Loading...
15090097CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 19164 MINER PL CONTRACTOR: PERMIT NO: 15090097 OWNER'S NAME: LANGEMAK DAVID AND KATHRYN r—w)u5ol DATE ISSUED: 12/14/2015 OWNER'S PHONE: 4085647864 PHONENO*WP4J 8W$ 0 LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL ® COMMERCIAL License Class 2 -_7 CONSTRUCT (N) ATTIC 2ND STORY ADDITION (738 S.F.) Lic. # REMODEL 2 (E) BATHROOMS (192 S.F.), KITCHEN Contractor 's ®/ 15- -&a Date__L— / L/ '` / REMODEL (117 S.F.), OTHER REMODEL (512 S.F.). I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the Sq. Ft Floor Area: Valuation: $165000 erformance of the work for which this permit is issued. have and will maintain Worker's Compensation Insurance, as provided for by .Section 3700 of the Labor Code, for the performance of the work for which this APN Number: 31626076.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct. I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save 180 -YS FROM LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities, judgments, •^ costs, and expenses which may accrue against said City in consequence of the Issued by: Date: granting of this permit. -Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section RE -ROOFS: inspected to material being installed. If a roof is 9.18. Date / Signature All roofs shall be prior any roofing installed without first obtaining an inspection, I agree to remove all new materials for inspection. ❑ OWNER -BUILDER DECLARATION Signature of Applicant: Date: I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project (Sec.7044, Business & Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the declarations: Health &Safety Code, Section 25532(a) should I store or handle hazardous I have and will maintain a Certificate of Consent to self --insure for Worker's material. Additionally, should I use equipment or devices which emit hazardous Compensation, as provided for by Section 3700 of the Labor Code, for the air contaminants as defined by the Bay Area Air Quality Management District I with the Cupertino Municipal Code, Chapter 9.12 and performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by will maintain compliance the Health & Safety Code, Sections 25 05, 25533, and 25534. Section 3700 of the Labor Code, for theerformance of the work for which this p Owner or authorized agent: � Date: permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's CONSTRUCTION LENDING AGENCY Compensation laws of California. If after making this certificate of exemption, I Code, I I hereby affirm that there is a construction lending agency for the performance of become subject to the Worker's Compensation provisions of the Labor must work's for which this permit is issued (Sec. 3097, Civ C.) forthwith comply with such provisions or this permit shall be deemed revoked. Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code; Section Licensed Professional 9.18. Signature Date CONSTRUCTION PERMIT APPLICATION i COMMUNITY DEVELOPMENT DEPARTMENT ® BUILDING DIVISION 90300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 FAX (408) 777-3333 • buildingP—cupertino.org NEW CONSTRUCTION X ADDITION ❑ ALTERATION / Ti ❑ REVISION / DEFERRED ORIGINAL PERMIT # PROJECT ADDRESS , 1 ! Y R 7 7 --Vb APN # f.. ` OWNERNAME PHONE E-MAIL STREET ADDRESS a t CITY, STATE, ZIP FAX to mp CONTACT NAME PHO E- STREET ADDRE C ST TE, ZIP FAX B 13 OWNER ❑ OWNER -BUILDER Q OWNERAGENT ❑. CONTRACTOR ❑ CONTRACTOR AGENT CHITECT. 13 ENGINEER. ❑ DEVELOPER ❑ TENANT CONTRACTOR NAME LICENSE NUMBER LICENSE TYPE BUS. LIC # COMPANY NAME E-MAIL FAX STREET ADDRESS CITY, STATE, ZIP PHONE ARCHITECT/E IG ER NAME LICENSE NUMBER BUS. LIC CO ANY AME 9 E-MAIL FAX STREET ADD SS s ZIP PHONE eNp DESCRIPTION OF XIS ATG SE ROP D US F n 1USE CONSTR.E # STORIES TYPE OCC. SQ.FT. VALUATION ($) EXIST AREA � NEW FLOOR AREA DEMO a AREA p 6 TOTAL NET AREA BATHROOM REMODEL AREA ` "'" i 2, KITCHEN IREMODEL AREA - OTHER - REMODEL AREA PORCH AREA -D CK AREA TOTAL DECK/PORCH AREA GARA E AREA: DETACH - CH # DWELLING UNITS: - IS A SECOND UNIT YES SEC ND STORY []YES BEING ADDED? ADDITION? ®NO ' PRE -APPLICATION ERYES IF YES, PROVIDE COPY OF PLANNING APPL # NO PLANNING APPROVAL LETTER IS THE BLDG AN ❑ YES EICHLER HOME? -. IVED BY: C w TOT VALUATION: 9 By my signature below, I certify to each of the following: I am the property caner or authorized agent to act on the properly owner's behalf. I hav read this application and the information I have provided is correct. I ve read th escription of Work and verify it is accurate. I agree to comply With all applicable local ordinances and state laws relating to buil ' true ' . I utho' epresentatives of Cupertino to enter the above -identified prop foction purposes. Signature of Applicant/Agent: Date: SUPPLEM„I11T INFORMATION P4QUIRED PaANCRECKTYPE , _ ROUTING SLIP rI1E-COU i' R 0 OVER=T` ❑ BUILDING PLAN REVIEW New SFD or Multifamily dwellings: Apply for demolition permit for _ existing building(s). Demolition permit is required prior to issuance of building permit for new building. ❑ EXPRESS ❑' PLANNING PLAN REVIEW Commercial Bldgs: Provide a completed Hazardous Materials Disclosure STANDARD 171 PUBLICWORKS _ form if any Hazardous Materials are being used as part of this project. 0 LARGE- C "RzDEFT _ Copy of Planning Approval Letter or Meeting with Planning prior to 0 MAJOR ❑ :SANITARY SEWERDISTRICT submittal of Building Permit application. ❑° ENVILUNMENTALHEALTB' BldgApp 201 Ldoc revised 06121111 CITY OF CUPERTINO b x FEE ESTIMATOR — BUILDING DIVISION - ADDRESS: 10164 Miner Place DATE: 09/15/2015 REVIEWED BY: PAUL ____ _ MISC ITEMS APN: 316 26 076 BP#: Plan Check Fee: *VALUATION: $165,000 PERMIT TYPE: Building Permit PLAN CHECK TYPE: Addition PRIMARY SFD or Duplex 2nd Unit? %Yes '' No PENTAMATION 1 R3SFDADD USE: $0.00 OTC? Yes No PERMIT TYPE: WORK Construct N attic 2nd story addition 738 S.Q Remodel 2 E Bathrooms 192 S.f. Kitchen Remodel SCOPE (117 S.f.), Other Remodel (512 S.f.). Upgrade (E) panel to (N) 250 Amp Panel. OCCUPANCY TYPE: TYPE OF FLR AREA PC FEES PC FEE EDBP FEES BP FEE ID CONSTR. s.% R-3 (Custom) 11-8,111-B,IV,V-B 738 $2,654.00 IR3PLNCK $1,666.00 IR3INSP TOTALS: 738 $2,654.00 $1'666.001 y ilecta..l'ltan C'vek f'lronb. I'lar C71tecF Elec. Plan Check 0.0 hrs $0.00 -tech. I'errtil Fee:. f' utnb. Penn tFee: Elec. Permit Fee: IEPERMIT Otitc r;AJie ch, Jnsp� O'dier 111muib hi "?, Other Elec. Insp. 0.0 hrs $48.00 ilech. hisp Fee: I'hvwb. Imp. Fee: I `ea Imp. f tte.� NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School .....:........t�.....s;,,..........t_Lt • .....i - --i,, not ncamain i-nniart the Dont for addn'l info. ivrae•au, eia.. a•awe ew ae•e •iuueee vc c•w •......•w..w. FEE ITEMS (Fee Resolution 11-053 E . 711/13) ...... ......_.... ... _-__�___ FEE ._____ __ _ QTYIFEE ____ _ MISC ITEMS Plan Check Fee: $2,654.00 192 s.f. $645.00 Remodel, Bath (<=300 sf) IRBMRESBAT Suppl. PC Fee: 0 Reg 0 OT0.0 hrs $0.00 PME Plan Check: $0.00117 s1 $645.00 Remodel, Kitchen (<=300 sf) IREMRESKIT Permit Fee: $1,666.00 Suppl. Insp. Fee -IS Reg. 0 OTE OO $0.00 512 s.f. Remodel, Other $503.00 IREMRESOTx PME Unit Fee: $0.00 PME Permit Fee: $48.00 250 amps Electrical IBELEC1000 Services $72.00. _ C�cast:struc:lzon 1trx: j A(hninisfrafiVe FEC.: O Work Without Permit? 0 Yes ) No $0.00 Advanced Planning Fee: IPLLONGR $103.32 Select a Non -Residential Building or Structure 19 Travel Documentation Fee: ITRA VDOC $48.00 Strong; Motion Fee: IBSEISMMICR $21.45 Select an Administrative Item Bldg, Stds Commission Fee: IBCBSC $7.00 BTOALB: $4,547.77 $1,865.00 TOAI. FES: $6,412.77 r[CVIJCu. V!/VLlLV 1J CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO: 15090097 10164 MINER PL CUPERTINO CA 95014 (316 26 076) BROOKE SHAW ENTERPRISES OF LOS ALTOS INC LOS ALTOS, CA 94023 OWNER'S NAME: DAVE LANGEMAK I JDATE ISSUED: 12/14/2015 OWNER'S PHONE: 650-335-5408 1 I PHONE NO: (650) 941-3223 License Class la Lic. #788224 Contractor BROOKE SHAW ENTERPRISES OF LOS ALTOS INC Date 01/31/2018 I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is In full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: 1. I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the PERMIT INFO: BLDG —ELECT _ PLUMB MECH _ RESIDENTIAL _ COMMERCIAL JOB DESCRIPTION: CONSTRUCT (N) ATTIC 2ND STORY ADDITION (738 S.F.) REMODEL 2 (E) BATHROOMS (192 S.F.), KITCHEN REMODEL (117 S.F.), OTHER REMODEL (512 S.F.). UPGRADE (E) PANEL TO (N) 250 AMP PANEL. REV #1 - REMOVE BEAM TO CREATE 68" CLEARANCE - ISSUED performance of the work for which this permit is issued. I have0��and will maintain Worker's Compensation Insurance, as provided for by �57/9/16 Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION_ certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Signature ( / C,{� <</ Date 5/9/2016 O R -B TR.DF.R DECTARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: 1. I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) z. I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Sec.7044, Business & Professions Code). hereby affirm under penalty of perjury one of the following three declarations: 1. I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. z. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Signature Date 5/9/2016 Sq. Ft Floor Area: I Valuation: $165000.00 APN Number: Occupancy Type: 316 26 076 PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROM LAST CALLED INSPECTION. Issued by: ABBY AYENDE Date: 12/14/2015 RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. Signature of Applicant: Date: 5/9/2016 II A 11 HAZARDOUS MATERIALS DISCLOSURE I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.11 and the Health & Safety Code, Sections 25505, 25533, and 25534. Owner or authorized agent: 4filz /I �,,_ Date: 5/9/2016 CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's Address ARCHITECT'S DECLARATION I understand my plans shall be used as public records. Licensed CUPERTINO CONSTRUCTION PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • building(cDcupertino.org n NF.W CONSTRIICTION r-1 ADDITION F-1 ALTERATION / TI F-1 REVISION/ DEFERRED ORIGINAL PERMIT # / 5-0 yin/ 2 PROJECT ADDRESS(� / �J /j� / h �� 1/G � i /I SL. APN # OWNER NAMEPHON� DRvZ La-�, �wI <s 33 S" S E-MAIL %ah svt2 ra�,�l STREET ADDRESS /Q�t/� CIE,vAT4 S 0�� / FAX .i, CONTACT NAME h - PHONE _ � 93 / E-MAIL «✓�r� G PS�t 1�t4, STREET ADDRESS 9 UZ l�loGkihfbir/ Gn CITY, STATE, ZIP sc.nn vr% .9 -_7 FAX ❑ OWNER ❑ OWNER -BUILDER ❑ OWNERAGENT ❑ CONTRACTOR XCONTRACTOR AGENT ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑ TENANT CONTRACTOR NAME a�oo� 5 -40/� LICENSE NUMBER 7dB 2 Z y LICENSE TYPE /3 BUS. LIC # c COMPANY NAME s/ c EMAILr �D .2 �OS G+ FAX STREET ADDRESSh CITY, STATE, ZIP PH - ARCHITECT/ENGINEER NAME • gs LICENSE NUMBER BUS. LIC # COMPANY NAMES at/- -2 E-MAIL T 2 �a 5 /9h @ py ' t FAX STREET ADDRESSCIT (, H4 Ie Rve .5✓/ Y, STATE, ZIP PHONF z rail 77� -;7,9.- DESCRIPTION OF WORK l2a✓; t.