Exhibit CC 05-17-2016 Special Item No. 1 FY2017 Proposed CIP Budget Council Presentation 2016 0517City Council
May 17, 2016
C I P FY 2017
Capital Improvement Program
CC 05/17/2016 Item No. 1
Completed Projects
Completed Projects FY2012
Projects completed by June 30, 2012
Description Description
2011-12 Annual Curb, Gutter & Sidewalk
Repairs & ADA Ramps
2011-12 Annual Pavement Management
2011-12 Annual Minor Storm Drain
Improvements
Blackberry Farm Infrastructure Upgrade
Civic Center Master Plan Framework Electric Vehicle Charging Station
Linda Vista Pond Improvements – Study McClellan Ranch/Simms Master Plan Update
McClellan Ranch 4H Sanitary Connection Permanente Creek
Safe Routed to School – Garden Gate Stocklmeir Orchard Irrigation
Various Minor Intersection Traffic Signal
Battery Backup System
Various Park Path and Parking Lot Repairs &
Resurfacing – Phase 1
Completed Projects FY2013
Projects completed by June 30, 2013
Description Description
Emergency Van Upgrades McClellan Ranch Repairs & Painting
McClellan Road Sidewalk Study Traffic Management Studies – 3 Intersections
Various Park Path and Parking Lot Repairs &
Resurfacing – Phase 2
Various Trail Resurfacing at School Sports
Fields – Phase 1
Various Trail Resurfacing at School Sports
Fields – Phase 2
Wilson Park Irrigation System Renovation
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 2 of 54
Completed Projects FY2014
Projects completed by June 30, 2014
Completed Projects FY2015
Projects completed by June 30, 2015
Description Description
Accessibility Transition Plan Update Bicycle and Pedestrian Facility Improvements
Calabazas Creek (Bollinger Rd.) Outfall Repair Install Speed Bumps – Vista and Lazaneo Dr
Mary Avenue Pedestrian & Streetscape
Improvements
McClellan Ranch Environmental Education
Center, Blacksmith Shop, Shelter, Solar &
Restroom Upgrades
McClellan Road Sidewalk Improvements –
Phase 1
Priority Green Bike Lane Improvements
Public Building Solar Installation – Service
Center
Quinlan Community Center Fiber Installation
Quinlan Center Interior Upgrades Sports Center Tennis Court Retaining Wall
Replacement
Description Description
McClellan Ranch – Historic Structures
Assessment
McClellan Ranch – Barn Evaluation &
Renovation Plan
Mary Avenue Dog Park McClellan Ranch Preserve Signage Program
Senior Center – Various Improvements Phase 1 Solar Assessment – Public Building
Sports Center – Various Improvements Various Park Path Repairs – Phase 3
Stevens Creek Corridor Park Phase 2 Various Trail Resurfacing at School Sports
Fields – Phase 3
Various Traffic Signal/Intersection
Modifications
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 3 of 54
Completed Projects FY2016
Projects completed by June 30, 2016
Description Description
Bicycle and Pedestrian Facility Improvements Bicycle Transportation Plan Update
Bubb Road (Elm Ct.) Storm Drain Imprvmts. Civic Center Master Plan
Civic Center-Parking Structure-Conceptual
Design
Fiber Network Expansion for Signal
Interconnect
Homestead Road Concrete Sidewalk Project McClellan Ranch - Pedestrian, Parking,
Landscape Improvements
McClellan Ranch West - Simms House
Removal
Monta Vista Storm Drain System
Quinlan Community Center - Cupertino Rm
Lighting Replacement
Senior Center - Exercise Room Wood Floor
Replacement
Senior Center - Mary Avenue Landscaping Service Center - Parking Lot Modification
Sport Center-Sport Court (Tennis Court
Resurfacing)
Stevens Creek Blvd. at Perimeter Rd. Turn
Pocket Extension
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 4 of 54
City of Cupertino FY 2017 – FY 2021 Proposed CIP Summary
Total Budget Prior Years FY 2017 FY 2018 FY 2019 FY 2020 FY 2021
Priority 1
1 2016 Bike Plan Implementation 3,000,000 2,000,000 1,000,000
2 ADA Improvements 450,000 75,000 75,000 75,000 75,000 75,000 75,000
3 Bicycle and Pedestrian Facility Improvements 1,206,000 1,123,000 83,000
4 Bikeway Enhancements and Wayfinding Plan 60,000 60,000
5 Blacksmith Shop Forge Restoration – Design 60,000 60,000
6 City Bridge Maintenance Repairs 700,000 165,000 535,000
7 City Hall Turf Reduction 320,000 320,000
