Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
B-2016-1757
CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO: B-2016-1757 10396 S STELLING RD CUPERTINO, CA 95014-4227 (359 13 124) COMPLETE SOLAR SOLUTION OF CALIFORNIA INC SAN MATEO, CA 94404 I OWNER'S NAME: ROSSI DONALD E TRUSTEE & ET AL I I DATE ISSUED: 04/13/2016 I OWNER'S PHONE: 408-417-0713 I I PHONE NO: (855) 541-6703 I LICENSED CONTRACTOR'S DECLARATION_ License Class C-10 Lic. #961988 Contractor COMPLETE SOLAR SOLUTION OF CALIFORNIA INC Date 06/30/2017 I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: 1. I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county "ordinances and state laws relating to'building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. •signatures Date 4/13/2016 OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: 1. I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) 2. I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). I hereby affirm under penalty of perjury one of the following three declarations: 1. I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. s. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code. Section 9.18. Signature Date 4/13/2016 BUILDING PERMIT INFO: X BLDG _ ELECT —PLUMB _ MECH X RESIDENTIAL _ COMMERCIAL JOB DESCRIPTION: INSTALL 26 (N) ROOF MOUNT SOLAR PANELS 7.02 KW Sq. Ft Floor Area: I Valuation: $35100.00 APN Number: Occupancy Type: 359 13 124 Deferred Submittal (R-3) PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROM LAST CALLED INSPECTION. Issued by: Abby Ayende Qum 04/13/2016 RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. Signature of Applicant: Date: 4/13/2016 ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Sections 25505, 25533, and 25534. k�ewn'er or authorized agent: _ Date: 4/13/2016 CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's Address ARCHITECT'S DECLARATION I understand my plans shall be used as public records. Licensed Professio CUPERTINO ALTERNATIVE ENERGY PERMIT APPLICATION Lumm COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • buildinon.cuperlino.p PROJECT ADDRESS Q 3 G 6 5 5 4 -e N w QO( 1 I APN R° � Sr�J i , �'�� v OWNER14AA4E 06 ( A SS fsla l L� I PHON`E=Q�,� / 1 u I7_ 6-7I3 E-MAIL -I -1 STREET ADDRESS 0 3 � S 5•fiz ((�� �� CITY, STATE, ZIP I FAX CONTACT NAME lineni'GI -` PHONE � L}'Q�i)/ ENiAII.�Lo� STREET ADDRESS CITY, STATE, ZIP t'COALtcta� FAX ❑ 01;?.=R ❑ Ow,,,�.-R-BULL DER ❑ 011w----R A9,N'T ❑ CONTRACTOR P CONTRACTOR AGENZ• ❑ ARc,=.cT ❑ ENGINEER ❑ DEVELOPER ❑ i_NAT'r CONTRACTOR NAME GC/�1 t SR LICENSE N'Uh-ILBER ; / "I LICENSE TYPE 16 I BUS. LIC R �� COMPANY NA1IE E-MAIL FAX STREET ADDRESS CITY, STATE, ZIP PHONE ARCHITECT/`ENGINEER NAhiz I LICENSE NUMBER BUS. LIC 1, C01+4PANY NAME E-M.AIL FAX STREET ADDRESS I CITY, STATE, ZIP PHONE USE OF ❑ SFD or Duplex ❑ Multi -Family PROJECT IN WILDLAND PROJECT IN STRUCTURE: ❑ Commercial URBAN INTERFACE AREA ❑ Yes ❑ NO FLOOD ZONE ❑ Yes ❑ NO U-SOLAR PANELS I ❑ ELECTRIC VEHICLE CHARGING STATION ❑ SOLAR WATER I'EATING ❑ MiER: FOR SOLAR FAA'ELS: NUMBER OF PANELS/L'NITS: / KILOWATTS (COMMERCIAL ONLY): TOTAL VALUATION: DESCRIPTION OF WORK • - RECEIVED BY.. - � � � r3 --r i . By my signature below, I certify to each of the following: I am the property m-\mer or authorized agent to act on the property ovme.r's be alf. I ha ,e read this application and the information I have provided is correct. I have read the Description of Work and ve.rii, it is accurate. I agree to comply with all applicable local ordinances and state laws relating to building connstruction. I authorize representatives of Cupertino to enter the above -identified prope, for inspection purposes. SianatureofApplicant/Agent: �J.a/7 ` Date: 9 SUPPLEMENTAL INFORM.4TI0N REQUIRED f � t• .�Y O �E12THE+COUI�'�'ER ` r a ram: cT43�DARDN { �€ PV,4pp_2011.doc revised 0311 b/11 GENERAL NOTES 1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED ELECTRICAL TESTING LABORATORY CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETEWRATED I SUBMITTED BY THE MANUFACTURER ATTESTING TO 2. OUTDOOR EQUIPMENT SHALL BE AT LEAST NEM 3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED 4. ALL SPECIFIC WIRING IS BASED ON THE USE OF COPPER. 5. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED. 6. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS. IF THE SOLAR BACK FED BREAKER IS VOER THE BUSS SIZE 20% LIMIT, CONTRACTOR SHALL INCLUDE THE COST TO REPLACE MAIN BREAKER OR ENLARGE MAIN CAPACITY. 7. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 8. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WHITSANDING THE EXTRA WEIGHT. 9. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE SIRE SIZE. FINAL DRAWINGS WILL BE RED -LINED AND UPDATED AS APPRPRIATE. 10. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS. 11. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS, ETC. SHALL BE HANDED OVER TO OWNER'S, REPRESENTATIVE AT THE COMPLETION OF WORK PHOTOVOLTAIC NOTES: DATE 1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED AND IDENTIFIED UL 1703. 2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS 3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. 4. SOLAR INVERTER MUST HAVE A MANUFACTURE INSTALLED DISCONNECTING MEANS THAT PREVENTS PARALLEL FEEDING UTILITY LINES DURING POWER OUTAGE. 5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS. 6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM ANY PHYSICAL PM %QV IVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT IRCUITS OVER 150V TO GROUND SHALL NOT BE ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED. 8. INVERTER IS EQUIPED W/ INTEGRATED GFDI, THUS PROVIDING GROUND FAULT PROTECTION 9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED 10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY OR APPROVED BY THE DEPARTMENT. 11. CONDUITS SHOULD BE PAINTED TO MATCH EXISTING ROOF AND WALL COLORS 12. ALL WORK SHALL BE IN ACCORD WITH THE 2013 CBC, 2013 CEC AND 2011 NEC WITH SPECIAL ENPHASIS ON ARTICLE 690 13. THE OUTPUT OF A UTILITY INTERACTIVE -INVERTER SHALL BE PERMITTED TO BE CONNECTED TO THE SUPPLY SIDE OF THE SERVICE DISCONNECTING MEANS AS PER 230.82(6) 14. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING, AC GROUNDING AND BONDING BETWEEN AC AND DC SYSTEMS AS PER NEC 690.47(C) AND SIZED AS PER SEC; 250.122 15. EQUIPMENT GROUND CONDUCTOR REQUIRED IN RACEWAYS SIZED PER CEC 250-122. 