��,�� 6 fw^-, EXISTING USE PROPOSED USE CONSTR. TYPE #STORIES OFFICE USE ONLY CC TYPE DESCRIPTION SO.FT. VALUATION EXISTG NEW FLOOR DEMO TOTAL AREA AREA AREA NET AREA BATHROOM KITCHEN OTHER REMODEL AREA REMODEL AREA REMODEL AREA PORCH AREA DECK AREA TOTAL DECK/PORCH AREA I GARAGE AREA: ❑ DETACH ❑ ATTACH_ DWELLING UMTS: IS A SECOND UNIT ❑ YES SECOND STORY ❑ YES BEING ADDED? ❑ NO ADDITION? ❑ NO PRE -APPLICATION ❑ YES IF YES, PROVIDE COPY OF PLANNER'S NAME: .RECEIVEDBY: TAL VALUATION: yle(�) PLANNING APPL # C] NO PLANNING APPROVAL LETTER By my signature below, I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. l have read this application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating to build' n cons ctiol I authorize representatives of Cupertino to enter the above-ide property for inspection purposes. Ofie Signature of Applicant/Agent: Date:/ SUPPLEMENTAL INFORMATION REQUIRED PLAN CHECK TYPE ROUTING SLIP ❑ OYER -THE -COUNTER ❑ BUILDING PLAN REVIEW _ New SFD or Multifamily dwellings: Apply for demolition permit for existing building(s). Demolition permit is required prior to issuance of building permit for new building. ❑ EXPRESS ❑ PLANNING PLAN REVIEW _ Commercial Bldgs: Provide a completed Hazardous Materials Disclosure ❑ STANDARD ❑ PUBLIC WORKS form if any Hazardous Materials are being used as part of this project. ❑ ❑ LARGE FIRE DEPT _ Copy of Planning Approval Letter or Meeting with Planning prior to ❑ MAJOR ❑ SANITARY SEWER DISTRICT submittal of Building Permit application. ❑ ENVIRONMENTAL HEALTH BldgApp_201 1. doc revised 03/16/11 e' u -7 -*J CUPERTINO CONTRACTOR / SUBCONTRACTOR LIST Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 Fax: 408-777-3333 JOB ADDRESS: %o t 6 M Ni a Qr P 14 .& PERMIT # /SSo 9 oo 9 7 OWNER'S NAME: Dw ve. L. a K w•.�is, PHONE # o 8 Z y L- 9 371 GENERAL CONTRACTOR: =3v-ovke, Bc,; Ida- BUSINESS LICENSE # 'f'Oo $O ADDRESS: P 0. 'ZS v)c 15-0( CITY/ZIPCODE: G c,s V k s c/f yya Z3 *Our municipal code requires all businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. I am not using any subcontractors: Signature Please check applicable subcontractors and complete the following information: Date V SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # V Cabinets & Millwork W v4J¢v► =/D 7 6 9 VF Cement Finishing G, c. 0`� C 5 �+"v c%�a� y0 yZ- 7 Electrical Z 9 Z Z Excavation 05 C�h s �-*� c �`/a h yv y Z 7 Fencing Flooring / Carpeting 32,17(,p:d, Linoleum / Wood Glass / Glazing o S C s C r+, G `/ Z f Heating A GQV q,, a %gym c D el Insulation :. ;& y G y -2 7 Landscaping / Lathing -z- zMasonry Masonry Painting/ Wallpaper s S C�.5 y Z Paving Plastering �a. c t o S C&AI4 f e%o C- Ir /-/04/2-7 Plumbing (,t J�'t;ra}� 'PC v:Mbo /-/073 RoofingL, �h d goo-Pin 3 9 t I Septic Tank Sheet Metal Sheet Rock F-cr c� 1 v S Ct, s k, a� oh, V v Z/ Z 7 Tile C.csnstiro`'-c o=. yvYZ7 / Contractor Signature L06/ // Date / S OKE ICARBON MONOXIDALARMS OW-NERCERTIFICATE OF COMPLIANCE COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING (DIVISION 10300 TORRE AVENUE • CUPERTI'NO, CA 95014-3255 (408) 777-3228 o FAX (408) 777-3333 ^ building(alcupertino.org /0/41 Hih&- /, / 15—of" 17'7 YERIMyIT C+��q:N+`�+'f�yT BF5 yFINALED AND rC0j.%j j,)EyTF.D [�lyl�j'tTIL This CE pR�y';yi FICATE, Asit) PURPOSE This affidavit is a self -certification for the installation of all required Smoke and Carbon Monoxide Alarms for compliance with 2013 CRC Section R314, 2013 CBC Sections 420.6 and 907.2.11.2 where no interior access for inspections are required. GENERAL INFORMATION Existing single-family and multi -family dwellings shall be provided with Smoke Alarms:and Carbon Monoxide alarms. When the valuation of additions, alterations, or repairs to existing dwelling units exceeds $1000.00, CRC Section R314 and CBC Sections 907.2.11.5 and 420.6 require that Smoke Alarms and/or Carbon Monoxide Alarms be installed in the following locations: N AREA SMOKE ALARM CO ALARM Outside of each separate sleeping area in the immediate vicinity of the bedroom(s) X X On every level of a dwelling unit including basements X X Within each slee2ing room X Carbon Monoxide alarms are not required u-1 dwellings which do not contain fuel-burni�ag appliances and that do not have an attached garage. Carbon monoxide alarms combined with smoke alarms shall comply with CBC Section 420.6 and shall be approved by the Office of the State Fire Marshal. Power Supply: In dwelling units with no commercial power supply, alarm(s) may be solely battery operated. In existing dwelling units, alarms are permitted to be solely battery operated where repairs or alterations do not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl space. Refer: to CRC Section R314 and CBC Sections 907.2.11.4 and 420,6.2. An electrical permit is required for alarms which must be connected to the building wiring. As owner of the above -referenced property, I hereby certify that the alarm(s) referenced above las/have been installed m accor dance with the manufactur. er's instructions and in- comph ance with the California Building, and Califomia Residential Codes. The alarms have been tested and are operational, as of the date signed bel( 15 v` p p 411- 5 Vtakv43 i (rte S -snake and" COfO177L d6c n -wised, 031118%14 CERTIFIWE OF cwPuA-,NcF_ COMMUNITY DEVELOPMENT DEPARTMENT- BUILDING DIVISION 'UPERT11"o C 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 ,_n_ Owner Name Daut, (408) 777-3228 - FAX (408) 777-3333 - building(@-cuperrino�oro Z -al-, �kvk Address -4 10f6,7, /41A,ZA pic,'e-p— P , ennit No. C) -------------- Your real Property a registered historical site? ❑ Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form. o GO to Question 2. 2. Does your real property have a licensed plumber certifying that, due to the age or configuration of theproperty or its plumbing, installation of water -conserving plumbing fixtures is not technically feasible? 0 Yes Civil Code Sections 1101.1 through 1101.8 donot apply. 0 The licensed plumber's certification has been provided to the Building Division. Skip the rest of the form and sign bottom of form. VNb G6 to Question 3. 3. Is water service permanently disconnected for your building? rr 0 Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form. P: -NO Go to Question 4. 4. Is your real property built and available, for use or occupancy on or before January 1, 1994? 0 No My real property is built and available for use or occupancy after January 1, 1994. Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form. K—Yes My real. property is built and av'ailablt, for use or occupancy on or before January 1, 1994. Civil Code Sections 1101.I through 1101.8 apply. Check one of the three following statements and sign bottom of form.. 5. ea, check ONE of the 0 c ec See Civil Code- Section 1101.4. _M ro ertyg a' single yp V On and after Janua improvements shall require, all non-compliant plarnbit1g, factures n to replaced with 2017 all non- com cothroughout the building. On or bef6re January, I m lit1)1,1 ribin water -conserving plumbing fixtures (regardless, of whether an 11 property undergoes alterations or -improvements). El My property is a multifamily residential real property. See Civil Code Section 1101,5-. On, and after January 1, 2014*,, specified buildingalterations, or i m-provements, shall require non- compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures. On or before January 1, 2049, all non-compliant plainbing fixtures, shall be replaced with water - conserving plunibing fixtures throughout the building (regardless of whet -her property undergoes alterations or improvements). 0 My property is, a commercial real, property.S et Civil C 1. Code Section n, ec w 11 0 On and after January 1, 2014, specified building alterations or improvements shall require non- compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures. On or h6bm January 1,, 2019,,all non-compliant plumbing fixturesshall be replaced with water- conserving plumbing fixtures, throughout the building (regardless of whether property undergoes- alterations or improvements)! 1, asthe -owner or owner's agent of this property,, certify under penalty of perjury that non—compliant P-1 replaced prior to date, specified, abovewith, water -conserving plumbing fixtures in accordance-- with, Civ through 1101 - 9, the,, current Cahif6rrda, Plumbing Code and California Green Building Standards Code„ installation requirements, and that thew r -conserving plumbing fixtures comply with the requireiner table err the fallowing page. A /,a 4, Owner or Owner Agent's,. Upon completing signing this; Ceitificate, please return it to the Building Division inorder, to final, fixtures, will be -Code Sections, 1101.1 A manufacturer's as, indicated in, the permit. SB4072015.do,c revised, 0812'6115 ,. 1,�q '-V CALGREEN RESIDENTIAL CHECKLIST — MANDATORY ITEMS COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVIPWCE? VED CUPERTINO ALBERT SALVADOR, P.E., C.B.O., BUILDING OFRCL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3l (408) 777-3228 • FAX (408) 777-3333 • buildin cuno.or PURPOSE: k BY The 2013 CalGreen Code applies to additions or alterations of existing residential buildings where the addition or alteration increases the building's conditioned area, volume, or size and also applies to all new low-rise residential buildings, high-rise residential buildings, or both. Existing site and landscaping improvements that are not otherwise disturbed are not subject to the requirements of CALGreen. Project Name: Project Address: 41 Project Instructions: oficenE 111. The Owner or the Owner's agent shall employ a feli & thPis A*& r that all required work desc ed�ltserlGreen Building Standards Codes to verify and assu e t qprop y planned and implemented in the project. 2. The licensed professional, in collaboration with the owner and the design professional shall initial Column 2 of this checklist, sign and date Section 1 - Design Verification at the end of this checklist and have the checklist printed on the approved plans for the project. 3. Prior to final inspection by the Building Department, the licensed professional shall complete Column 3 and sign and date Section 2 - Implementation Verification atgf thihe klist and submit the 8Ms completed form to the Building Inspector. M A L #3 Page 1 of 5 CalGreen_2014.doc revised 11104114 Column 2 Column 3 MANDATORY FEATURE OR MEASURE Project Verification Re uirements A4.1 PLANNING AND DESIGN Planning and Design - Site Development 4.106.2 Storm water drainage and retention during construction. A plan is developed and implemented to manage storm water drainage during ❑ ❑ construction. 4.106.3 Grading and paving. The site shall be planned and developed to keep surface water away from buildings. Construction plans shall indicate how ❑ ❑ site grading or a drainage system will manage all surface water flows. dJA Page 1 of 5 CalGreen_2014.doc revised 11104114 .. .2 ENERGY EFFICIENCY General 4.201.1 Low-rise residential buildings shall meet or exceed the minimum ❑ standard design required by the California Energy Standards. A4.3 WATER EFFICIENCY AND CONSERVATION Indoor Water Use 4.303.1 Water conserving plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the following: 4.303.1.3.2 Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per flush. Tank -type water closets shall be certified to the performance criteria of the U.S. EPA WaterSense Specifications for Tank -type Toilets. ❑ 4.303.1.3.2 Urinals. The effective flush volume of urinals shall not exceed 0.5 gallons per flush. OA 4.303.1.3.1 Single Showerheads. Showerheads shall have a maximum flow rate of not more than 2.0 gallons per minute at 80 psi. Showerheads shall be certified to the performance criteria of the U.S. EPA WaterSense Specification for showerheads. 