCTION BOXES REQ. BY 690.1 3 B 2 6 APPLY TO: DC DISCONNECT REQ. BY NEC 690.35 F 10 APPLY TO: JUNCTION BOXES, COMBINER BOXES, DC DISCONNECTS, INVERTERS REQ. BY NEC 705.1 2 D 4 3 APPLY TO: MAIN SERVICE PANEL REQ. BY NEC 690.5 C E APPLY TO: INVERTER REQ. BY NEC 705.1 2 D 7 4 APPLY TO: PV SYSTEM BREAKER REQ. BY NEC 690.5 4 $ APPLY TO: PV SYSTEM DISCONNECT REQ. BY CRC R331.7 11 APPLY TO: MAIN SERVICE DISCONNECTS SIGNAGE REQUIREMENTS: 1. RED BACKGROUND 2. WHITE LETTERING 3. MIN. 3/8" LETTER HEIGHT 4. ALL CAPITAL LETTERS 5. ARIAL OR SIMILAR FONT 6. WEATHER RESISTANT MATERIAL, PER UL 969 DC: Vmax=500, Vmp=350, Imax=15, Imp=10.8 AC: V=240, I=12.5 W I-- U) U 0 O M Lo rnr-.- Q U� O~ Z M i=o ryLo w(D U J W o0_.� ::) d Q_'NO(n >ojQww aoz0-ww v�0-www # REVISION DATE 0 Original 3/22116 B — C — — D — — F - - JOB #: 12120583 DESIGN: RDELGADO PAGE: LABELS PAGE NUMBER LG Life's Good Lt:, 2 Black LG's new module, LG NeONTP" 2 Black, adopts Cello technology. Cello technology replaces 3 busbars with ll 12 thin wires to enhance power output and reliability. 60 ceLG NeONT"' 2 Black demonstrates LG's efforts to increase customer's values beyond efficiency. It features enhanced warranty, durability, performance under real environment, and aesthetic design suitable for roofs. LG300N1K G4` TAPPROVED PRODUCT Intertek x��swlsre esEn!stau pharnvlwic Maduxs MI., Enhanced Performance Warranty !1L1 ® High Power Output €� @t® LG NeONT"' 2 Black has an enhanced performance Compared with previous models, the LG NeONT'" 2 Black f warranty. The annual degradation has fallen from-0.7%/yr has been designed to significantly enhance its output �F to-0.6`Yu1yr, Even after 25 years, the cell guarantees 2.4%p efficiency, thereby making it efficient even in limited space. more output than the previous LG NeONT" modules. Aesthetic Roof a� ° mizea LG NeCINT 2 Black has been designed with aesthetics in thinner that appear all black at a distance_ mind; wires The product may increase the value of a property with its modern design. Better Performance on a Sunny Day 111 lee=0 LG NeONT�' 2 Black now performs better on sunny days � 1_ - 1;M01,011 P F S1 thanks to its improved temperature coefficiency. About LG Electronics Outstanding Durability 6 VAfith its newly reinforced frame design, LG has extended the warranty of the LG NeONTA° 2 Black for an additional F5 2 years. Additionally, LG NeONT"" 2 Black can endure a front load up to 6000 Pa, and a rear load up to 5400 Pa. Double -Sided Cell Structure a The rear of the cell used in LG NeON"' 2 Black will contribute to generation, just like the front; the light beam reflected (��€ F from the rear of the module is reabsorbed to generate a great amount of additional power. LG Electronics is a global player who has been committed to expanding its capacity, based on solar energy business as its future growth engine. We embarked on a solar energy source research program in 1985, supported by LG Groups rich experience in semi -conductor, LCO, chemistry, and materials industry. VVe successfully released the first Mono X® series to the market in 2010. which were exported to 32 countries in the following 2 years, thereafter. In 2013, LG NeON- (previously known as Mono Xvl NeON) won "Intersolar Award" which proved LG is the leader of innovation in the industry. ■'2 B1,gckLG30UN1K-.G4 Mechanical Properties Cells 6 x 10 Cell Vendor _ LG Cell Type _ Monocrystalline / N-type Cell Dimensions 156.75 x 156.75 mm / 6 inches _ c of Busbar 12 (Multi Wire Busbar) C Dimensions (L x W x H) _ 1640 r.1000 x 40 mm 64.57 x 39.37 x 1.57 inch Front Load 6000 Pa 1125 psf Q Rear Load 5400 Pa / '113 psf ;'y