16. PER ART 250.92. NON -CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER. BOND BOTH ENDS OF RACEWAYS pLq� � p �l�NG DEPT RTINO SHEET INDEX 1 ROOF PLAN 2 SINGLE LINE DIAGRAM 3 CODE REQUIRED SIGNAGE 4 SITE PLAN 5 ATTACHMENT LAYOUT 6 INVERTER MAP 7 MODULE MAP 8 INVERTER DATA SHEET 9 MODULE DATA SHEET 10 MODULE CERTIFICATION 11 RACKING DATA SHEET 12 RACKING SPECS 13 RACKING CERTIFICATVM"'t INSTALLER Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877) 299-4943 Lic# 961988 Class C-10 om IeteSolar DESIGNER NAME: DA VI D D. DATfOEPARTMENT 11- MARCM4016 � rrwvw 14 ATTACHMENT DATA SH F Td s ecifications MUST be kept at the on. It is unlawful to make any THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC' wiate POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWiNGCODES9Official- 2013 CALIFORNIA ELECTRICAL CODE ,f this plan and specifications SHALL NOT 2013 CALIFORNIA RESIDENTIAL CODE rmit or to bean approval of the violation 2013 CALIFORNIA BUILDING CODE pr,"I^i^ns of any City Ordinance or tate Law. 2013 CALIFORNIA GREEN BUILDING STANDARDS CODE Onk , l i.�. _ n _ 2013 CALIFORNIA ENERGY CODE 2013 CALIFORNIA MECHANICAL CODE 2013 CALIFORNIA PLUMBING CODE '20c0 ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES BY PROJECT NAME: Donald Rossi 10396 S Stelling Rd, Cupertino, CA 95014 Y 103969 DbAWd VICINITY MAP SCALE.NTS SATELLITE VIEW SCALE:NTS PHOTOVOLTAIC.SYSffii,4619 IARY ? , � aullding 0epertmen SYSTEM SIZE: DC STC: 7.02 KW SYSTEM SIZE: AC CEC 6.18 KW, 3 2016 SOLAR MODULES: (26) SUNEDISON F270KzDDL17A0NVF MICROINVERTE,RS:( 6) M215-60-2LL S2;I� MOUNTING �Y§YEA EVEREST MO:�YSTEM ELECTRICAL INFO610ION: MAIN SERVICE PANEL BUS SIZE: 200A MAIN SERVICE BREAKER SIZE: 100A BUILDING INFORMATION: TWO STORY HOUSE CONSTRUCTION TYPE: V-B OCCUPANCY: R-'fj ROOF: S CONCRETE TILE TRUSSES: 2"X6" @ 24" O.C. PHOTOVOLTAIC ARRAY (26) SunEdison 270 W Solar Modules (SE F270KzD-3y) (26) Enphase Energy (M215-60-2LL-S22-IG) UNIT INDEX MSP (E) 200A Main Service Panel PV (N) PV Load Center J/B (N) Junction Box Cl M215 Micro Inverter Solar Module EMT Type Conduit OSuneye reading South Side view 11-0 (E)Timer Box (E)Main Service Panel Gas B.O.S. LOCATION MAP min 10"t- 0 4--min 3' (N)PV Load Center Window W FROM JUNCTION BOX TO ROOF EAVE EMT TYPE CONDUIT WILL RUN OVER THE ROOF AT 1 1/2" HEIGHT, THEN UNDER THE EAVE TO PV EQUIPMENT Solar Array 2 14 SunEdison 270W 14 M215 Micro -Inverters Pitch: 18 Deg CaUPERT INC) &uilding 1)6P8ttrr`t%r't REVIEWED FOR CODE CUIViP, Reviewed By. =� N 0° W E 270° 90° S 180° SCALE 0 1 5 loft General Notes ROOF PLAN Drawn By : David D. No. Revision/Issue Date CONTRACTOR Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877) 299-4943 Lic# 961988 I$ kL om IeteSolar Re}ot N— a A* — Donald Rossi 10396 S Stelling Rd Cupertino, CA 95014 Deb ae.w Mar 17, 2016 AS INDICATED PV SYSTEM NOTE A continuity of equipment grounding shall be provided with a minimum of #6 A WG copper grounding All the photovoltaic systems wires that on the roof and UTILITY conductor between rail interconnection, and rail end connection side of the building shall be protected against physical damage M 0 #6 AWG EGC COPPER WIRE AC.1 100A CENTER B CIRCUIT a _ INSTALL (1) 20A PV 2-POLE C/B FEED MAIN C/B PV ARRAY 1 \ J BOX# 1 AC.2 INSTALL (1) 15A PV 2-POLE C/B INSTALL V) 12 SUNEDISON _❑+ -❑+ -❑+ �%I 6E BY 6R 30A CB(PV) 270 WATT MODULES, AC.4 AT OPPOSITE END 12 ENPHASE M215 I 314" EMT AC.3 OF BUS FROM MICROINVERTERS . . . . . . CONDUIT MAIN FEEDER CB 30 FEET 15A B CIRCUIT b _ 20A PV ARRAY 2 ' --J BOX# 2 F" 14 SUNEDISON NEMA3R 270 WATT MODULES, -❑+ -❑+ -❑+ �/ 6 BY6 14 ENPHASE M215 PV ONLY LOAD CENTER 314" EMT MICROINVERTERS """" EMT 125A , 120/240V CONDUIT NEMA 3R CONDUIT 5 FEET 10 FEET PV ARRAY INFORMATION [ ACA ] FROM PV MODULES TO J-BOX (3) ENPHASE TRUNK CABLE # 12 AWG, PV WIRE + (1) #6 AWG BARE CU EGC 26 SUNEDISON 270WATT SOLAR MODULES FREE IN THE AIR MODEL # SE F270KzD-3y 26 ENPHASE ENERGY MICROINVERTERS [ AC.2 ] FROM J-BOX1 TO J-BOX2 MODEL # M215-60-2LL-S22-IG (3) #10 AWG THWN-2 + (1) #8 AWG CU EGC, 3/4" EMT TYPE CONDUIT, 30 FEET NUMBER OF BRANCH CIRCUITS: 2 NUMBER OF MODULES IN BRANCH CIRCUIT a : 12 NUMBER OF MODULES IN BRANCH CIRCUIT b . 14 [ AC.3 ] FROM J-BOX2 TO PV LOAD CENTER (6) # 10 AWG THWN-2 + (1) #8 AWG CU EGC, 3/4" EMT TYPE CONDUIT, 10 FEET # OF MICROINVERTERS IN BRANCH CIRCUIT 2: 12 PV MODULE RATINGS # STC EACH INVERTER OUTPUT MAX CURRENT: 0.9 A BRANCH CIRCUIT CURRENT: 12 " 0.9'1.25 = 13.5 A SHORT CIRCUIT CURRENT I -SC = 9.30A BREAKER SIZE PER B. CRCT - 15A MAXIMUM POWER CURRENT I -MP = 8.94A OPEN CIRCUIT VOLTAGE V-OC = 37.8V # OF MICROINVERTERS IN BRANCH CIRCUIT b : 14 MAXIMUM POWER VOLTAGE V-MP = 30.2V EACH INVERTER OUTPUT MAX CURRENT: 0.9 A BRANCH CIRCUIT CURRENT: 14 * 0.9 `1.25 = 15.8 A BREAKER SIZE PER B. CRCT - 20A INVERTER RATING MAXIMUM CONTINUOUS CURRENT: 15.8 A PEAK PWR TRACKING VOLTAGE = 27-39 V RACEWAY HEIGHT FROM ROOF 1 2" (TEMP - 39 + 22 = 61 C) CEC EFFICIENCY = 96.5 /o TEMP. DERATE FACTOR - 15.8 A / 0.58 = 27.2 A ENCLOSURE: NEMA6 MORE THAN 3 CCC ADJST. FACTOR (6 WIRES) - 0.8 MAXIMUM INPUT CURRENT = 10 A ADJUSTED CONDUCTOR AMPACITY - 27.2 / 0.8 = 34.1 A MAXIMUM OUTPUT CURRENT = 0.9 A MAXIMUM INPUT POWER = 210 - 300 W WIRE SIZE FROM NEC TABLE 310.15(b)16 - 10 AWG MAXIMUM OUTPUT POWER = 215 W AMBIENT TEM FACTOR 0.58 PER NEC 310.15(b)(2)(a) IN U) D m Q CD C) N EXISTING 200A MAIN SERVICE PANEL 120/240V 1P,3W, 3AWG EXISTING BUILDING GROUND SYSTEM TO CW PIPE AND'UFER' Connection to the Interior metal water piping shall be made within 5 feet from the point of entrance. 250.68(C) (1) [ ACA ] FROM PV LOAD CENTER TO MAIN SERVICE PANEL (3) # 10 AWG THWN-2 + (1) #8 AWG CU EGC 3/4" EMT TYPE CONDUIT, 5 FEET „ C U PR BuildIng De,, BRANCH CIRCUITS: 2'�' F� TOTAL AMPS FROM 2 BRANCH CIRC : 26 * 0.9A = 23,4A;t'. CONSIDER CONTINUOUS: 23.4 A * 1.25 = 29.3 A = s>, �`'' ASP J TEMP. DERATE FACTOR - 29.3 A / 0.91 = 32.2 A REVIEWED FOR CODE WIRE SIZE FROM NEC TABLE 310.15(b)16 - 10 AWG AMBIENT TEM FACTOR 0.91 PER NEC 310.15(b)(2)(a) Reviewed By: MAIN PANEL RATING OUTPUT CALCULATIONS PV SYSTEM MAX DC OUTPUT: EXISTING SPLIT PHASE: 3W, 120/240V 26 " 270W = 702OW BUSBAR RATING = 200A PV SYSTEM MAX AC OUTPUT: MAIN SERVICE BREAKER = 100A CENTER FEED (26) SUNEDISON F270KzD-3y 100% RULE: (26) M215-60-2LL-S22-IG MAX ALLOWED FEED: 200A Pmax (PTC Rating) PER MODULE: 246.6W ACTUAL FEED: 246.6W' 26 = 6.41 KW 100 "MSP" + 30 A "SOLAR" = 130 A - 200A MAX 6.41 KW ` 96.5% CEC INVERTER = 6.18KW General Notse SINGLE LINE DIAGRAM Drawn By : David D. No. Revision/Issue Date CONTRACTOR Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877)299-4943 Lic# 961988 4 kL om IeteSolar IIAPLIANCE Donald Rossi 10396 S Stelling Rd Cupertino, CA 95014 sot. Mar 17, 2016 >r soon AS INDICATED2 PV SYSTEM S O 0 0 (STICKER TO BE LOCATED ON CONDUIT WITH DC CURRENT EVERY 4' HORIZONTALLY OR 10' VERTICALLY AND 1' FROM EACH SIDE OF A BEND) (TO BE LOCATED ON SUB -PANEL ONLY WHEN SUB -PANEL IS DEDICATED FOR PV ONLY) O AC DISCONNECT AC PHOTOVOLTAIC POWER SOURCE RATED AC OUTPUT CURRENT: 23.4 A MAX NOMINAL AC OPERATING VOLTAGE: 240 Vac DC