4.303.1.3.2 Multiple Showerheads serving one shower. When a shower is served by more than one showerhead, the combined flow rate of all showerheads and/or other shower outlets controlled by a single valve shall not exceed 2.0 gallons per minute at 80 psi, or the shower shall be ❑ designed to allow only one shower outlet to be in operation at a time. 4.303.1.4.1 Residential lavatory faucets. The maximum flow rate of residential lavatory faucets shall not exceed 1.5 gallons per minute at 60 psi. The minimum flow rate of residential lavatory faucets shall not be less than 0.8 gallons per minute at 20 psi. ❑ 4.303.1.3.2 Lavatory faucets in common and public use areas. The maximum flow rate of lavatory faucets installed in common and public use areas (outside of dwellings or sleeping units) in residential buildings shall not exceed 0.5 gallons per minute at 60 psi. ❑ 4.303.1.4.3 Metering faucets. Metering faucets when installed in residential buildings shall not deliver more than 0.25 gallons per cycle. 4.303.1.4.4 Kitchen Faucets. The maximum flow rate of kitchen faucets shall not exceed 1.8 gallons per minute at 60 psi. Kitchen faucets may temporarily increase the flow above the maximum rate, but not to exceed 2.2 gallons per minute at 60 psi, and must default to a maximum flow rate of 1.8 gallons per minute at 60 psi. 4.303.2 Standards for plumbing fixtures and fittings. Plumbing fixtures and fittings shall be installed in accordance with the California Plumbing Code, ❑ and shall meet the applicable standards referenced in Table 1401.1 of the California Plumbing Code. Page 2 of 5 ('ulGreen 201 l.doc revised 11 04 14 Outdoor Water Use 4.304.1 Irrigation controllers. Automatic irrigation systems installed at the time of final inspection shall be weather -based. 0,A,- ❑ 4.304.1.1 Controllers shall be weather- or soil moisture -based controllers that automatically adjust irrigation in response to changes in plants' needs as weather conditions change. 1,)A, ❑ ❑ ❑ 4.304.1.2 Weather -based controllers without integral rain sensors or communication systems that account for local rainfall shall have a separate rtl�• wired or wireless rain sensor which connects or communicated with the controller(s). Soil moisture -based controllers are not required to have rain sensor input. (JA A4.4 • - •RESOURCE EFFICIENCY Enhanced Durability and Reduced Maintenance 4.406.1 Rodent proofing. Annular spaces around pipes, electric cables, conduits, or other openings in plates at exterior walls shall be protected }a ❑ against the passage of rodents by closing such openings with cement mortar, f� concrete masonry or similar method acceptable to the enforcing agency. Construction Waste Reduction, Disposal and Recycling 4.408.2 Construction waste management plan. Where a local jurisdiction does not have a construction and demolition waste management ordinance, a ❑ construction waste management plan shall be submitted for approval to the enforcing agency. Building Maintenance and Operation 4.410.1 Operation and maintenance manual. At the time of final inspection, an operation and maintenance manual shall be provided to the building ❑ occupant or owner. 0xz-t_Y ,qC-3-9) A4.5 - • QUALITY Fireplaces 4.503.1 General. Install only a direct -vent sealed -combustion gas or sealed ❑ ❑ wood -burning fireplace, or a sealed woodstove. �jk Pollutant Control 4.504.1 Covering of duct openings and protection of mechanical equipment during construction. Duct openings and other related air ❑ distribution component openings shall be covered during construction. 4.504.2.1 Adhesives, sealants and caulks. Adhesives, sealants and caulks � ❑ shall be compliant with VOC and other toxic compound limits. 4.504.2.2 Paints and coatings. Paints, stains and other coatings shall be ❑ compliant with VOC limits. 4.504.2.3 Aerosol paints and coatings. Aerosol paints and other coatings shall be compliant with product weighted MIR Limits for ROC and other toxic ❑ compounds. Page 3 of 5 CalGreen 2014.docrevised 11104;14 4.504.2.4 Verification. Documentation shall be provided to verify that compliant VOC limit finish materials have been used. 4.504.3 Carpet Systems. Carpet and carpet systems shall be compliant with VOC limits. 4.504.4 Resilient flooring systems. Eighty (80) percent of floor area receiving resilient flooring shall comply with the VOC-emission limits defined in the Collaborative for High Performance Schools (CHPS) Low -emitting 10-1 Materials List or be certified under the Resilient Floor Covering Institute (RCFI) FloorScore program. 4.504.5 Composite wood products. Particleboard, medium density fiberboard (MDF), and hardwood plywood used in interior finish systems shall [' comply with low formaldehyde emission standards. Interior Moisture Control 4.505.2 Concrete slab foundation. Required vapor retarders and capillary breaks are also required to comply with CalGreen Section 4.505.2.1. tj'4� 4.505.3 Moisture content of building materials. Moisture content of building materials used in wall and floor framing is checked before enclosure. Indoor Air Quality and Exhaust 4.506.1 Bathroom exhaust fans. Exhaust fans which terminate outside the building are provided in every bathroom. Environmental Comfort 4.507.2. Duct systems are sized and designed and equipment is selected using the following methods: 1. Establish heat loss and heat gain values according to ACCA Manual J or equivalent. 2. Size duct systems according to ACCA 29-D (Manual D) or equivalent. 3. Select heating and cooling equipment according to ACCA 36-S (Manual S) or equivalent. INSTALLER AND SPECIAL INSPECTOR QUALIFICATIONS Qualifications 702.1 Installer training. HVAC system installers are trained and certified in rte' Ux the proper installation of HVAC systems. 702.2 Special inspection. The Licensed Professional responsible to verify -4 CALGreen compliance is qualified and able to demonstrate competence in the ❑ discipline they inspect and verify. Verifications 703.1 Documentation. Verification of compliance with CALGreen may include construction documents, plans, specifications, builder or installer certification, inspection reports, or other methods acceptable to the enforcing R� agency which show substantial conformance. Implementation verification shall be submitted to the Building Department after implementation of all required measures and prior to final inspection approval. Page 4 of 5 CalGreen_2014.doc revised 11/04 14 Project Name: Project Address: Project Description: CALGREEN SIGNATURE DECLARATIONS SECTION 1 - DESIGN VERIFICATION 1 Complete all lines of Section 1 — `Design Verification" and submit the completed checklist (Columns 1 and 2) with the plans and building permit application to the Building Department. The owner and design professional responsible for compliance with CalGreen Standards have revised the plans and certify that the items checked above are hereby incorporated into the project plans and will be implemented into the project in accordance with the requirements set forth in the 2013 California Green Building Standards Code as adopted by the City of Cupertino. �--- U (8 2-0{s` owners Signature Date yfJ Owners Name (Please Print) Design Professional's Name (Please Print) Signature of License Professional responsible for CalGreen compliance Name of License Professional responsible for CalGreen compliance (Please Print) Phone Yww�v� vr3�s� _ U�e-� cif>� -6- 1i - 3W6 Email Address for License Professional responsible for CalGreen compliance SECTION 2 - IMPLEMENTATION VERIFICATION Complete, sign and submit the competed checklist, including column 3, together with all original signatures on Section 2 to the Building Department prior to Building Department final inspection. I have inspected the work and have received sufficient documentation to verify and certify that the project identified above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of the 2013 California Green Building Standards Code as adopted by the City of Cupertino. Signature of License Professional responsible for CalGreen compliance Date Name of License Professional responsible for CalGreen compliance (Please Print) Phone Email responsible for CalGreen compliance Page 5 or5 CalGreeei 2014.doe revised 11 n444 t STATEMENT OF SPECIAL INSPECTIONS, 2013 CBC COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ALBERT SALVADOR, P.E.. C.B.O., BUILDING OFFICIAL CUPERTINC7 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 �� j�� (408) 777-3228 • FAX (408) 777-3333 • building(Dcuoertino.orlls !/� h, SITE SS lb ADDREU �% APN Project Engineer D Architect BP# a„y Owner....%�.�.ti-.Q......... (,A.!l7?/ C,- ............................................. _.. Contractor............................................ ..................................... .............. Address ... (042.9 ... ..I .� Q........e4nL C01 ...................................... Address........................................................ ............. ............................VI y_7 City/St...2'.............. Zip /.�...... Phone........... City/St........ ............... ........................... Zip ................... Phone:.;w�........... . Applicant .. ....... ....................... ......................_....................... Engineerl� hitectl.' �� i�.... 6-V......r ............., Address ............ ............ .............. ..................................................._............ Address ....... Z..la.... S..c�l.C)......?% c., �, ............... . City/St................ ..................... ....... Zip ................. .......... Phone .... ................. Cit /St...X-' .�z).,. ........Zi /G� § - PhoneR-.191ri PROJECT DESCRIPTION: This "STATEMENT OF SPECIAL INSPECTIONS" is submitted in fulfillment of the requirements of CBC Sections 1704 and 1705' This form is structured after and used by permission from the Structural Engineer Association of Northern California's (SEAONC) mode statement of Special Inspections. Also, included with this form is the following :y El"LIST OF SPECIAL INSPECTION AGENCIES (page 2). A list of testing agencies and other special inspectors that'VA be retained to conduct the tests and inspections for this project ❑ "SCHEDULE OF SPECIAL INSPECTION" (page 3 - 6). The Schedule of Special Inspections summarizes the Sped* Inspections and tests required. Special Inspectors will refer to the approved plans and specifications for detailed special inspection requirements. Any additional tests and inspections required by the approved plans and specifications shall also be performed. Cn Special Inspections and Testing will be performed in accordance with the approved plans and specific, this statement and CBC Sections 1704, 1705, 1706, 1707, and 1708. Interim reports will be submitted to the Building Official a Registered Design Professional in Responsible Charge in accordance with CBC Section 1704.1.2. 