Weight 17.0 ± 0.5 kg / 37.48 ± 1.1 lbs Connector Type MC4, MC4 Compatible, IP67 Junction Box IP67 with 3 Bypass Diodes _ Length of Cables- 2 x 1000 mm 12 x 39.37 inch Glass High Transmission Tempered Glass Frame Anodized Aluminum Certifications and Warranty Certifications IEC 61215, IEC 61730-1/-2 IEC 62716 (Ammonia Test) IEC 61701 (Salt Mist Corrosion Test) _ ISO 9001 UL 1703 Electrical Properties (STC *) Module Type 300 W MPP Voltage (Vmpp) 32.5 MPP Current (Impp) _ 9.26 Open Circuit Voltage (Voc) _ 39.7 Short Circuit Current (Isc) 9.70 _ Module Efficiency (%) _ _ _ _ _ 18.3 Operating Temperature (°C) y� -40 - +90 Maximum System Voltage (V) 1000 Maximum Series Fuse Rating (A) 20 Power Tolerance (V.) 0 - 43 "STC (Standarcl Test Condition} Irradiance 7000 Wfm', PAaJuie Tem[,e;an:m 25 `C, A"" i.5 `The nameplate power output is measurad and deter mined by tG E-t,o i at Its sole and absolute d-ti.. "The typical change in module erfitler y at 200 W/m' in relation to 1000 V1/m' is-3.09E. Electrical Properties (NOCT*) Module Type 300 VV Maximum Power (Pmax) -- �- 218 MPP Voltage (Vmpp) 29.5 MPP Current (Impp) 7.38 Open Circuit Voltage (Voc) _ 36.5 Short Circuit Current (Isc) 7,83 • NOCT (Nominal Operating Cell Temperature): Irradiance 800 W/m', ambient temperature 20 `C, evind speed 1 m/s Module Fire Performance (USA) _ -_ape 2 (UL 1703) Fire Rating (for CANADA) -_ _ Class C (ULC/ORD C_1703) !_ - Dimensions (mm/in) Product Warranty 12 years Q T o Output Warranty of Pmax Linear warranty* ® - • 1) 1st yaw. 9825 2) After 2nd yeas 0.6%p annual degradation, 3) 83.6°k for 25 years Temperature Characteristics i NOCT 46 ± 3 °C Pmpp �- -0.38 %1'C o.w x �� oMwT o ra:z sty. ,,K son we4r ar Voc -0.28 %rC Isc 0.03 %/°C Characteristic Curves s gp ,o.m t000w B am sooty 6m 609W 4m 4oaw va¢�gc(v) om S.00 low 15.00 20.0o 2SM 30.00 35.00 40.00 45.W g ,40 ---------------------- o Temp¢rawm(°Q North America Solar Business Team LG LG Electronics USA Inc Ofe's Good 1000 Sylvan Ave, Englewood Cliff, N107632 Contact lgsolar@a lgecom www1gsolarusamm MVRI pa�A rp`��nw (s�.awn.uel r f ( a • The distance between the center of the mounting/grounding hales Product specifications are subject to change without notice DS-N2-60-K-G-F-EN-50427 Copyright O 2015 LG Electronics. All rights reserved. 01/04/2015 M W U W �'❑ VJ W olf .__t 0 W 0 J z Q L1� 0 U �N L.L W �M W M O T_ r C] Lf') C� Q � U� r O z M N:N o 0. Lo WC-0 a_ U J_ Q D��NpU) C)(DW U00 00 o j Q W W a m - LLI LLI J i2 W LLl Lu # REVISION DATE 0 Original 3/22/16 A - - B - - 0 -- - D - - E - Innovation fora Better Life T P e. r ® .r.d dOB #: 12120583 DESIGN. RDELGADO PAGE: DATASHEETS PAGE NUMBER DS01 Enphase° Microinverters Enphase@M250 The Enphase' M250 Microinverter delivers increased energy harvest and reduces design and installation complexity with its all -AC approach. With the M250, the DC circuit is isolated and insulated from ground, so no Ground Electrode Conductor (GEC) is required for the microinverter. This further simplifies installation, enhances safety, and saves on labor and materials costs. The Enphase M250 integrates seamlessly with the Engage® Cable, the Envoy' Communications Gateway', and Enlighten®, Enphase's monitoring and analysis software. PRODUCTIVE - Optimized for higher -power modules - Maximizes energy production - Minimizes impact of shading, dust, and debris []enphase° E N E R G Y SIMPLE - No GEC needed for microinverter - No DC design or string calculation required - Easy installation with Engage Cable RELIABLE - 4th-generation product - More than 1 million hours of testing and millions of units shipped - Industry -leading