DISCONNECT DC PHOTOVOLTAIC POWER SOURCE O RATED MAX POWER POINT CURRENT- 8.94 AMPS RATED MAX POWER POINT VOLTAGE- 30.2 VOLTS MAXIMUM SYSTEM VOLTAGE- 44.2 VOLTS SHORT CIRCUIT CURRENT- 9.30 AMPS WARNING! ELECTRIC SHOCK HAZARD. DO NOT TOUCH THE TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. (STICKER LOCATED INSIDE PANEL NEXT TO SOLAR BREAKER) (STICKER LOCATED INSIDE PANEL BELOW PV BREAKER) (STICKER LOCATED ON THE PV SUB PANEL) Permanent directory or plaque providing location of service disconnecting means and photovoltaic system disconnecting means, if not located at the same location. (Plaques shall be metal or plastic, with engraved or machine printed letters, or electro-photo plating, in a contrasting color to the plaque. Plaques shall be permanently attached to the equipmenq or in the required location using an approved method that is suitable to withstand the environment to which it is exposed. Plaques and signage shall meet legibility, defacemet, exposure and adhesion requirements of Underwriters Laboratories marking and labeling system 969(UL969). Plaques will have red background & white lettering. MARKINGS, LABELS AND WIRING SIGNS A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating solar electric system. This can facilitate identifying energized electrical lines that connect solar panels to the inverter, as these should not be cut when venting for smoke removal B. Main Service Disconnect. 1. Residential buildings - The marking main be placed within the main service disconnect. The marking shall be placed outside cover if the main service disconnect is operable with the service panel closed. 2. Commercial buildings - Tha marking shall be placed adjacent to the main service disconnect clearly visible from the location where the level is operated 3. Markings: Verbiage, Format and Type of Material. a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All letters shall be capitalized. Anal or similar font, non bold. c. Material: Reflective, weather resistant material suitable for the environment (use UL - 969 as standard for weather rating). Durable adhesive materials meet this requirement. C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC combiners and junction boxes: 1. Markings: Verbiage, Format and Type of Material. a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns, above and for below penetrations, all DC combiners and junction boxes b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall adhere to "V. V-3b, c" of this requirement. c. Inverters are not required to have caution markings 1.Marking is required on all interior and exterior DC conduit raceways, enclosures,cable assemblies,and junction boxes,combiner boxes and disconnects.CFC 605.11.1 23he materials used for marking shall be reflective,weather resistant material suitable for the environment. Minimum 3/8 "letter height; all upper case letters Arial or similar font, Red background with white lettering. CFC 605.11.1.1 3.Marcking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE. CFC 605.11.1.2 4.Marcking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operated CFC 605.11.1.3 CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROMTHE FOLLOWING SOURCES WITH PV EQUIPMENT LOCATED AS SHOWN: INVERTER TYPE: MICR PERT It ing Depa tl P13 R CODE J By. CODE REQUIRED SIGNAGE I Drawn By : David D. I I No. I Revteion/looue I Date I CONTRACTOR Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877)299-4943 Lic# 961988 omPIete SOI(-)r PLIANCE Donald Rossi 10396 S Stelling Rd Cupertino, CA 95014 D > Mar 17, 2016 S..e AS INDICATED ft*d PV SYSTEM UNIT INDEX MSP (E) 200A Main Service Panel PV (N) PV Load Center O M215 Micro Inverter Solar Module W Driveway Driveway '_r• -3 5' 112' 24' i EWE mmm MSPI IPV m 90' 32' CUPL R- h Bui'd;rg Dip REVIEWED FOR CODE 4viewed By: W E 270° 90° s 180° SCALE 0 5 10 2011 Cenervl Notea SITE PLAN Drawn By David D. No. Revision/Issue Date CONTRACTOR Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877)299-4943 Lic# 961988 ,4 kL ,gqm IeteSolar 'Irrient MPLIANC` Donald Rossi 10396 S Stelling Rd Cupertino, CA 95014 Mar 17, 2016 sm. AS INDICATED ...,,. PV SYSTEM FLASH MOUNTING DETAIL MODULE WEIGHT (Ibs) 41.9 # OF MODULES 26 TOTAL MODULE WEIGHT (Ibs) 1089 RACK WEIGHT (Ibs) 218 MICROINVERTERS WEIGHT (Ibs) 88 TOTAL SYSTEM WEIGHT (Ibs) # OF STANDOFFS 52 MAX SPAN BETWEEN STANDOFFS (in) 48 LOADING PER STANDOFF (Ibs) 26.8 TOTAL AREA (scift) 468 LOADING (PSF) 2 98 1. Everest Solar Mount Racking System 2. Solar Roof Hook Attachment 3. Racking loading calculations were performed for ASCE 7-10 wind speeds @ 110 mph for B and C exposure categories and ASCE 7-10 Seismic Design Category E. 4. Roof attachment hardware to be mounted to existing structure (2"x6"@24" O.C. Trusses/Rafters) at 48" O.C. rail spans or less. 5. Lag bolts are 5/16" X 3.5" stainless steel with 2.5" minimum embedment into the roof rafters. 6. Roof sheathed with 1/2" plywood and upper surface is faced with felt paper. Finished roof surface is S Concrete Tile. 7. Mounts or/and mounting hardware will be sealed with Tremco Vulkem 116 Polyurethane Sealant or equivalent. cking nd Brace CUr.. auildln PR :D FOR viewed B General Not" ATTACHMENT LAYOUT Drawn By : David D. No. Revision/Issue Date CONTRACTOR Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877) 299-4943 Lic# 961988 4 f,RMpleteSolar apartrnent 20116 DE COMPLIANCE R,.. Man.. •s.. Donald Rossi 10396 S Stelling Rd Cupertino, CA 95014 W. >� Mar 17, 2016 soave AS INDICATED 5 nWrat PV SYSTEM 7.02 KW DC (STC) 26 SUNEDSION F270KzD-3y 270W MODULES & ENPHASE ENERGY M215-60-2LL-S22 MICRO INVERTERS ENVOY SERIAL #: f:00,19 -a[•14 "TA 00103 COMMUNICATION LEVEL: ETHERNET BRIDGE INSTALLED: NOTES: au Revie,�.,r . General Notes INVERTER MAP Drawn By : David D. No. Revision/Issue Data CONTRACTOR Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877)299-4943 Lic# 961988 GopR*teScilar I Department 13 2016 CODE COMPLIANCE By: p W— a ,*— Donald Rossi 10396 S Stellinq Rd Cupertino, CA 95014 Mar 17, 2016 >� 6 SoaY AS INDICATED nq.ut PV SYSTEM 7.02 KW DC (STC) 26 SUNEDSION F270KzD-3y 270W MODULES & ENPHASE ENERGY M215-60-21-L-S22 MICRO INVERTERS F- i REVIEWED FOR CO[ Reviewed By. General Notes MODULE MAP Drawn By : David D. No. Revision/lanue Date CONTRACTOR Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877) 299-4943 Lic# 961988 dm IeteSolai I� COMPLIANCE Donald Rossi 10396 S Stellinq Rd Cupertino, CA 95014 D.W Mar 17, 2016 m..e sow. AS INDICATED ny..r PV SYSTEM 1I, Microinverters Enphase M215 -At The with integrated ground delivers increased energy harvest and reduces design and installation complexity with its all -AC approach. With the advanced M215, the DC circuit is isolated and insulated from ground, so