4� � A Final Report of Special Inspections documenting required Special Inspections, testing and corteQr&Q4ny discrepancies noted in the inspections shall be submitted prior to issuance of a Certificate of Use and Occupancy (Section 172). The Final Report will document: • Required special inspections. • Correction of discrepancies noted in inspections. The Owner recognizes his or her obligation to ensure that the construction complies with the approved permit documents and to implement this program of special inspections. In partial fulfillment of these obligations, the Owner will retain and directly pay for the Special Inspections as required in CBC Section 1704.1. This plan has been developed with the understanding that the Building Official will: • Review and approve the qualifications of the Special Inspectors who will perform the inspections. • Monitor special inspection activities on the job site to assure that the Special Inspectors are qualified and are performing their duties as called for in this Statement of Special Inspection. • Review submitted inspection reports. • Perform inspections as required by the local building code. t have read and agree to comply with the tems and conditions of this statement Prepared By: / Project Engineer D Architect ; �t -Registered esi n Professional in Charge Si natur ... ........ ......... ....... ......Lic.# .... ..40....lQ..... Date:..... �,e� ........�. Own r Name: [Avip LIWO MAI- _ Owner's Authorization )c 2! zo,� Signature ........... ..... ....................................................................... Date:.....f......../........ In/sp ctio Agency,/ Inspector Name: C �� t'- Signature .� .:......... : �--.....Lia# ..J:.. tj..�... .�....... Date:.. ...� ..� Buikfi6gcial or designee: Sinature ............. r............................................... ................. .................................. Date:.......................... i LIST OF SPECIAL INSPECTION AGENCIES APPROVAL OF SPECIAL INSPECTORS: Each special inspection agency, testing facility, and special inspector shall be recognized by the Building Official prior to performing any duties. Special Inspection agency's listed on this form must be pre -approved and listed on Cupertino's approved Special Inspectors list. Special inspectors shall carry approved identification when performing the functions of a special inspector. Identification cards shall follow the criteria set by the California Council of Testing and Inspection Agencies. No personnel changes shall be made without first obtaining the approval of the Building Official. Any unauthorized personnel changes may result in a "Stop Work Order" and possible permit revocation. To be pre- approved by the City of Cupertino, refer to the SPECIAL INSPECTION CRITERIA handout. Please allow two weeks to complete the application process. Tho follnveiinn are tha tpctinn anti snecial insnertion anencies that will be retained to conduct tests and inspection on this project: EXPERTISE FIRM i INSPECTOR INFORMATION' 1. Special Inspection (except for Firm.....................................................................Addr......................................................................................... geotechnical) City.......................................................................................................... State .......................Zip ...................... Telephone...................................... Fax ............................................ Email ......................................................... 2. Material Testing Firm .................................................. ................... Addr...... ................................................................. .................. City.......................................................................................................... State .......................Zip ...................... Telephone.......................................Fax............................................ Email......................................................... 3. Geotechnical Inspections Firm.....................................................................Addr......................................................................................... City.......................................................................................................... State .......................Zip ...................... Telephone...................................... Fax ............................................ Email......................................................... 4. Other: Firm.....................................................................Addr......................................................................................... City.......................................................................................................... State .......................Zip ...................... -- Telephone ...................................... Fax............................................ Email......................................................... 'All agencies specified on this form must be pre -approved and listed on the City of Cupertino s Approvea apecial Inspector s List. A- A Jmw,_ , SEISMIC REQUIREMENTS (Section 1705.3.6) Description of seismic -force -resisting system and designated seismic systems subject to special inspections as per Section 1705.3: The extent of the seismic -force -resisting system is defined in more detail in the construction documents. WIND KLUUIKhMLN 15 (Section 7 Description of main wind -force -resisting system and designated wind resisting components subject to special inspections in accordance with Section 1705.4.2: The extent of the main wind -force -resisting system and wind resisting components is defined in more detail in the construction documents. SpeeialnspectionForm_2012.doc revised 03/20/12 _1___J Pagel o 404J� LANDSCAPE WATER -EFFICIENCY CHECKLIST Community Development Department 10300 Torre Avenue 408.777.3308/ Fax 408.777.3333 Cupertino, CA 95014 planning@cupertino.org C U P E RT I N O http://cupertino.org/plannini Applicant Name: Email: Project Site Address: 0 (Q Phone: Wek--2_?&- Total Landscape _ ` Q Landscape area: All the planti g areas, turf areas, and water features in a landscape installation. The landscape area does Area (square feet): not include footprints of buildings or structures, sidewalks, driveways, parking lots, decks, patios, gravel or stone walks, hardscapes, Turf Area: /� other pervious or non -pervious and other non- irrigated areas designated for non -development (e.g., open spaces and existing wildland vegetation). Non -Turf Plant Area: Turf: A ground cover surface consisting of non-native grass species that is customarily mowed. Annual bluegrass, fescue, Kentucky bluegrass, perennial ryegrass, red and tall Special Landscape Area: fescue are examples of cool -season turf grasses. Bermuda grass, kikuyu grass, seashore paspalum, St. Augustine grass, zoysia grass, and buffalo grass are warm -season turf grasses. Water Feature Wet Surface Area: If > 10% of landscaped area, water budget calcu- lation required with landscape project submittal. See reverse side for other definitions. NOTE: If landscape area exceeds 2,500 sq. ft., a landscape project submittal shall be required. If no landscaping is proposed, enter "0" above and proceed directly to the signature block at the bottom of this form. Landscape Parameter Requirements Project Compliance Turf Total turf area shall not exceed 25% of the landscape es ❑ No area, or 1,250 square feet, whichever is lesser in area. [If no, Water budget calculation requirec with landscape project submittal] es All portions of turf areas shall be wider than eight (8) feet. Turf (if utilized) is limited to slopes not exceeding 15%. *,Ye -s Non -Turf At least 80% of non -turf area shall consist of native or ❑ No low water use plants. [lFno, Water budget calculation require with landscape project submittal] Hydrozones Plants with similar water needs shall be grouped within es ❑ No hydrozones. Each hydrozone shall be controlled by a [Plants can be grouped per separate valve. Table 14.15.050(C)] Irrigation System Systems shall be designed and maintained to minimize �•�s Ll No water waste (e.g., runoff, low head drainage, overspray). �' Low-volume irrigation shall be utilized in non -turf areas. Irrigation shall only occur between the hours of 8:00 pm [If no, Provide explanation on back] and 10:00 am. Soil A minimum of eight (8) inches of non -compacted topsoil es ❑ No shall be available in planted areas. [If no, Provide explanation on back] Yes ❑ No Soil amendments, such as compost or fertilizer, shall be appropriately added according to the soil conditions at the project site and based on what is appropriate for the [If no, Provide explanation on back] selected plants. Mulch A minimum two (2) -inch layer of mulch shall be appliedes LJ No on all exposed soil surfaces of planting areas, except in Ilf"no, areas of direct seeding application (e.g. hydro -seed). .Provide explanation on back] I am aware of available informational resources regarding native and low water use plants, irrigation efficiency, and other aspects of water -efficient landscaping. I certify that the information provided on this checklist is correct, and the installed landscape complies with the requirements of Chapter 14.15. I also understand that any -changes to the project will necessitate a new checklist. Si tur roe ner o thorized representative Date _1___J Pagel o 404J� This checklist implements the requirements of Chapter 14.15, Landscape Ordinance, of the Cupertino Municipal Code. The responses provided will be evaluated to determine whether the proposed landscape is generally consistent with the ordinance's water -efficiency goals. Applicant Comments Use additiomi i i ', if necessary Staff Evaluation Staff Comments JApproved JNot Approved Signature Select Definitions Date Hydrozone: A portion of the landscaped area having plants with similar water needs. A hydrozone may be irrigated or non -irrigated. Low-volume irrigation: The application of irrigation water through a system of tubing or lateral lines and low-volume emitters such as drip and bubblers. Certain rotary emitters designed for highly efficient water distribution, and situated to irrigate low water use plants, may also be included in this definition at the discretion of the Planning Office. Low water use plant: A plant species whose demonstrated water needs are compatible with local climate and soil conditions such that regular supplemental irrigation is not required to sustain the plant after it has be- come established. Any species classified as "very low water use" and "low water use' by WUCOLS, having a regionally adjusted plant factor of 0.0 through 0.3, shall be categorically deemed a low water use plant. Native plant: A plant indigenous to a specific area of consideration. For the purpose of this division, the term will refer to plants indigenous to the coastal ranges of Central and Northern California, and more specifical- ly to such plants that are suited to the ecology of the present or historic natural community of the project's vicinity. Special landscape area: An area of the landscape dedicated solely to edible plants, areas irrigated with re- cycled water, water features using recycled water and areas dedicated to active play such as parks, sports fields, golf courses, and where turf provides a playing surface. Turf: A ground cover surface consisting of non-native grass species that is customarily mowed. Annual blue- grass, Kentucky bluegrass, perennial ryegrass, red fescue, and tall fescue are examples of cool -season turf grasses. Bermuda grass, kikuyu grass, seashore paspalum, St. Augustine