warranty, up to 25 years GO c us Enphase® M250 Microinverter // DATA INPUT DATA (DC) M250-60-2LL-S22 Recommended input power (STC) 210 - 310 W Maximum input DC voltage 48 V Peak power tracking voltage 27 V - 39 V Operating range 16 V - 48 V Min/Max start voltage 22 V / 48 V Max DC short circuit current 15 A OUTPUT DATA (AC) @208 VAC @240 VAC Peak output power 250 W 250 W Rated (continuous) output power 240 W 240 W Nominal output current 1.15 A (A rms at nominal duration) 1.0 A (A rms at nominal duration) Nominal voltage/range 208 V / 183-229 V 240 V / 211-264 V Nominal frequency/range 60.0 / 57-61 Hz 60.0 / 57-61 Hz Extended frequency range" 57-62.5 Hz 57-62.5 Hz Power factor >0.95 >0.95 Maximum units per 20 A branch circuit 24 (three phase) 16 (single phase) Maximum output fault current 850 mA rms for 6 cycles 850 mA rms for 6 cycles EFFICIENCY CEC weighted efficiency 96.5% Peak inverter efficiency 96.5% Static MPPT efficiency (weighted, reference EN50530) 99.4 % Night time power consumption 65 mW max MECHANICAL DATA Ambient temperature range -400C to +65°C Operating temperature range (internal) -40°C to +85°C Dimensions (WxHxD) 171 .mm x 173 mm x 30 mm (without mounting bracket) Weight 2.0 kg Cooling Natural convection - No fans Enclosure environmental rating Outdoor - NEMA 6 FEATURES Compatibility Compatible with 60-cell PV modules Communication Power line Integrated ground The DC circuit meets the requirements for ungrounded PV arrays in NEC 690.35. Equipment ground is provided in the Engage Cable. No additional GEC or ground is required. Ground fault protection (GFP) is integrated into the microinverter. Monitoring Free lifetime monitoring via Enlighten software Compliance UL1741/IEEE1547, FCC Part 15 Class B, CAN/CSA-C22.2 NO. 0-M91, 0.4-04, and 107.1-01 ` Frequency ranges can be extended beyond nominal if required by the utility To learn more about Enphase Microinverter technology, visit enphase.com © 2015 Enphase Energy. All rights reserved. All trademarks or brands in this document are registered by their respective owner. [e] einphase- E N E R G Y MKT-00070 Rev 1.0 W U W W 0 O D O Lo fn U) U IIIIIC)00>-1-0 �j O cYiJ�U (n W J O � p U J W 0-)W N 0) Q d ZZ � (` 00 co Cfl Z Q J_ Q _j040� W�U00 > Z j Q w w a o Z IL of of W W M0>Z>> J IL W W W # REVISION DATE 0 Original 3/22116 A --- -- B — — c — - D -_- JOB #: 12120583 DESIGN: RDELGADO PAGE: DATASHEETS PAGE NUMBER DS02 Everest Solar Systems CrossRail 48-S CrossRail 48-S is the latest addition to our residential product line. It has been optimized for installations with low to moderate snow loads, and can be used as a more economical solution for these markets. ➢ Cost effective solution for areas with snow loads under 40 psf ➢ 6` spans achieved under 10 psf snow load ➢ UL 2703 Listed System ➢ Available in mill or dark anodized finish ➢ Compatible with existing CrossRail hardware f New rail connector uses only two bolts! CrossRail 48-S shown with EverFlash roof attachment Everest Solar Systems CrossRail 48-S Technical data: 48-5 Rail Connector Material: corrosion resistant aluminum and 1.811 in stainless steel 146 mm] Engineering: stamped engineering letters available for all solar states Warranty: 12 years Certification: UL 2703 Listed System for bonding and fire 2.028 in L_ y [52 mm] 1.890 in [48 mm] 48-5 Rail Profile 1.535 in z Z Table 1: Rail Selection Chart Solar Systems, LLC Everest age I re 10615 Product images are for illustrative purposes Product 1 ��5 C ART' CSTQ VDE 3809 Ocean Ranch Blvd., Suite 111 only. Spedf:,aticns are subsea to chanoe u VDETIi� :•� Oceanside, CA 92056 without notice. All sales of our products shall be U REG: Nr. E524 "`•` REG: Nr. E524 +1,760.301.5300 subject to Everest Solar Systems terms and VDE CEIAB (fr) Pass'Innovatior TOV Rheinland VDE Certificate info@everest-solarsystems.com conditions, including the exclusive limited warranty set Declaration of Conformity 2011-128 (fr) -ISO 9001:2008 (de) '^"!