8 Citywide Park and Recreation Master Plan 500,000 500,000
9 Fiber Network Expansion to Service Center 350,000 350,000
10 Lawrence – Mitty Park 8,270,994 8,270,994
11 McClellan Ranch West Parking Lot Improvement 400,000 400,000
12 McClellan Road Sidewalk Improvements – Phase 2 2,035,000 2,035,000
13 Pedestrian Master Plan 120,000 120,000
14 Quinlan Community Center – Fire Alarm Panel Upgrade 135,000 135,000
15 Service Center New Admin. Bldg. Feasibility Study 35,000 35,000
16 Service Center Shed No. 3 Improvements 500,000 100,000 400,000
17 Sports Center – Resurface Tennis Courts (18 Cts.) 735,000 735,000
18 Stevens Creek Corridor Park Chain Master Plan 535,000 535,000
19 Stocklmeir House – New Sewer Lateral 50,000 50,000
20 Storm Drain Improvements – Foothill/Cupertino 1,900,000 1,900,000
21 Storm Drain Master Plan Update 380,000 330,000 50,000
22 Street Median Irrigation & Plant Replacement 660,000 440,000 220,000
Priority 2
23 Pasadena Ave. Public Improvements 827,000 827,000
24 Retaining Wall Repair – Cordova Rd. 350,000 350,000
25 Retaining Wall Replacement – Regnart Rd. 450,000 450,000
26 Sidewalk Improvements – Orange & Byrne 1,888,000 500,000 1,388,000
27 Tennis Court Resurfacing – Various Parks 1,103,000 588,000 280,000 235,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 5 of 54
City of Cupertino FY 2017 – FY 2021 Proposed CIP Summary (cont’d)
Total Budget Prior Years FY 2017 FY 2018 FY 2019 FY 2020 FY 2021
Priority 3
28 Blackberry Farm Golf Course Renovation 1,043,000 1,043,000
29 Blackberry Farm – Splash Pad 690,000 70,000 620,000
30 McClellan Ranch – Comm. Garden Imp. Design 96,000 30,000 66,000
31 McClellan Ranch – Construct Trash Enclosure 154,000 154,000
32 Memorial Park Master Plan & Parking Study 150,000 150,000
33 Recreation Facilities Monument Signs 385,000 385,000
34 Sports Center – Children’s Play Area 470,000 470,000
35 Sports Center – Exterior Upgrades 270,000 270,000
36 Sports Center – Interior Upgrades 270,000 20,000 250,000
Priority 4
37 Blackberry Farm Pool Bldg. Mod. Feasibility Study 25,000 25,000
38 Blackberry Farm Pool Modification Study 25,000 25,000
39 Blackberry Farm Maint. & Restroom Replacement
Feasibility Study 25,000 25,000
40 Blackberry Farm San Fernando Dr. Entry
Feasibility Study 35,000 35,000
41 Memorial Park Phase 1 – Design 250,000 250,000
42 Memorial Park Phase 1 – Construction 1,000,000 1,000,000
43 Memorial Park – Tennis Ct. Restroom Replacement 448,000 148,000 300,000
44 Monta Vista Park Master Plan 55,000 55,000
45 Portal Park – Renovation Master Plan 55,000 55,000
46 Quinlan Community Center – Turf Reduction /
Landscape Modifications 1,493,000 750,000 743,000
47 Stevens Creek Bank Repair – South of SCB –
Conceptual Design 100,000 100,000
48 Storm Drain Improvements – Byrne and SCB 1,200,000 1,200,000
49 Storm Drain Improvements – Homestead Rd. 2,398,000 2,398,000
50 Traffic Signal: Foothill/I-280 SB Off-ramp 100,000 100,000
51 Wilson Park Renovation Master Plan 55,000 55,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 6 of 54
Unfunded Projects for Future Consideration
Blackberry Farm – Play Area Improvements
Implement Storm Drain Master Plan Priorities
Jollyman Park Irrigation Update
Linda Vista Pond Repair
McClellan Ranch – Barn Renovation
McClellan Ranch Preserve Stevens Creek
Monta Vista Park Play Area
Monta Vista Park Turf Reduction
Portal Park Phase 1 – Design and Construction
Quinlan Community Center Turf Reduction/Landscape Modifications
Stevens Creek Trail Bridge over UPRR
Stevens Creek Trail to Linda Vista Park
Stocklmeir House Preservation and Restoration
Stocklmeir Legacy Farm – Phase 1 Improvement
Tank House completion (Nathan Hall)
Wilson Park Phase 1 – Design and Construction
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 7 of 54
Current and Proposed CIP Projects
Proposed Funding FY 2017-2021
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 8 of 54
Priority 1 Projects
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 9 of 54
2016 Bike Plan Implementation
DESCRIPTION
Design and construct high priority improvements of the 2016 Bicycle Transportation Plan.