grass, zoysia grass, and buffalo grass are warm -season turf grasses. Water feature: A landscape design element where open water performs an aesthetic or recreational function. Water features include ponds, fountains, waterfalls and artificial streams. Also includes spas and swim- ming pools that are ancillary to single-family, two-family and multi -family residential uses. Wet surface area: The surface area of that portion of a water feature that functions to contain water, such as the water surface of a swimming pool, spa, or garden pond. For a fountain or other feature with flowing water, wet surface area shall be measured as a two dimensional plane bounded by the perimeter of the area where water has been designed to flow. BUILDING ENERGY ANALYSIS REPORT PROJECT: Langemak Residence 10164 Miner Place Cupertino, CA 95014 SUBMITTAt Project Designer: DZ Design Associates 17705 Hale Avenue Morgan Hill, CA 95037 408-778-7005 Report Prepared by: Yarmila Kennett Yarmila Kennett & Associates 15231 Perry Lane Morgan Hill, California 95037 1-408-621-3740 4, Job Number: 0 Langemak 0 Date: 0 8/12/2015 O 01*111 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards. This program developed by EnergySoft. LLC - www.energysoft.com. EnergyPro 6 7 by EnergySoft User Number 9615 ID. Langemak I TABLE OF CONTENTS I Cover Page Table of Contents Form CF -1 R -PRF -01 -E Certificate of Compliance Form MF -1 R Mandatory Measures Summary Form ECON-1 Energy Use and Cost Summary 6.7 by EnergySaft ID: Langemek User Number: 9615 1 2 3 14 18 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Langemak Residence Calculation DatelTime: 10:56, Wed, Aug 12, 2015 Calculation Description: Title 24 Analysis Input File Name: Langemak-Existing+Alterations+Addition.xml CF1 R -PRF -01-E Page 1 of 11 GENERAL INFORMATION 01 Building Complies with Computer Performance 01 Project Name Langemak Residence 03 This building incorporates one or more Special Features shown below 02 Calculation Description Title 24 Analysis 08 Energy Use (kTDVIft2-yr) 03 Project Location 10164 Miner Place Compliance Margin Percent Improvement 04 City Cupertino 05 Standards Version Compliance 2015 06 Zip Code 95014 07 Compliance Manager Version BEMCmpMgr 2013-4 (744) 08 Climate Zone CZ4 09 Software Version EnergyPro 6.6 10 Building Type Single Family 11 Front Orientation (deg/Cardinal) 270 12 Project Scope Addition and/or Alteration 13 Number of Dwelling Units 1 14 Total Cond. Floor Area (ft2) 2824 15 Number of Zones 2 16 Slab Area (ft) 0 17 Number of Stories 2 18 Addition Cond. Floor Area 738 19 Natural Gas Available Yes 20 Addition Slab Area (ft2) 0 21 Glazing Percentage (%) 11.7% COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below 06 Registration Number: 215-A0224101A-000000000-0000 Registration Date/Time: 2015-08-12 13:42:16 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-07082015-744 Report Generated at: 2015-08-12 10:57:32 ENERGY USE SUMMARY 04 05 06 07 08 Energy Use (kTDVIft2-yr) Standard Design Proposed Design Compliance Margin Percent Improvement Space Heating 17.34 13.06 4.28 24.7% Space Cooling 8.53 12.74 -4.21 -49.4% IAQ Ventilation 0.00 0.00 0.00 0.0% Water Heating 9.83 9.83 0.00 0.0% Photovoltaic Offset ---- 0.00 0.00 ---- Compliance Energy Total 35.70 35.63 0.07 0.2% Registration Number: 215-A0224101A-000000000-0000 Registration Date/Time: 2015-08-12 13:42:16 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-07082015-744 Report Generated at: 2015-08-12 10:57:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Langemak Residence Calculation Description: Title 24 Analysis CF1 R -PRF -01-E Calculation Date/Time: 10:56, Wed, Aug 12, 2015 Page 2 of 11 Input File Name: Langemak-Existing+Alterations+Addition.xml REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. • Ducts with high level of insulation • Cathedral Ceiling • Ceiling has high level of insulation HERS FEATURE SUMMARY The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building components tables below. Building -level Verifications: • --None -- Cooling System Verifications: • Minimum Airflow • Verified EER • Fan Efficacy Watts/CFM HVAC Distribution System Verifications: • Duct Sealing • Duct Design -Return • Duct Design -Supply Domestic Hot Water System Verifications: • -- None -- ENERGY DESIGN RATING This is the sum of the annual TDV energy consumption for energy use components included in the performance compliance approach for the Standard Design Building (Energy Budget) and the annual TDV energy consumption for lighting and components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics) and accounting for the annual TDV energy offset by an on-site renewable energy system. Reference Energy Use Energy Design Rating Margin Percent Improvement Total Energy (kTDV/f2-yr)' 79.84 79.77 0.07 0.1% includes calculated Appliances and Miscellaneous Energy Use (AMEU) BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (112) Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Langemak Residence 2824 1 5 2 0 1 Registration Number: 215-A0224101A-000000000-0000 Registration Date/Time: 2015-08-12 13:42:16 HERS Provider: CalCERTS Inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-07082015-744 Report Generated at: 2015-08-12 10:57:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Langemak Residence Calculation Date/Time: 10:56, Wed, Aug 12, 2015 Calculation Description: Title 24 Analysis Input File Name: Langemak-Existing+Alterations+Addition.xml CF1 R -PRF -01-E Page 3 of 11 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft2) Avg. Ceiling Height Water Heating System 1 Water Heating System 2 1st Level -Existing -Altera Conditioned FAU & ACI 2086 8 DHW Sys 1 2nd Floor Add Conditioned FAU & AC1 738 8 DHW Sys 1 Registration Number: 215-Ao224101A-000000000-0000 Registration Date/Time: 2015-08-12 13:42:16 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF111-07082015-744 Report Generated at: 2015-08-12 10:57:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Langemak Residence Calculation Datefrime: 10:56, Wed, Aug 12, 2015 Calculation Description: Title 24 Analysis Input File Name: Lange mak-Ex isting+Alteratio ns+Addition. xml CF1 R -PRF -01-E Page 4 of 11 OPAQUE SURFACES 01 02 03 04 05 06 07 08 09 10 Name Zone Construction Azimuth Orientation Gross Area (ft2) Window & boor Area (ft) Tilt (deg) Status Verified Existing Condition Front Wall: To Remain 1st Level -Existing -Altera R-0 Wall 270 Front 144 90 Existing No Left Wall: To Remain 1st Level -Existing -Altera R-0 Wall 0 Left 268 90 Existing No Back Walt: To Remain 1st Level -Existing -Altera R-0 Wall 90 Back 96 90 Existing No Right Wall: To Remain 1st Level -Existing -Altera R-0 Wall 180 Right 228 90 Existing No Back Wall1: Altered 1st Level -Existing -Altera R-13 Wall 90 Back 184 85 90 Altered N/A Back Wa112: Altered 1st Level -Existing -Altera R-13 Wall 45 135 40 12.3 90 Altered N/A Front Wall: Altered 1 st Level -Existing -Altera R-13 Wall 270 Front 40 16 90 Altered N/A Left Wall: Altered 1 st Level -Existing -Altera R-13 Wall 0 Left 204 47.5 90 New N/A Back Wa113: Altered 1 st Level -Existing -Altera R-13 Wall 315 45 40 12.3 90 Altered NIA Right Wall: Altered 1 st Level -Existing -Altera R-13 Wall 180 Right 104 36 90 Altered N/A Nall to Garage 1st Level -Existing- Altera »_Garage_ R-13 Walll 204 Existing No Roofl: Altered 2 1 st Level -Existing -Altera R-38 Roof Attic 1212.4 New N/A Raised Floor To Remain 1 st Level -Existing -Altera R-19 Floor Crawlspace 2086 Existing No Front Wall 2nd Floor Add R-13 Wall 270 Front 210 90 New N/A Left Wall 2nd Floor Add R-13 Wall 0 Left 176 20 90 New N/A Back Wall 2nd Floor Add R-13 Wall 90 Back 293 90 New N/A Right Wall 2nd Floor Add R-13 Wall 320 50 176 40 90 New NIA Roof2 2nd Floor Add R-30 Roof Attic 198 New N/A Front Wall 2 Garage_ R-0 Wall 270 Front 176 112 90 Existing No Left Wall 2 Garage_ R-0 Wall 0 Left 160 90 Existing No Right Wall 2 _Garage_ R-0 Wall 180 Right 188 90 Existing No Roof _Garage_ R-0 Roof Attic 456 Existing No Registration Number: 215-A0224101A-000000000-0000 Registration Date/Time: 2015-08-12 13:42:16 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CFIR-07082015-744 Report Generated at: 2015-08-12 10:57:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Langemak Residence Calculation Date/Time: 10:56, Wed, Aug 12, 2015 Calculation Description: Title 24 Analysis Input File Name: Langemak-Existing+Alterations+Addition.xml C F 1 R -PRF -01-E Page 5 of 11 OPAQUE SURFACES — Cathedral Ceilings 01 02 03 04 05 06 06 07 08 09 10 11 12 13 Radiant Statu Verified Existing Name Construction Type Roof Roof Reflectance Framin Barrier Verified s Condition Orientatio Area Skylight Roof Rise Roof Roof Reflectan Roof g Statu Existing Name Zone Type n (ft2) Area (ft2) (x in 12) Pitch Tilt(deg) ce Emittance Factor S Condifion Roof 1: Altered R-38 Roof Atticl Front 12.7 12.6 5 0.42 22.62 0.1 0.85 0.07 New N/A Level -Existing -Altera Attic 2nd Floor Add Attic Roof2nd Floor Add Ventilated 1 5 Roof2: Altered 1st R-21 Roof Front 123 0 5 0.42 22.62 0.1 0.85 0.1 New N/A Level -Existing -Altera Cathedral Rcof1 2nd Floor Add R-21 Roof Front 538 48 5 0.42 22.62 0.1 I 0.85 t 0.1 New N/A Cathedral I I I I - ATTIC 01 02 03 04 05 06 07 08 09 10 Radiant Statu Verified Existing Name Construction Type Roof Rise Roof Reflectance Roof Emittance Barrier Cool Roof s Condition Ex9 ti Attic Attic Garage Roof Cons Ventilated 5 0.1 0.85 No No No _Garage_ Attic 1st Level -Existing -Altera Attic Rooflst Ventilated 5 0.1 0.85 Yes No New No Level -Existing -Altera Attic 2nd Floor Add Attic Roof2nd Floor Add Ventilated 1 5 1 0.1 0.85 Yes No New No Registration Number: 215-A0224101A-000000000-0000 Registration Date/Time: 2015-08-12 13:42:16 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-07082015-744 Report Generated at: 2015-08-12 10:57:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Langemak Residence Calculation Date/Time: 10:56, Wed, Aug 12, 2015 Calculation Description: Title 24 Analysis Input File Name: Langemak-Existing+Alterations+Addition.xml CF1 R -PRF -01-E Page 6 of 11 WINDOWS 01 02 03 04 05 06 07 08 09 10 11 Name Surface (Orientation -Azimuth) Width(ft) Height (ft) Multiplie r Area (ft2) U -factor SHGC Exterior Shading Status Verified Existing Condition Back Window Back Wail Altered (Back -90) ---- ---- 1 85.0 0.28 0.28 Insect Screen (default) New N/A Back Window 2 Back Wa112: Altered (- specify --45) — 1 12.3 0.28 0.28 Insect Screen (default) New N/A Front Window Front Wall: Altered (Front -270) ---- ---- 1 16.0 0.28 0.28 Insect Screen (default) New N/A Left Window Left Wall: Altered (Left -0) ---- ---- 1 47.5 0.28 0,28 Insect Screen (default) New N/A Back Window 3 Back Wall3: Altered (- specify ---- ---- 1 12.3 0.28 0.28 Insect Screen (default) New N/A Right Window Right Wall: Altered (Right -180) ---- 1 36.0 0.71 0.73 Insect Screen (default) New N/A Skylight Roof 11: Altered (Front -270) ---- ---- 1 12.6 0.30 0.28 None New N/A Left Window 2 Left Wall (Left -0) ---- ---- 1 20.0 0.28 0.28 Insect Screen (default) New N/A Right Window 2 Right Wall (- specify --320) --- 1 40.0 0.28 0.28 Insect Screen (default) New N/A Skylight 2 Roofl (Front -270) ---- ---- 1 48.0 0.30 0.28 None New N/A DOORS 01 02 03 04 05 06 Name Side of Building Area (ft) U -factor Status Verified Existing Condition Registration Number: 215-A0224101A-000000000-0000 Registration Date/Time: 2015-08-12 13:42:16 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-07082015-744 Report Generated at: 2015-08-12 10:57:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Langemak Residence Calculation Date/Time: 10:56, Wed, Aug 12, 2015 Calculation Description: Title 24 Analysis Input File Name: Langemak-Existing+Alterations+Addition.xml CF1 R -PRF -01-E Page 7 of 11 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 Total Cavity Winter Design Construction Name Surface Type Construction Type Framing R -value U -value Assembly Layers Inside Finish: Gypsum Board Cavity / Frame: no insul. 