�`'�'•everest-solarsystems.corn 20150618-03 U� VDE REG: Nr. E524 CSTI3 ' C_c [Y t`� j 6ERT1 VDE REG: Nr. E114 LISTED VDE DConform Conformity eclaration of CEIAB (fr) PaSs'Innovatior 2011-128 (fr) TOV Rheinland 9001.2008 VDE Certificate (del 9 20150618-03 W U mot' W [--� U)E3O�r` >- U) 0_JWOZM C) _ O cY)JT2U W 0 W 0_ 60LO 0 0 (� fl U }- J M O N O Q U — W 0_ 5 r i O � Z Q J_ Q co 0C9wN�00 r U d o j Q W W a co Z W W 0- W W W # REVISION DATE 0 Original 3/22/16 A — -- B — — D — 1171 — — JOB #: 12120583 DESIGN: RDELGADO PAGE: DATA SHEETS PAGE NUMBER DS03 GENERAL GUIDELINES 1 - Always refer to roofing manufacturer's instructions prior to starting work. Mounting systems for solar technology Refer to the American Wood Council's guidelines for Lag pull-out capacities (NDS 2005, Table 11.2A). - Everest Solar recommends consulting a professional roofer prior to beginning work. - Installer is responsible for verifying the structural integrity of the roof prior to installation. solar system ASSEMBLY., STEP BY STEP Locate the rafters and snap horizontal and vertical lines to mark the installation position for / each EverFlash flashing. I . - Materials required: Tape measure, string line a m� C ` Drill a pilot hole (1/4" diameter) for the lag bolt. Remove any saw dust and fill the hole with the roofing manufacturer's recommended sealant. Materials required: Drill ,.. . ,`3 + Insert the flashing so the top part is under the next row of shingles and pushed far enough infiltration up slope to prevent water through vertical joint in shingles. The leading edge of _ :"'' flashing must butt against upper row of nails to prevent turning when tourqued. Materials required: EverFlash flashing C Line up pilot hole with EverFlash flashing hole. Insert the lag bolt through the EPDM bonded hole flashing washer, the L-Foot, the gasketed in the and into the rafter. 1;W�'%�✓ ice. "'i:.. 0 Torque: The range is between 8.3 - 11.6 lb-ft depending on the type of wood and time of The visual indicator for torque is when the EPDM on the underside of the bonded EVEREST SOLAR SYSTEMS o year. proper washer begins to push out the sides as the washer compresses. If using an impact wrench to EverFlash install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to finish the install. 4000367 I EverFlash Comp Kit, 10X12" Mil COMP SHINGLE ROOF ATTACHMENT 4000366 I EverFlash Comp Kit, 10X12" Black Install Everest Mounting System (refer to CrossRail 48/80 installation n manual) EverFlash Flashing, 10" x 12" 5/16" Sealing Washer Material: aluminum dark Material: stainless steel, EPDM insert Finish: mill, EverFlash L-Foot and Hardware 5/16" Lag Bolt --- -= ----- -- Material: aluminum Finish: mill, dark Material: stainless steel The EverFlash is simple and fast to Everest Solar Solar Systems, LLC 3809 Ocean Ranch Blvd., Suite 111 install. Please contact us for further Oceanside, CA 92056 assistance: Service -Hotline +1.760.301.5300 info@everest-solarsystems.com SERVICE -HOTLINE + 1760.301.5300 www.everest-solarsystems.com U LLJwOlf� U) U)2 C)J 0chFo O ceiz�U LL1 000 0 C) J W 0 N L5 M Q U� ZZ LLJ0 � M LO O Q J LLI a J d U' W N U co t �UIt >ZZ�QLULU aoZaww M 0 > Z > > J 0- L1J L U L U # REVISION DATE 0 Original 3122116 A — -- B — — __ D — -- E _ JOB #: 12120583 DESIGN: RDELGADO PAGE: DATA SHEETS PAGE NUMBER DS04