no Ground Electrode Conductor (GEC) is required for the microinverter. This further simplifies installation, enhances safety, and saves on labor and materials costs. The Enphase M215 integrates seamlessly with the Engage Cable, the Envoy Communications Gateway'', and Enlighten', Enphase's monitoring and analysis software. PRODUCTIVE Maximizes energy production Minimizes impact of shading, dust, and debris No single point of system failure enphaser E N E R G Y SIMPLE No GFC needed for microinverter No DC design or string calculation required Easy installation with Engage Cable RELIABLE More than 1 million hOLIrS of testing and millions of units shipped Industry -leading warranty, up to 25 years Enphase" M215 Microinverter // DATA INPUT DATA (DC) Recommended input power (STC) Maximum input DC voltage Peak power tracking voltage Operating range Min/Max start voltage Max DC short circuit current OUTPUT DATA (AC) Peak output power Rated (continuous) output power Nominal output current Nominal voltage/range Nominal frequency/range Extended frequency range" Power factor Maximum units per 20 A branch circuit Maximum output fault current EFFICIENCY CEC weighted efficiency, 240 VAC CEC weighted efficiency, 208 VAC Peak inverter efficiency Static MPPT efficiency (weighted, reference EN50530) Night time power consumption MECHANICAL DATA Ambient temperature range Dimensions (WxHxD) Weight Cooling Enclosure environmental rating Connector type M215-60-2LL-S22-IG, M215-60-2LL-S25-IG 190 - 270 W 48 V 27V-39V 16V-48V 22V148V 15A (5208 VAC (4240 VAC 225 W 225 W 215 W 215 W 1.03 A (A rms at nominal duration) 0.9 A (A rms at nominal duration) 208 V / 183-229 V 240 V / 211-264 V 60.0 / 57-61 Hz 60.0 / 57-61 Hz 57-62.5 Hz 57-62.5 Hz >0.95 >0.95 25 (three phase) 17 (single phase) 850 mA rms for 6 cycles 850 rn4 rms for 6 cycles 96.5% 96.5% 96.5% 99.4 % R..r, mw max -4U"G 10 +fib"G 171 mm x 173 mm x 30 mm (without mounting bracket) 1.6 kg (3.4 Ibs) Natural convection - No fans Outdoor - NEMA 6 M215-60-2LL-S22-IG: MC4 M215-60-2LL-S25-IG: Amphenol H4 FEATURES Compatibility Compatible with 60-cell PV modules. Communication �°v f Power line '"3 f+► Integrated ground The DC circuit meets the requirements for ungrounded PV irr ys in; °_ suh NEC 690.35. Equipment ground is provided in the Engage *e-I Ct additional GEC or ground is required. Ground fault protecti i1(GF1P) is integrated into the microinverter.tiic Monitoring Enlighten Manager and MyEnlighten monitoring options Compliance UL1741/IEEE1547, FCC Part 15 Class B, CAN/CSA-C22.2 N(R&VJFWED Ff 0.4-04, and 107.1-01 Frequency ranges can be extended beyond nominal it required by the utility ReviewE Q` To learn more about Enphase Microinverter technology, c us visit enphase.corn Qa 2015 Enphase Energy. N rights resemed Ad tradenk,,:�s or brands it-, this doannent a e registered by their respective owner. enphase E N E R G Y MKT 00069 Rev 1.J General Not" INVERTER DATA SHEET Drawn By : David D. No. Rwision/Issue Date CONTRACTOR Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877) 299-4943 Lic# 961988 4 kL om IeteSolar 'ERTINQ °1 Department 13 2016 2 CODE COMPLIANCE naps w,. • rs�. Donald Rossi 10396 S Stellinq Rd Cupertino, CA 95014 our Mar 17, 2016 s.w 8 soar AS INDICATED v,e}a PV SYSTEM El sanedison. corn (t SunEdisori �SunEdison° SILVANTIS ADVANTAGE • 16.8% module efficiency with positive power tolerance • PID-free: compatible with transformerless and multi-MPPT inverters • Tariff -free: not subject to U.S. countervailing or antidumping tariffs • Higher return on investment with more watts -per -module • Utility -grade manufacturing: ISO 14001, ISO 9001 and 100% EL inspection QUALITY £r SAFETY • Industry leading PID test conditions: • 96 hours, 65 C. 65% relative humidity, -1 kV • IEC certified by TUV SOD: • 61730 to ensure electrical safety e 61215long-term operation in a variety of climates including snow loading up to 5400 Pa and hail testing * 61701 Level 1 salt mist corrosion resistant for marine regions • 62716 ammonia testing for agricultural environments • Manufactured to AQL 0.4 Level II quality and tested up to 3x beyond IEC standards • CSA certified to UL 1703 for 1,000 V systems in the US and Canada • MCS certified by BABT for the UK SP PV CYCLE IXI atw i .:.. C E D% p 1 ROBUST 6 AESTHETIC DESIGN • Black anodized corrosion resistant aluminum frame 1) White back sheet: SE-F2xxCzD3y II Black back sheet: SE F2xxKzD-3y • Low glare anti -reflective coated (ARC) tempered glass • Reliability tested beyond international standards SUNEDISON WARRANTY • 25 year limited warranty for materials and workmanship for installations < 250 kWDC • 25 year linear power warranty at STC: ,I Year 1: s 3.5% of rated power I, Alter year 1 : :i 0.7% rated power degradation per year Additional coverage from SunEdieon'f Linear Warrenry 1 Standard Warranty 4 6 6 7 8 8 10 11 n 13 14 15 15 17 It 18 20 21 22 23 24 25 r44,4 rr Wwr-ty cev.4e• SILVANTIS F-SERIES: 255 W TO 275 W PHYSICAL PARAMETERS F-SERIES SOLAR MODULE DIMENSIONS mm [inch] Dimensions Module 19 mm x 990 m x 50 mry Weight Module Wet hl 10 k ky - - Cell Type -+ Continuous C7 (C(:7) monoc stalllne Number of Cells 60 Material -- -�Frame Black Anocrzed Auminum Irar+ao-' Tempered ARC Glass Thickness : 3.2 mm 4PLACES TS AND PARAMETERS' - . -e4e eeaA�nrole rs6 �c� $KAM Nominal Operating Cell Temperature (NOCT) '. 45C ! 2C _ _ -- Temperature Coefficient of Pmax 0.46 i !C e • Temperature Coefficient of Voc -0.34 %!C ,' Temperature Coefficient of Isc 10.06 WC _ Operating Temperature -40 C to i 85 C F Maximum System Voltage 1000 V (UI FI IFC.) Limiting Reverse Current 9.20 A e Maximum Series Fuse Rating 15 A > _, ___ Pmax Production Tolerance 0 w to -5 W Junction Box Rating I_P.67 _ IEC 61730 Application Class A Module Fire Performance Type 2 Module Fire Resistance Rating Class C _ Packaging Specifications 20 modules pe pallet J J- 620 ^,odules per40' high cube container Wind and Snow Front Load j Up to 5,400 Pa ere�naaa 1111f Wind Back Load 2,400 Pa Reduction of STC efficiency from 1000 W/m2 < 4% Module Dimensions to 200 Wim2 (Relative) P, 390 i35.0; 3 - 1F,68 165 3_ C 5012,0, D - 3C i,riARACTFR!4T!C`7 Mourrting Role Spacing _ I. -- 45C 1-17.41 - 90A 39.11 Model # _ F255 F260 F265 F270 F275 F255 F260 F265 F270 F275 Cable Length (e.g. F2xxCzD_3y)' CzD CzD C7D CzD C?D KzD KzD KzD KzD KzD •L _ 1,DW 139 41 Rated Maximum 266 20G 266 2%0 Z?6 ti6 260 20 27C 275 *1-Other opronsava,laniaupanrequesr,please mntarryourforal Pnw'r Pmax (WI sales representative for more information. Open -Circuit Voltage 37.5 37.6 377 37.8 37.9 37.5 37.6 377 37.8 37.9 Voc (VI Short -Circuit Current 9 25 930 935 940 945 9 ', S 920, 925 930 935 Isc (A) Module Efficiency (%) 15.7 15.H 1(j 1 16.4 16,H 15.5 15.8 161 16.4 16.8 Maximum Power Point 29.9 300 30 1 302 303 29.9 30 0 30.1 30 2 30,3 Voltage Vmpp IV) Maximum Power Point 8.53 867 881 8 94 9011, 8.53 8.