12x4 Exterior Finish: Wood R-0 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O.C. none 0.302 Siding/sheathing/decking Ceilings (below inside Finish: Gypsum Board R-0 Roof Attic attic) Wood Framed Ceiling 2x4 @ 24 in. O.C. none 0.481 Cavity/Frame: no insul. /2x4 • Cavity/ Frame: no insul. / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Attic Garage Roof Cons Attic Roofs Wood Framed Ceiling in. O.C. none 0.644 Roofing: Light Roof (Asphalt Shingle) • Cavity/Frame: no insui. /2x4 Top Chrd Attic Roof 1st 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Level -Existing -Altera Attic Roofs Wood Framed Ceiling in. O.C. none 0.644 Roofing: Light Roof (Asphalt Shingle) Inside Finish: Gypsum Board • Cavity/ Frame: R-13 / 2x4 • Sheathing / Insulation: R5 Sheathing • Exterior Finish: Wood R-13 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O.C. R 13 0.061 Siding/sheathing/decking • Floor Surface: Carpeted Floors Over Floor Deck: Wood Siding/sheathing/decking R-19 Floor Crawlspace Crawlspace Wood Framed Floor 2x6 @ 16 in. O.C. R 19 0.049 Cavity/Frame: R -19/2x6 • Inside Finish: Gypsum Board • Cavity / Frame: R-13 / 2x4 • Sheathing/ Insulation: R5 Sheathing R-13 Wall Interior Walls Wood Framed Wall 2x4 @ 16 in. O.C. R 13 0.060 Other Side Finish: Gypsum Board • Inside Finish: Gypsum Board Ceilings (below Cavity/Frame: R-9.1 /2x4 R-38 Roof Attic attic) Wood Framed Ceiling 2x4 @ 24 in. O.C. R 38 0.025 Over Floor Joists: R-28.9 insul. • Inside Finish: Gypsum Board • Cavity / Frame: R-38 / 2x4 • Roof Deck., Wood Siding/sheathing/decking R-38 Roof Atticl Cathedral Ceilings Wood Framed Ceiling 2x.4 @ 24 in. O.C. R 38 0.036 Roofing: Light Roof (Asphalt Shingle) • Inside Finish: Gypsum Board • Cavity/Frame: R-21 /2x8 • Roof Deck: Wood Siding/sheathing/decking R-21 Roof Cathedral Cathedral Ceilings Wood Framed Ceiling 2x8 @ 16 in. O.C. R 21 0.050 Roofing: Light Roof (Asphalt Shingle) • Cavity/ Frame: no insul. /2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Attic Roof2nd Floor Add Attic Roofs Wood Framed Ceiling in. O.C. none 0.644 Roofing: Light Roof (Asphalt Shingle) Registration Number: 215-A0224101A-000000000-0000 Registration Date/Time: 2015-08-1213:42:16 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-07082015-744 Report Generated at: 2015-08-12 10:57:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Langemak Residence Calculation Date/Time: 10:56, Wed, Aug 12, 2015 Calculation Description: Title 24 Analysis Input File Name: Lang emak- Existing +Alteratio ns+Addition. xml C F1 R -PRF -01-E Page 8 of 11 WATER HEATING SYSTEMS 01 02 03 04 05 • Floor Surface: Carpeted 07 08 Name System Type Distribution Type Water Heater • Floor Deck: Wood Siding/sheathing/decking Solar Fraction M Status Verified Existing Condition DHW Sys 1 DHW Standard • Cavity / Frame: no insul. / 2x12 R-0 Floor No Crawlspace Interior Floors Wood Framed Floor 2x12 @ 16 in. O.C. none 0.196 Ceiling Below Finish: Gypsum Board Name System Type Name Ducted Name Ducted System System • Inside Finish: Gypsum Board Status Ceilings (below FAU & AC1 Other Heating and Heating Yes Cavity/ Frame: R-9.1 /2x4 R-30 Roof Attic attic) Wood Framed Ceiling 2x4 @ 24 in. O.C. R 30 0.032 Over Floor Joists: R-20.9 insul. WATER HEATING SYSTEMS 01 02 03 04 05 06 07 08 Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction M Status Verified Existing Condition DHW Sys 1 DHW Standard DHW Heater 1 1 Annual Existing No WATER HEATERS 01 02 03 04 05 06 07 08 Name Heater Element Type Tank Type Tank Volume (gal) Energy Factor or Efficiency Input Rating Tank Exterior Insulation R -value Standby Loss (Fraction) DHW Heater 1 Natural Gas Small Storage 50 0.65 EF 62500-Btu/hr 0 0 WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 Name Pipe Insulation Parallel Piping Compact Distribution Point -of Use Recirculation with Manual Control Recirculation with Sensor Control DHW Sys 1 n/a n/a n/a n/a nia nla SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 07 08 09 Heating System Cooling System Distribution Fan Floor Area Verified Existing Name System Type Name Ducted Name Ducted System System Served Status Condition FAU & AC1 Other Heating and Heating Yes Cooling Yes Air Distribution HVAC Fan 2824 Altered No Cooling System Component 1 Component 1 System 1 1 Registration Number: 215-A0224101A-000000000-0000 Registration Date/Time: 2015-08-12 13:42:16 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-07082015-744 Report Generated at: 2015-08-12 10:57:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Langemak Residence Calculation Date/Time: 10:56, Wed, Aug 12, 2015 Calculation Description: Title 24 Analysis Input File Name: Lang emak-Existing+Alterations +Addition.xmI HVAC - HEATING SYSTEMS 01 02 03 Name Type Efficiency Heating Component 1 CntrlFurnace - Fuel -fired central furnace 85.5 AFUE CF 1 R -PRF -01-E Page 9 of 11 HVAC - COOLING SYSTEMS 01 02 03 04 05 06 07 Name Verified Airflow Efficiency Verified EER Multi -speed Verified Refrigerant Charge Name System Type EER SEER Zonally Controlled Compressor HERS Verification Cooling Component 1 SplitAirCond - Split air conditioning 12 13 No No Cooling Component Location system Status Condition Verification HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component 1 -hers -cool Required 350 Required Not Required Not Required HVAC - DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 08 09 10 Name Duct Leakage Verification Duct Leakage Target (%) Insulation Supply Duct Return Duct Required 6.0 Verified Existing HERS Name Type Duct Leakage R -value Location Location Bypass Duct Status Condition Verification Air Distribution Air Distribution Ducts located in attic Sealed and tested 8.0 Attic Attic None Existing + New No System System 1 1 -hers -dist HVAC DISTRIBUTION - HERS VERIFICATION 01 02 03 04 05 06 Name Duct Leakage Verification Duct Leakage Target (%) Verified Duct Location Verified Duct Design Return Supply Air Distribution System 1 -hers -dist Required 6.0 - 0 ft2 0 ft2 HVAC -FAN SYSTEMS & HERS VERIFICATION 01 02 03 04 Name Type Fan Power (Watts/CFM) HERS Verification HVAC Fan 1 Single Speed PSC Furnace Fan 0.58 Required Registration Number: 215-A0224101A-000000000-0000 Registration Date/Time: 2015-08-12 13:42:16 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-07082015-744 Report Generated at: 2015-08-12 10:57:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Langemak Residence Calculation Date/Time: 10:56, Wed, Aug 12, 2015 Calculation Description: Title 24 Analysis Input File Name: Langemak-Existing+Alterations+Addition.xml CF1R-PRF-01-E Page 10 of 11 IAQ (Indoor Air Quality) FANS 01 02 03 04 05 Name IAQ CFM IAQ Fan Type IAQ Recovery Effectiveness(%) HERS Verification SFam IAQVentRpt 0 Default 0 Not Required Registration Number: 215-A0224101A-000000000-0000 Registration Date/Time: 2015-08-12 13:42:16 HERS Provider: CaICERTS inc, CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-07082015-744 Report Generated at: 2015-08-12 10:57:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Langemak Residence Calculation Date/Time: 10:56, Wed, Aug 12, 2015 Calculation Description: Title 24 Analysis Input File Name: Langemak-Existing +Alterations+Addition.xmI CF1 R -PRF -01-E Page 11 of 11 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Yarmila Kennett Company: Signature Date: Yarmila Vera Kennett & Associates 2015-08-12 11:12:37 ICABEC Address: CEA/HERS Certification Identification (If applicable): 15231 Perry Lane R13-93-10070 :..I A:rm.. Awavu�.+n of F..Jduv 9ve'v(o,nuh:u,i City/State/Zip: Phone. Morgan Hill, CA 95037 408-621-3740 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name: Responsible Designer Signature: Scott Zazueta --�-- Company: Date Signed. D&Z Design Associates, Inc. 2015-08-12 13:42:16 Address, License: 17705 Hale Ave, Ste H4 NA City/State/Zip: Phone: Morgan Hill, CA 95037 408-778-7005 Digitally signed by Ca10ERTS. This digital signature is provided in order to secure the content of this registered document, and in noway implies Registration Provider responsibility for the accuracy of the information. Registration Number: 215-A0224101A-000000000-0000 Registration Date/Time: 2015-08-12 13:42:16 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-07082015-744 Report Generated at: 2015-08-12 10:57:32 2013 Low -Rise Residential Mandatory Measures Summary NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measures listed, regardless of the rmUta annrno Ar viced F.rcentinn.c maw annly Review the respective code section for more information. Building Envelope Measures: § 110.6(a)1: Doors and windows between conditioned and unconditioned spaces are manufactured to limit air leakage. Fenestration products (except field -fabricated windows) have a label listing the certified U -Factor, certified Solar Heat Gain § 110.6(a)5: Coefficient SHGC , and infiltration that meets the requirements of § 10-11 1 a . §110.7: Exterior doors and windows are weatherstripped; all joints and penetrations are caulked and sealed. § 110.8(a): Insulation specified or installed meets Standards for Insulating Material. Indicate type and include on the CF2R. The thermal emittance and aged solar reflectance values of the cool roofing material meets the requirements of § 110.8(i) when the § 110.8(i): installation of a cool roof is specified on the CF 1R. § 110.8(j): A radiant barrier shall have an emittance of 0.05 or less when the installation of a radiant barrier is specified on the CF 1 R. Minimum R-30 insulation in wood -frame ceiling; or the weighted average U -factor shall not exceed 0.031. Minimum R-19 in a § 150.0(a): rafter roof alteration. Attic access doors shall have permanently attached insulation using adhesive or mechanical fasteners. The attic access shall be gasketed to prevent air leak § 150.0(b): Loose fill insulation shall conform with manufacturer's installed design labeled R -value. Minimum R-13 insulation in 2x4 inch wood framing wall or have a U -factor of 0.102 or less (R-19 in 2x6 or 0.074 maximum U - §I50.0(c): factor). § 150.0(d): Minimum R-19 insulation in raised wood -frame floor or 0.037 maximum U -factor. In Climate Zones 14 and 16 a Class II vapor retarder shall be installed on the conditioned space side of all insulation in all exterior § 150.0(g)1: walls, vented attics and unvented attics with air -permeable insulation. In Climate Zones 1-16 with unvented crawl spaces the earth floor of the crawl space shall be covered with a Class I or Class II § 150.0(g)2: vapor retarder. In a building having a controlled ventilation crawl space, a Class I or Class II vapor retarder shall be placed over the earth floor of § I50.0(g)3: the crawl space to reduce moisture entry and protect