PROJECT JUSTIFICATION
The Bicycle Transportation Plan Update was completed in FY2015-16. The Plan identifies improvements
needed and priorities to enhance and promote safer bicycle transportation in the City. Upon its approval
by City Council, implementing the recommended improvements is the next step.
STATUS
Identify and implement improvements throughout FY2016-17 and FY2017-18. Initiate project in summer
2016.
FY 2017: $ 2,000,000
FY 2018: $ 1,000,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 10 of 54
ADA Improvements
DESCRIPTION
Implement ADA improvements annually.
PROJECT JUSTIFICATION
An update of the City’s ADA Transition Plan was completed in April 2015. The plan identifies
improvements needed and priorities to achieve compliance with ADA in public buildings, parks, and the
public right of way.
STATUS
Identify and implement improvements throughout FY 2016-17.
Prior Years: $ 75,000
FY 2017-2021: $ 75,000 per year = $ 375,000 over 5 years
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 11 of 54
Bicycle and Pedestrian Facility Improvements
DESCRIPTION
Implement the Bicycle Transportation Plan and other bicycle network-related facility improvements.
PROJECT JUSTIFICATION
In 2011 the City Council approved and adopted the Cupertino Bicycle Transportation Plan, which
recommended improvements to 17 proposed bikeways throughout the City. In February of 2015, Council
approved an update to Plan that included many short-term, achievable projects.
STATUS
Approximately 80% of improvements funded in 2015 Bicycle Plan Update have been completed. Work is
progressing on the remaining items, with the longer-term ones being rolled into 2016 Bicycle
Transportation Plan.
Prior Years: $ 1,123,000
FY 2017: $ 83,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 12 of 54
Bikeway Enhancements and Wayfinding Plan
DESCRIPTION
Develop a plan that identifies and prioritizes key City locations where bicycle wayfinding signage,
bicycle parking – both short-term and long-term – and Bike Share Program Depots would be beneficial
and most impactful. The plan will also provide a design standard for signage. Available grant funding
that may be applied towards these improvements will be identified as part of this effort.
PROJECT JUSTIFICATION
Upon approval of the 2016 Bicycle Transportation Plan Update, further development of implementation
strategies, specific locations, priorities, and design standards for bicycle facility enhancements will be the
next step toward implementation of the 2016 recommendations.
STATUS
Initiate the project in FY 2016-17.
FY 2017: $ 60,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 13 of 54
City Bridge Maintenance Repairs
DESCRIPTION
Design and construct bridge repairs recommended in the Caltrans report along with additional improvements to
prolong the useful life of the bridges.
PROJECT JUSTIFICATION
The City owns and maintains a total of seven vehicular bridges. Six of the seven bridges require rehabilitation.
The required minor rehabilitation includes the repairs as recommended in the Caltrans Bridge Report as well as
additional work to prolong the life and use of the bridges. Approximately 88% of the project costs are eligible for
Federal reimbursement through Caltrans’ Bridge Preventive Maintenance Program (BPMP).
STATUS
This project was previously titled Bridge Rehabilitation-Minor. The grant application to begin the preliminary
engineering phase was submitted in March 2016. The authorization to proceed with the Preliminary Engineering
work and NEPA Certification was received in May 2016.
Prior Years: $ 165,000
FY 2017: $ 535,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 14 of 54
City Hall Turf Reduction
DESCRIPTION
Design and install replacement landscape with alternative low-water demand plantings and drip
irrigation at the existing turf along Rodriguez Ave. and Torre Ave. fronting City Hall.
PROJECT JUSTIFICATION
Conventional turf, such as that around the perimeter of City Hall along Torre and Rodriguez Avenues
requires regular water throughout the year and especially so during the warm, dry summer months.
Reducing the amount of turf will save water and the cost of water. Retaining turf in areas of active
recreation and play, while reducing turf where it serves primarily as a cosmetic treatment, will save
resources.
STATUS
Initiate the project in fall FY 2016-17.
FY 2017: $ 320,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 15 of 54
Fiber Network Expansion to Service Center
DESCRIPTION
Design for and install fiber optic cable along Mary Avenue between the intersection of Stevens Creek
Boulevard and Mary Avenue and the City of Cupertino Service Center.