(37 8 80 844 908 a Current Impp (A) NOCT ELECTRICAL CHARACTERISTICS' 3 5 Model# F255 F260 F265 F270 F275 F255 F260 F265 F270 F275 4 Ie.g.F2xxCzD-3y)' CzD CzD CzD CzD CzD KzD KzD KzD KzD ll o Rated Maximum 1857 1894 '930 1966 200.3 184' 1877 1e13 "9,:9 'c95 Power Pmax (WI I I2 Open -Circuit voltage 34.7 ' 34.8 :N 8 34 9 34.9 134.6 i 34.7 M 7 _0 13 :0.8 IV CURVES AT MULTIPLE IRRADIANCES [25C] Io - IOOC'N Short -Circuit Current 7 h2 7 55 7 'Al 7.61 TEA 1 7.32 7 3h 7.39 7.41 7 44 0 5 10 15 2c 25 70 Ise (A) mn•e� Ivl »? �q 1 'yr/ Maximum Power Point 27.4 21.5 27.5 27.6 27.6 21.4 27,4 27.b 275 2/.6 ] 47LIIi i Voltage Vmpp (V) IV CURVES AT MULTIPLE TEMPERATUR 100 Maximum Power Point 6.78 I 6.90 7.02 7.14 7.26 6.73 6.85 6.97 7.09 7.21 -o �` ? Current Impp (A) Listed specifications are subject to change without prior notice. 6 ! ` �r eTemperature coefficients m.ay vary. by , 10% - csc MODULE DATA SHEET I Drawn By : David D. I I No. I Revision/lasue I Date I I CONTRACTOR I COmDlete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877) 299-4943 Lic# 961988 ft teSolar g Department 13 20116 :,,411 electrical data at slandard test conditions iS7Q. I" Wp7r; AM 1. 5, 25 C: ekcaical etwfactenstics may t%nd E V IE.��D F CODE COMPLIANCE varyry- Pmdx f-toduaton Tolerance: factory -measured module performance rs warranted to rneel or exctaed the V 4 .eared pane! Sir: pn:ver rating by D W ro +51N Ay rndicares connector two. 34 = Bizhnk S418, 38 = Ampheno/ Hclio s H4 z indicates manuf3ctunng location,: M = Malayse, X = Mcxico, K = Korca ` 'NOCT elecnicar' characteristic measured under normal operating condition of cells: 800 VV,'nr: 20 C. AM; 5. 'vend ! M"s o For more information about SunEdison's Silvantis modules, please visit www.sunedison.com Gael Ile. Lld.; a a Ed lCr 1p1n iJ li 1::�ervell t;n _ 1 Ld ,And 11 I In �11,1.i Ir�1 t� �� AI IA .te�• l��d_I 11 ks 11�e r- 1, ii e11 d _ 1. ,. _ . 1�� IAIIIIIve'v of l� _n I.VI_.i.c uwi:;---; Reviews - ky- 1n 15 zc P. x ... mU vw.v M L_v1,1 19 dt T -ct) V,,0:1_4b US �14 D2 .,41UIt, rrael.r Ib,r ! ti� Donald Rossi 10396 S Stelling Rd Cupertino, CA 95014 D.. Mar 17, 2016 sw14 AS INDICATED 9 n.1.a PV SYSTEM AWW* CSA Group Certificate of Compliance Certificate: 2536234 Project: 70014794 Issued to: SunEdison Products Singapore PTE Ltd 80 Robinson Road #02-00 Singapore, Singapore 068898 Singapore Master Contract: 521_'7 Date Issued: NoNcinber ?1114 The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C' and 'US' fur Canada and US or with adjacent indicator 'US' for US only or without either indicator for Canada only. ® Mary Chen. Issued by: Mary Chen C us PRODUCTS CLASS 531190 - POWER SUPPLIES - Photovoltaic Modules and Panels - Certified to US Standards CLASS 5311 10 -POWER SUPPLIES -Photovoltaic Modules and Panels Photovoltaic Modules with maximum system voltage of 600 V do or 1000 V do and Fire Class C or with Fire Performance of Type 2 with the model numbers and electrical ratings as follows: SE-QXXXWCA-3Y, SE-QXXXWCC-3Y where XXX is the power output from 270 W to 330 W, W=A, B, or C. and Y=1, 2. 3, 4, 5, 6, 7, 8, and 9 SE-QXXXWMA-3Y, SE-QXXXWMC-3Y where XXX is the power output from 270 W to 330 W, W=A, B, or C, and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9 SE-QXXXWPA-3Y, SE-QXXXWPC-3Y where XXX is the power output from 270 W to 330 W, W=A, B. or C, and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9 SE-QXXXWTA-3Y, SE-QXXXWTC-3Y where XXX is the power output from 270 W to 330 W, W=A, B, or C,and Y=1,2,3,4,5,6,7,8,and 9 SE-QXXXWXA-3Y, SE-QXXXWXC-3Y where XXX is the power output from 270 W to 330 W. W=A, B, or C. and Y=1, 2, 3, 41.5, 6, 7, 8, and 9 I DQD 507 Re.. 2012-05-22 Page. I In CSA CPO �� A Group Certificate: 2536234 Master Contract: 252127 Project: 70014794 Date Issued: November 3, 2014 SE-PXXXWPA-3Y, SE-PXXXWPC-3Y, SE-PXXXWPD-3Y, SE-PXXXWPC4Y where XXX is the power output from 260 W to 320 W (72 cells) W=A, B. or E and Y=1, 2, 3, 4, 5, 61 7, 8, and 9 SE-PXXXWTA-3Y, SE-PXXXWTC-3Y SE-PXXXWTD-3Y , SE-PXXXWTC4Y where XXX is the power output from 260 W to 320 W (72 cells) W=A, B,or E and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9 SE-PXXXWXA-3Y, SE-PXXXWXC-3Y, SE-PXXXWXD-3Y, SE-PXXXWXC4Y where XXX is the power output from 260 W to 320 W (72 cells) W=A, B, or E and Y=1, 2, 3, 41 5, 6, 7, 8. and 9 SE-FXXXWCC-3Y, SE-FXXXWCD-3YUSE-RXXXWCC4Y where XXX is the power output from 315 W to 375 W (72 cells) W= B or E, and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9 SE-RXXXWCC-3Y, SE-RXXXWCD-3Y, SE-RXXXWCC4Y where XXX is the power output from 260 W to 305 W (60 cells) W= C, F. G or K. and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9 SE-RX XWMC-3Y, SE-RXXXWMD-3Y, SE-RXXXWMC-4Y where XXX is the power output from 315 W to 375 W (72 cells) W= B or E and Y=1, 2, 3, 4, 51 6, 7. 8, and 9 SE-RXXXWMC-3Y, SE-RXXXWMD-3Y, SE-RXXXWMC4Y where XXX is the power output from 260 W to 305 W (60 cells) W= C, F. G or K, and Y=1, 2, 3, 4, 5, 6. 7, 8, and 9 SE-RXXXWPC-3Y, SE-RXXXWPD-3Y, SE-RXXXWPC4Y where XXX is the power output from 315 W to 375 W (72 cells) W= B or E and Y=1, 2, 3, 4. 5, 6, 7, 8, and 9 SE-RXXXWPC-3Y, SE-RXXXWPD-3Y, SE-RXXXWPC4Y where XXX is the power output from 260 W to 305 W (60 cells) W= C, F, G or K, and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9 SE-RXXXWTC-3Y, SE-RXXXWTD-3Y, SE-RXXXWTC4Y where XXX is the power output from 315 W to 375 W (72 cells) W= B or E and Y=1, 2, 3, 4, 5, 6, 7, 8. and 9 SE-RXXXWTC-3Y, SE-RXXXWTD-3Y, SE-RXXXWTC4Y where XXX is the power output from 260 W to 305 W (60 cells) W= C, F, G or K and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9 SE-RXXXWXC 3Y, SE-RXXXWXD-3Y, SE-RXXXWXC4Y where XXX is the power output from 315 W to 375 W (72 cells) W=B or E. and Y=1, 2, 3, 4, 5, 6, 7, S. and 9 SE-RXXXWXC-3Y, SE-RXXXWXD-3Y, SE-RXXXWXC4Y where XXX is the power output from 260 W to 305 W (60 cells) W= C. F. G or K. and Y=1, 2, 3, 4.5, 6, 7, 8, and 9 SE-HXXXWCC-3Y, SE-HXXXWCC4Y where XXX is the power output from 315 W to 375 W (144 cells W= B, or E. and Y=l, 2, 3, 4, 5, 6, 7, 8, and 9 SE-HXXXWCC-3Y, SE-IDXWCC-4Y where XXX is the power output from 260 W to 305 W (120 cell W= C,F, G or K. and Y=1.2, 3, 4, 5, 6, 7, 8. and 9 r SE-BXXXWMC-3Y. SE -I )CKXWMC-4Y where XXX is the power output from 315 W to 375 W (144 cell W= B. or E. and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9 REVIEWED Revi DQD 507 Rev. 2012-0.5-22 Page 4 Cenerul Notes MODULE CERTIFICATION Drawn By: David D. No. Rwision/lamse Date CONTRACTOR M_ ems.. A*-. Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877)299-4943 Lic# 961988 om IeteSolar 'ERTINO Department 13 2016 CODE COMPLIANCE Donald Rossi 10396 S Stellinq Rd Cupertino, CA 95014 oea Mar 17, 2016 a.4 10 sod. AS INDICATED vr.}.r PV SYSTEM Mounting systems for solar technology Everest Solar Systems Mounting Systems Solutions TABLE OF CONTENTS NEW New Tilt Kit for CrossRail [Page 31 Enhanced D Dome System [Page 6] CrossRail for Pitched Roofs 2 CrossRail Tilt Up Systems 3 CrossRail for Ground Mount 4 XPressRail for Trapezoidal Metal Roofs 5 D Dome for Flat Roofs 6 S Dome for Flat Roofs 7 Innovation, Quality and Service 8 For more information contact: sales@everest-solarsystems.com I Phone: 760-301-5300 Mounting systems for solar technology CrossRail 48 & CrossRail 80 Material: aluminum Standard length: 16A" or custom L-Foot w/ T-Bolt and Flange Nut vlatena!: aluminun, Hardware. stainless steel Rail Connector Set CrossRail 48 & 80 Material: aluminum splice t Hardware: stainless steel Module End Clamp Set Material: aluminum, mil, dark Hardware: stainless steel Module Middle Clamp Set Material: aluminum, mil, cork Hardware: stainless steel IBurndy WEEB Lug 8.0 + Hardware 16 Weeb Lug 8.0 Material: tin plated copper Hardware: stainless steel 0► t•� 0 12 CROSSRAIL FOR PITCHED ROOFS CrossRail for Pitched Roof : German engineering - optimized for the US UL 2703 / ETL approved integrated bonding Super fast, simple installation No drilling, no bonding jumpers Pre -assembled clamps Robust bonding rail splices Low part count Micro Inverter Mounting Kit Material: stainless steel End Cap for CrossRail 48 & 80 Material high strength nylon (PA66) Omega Wire Management Clip Material: high density plastic (PP) Burndy KMC WEEB Clip Material: stainless steel Pre -assembled with Mid Clamp HEYClip SunRunner Cable Clip SS, S6404 Material: stainless steel REVI For more information contact: salesoeverest-solarsystems.com I Phone: 760-301-5300 ciuPI-11 Cenerol Not" RACKING DATA SHEET Drawn By: David D. No. Revision/laaue Dab CONTRACTOR M.e ., Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877)299-4943 Lic# 961988 4 kL om IeteSolar Inu ;rtment COMPLIANCE Donald Rossi 10396 S Stelling Rd Cupertino, CA 95014 D Mar 17, 2016 a soa. AS INDICATED re}a PV SYSTEM Everest Solar Systems Everest Solar Systems Bonding End Clamp Spec Sheet salusystera Bonding Mid Clamp Spec Sheet 'q 1W A µ. :06 Integrated bonding 3 UL 2703 component y Fast, simple installation i Rugged design complies with a wide variety of module manufacturer's requirements Secured in place with MK2 for single -hand installation High strength, corrosion resistant stainless steel construction 1 z'� 3-f 4 5 -41$W Dark End Clamn Sets US00_4000353 End Clamp UL 2703 Set, Black, 30-40mm 1. Allen Bolt, Black 1. Lock Washer 1. Universal End Clamp. Black 1 Clamp Spring 5, MK2 Slot Nut U500_4000354 End Clamp UL 2703,SS, Black, Set 41-50mm 1. Allen Bolt, Black 2. Luck Washer 3. Universal End Clamp. Black 4. Clamp Spring S. MK2 Slot Nut 3 4 5 - Plain End lamn C t< US00 40003S1 End Clamp UL 2703,SS Set 30AOmm 1. Allen Bolt 2. Lock Washer 3. Universal End Clamp 4. Clamp Spring 5. MK2 Slot Nut US00 4000352 End Clamp UL 2703,SS Set 41-50mm 1. Allen Bolt 2. Luck Washer 3. Universal End Clamp 4. Clamp Spring 5. MK2 Slot Nut solar system Integrated bonding i UL 2703 component )o Fast, simple installation Rugged design complies with a wide variety of module manufacturer's requirements Secured in place with MK2 for single -hand installation i� High strength, corrosion resistant stainless steel construction Dark Mid Clamn Sets US00_4000349 Mid Clamp UL 2703 Set, Black, 30-40mm 1. Allen Bolt, Black 2. Lock Washer 3. Universal Mid Clamp, Black 4. Clamp Spring 5, MK2 Slot Nut USDO 4000350 Mid Clamp UL 2703,SS,Black,Set 41-50mm 1. Allen Bolt, Black 2. Lock Washer 3. Universal Mid Clamp, Black 4. Clamp Spring S. MK2 Slot Nut 01 2 3 - 4 5 -4W Plain Mid Clamn Sct f..,.r.,,� US00_4000347 Mid Clamp UL 2703 S 5 t 30'-40mm>• 1. Allen Bolt ! 2. Lock Washer 3. Universal Mid Clamp,,,k p 4. Clamp Spring E, S. MK2 Slot Nut USOO 4000348 Mid Clamp UL2703,SSRbmAPJED ` C C 1. Allen Bolt 2. Lock Washer Reviewe 3. Universal Mid Clamp 4. Clamp Spring 5. MK2 Slot Nut U� voe CSTIB `4 CIFAT voe voE i Ls CST13 � wE"Tf voE REG.-Nr. E520 RFC N, F52a CEIAB (rr) Passinriovetior TOV Rheinland VDE Certificate - - 2011-128 (fr) -ISO (de) 9001:2008 2015D428-02 20150428-03 Cenercil Notes RACKING SPECS Drawn By : David D. No. Revision/Issue Date CONTRACTOR Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877)299-4943 Lic# 961988 %WOlete Siar partment it - DE COMPLIANCE Donald Rossi 10396 S Stelling Rd Cupertino, CA 95014 Dee. Mar 17, 2016 3h d 12 seer AS INDICATED no}et PV SYSTEM Certificate of �vitliicate NuniUef 20150311-E467724 Report Reference E467724-2015-01-08 Issue Date 2015 March 11 VL Issued to: EVEREST SOLAR SYSTEMS 3809 Ocean Ranch Blvd Suite 111 Oceanside, CA 92056 Underwriters Laboratories This is to cer7ifp that Mounting Systems for Use with Flat -Plate Photovoltaic representative samples of Modules and Panels Everest CrossRail System utilizing CrossRail 48 rail Have been investigated by UL LLC in accordance with the Standard(s) indicated on this Certificate. Standards) far Safety: UL 2703, Mounting Systems, Mounting Devices. Clamping/Retention Devices, and Ground Lugs for Use with Flat -Plate Photovoltaic Modules and Panels. Additional Information: See UL On-line Certification Directory at WWW.UL.COM for additional information. The Everest CrossRail System achieved a system fire classification `A' when tested in combination with UL 1703 Listed PV modules with Type 1 and Type 2 module fire performance ratings. The system fire test method was in accordance with the Standard for Safety for Flat -Plate Photovoltaic Modules and Panels, UL 1703, 3rd Edition, dated November 28, 2014. Look for the UL Listing Mark on the product Only those products hearing the UL Listing Mark should he considered as being covered by l Us Listing and Follow -Up Service. ' The UL Listing Mark generally includes the following elements: the symbol UL in a circle.: © with the. word "LISTED-, a control number (may be alphanumeric) assigned by UL: and the product category name (product identifier) as indicated in the appropriate UL Directory. William R. Carney Director, North American Certification Programs UL LLC Any information and documentation involving UL Mark services are provided on behalf of UL LLC (UL) or any authorized licensee of UL. Fur yuestitets, please contact a Itk•al UL Castonter Service Representative at http.t/www.ul.condgluhal/etty,/pages/cugwrale/cunlaclus/ CUPE 13U06119 f { �-.PR ' REVIEWED FOR C Reviewed B Ceneml Notes RACKING CERTIFICATION Drawn By: David D. No. Revision/Issas Date CONTRACTOR R. e.