insulation from condensation, as specified in the exception to Section 150.0(d). Slab edge insulation shall: have a water absorption rate, for the insulation material alone without facings, no greater than 0.3%; § 150.0(1): have water vapor permeance rate is no greater than 2.0 perm/inch, be protected from physical damage and UV light deterioration; and when installed as part of a heated slab floor meets therequirements of § 110.8 . Fenestration, including skylights, separating conditioned space from unconditioned space or outdoors shall have a maximum U - § 150.0(q): factor of 0.58: or the weighted average U -factor of all fenestration shall not exceed 0.58. Fireplaces, Decorative Gas Appliances and Gas Log Measures: §150.0(e)IA: Masonry or factory -built fireplaces have a closable metal or glass door covering the entire opening of the firebox. Masonry or factory -built fireplaces have a combustion outside air intake, which is at least six square inches in area and is § 150.0(e)1 B: equipped with a readily accessible, operable, and tight-fiffing tight-fittingdamper or a combustion -air control device. §150.0(e)1C: Masonry or factory -built fireplaces have a flue damper with a readily accessible control. § 150.0(e)2: Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of the building, are prohibited. Space Conditioning, water Heating and Plumbing System Measures: §110.0-§110.3: HVAC equipment, water heaters, showerheads, faucets and all other regulated appliances are certified to the Energy Commission. Water heating recirculation loops serving multiple dwelling units meet the air release valve, backflow prevention, pump isolation § 110.3(c)5: valve, and recirculation loop connection requirements of §110.3(c)5. Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces, household cooking appliances (appli- § 110.5: ances without an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt), and pool ands a heaters. Heating and/or cooling loads are calculated in accordance with ASHRAE, SMACNA or ACCA using design conditions specified §I50.0(h)1: in §150.0(h)2. Installed air conditioner and heat pump outdoor condensing units shall have a clearance of at least five feet from the outlet of any § I50.0(h)3A: dryer vent. § 150.0(i): Heating systems are equipped with thermostats that meet the setback requirements of § l 10.2(c). Storage gas water heaters with an energy factor equal to or less than the federal minimum standards shall be externally wrapped §150.0(j)IA: with insulation having an installed thermal resistance of R-12 or greater. § 150.0(j)1B: Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, have R-12 external insulation or R-16 internal insulation where the internal insulation R -value is indicated on the exterior of the tank. For domestic hot water system piping, whether buried or unburied: the first 5 feet of hot and cold water pipes from the storage tank, all piping with a nominal diameter of 3/4 inch or larger, all piping associated with a domestic hot water recirculation system § 150.0(j)2A: regardless of the pipe diameter, piping from the heating source to storage tank or between tanks, piping buried below grade, and all hot water pipes from the heating source to kitchen fixtures must be insulated according to the requirements of TABLE 1203- A. All domestic hot water pipes that are buried below grade must be installed in a water proof and non -crushable casing or sleeve § 150.0(j)2B: that allows for installation, removal, and replacement of the enclosed pipe and insulation. 2013 Low -Rise Residential Mandatory Measures Summary § 150.0(j)2C: Pipe for cooling system lines shall be insulated as specified in § 150.00)2A. Piping insulation for steam and hydronic heating systems or hot water systems with pressure > 15 psig shall meet therequirements in TABLE 120.3-A. §150.0(j)3: Insulation is protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation exposed to weather shall either be rated for outdoor use or installed with a cover suitable for outdoor service. For § 150.0(j)3A: example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation protected as specified or painted with coating that is water retardant and provides shielding from solar radiation that degrades the material. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space shall have a Class I § 150.00)3B: or Class II vapor retarding facing, or the insulation shall be installed at the thickness that qualifies as a Class I or Class II vapor retarder. Systems using gas or propane water heaters to serve individual dwelling units shall include: a 120V electrical receptacle within 3 feet of the water heater; a Category III or IV vent, or a Type B vent with straight pipe between the outside termination and the § 150.0(n)1: space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the installed water heater, and allows natural draining without pump assistance; and a gas supply line with a capacity of at least 200,000 Btu/hr. § I50.0(n)2: Recirculating loops serving multiple dwelling units shall meet the requirements of § 110.3(c)5. § 150.0(n)3: Solar water -heating systems and collectors shall be certified and rated by the Solar Rating and Certification Corporation (SRCC) or by a testing agencyroved by the Executive Director. Ducts and Fans Measures: All air -distribution system ducts and plenums installed are sealed and insulated to meet the requirements of CMC §601.0, §602.0, §603.0, §604.0, §605.0 and ANSUSMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-6.0 (or higher if required by CMC §605.0) or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing (RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts are mechanically fastened. Openings shall be sealed § 150.0(m)1: with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than'/. inch, the combination of mastic and either mesh or tape shall be used. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. Factory -Fabricated Duct Systems shall comply with specified requirements for duct construction, connections, and closures; joints §150.0(m)2: and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands. §150.0(m)3-6; Field -Fabricated Duct Systems shall comply with requirements for: pressure -sensitive tapes, mastics, sealants, and other requirements specified for duct constriction; duct insulation R -value ratings; duct insulation thickness; and duct labeling. § 150.0(m)7: All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or automatic dam § 150.0(m)8: Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers except combustion inlet and outlet air openings and elevator shaft vents. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not § 150.0(m)9: limited to the following: insulation exposed to weather shall be suitable for outdoor service. For example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation. § 150.0(m)10: Flexible ducts cannot have porous inner cores. When space conditioning systems use forced air duct systems to supply conditioned air to an occupiable space, the ducts shall be § 150.0(m)11: sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 feet in length and through a thermal §150.0(m)12: conditioning component, except evaporative coolers, shall be provided with air filter devices that meet the requirements of § I50.0(m)12. Space conditioning systems that utilize forced air ducts to supply cooling to an occupiable space shall have a hole for the placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the supply plenum. The § 150.0(m) 13: space conditioning system must also demonstrate airflow >_ 350 CFM per ton of nominal cooling capacity through the return grilles, and an air -handling unit fan efficacy:5 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Zonally controlled central forced air cooling systems shall be capable of simultaneously delivering, in every zonal control mode, § 150.0(m)15: an airflow from the dwelling, through the air handler fan and delivered to the dwelling, of _> 350 CFM per ton of nominal cooling capacity, and operating at an air -handling unit fan efficacy of 5 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. All dwelling units shall meet the requirements of ASHRAE Standard 62.2. Neither window operation nor continuous operation of § 150.0(o): central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of providing the Whole Building Ventilation. § 150.0(o) I A: Whole Building Ventilation airflow shall be confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Pool and Spa Heating Systems and Equipment Measures: Any pool or spa heating system shall be certified to have: a thermal efficiency that complies with the Appliance Efficiency § 110.4(a): Regulations; an on-off switch mounted outside of the heater that allows shutting off the heater without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and shall not use electric resistance heating. 2013 Low -Rise Residential Mandatory Measures Summary § 110.4(b)1: Any Pool or spa heating equipment shall be installed with at least 36 inches of pipe between filter and heater or dedicated suction and return lines, or built-up connections for future solar heating. § 110.4(b)2: Outdoor pools or spas that have a heat pump or gas heater shall have a cover. § 110.4(b)3: Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or pro- med to run only during off-peak electric demand periods. § 110.5: Natural gas pool and spa heaters shall not have a continuous burning pilot light. § 150.0(p): Residential pool systems or equipment shall meet specified pump sizing, flow rate, piping, filters, and valve requirements. Lighting Measures: § 110.9: All lighting control devices and systems, ballasts, and luminaires shall meet the applicable requirements of § 110.9. § 150.0(k)1 A: Installed luminaires shall be classified as high -efficacy or low -efficacy for compliance with § 150.0(k) in accordance with TABLE 150.0-A or TABLE 150.0-B, as applicable. §150.0(k)1B: When a high efficacy and low efficacy lighting system are combined in a single luminaire, each system shall separately comply with the applicable provisions of § 150.0(k). The wattage and classification of permanently installed luminaires in residential kitchens shall be determined in accordance with § 150.0(k)IC: § 130.0(c). In residential kitchens, the wattage of electrical boxes finished with a blank cover or where no electrical equipment has been installed, and where the electrical box can be used for a luminaire or a surface mounted ceiling fan, shall be calculated as 180 watts of low efficacy lighting r electrical box. § 150.0(k)ID: Ballasts for fluorescent lamps rated 13 watts or greater shall be electronic and shall have an output frequency no less than 20 kHz Permanently installed night lights and night lights integral to installed luminaires or exhaust fans shall be rated to consume no § 150.0(k)IE: more than 5 watts of power per luminaire or exhaust fan as determined in accordance with §I30.0(c). Night lights do not need to be controlled by vacancy sensors. §150.0(k)IF: Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods) shall meet the applicable requirements of § I50.0(k). § 150.0(k)2A: High efficacy luminaires must be switched separately from low efficacy luminaires. § 150.0(k)2B: Exhaust fans shall be switched separately from lighting systems. § 150.0(k)2C: