Loading...
15090124-SPECIAL INSPECTION REPORT TO: CITY OF CUPERTINO, CA INSPECTION DEPARTMENT FROM: FRANCISCO M. LACSINA, JR. � DATED: 12 MARCH 2 SUBJEC HOLDDOWN ANCH R BOLT CERTIFICATION PERMIT# 15090124 10529 Johnson Ave., Cupertino, CA 95014 The following was an actual observation by the undersigned at the above jobsite on Murch 12„ 2016: Anchor bolts holes were drilled with a minimum 9" depth into existing concrete foundation and properly cleaned with pressurized air afterward. Then Simpson Set-XP Epoxy was properly injected into the holes at an appropriate depth, then inserted the 5/8 full treaded' anchor bolt. 1 certify that the procedure described above was correctly administered and anchor bolts adequately installed. This certification is issued for reference purposes. C 34945 EXP. 09.3CL 17 S�9r el v I L RSP Ee c � ' FRANCISCO M. LACSINA JR., PE