-aft - Complete Solar Address: 1850 Gateway Dr., Suite 450, Foster City, CA 94404 Phone Number: (877) 299-4943 Lic# 961988 om lete Solar TINO partm nt DE COMPLIANCE t�µ.r n.e • �r.. Donald Rossi 10396 S Stelling Rd Cupertino, CA 95014 oa. Mar 17, 2016 9h t 13 9oaM AS INDICATED w.i.a PV SYSTEM Part # Box QuantKy Screw Size 17585 10 Hooks Not Included 17586 1 Hook Not Included 17587 10 Hooks & 20 Screws 5/16" x 3" 17588 1 Hook & 2 Screws 516" x 3" 17589 10 Hooks & 20 Screws #14 x 3" 17618 1 1 Hook & 2 Screws 1 #14 x 3" Type 304 Stainless Steel For Side Mount Rails Letter Description Size/Length A Mounting Screw Slots 9mm x 18mm B Rail Slot Size 10mm x 46mm C Length of Roof Hook 179 50mm D Bottom End to Top End 165 30mm - 173 50mm E Thickness 6mm 122mm }IjjI=Bmm TB Rail Slot Accepts 5116' or 3/8' Bolts 8 70mm ❑ ® ❑ 140mm Use our 014 or 5/16' A Solar Mounting Screws 54mm I!:- 30mm 25.50mm �N 88mm =21mm 38. 8.70mm Ydiu 11t 1h � O F► 120mm E Revt 95° 5830 Las Positas Road, Livermore, California 94551 1 3948 Airway Drive, Rock Hill, South Carolina 29732 Phone: (844)-671-6045 1 Fax: (800)-689-7975 1 www.solarroofhook.com solarroofhook.com is a division of Quickscrews International Corp. AFIVE GJppLUED HAri EQOQd8 A EMSoaCEG30M% 0H6a 980 41st Street Tel: (510) 420.8190 Oakland, CA 94608 FAX (510) 420-8186 e-mail: info@appmateng.com September 17, 2015 Mr. Rick Gentry QUICKSCREWS INTERNATIONAL 5830 Las Positas Road Livermore, CA 94551 Subject: OS# 17585 —All Tile Roof Hook 90' Laboratory Load Tcstin Dear Mr. Gentry: January 23. 2014 To whom this may concern. SolarRoofHook.com is committed to excellence. All of our parts were tested by a third party test facility for the following. 1. Uplift test 2. Downward load test 3. Water Proof- QuickBOLT only AME Research facility had a current engineer license per the State of California in 2012 and 2013. Terrapin Testing had a current engineer license per the State of California in 2011. The following is an excerpt from: CALIFORNIA BOARD FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS g u i d e to Engineering & Land Surveying for City and County Officials Page 12 Line 27 27. If the license has expired between the time the engineering documents were prepared and the time where the local agency's review is performed, do the documents need to be re -seated by a licensee with a current license? (B&P Code §§ 6733, 6735, 6735.3, 6735.4) As long as the license was current at the time the engineering documents were prepared, the documents do not need to be re -sealed prior to review by the tocat agency. However. any changes (updates or modifications) to the documents that are made following the review by the local agency would have to be prepared by a licensed engineer with a current license and those changes would have to be signed and sealed. We trust the information provided will alleviate any request for the test reports submitted to have a stamp from the current year. Respectfully, Rick Gentry V.P. of Sales & Marketing 5830 Las Positas Rd I Livermore, CA 94551 Phone: (844)-671-60451Fax: (800)-689-7975 www.solatroofhook.com Mr. Rick Gentry QUICKSCREWS INTERNATIONAL 5830 Las Positas Road Livermore, CA 94551 Project Number 11572,t 2. Tensile (Uplift) Load Test Project Number 115727C A total of three tests were conducted for compressive load capacity on September 14, 2015 using a United Universal testing machine. Samples were rigidly attached to the testing machine and an uplift load was applied to the hook. The samples were loaded in tension at a constant rate of axial deformation of 0.09 in. /min. without shock until failure occurred; displacement at maximum load was recorded. Based on the above testing, the average maximum uplift load of the All Tile Roof Hook 90' attached to a 2N4" Douglas Fir rafter using two 5/16"0x3" screws was determined to be 2091 Ibf. Detailed results are provided in Table II. Test setup and mode of failure are provided in Appendix B, Figure 2. As requested, Applied Materials & Engineering, Inc. (AME) has completed load -testing the All Tile Roof Hook 90' (see Appendix A, Figure 1). The purpose of our testing was to evaluate the compressive tensile (uplift) and shear (parallel to rafter) load capacity of the All Tile Roof Hook 90' attached to a 2"x4" Douglas Fir Rafter using two 5/16"00" screws. SAMMY DESCRIPTION Mockup samples were assembled in our laboratory on August 31.2015. Mockup configuration consisted of ftee 12" long rafters at 4.5"o.c., screwed to 1/2" Structural I plywood. All Tile Roof Hook 90' is attached through the plywood into a rafter with two fasteners installed at the farthest end. TEST PROCEDURES & RESULTS 1. Compressive Load Test A total of three tests were conducted for compressive load capacity on September 11, 2015 using a United Universal testing machine. Samples were rigidly attached to the testing machine and a compressive load was applied to the hook. The samples were loaded in compression at a constant rate of axial deformation of 0.09 in. /min. without shock until the hook was bent and came in contact with the test board: displacement at maximum load was recorded. Based on the above testing, the average maximum compression load of the All Tile Roof Hook 901'attached to a 2"x4" Douglas Fir rafter using two 5/16"Ox3" screws was determined to be 395 lbf. Detailed results are provided in Table I. Test setup and mode of failure are provided in Appendix B. Figure 1. The specific gravity and moisture content of the rafter was tested in accordance with ASTM D2395, Method A (oven -dry). The specific gravity and moisture content were determined to be 0.379 and 10.0%. respectively. ;0 m� < a'1 CD < m Page i of 12 Q o © _5 —�1n The specific gravity and moisture content of the rafter was tested in accordance with ASTM D2395, Method A (oven -dry). The specific gravity and moisture content were determined to be 0.383 and 11.5%, respectively. 