Luminaires shall be switched with readily accessible controls that permit the luminaires to be manually switched ON and OFF. § 150.0(k)2D: Controls and equipment are installed in accordance with manufacturer's instructions. § 150.0(k)2E: No control shall bypass a dimmer or vacancy sensor function if the control is installed to comply with § 150.0(k). § 150.0(k)2F: Lighting controls comply with applicable requirements of § 110.9. An Energy Management Control System (FMCS) may be used to comply with dimmer requirements if. it functions as a dimmer § 150.0(k)2G: according to § 110.9; meets Installation Certificate requirements of § 130.4; the EMCS requirements of § 130.5; and all other requirements in § 150.0(k)2. An Energy Management Control System (EMCS) may be used to comply with vacancy sensor requirements of §150.0(k) if. it § 150.0(k)2H: functions as a vacancy sensor according to § 110.9; meets Installation Certificate requirements of § 130.4; the EMCS requirements of § 130.5; and all other requirements in § 150.0(k)2. § 150.0(k)21: A multiscene programmable controller may be used to comply with dimmer requirements of this section if it provides the hinctionality of a dimmer according to §110.9, and complies with all other applicable requirements in §150.0(k)2. § 150.0(k)3A: A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. Kitchen lighting includes all permanently installed lighting in the kitchen except internal lighting in cabinets that illuminate only § 150.0(k)3B: the inside of the cabinets. Lighting in areas adjacent to the kitchen, including but not limited to dining and nook areas, are considered kitchen lighting if they are not separately switched from kitchen lighting. §150.0(k)<l: Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of illuminated cabinet. §150.0(k)5: A minimum of one high efficacy luminaire shall be installed in each bathroom; and all other lighting installed in each bathroom shall be high efficacy or controlled by vacancy sensors. § 150.0(k)6: Lighting installed in attached and detached garages, laundry rooms, and utility rooms shall be high efficacy luminaires and controlled by vacancy sensors. § I50.0(k)7: Lighting installed in rooms or areas other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy, or shall be controlled by either dimmers or vacancy sensors. Luminaires recessed into ceilings shall: be listed for zero clearance insulation contact (IC) by Underwriters Laboratories or other nationally recognized testing/rating laboratory; have a label that certifies that the luminaire is airtight with air leakage less than 2.0 CFM at 75 Pascals when tested in accordance with ASTM E283; be sealed with a gasket or caulk between the luminaire housing § 150.0(k)8: and ceiling, and shall have all air leak paths between conditioned and unconditioned spaces sealed with a gasket or caulk; and allow ballast maintenance and replacement without requiring cutting holes in the ceiling. For recessed compact fluorescent luminaries with ballasts to qualify as high efficacy for compliance with § 150.0(k), the ballasts shall be certified to the Energy Commission to comply with the applicable requirements in ' 110.9. For single-family residential buildings, outdoor lighting permanently mounted to a residential building or other buildings on the same lot shall be high efficacy, or may be low efficacy if it meets all of the following requirements: i. Controlled by a manual ON and OFF switch that does not override to ON the automatic actions of Items ii or iii below; and 150.0t k?9A: ii. Controlled by a motion sensor not having an override or bypass switch that disables the motion sensor, or controlled by a motion sensor having a temporary override switch which temporarily bypasses the motion sensing function and automatically reactivates the motion sensor within 6 hours; and iii. Controlled by one of the following methods: 2013 Low -Rise Residential Mandatory Measures Summary a. Photocontrol not having an override or bypass switch that disables the photocontrol; or b. Astronomical time clock not having an override or bypass switch that disables the astronomical time clock, and which is programmed to automatically tum the outdoor lighting OFF during daylight hours; or c. Energy management control system which meets all of the following requirements: At a minimum provides the functionality of an astronomical time clock in accordance with § 110.9; meets the Installation Certification requirements in § 130.4; meets the requirements for an EMCS in § 130.5; does not have an override or bypass switch that allows the luminaire to be always ON; and, is programmed to automatically turn the outdoor lighting OFF during daylight hours. For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies, and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site shall comply with one of the § 150.0(k)9B: following requirements: i. Shall comply with § 150.0(k)9A; or ii. Shall comply with the applicable requirements in 110.9, 130.0, ' 130.2, 130.4, 140.7 and 141.0. § 150.0(k)9C: For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by § 150.0(k)9B or 150.0(k)9D shall comply with the applicable requirements in 110.9, 130.0, 130.2, 130.4, §140.7 and 141.0. § 150.0(k)9D: Outdoor lighting for residential parking lots and residential carports with a total of eight or more vehicles per site shall comply ' ' with the applicable requirements in 110.9, § 130.0, § 130.2, §130.4, 140.7 and 141.0. Internally illuminated address signs shall comply with § 140.8; or shall consume no more than 5 watts of power as determined §150.0(k)10• according to § 130.0(c). Lighting for residential parking garages for eight or more vehicles shall comply with the applicable requirements for § 150.0(k)11: nonresidential garages in §110.9, 130.0, 130.1, 130.4 140.6, and 141.0. In a low-rise multifamily residential building where the total interior common area in a single building equals 20 percent or less of § 150.0(k)12A: the floor area, permanently installed lighting for the interior common areas in that building shall be high efficacy luminaires or controlled by an occupant sensor. In a low-rise multifamily residential building where the total interior common area in a single building equals more than 20 percent of the floor area, permanently installed lighting in that building shall: i. Comply with the applicable requirements in §110.9, §130.0, §130.1, §140.6 and §141.0; and § I50.0(k)12B: ii. Lighting installed in corridors and stairwells shall be controlled by occupant sensors that reduce the lighting power in each space by at least 50 percent. The occupant sensors shall be capable of turning the light fully On and Off from all designed paths of ingress and egress. Solar Ready Buildings: Single family residences located in subdivisions with ten or more single family residences and where the application for a § 110.10(a)1: tentative subdivision map for the residences has been deemed complete, by the enforcement agency, on or after January 1, 2014, shall comply with the requirements of §110.10 through 110.10(e). §110.10(a)2: Low-rise multi -family buildings shall comply with the requirements of §110.10(b) through §110.10(d). The solar zone shall have a minimum total area as described below. The solar zone shall comply with access, pathway, smoke ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local jurisdiction. The solar zone total area shall be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for § 110.10(b)1: buildings with roof areas greater than 10,000 square feet. For single family residences the solar zone shall be located on the roof or overhang of the building and have a total area no less than 250 square feet. For low-rise multi -family buildings the solar zone shall be located on the roof or overhang of the building or on the roof or overhang of another structure located within 250 feet of the building or on covered parking installed with the building project and have a total area no less than 15 percent of the total roof area of the building excluding any skylight area § 110.10(b)2: All sections of the solar zone located on steep -sloped roofs shall be oriented between 110 degrees and 270 degrees of true north. § 110.10(b)3A: No obstructions, including but not limited to, vents, chimneys, architectural features, and roof mounted equipment, shall be located in the solar zone. Any obstruction, located on the roof or any other part of the building that projects above a solar zone shall be located at least twice § 110.10(b)3B: the distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of the nearest point of the solar zone, measured in the vertical plane. § 110.10(b)4: For areas of the roof designated as solar zone, the suvctural design loads for roof dead load and roof live load shall be clearly indicated on the construction documents. The construction documents shall indicate: a location for inverters and metering equipment and a pathway for routing of conduit § 110.10(c): from the solar zone to the point of interconnection with the electrical service (for single family residences the point of interconnection will be the main service panel); a pathway for routing of plumbing from the solar zone to the water -heating system. A copy of the construction documents or a comparable document indicating the information from § 110.10(b) through § 110.10(c) § 110.10(d): shall be provided to the occupant. § 110.10(e)l: The main electrical service panel shall have a minimum busbar rating of 200 amps. The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a § 110.10(e)2: future solar electric installation. The reserved space shall be: positioned at the opposite (load) end from the input feeder location or main circuit location, and permanently marked as "For Future Solar Electric". ENERGY USE AND COST SUMMARY ECON-1 Project Name Langemak Residence Date 8/12/2015 Rate: STANDARD PROPOSED Fuel Type: Electricity MARGIN Energy Use kWh Peak Demand Cost kW $ Energy Use kWh Peak Demand kW Cost $ Energy Use kWh Peak Demand Cost k $ Jan 575 1.4 567 1.4 8 0.0 Feb 479 1.3 473 1.3 61 0.0 Mar 480 1.2 474 1.2 6 .0A 0.0- r 428 Apr 1.1 426 1.6 3 -0.4 May 430 2.8 458 3.0 -28 -0.2 Jun 400 2.8 439 2.9 -39 -0.1 Jul 473 2.8 1 547 2.9 -74 -0.1 Aug467 2.8 525 3.0 -58 -0.2 Sep 604 3.0 626 3.1 -22 -0.1 Oct 477 1.2 477 1.2 0 0.0 Nov 524 1.4 519 1.4 5 0.0 Dec 581 1.4 574 1.4 7 0.0 Year 5,919 3.0 6,104 3.1 -185 -0.1 CO2 I lbs/yr Ibs/ r lbs/yr Rate: Fuel T e: Natural Gas STANDARD PROPOSED MARGIN Energy Use therms Peak Demand Cost kBtu/hr $ Energy Use therms Peak Demand kBtu/hr Cost $ Energy Use therms Peak Demand Cost kBtu/hr $ Jan 84 78.1 70 61.4 14 16.7 Feb 61 73.7 51 58.2 10 15.4 Mar 48 73.3 39 58.2 8 15.1 Apr 42 60.3 33 46.5 8 13.8 May 22 34.4 20 19.3 2 15.1 Jun 18 5.5 18 5.5 0 0.0 Jul 18 5.3 18 5.3 0 0.0 Aug18 5.1 18 5.1 0 0.0 Sep 18 5.1 18 5.1 0 0.0 Oct 20 38.1 20 28.2 0 9.9 Nov 55 77.6 46 60.6 9 17.0 Dec 82 75.4 69 59.5 13 15.9 Year 484 78.1 420 61.4 64 16.7 CO2 lbs/yr lbs/yr lbs/yr Annual Totals Energy Demand Cost CosUs ft Virtual Rate Electricity 6,104 kWh 3 kW $ 0 $ 0.00 lg $ 0.00 /kWh Natural Gas 420 therms 61 kBtu/hr $ 0 $ 0.00 /g $ 0.00 /therm Total $ 0 $ 0.00 /scIft Avoided CO2 Emissions: 0 lbs/yr EnergyPfo 6.7 by EnergySoft User Number. 9615 RunCode: 2015-08-12T10:56:1 ID. Langemak Page 18 Of 16