3. Shear (Lateral) Load Test Parallel to Rafter A total of three tests were conducted for shear load capacity on September 16, 2015 using a United Universal testing machine. Samples were rigidly attached to the testing machine and a shear load (parallel to rafter) was applied to the hook. The samples were loaded in shear at a constant rate of axial deformation of 0.09 in. /min. without shock until failure occurred; displacement at maximum load was recorded. Based on the above testing, the average maximum shear load (parallel to rafter) of the All Tile Roof Book 90° attached to a 2"0" Douglas Fir rafter using two 5/16"00" screws was determined to be 487 Ibf. Detailed results are provided in Table III. Test setup and mode of failure are provided in Appendix B, Figure 3. The specific gravity and moisture content of the rafter was tested in accordance with ASTM D2395, Method A (oven -dry). The specific gravity and moisture content were determined to be 0.354 and 10.90/0, respectively. Respectfully Submitted. APPLIED MATERIALS & ENGINEERING, INC. ed IM 4.1ratory Page 2 of 12 Reviewed By: FEssto QQOlit--- �N TAJIIi �yc c� 3558Ami Irian. h.D.. P.E. „]3Fiflc a Exp 9 *Sr ClVty o P 4� OF CA`�4 PMbIVE 21 E:4VREEERI,' iZ, li::. �Nt ffl t D N Q o o sv r C) �7 7 G 0 0 ccn 0 = ° C° o � 0- D 3 C) O f" 7 =l O< CD CO N rD A • ^ QJ CO C A (D O { .i O r ti Q A 00 ? g n: r 6 Ci a _ `°. z 0 "' �D °i D n v N 3 m U) rD -a rn m (". O4 O rn z A` CDLi �rT.t9s s CUPERTtNO Address Va SMOKE / CARBON MONOXIDE ALARMS OWNER CERTIFICATE OF COMPLIANCE COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 10300 TORRE AVENUE CUPERTINO, CA 95014-3255 (408) 777-3228 FAX (408) 777-3333 • buildinq(@cui)errino.org PERMIT CANNOTBE FINALED AND COMPLETED UNTIL THIS CERTIFICATE HAS BEEN SIGNED AND RETURNED TO THE BUILDING DIVISION t PURPOSE This affidavit is a self -certification for the installation of all required Smoke and Carbon Monoxide .Alarms for compliance with 2013 CRC Section R314, 9013 CBC Sections 420.6 and 907.2.11.2 where no interior access for inspections are required.. GENERAL INFORMATION Existing single-family and multi -family dwellings shall be provided with Smoke Alarms and Carbon =4 Monoxide alarms. When the valuation of additions, alterations, or repairs to existing dwelling units exceeds $1000.00, CRC Section R314 and CBC Sections 907.2.115 and 420.6 require that Sinoke Alarms and/or Carbon Monoxide Alarms be .installed in the following locations; AREA SMOKE ALARM CO ALARM Outside of each separate sleeping area in the immediate vicinity of the bedrooms) X X On every level of adwellipg unit including basements X X Within each sleeping room X Carbon Monoxide alarms are not required in dwellings which do not contain, fuel -burning appliances and that do not have an attached garage. Carbon monoxide alarms combined with smoke alarms shall comply with CBC Section 420.6 and shall be approved by the Office of the State Fire Marshal, Power Supply. In dwelling units: with no commercial power supply, alarm(s) may be solely battery operated. In existing dwelling units, alarms are permitted to be solely battery operated where repairs or alterations do not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl space. Refer to CRC Section R314 and CBC Sections 907.2.11A and 420.6.2. An electrical permit is required for alarms which mustbe connected to the building wiring. As owner. of the above -referenced property, I hereby certify that the alarm(s) referenced above has/have been installed in accordance with the manufacturer's instructions and in compliance with the California Building and California Residential. Codes. The alarms have been tested and are operational, as of the elate signed below. Smoke and CO form.doc revised 03118114 WATER -CONSERVING PLUMBING FIXTURES FILE OWNER CERTIFICATE OF COMPLIANCE �` { COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION CUP6RTINC> 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777- 228 a FAX (408) 777-3333 buildingCaicupertino.org Owner Name o r Permit N o!"I Address 1 I 3� (,- 57oL r,,-4-" r7 1. Is your real property a registered historical site? ❑ Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form. C) 1� No Go to Question 2. 2. Does your real property have a licensed plumber certifying that, due to the age or configuration of the property or its plumbing, installation of water -conserving plumbing fixtures is not technically feasible? Yes Civil Code Sections 110 1. 1 through 110 1. 8 do not apply. El The licensed plumber's certification has been provided to the Building Division. Skip the rest of the form and sign bottom of form. j P No Go to Question 3. 3. Is water service permanently disconnected for your building? El Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Ski the rest of the form and sign bottom of form. ED �k No Go to Question 4. 4. Is your real property built and available for use or occupancy on or before January 1, 1994? No My real property is built and available for use or occupancy after January 1, 1994. Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form. Ej ❑ Yes My real property is built and available for use or occupancy on or before January 1, 1994. Civil Code Sections 1101.1 through 1101.8 apply. Check one of the three following statements and sign bottom of form.. 5. Please check ONE of the following: My property is a single-family residential real property. See Civil Code Section 1101.4. On and after January 1, 2014, building alterations or improvements shall require all non -compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures throughout the building. On or before January 1, 2017, all non- compliant plumbing fixtures shall be replaced with water -conserving plumbing fixtures (regardless of whether property undergoes alterations or improvements). ❑ My property is a multifamily residential real property. See Civil Code Section 1101.5. On and after January 1, 2014, specified building alterations or improvements shall require non- compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures. On or before January 1, 2019, all non -compliant plumbing fixtures shall be replaced with water - conserving plumbing fixtures throughout the building (regardless of whether property undergoes alterations or improvements). ❑ My property is a commercial real property. See Civil Code Section 1101.5. On and after January 1, 2014, specified building alterations or improvements shall require non- compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures. On or before January 1, 2019, all non -compliant plumbing fixtures shall be replaced with water conserving plumbing fixtures throughout the building (regardless of whether property undergoes alterations or improvements). I, as the owner or owner's agent of this property, certify under penalty of perjury that non -compliant plumbing fixtures will be replaced prior to date specified above with water -conserving plumbing fixtures in accordance with Civil Code Sections 110 1. 1 through 1101.8, the current California Plumbing Code and California Green Building Standards Code, and manufacturer's installation requirements, and that the water -conserving plumbing fixtures comply with the requirements as indicated in the table on the following page. _ .-. - Owner or Owner Agent's Signature; R )"AR V,-\ Date:) -'/ Z::�U L4� I T Tnnn romnl'etinQ and signing this Ceitificate. please return it to the Building Division in order to final your building permit. SB4072015.doc revised 08126115