PROJECT JUSTIFICATION
The Service Center currently has no direct communication and network connection to City Hall.
A direct digital link between the two facilities would improve communication for city operations.
STATUS
Initiate the project in winter FY 2016-17.
FY 2017: $ 350,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 16 of 54
McClellan Ranch West Parking Lot Improvement
DESCRIPTION
Design and construct a new “green” meadow-style parking lot that is compatible with the creek environment at
McClellan Ranch West, which will be designed to have minimal impact to the site.
PROJECT JUSTIFICATION
The Stevens Creek Corridor Master Plan identified the need for additional parking to support the programs at
McClellan Ranch Preserve and users of the Stevens Creek trail. The opening of the Environmental Education
Center in 2015 has increased the parking demand at McClellan Ranch Preserve. The McClellan Ranch West site
has been used informally for staff and overflow parking without a suitable, stable surface, and which is not
available for use during wet weather due to mud.
STATUS
Initiate the project in summer FY 2016-17.
FY 2017: $ 400,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 17 of 54
Pedestrian Master Plan
DESCRIPTION
Prepare a Pedestrian Master Plan, which will identify changes and enhancements, establish performance
measures to determine the effectiveness of the enhancements, and identify potential grants that are available to
fund future projects. This project may result in future improvement projects.
PROJECT JUSTIFICATION
As the City continues to promote bicycle and pedestrian modes of travel, it becomes necessary to identify the
most heavily traveled pedestrian corridors and evaluate these for accessibility and safety. Having a pedestrian
master plan will allow the City to proactively identify areas prone to conflicts and prioritize improvements to
eliminate or minimize these conflicts.
STATUS
Initiate the project in spring 2017.
FY 2017: $ 120,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 18 of 54
Service Center - New Administration Building Feasibility Study
DESCRIPTION
Conduct a feasibility study to develop design options and cost estimates for building a new
administration building at the Service Center.
PROJECT JUSTIFICATION
The current Service Center Administration Building is inadequate for meeting current staffing levels. It
was designed and built in the late 1970’s and does not meet current building codes and accessibility
requirements. A new administration building will provide adequate efficient office and meeting space
for Service Center staff, as well as provide an opportunity to locate an Emergency Operations Center
(EOC) in a structurally sound building.
STATUS
Initiate the project in the winter of FY 2016-17.
FY 2017: $ 35,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 19 of 54
Service Center Shed No. 3 Improvements
DESCRIPTION
Design and construct a replacement for the existing Shed 3 to accommodate the landscape material storage and
organic waste storage requirements, including durable walls and canopy.
PROJECT JUSTIFICATION
As part of the City’s increasing waste diversion efforts, it now collects different types of organics from its sites to
recycle, including food scraps. To support this program, there needs to be a sufficient number of storage bays at
the Service Center to store the organic waste and keep the waste streams separate and covered until they can be
collected by the City’s recycling hauler. The existing material bays need to be reconfigured to accommodate the
increasing demand for separate storage bays.
STATUS
Initiate the project in the summer of FY 2016-17.
FY 2017: $ 100,000
FY 2018: $ 400,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 20 of 54
Stocklmeir House – New Sewer Lateral
DESCRIPTION
Install a new sewer lateral to connect the Stocklmeir House to the City’s sanitary sewer main.
PROJECT JUSTIFICATION
Alternative uses for the Stocklmeir house are being considered, including for office space. In order to
occupy the building various improvements will be necessary, including replacement of the sanitary
sewer line serving the house. This is the first step towards renovating this house and making it suitable
for future non-residential use and occupancy. The project will not be initiated until the new use of the
building is identified and approved by Council.
STATUS
Initiate and complete the project in FY 2016-17.
FY 2017: $ 50,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 21 of 54
Storm Drain Improvements – Foothill Blvd./Cupertino Rd.
DESCRIPTION
Design and construct a parallel system to the existing storm system to provide additional capacity.
PROJECT JUSTIFICATION
Alleviate local flooding and provide adequate downstream capacity. An existing section of storm line
that drains Cupertino Rd., which crosses by easement over private property, is prone to flooding.
Increasing the flow capacity of the storm drainage system by adding a supplemental main on Cupertino
Rd. and Foothill Blvd., will reduce the potential for flooding. This project will be Priority No. 1 in the
updated Storm Drain Master Plan (SDMP).
STATUS
Initiate the project in summer of FY 2016-17.
FY 2017: $ 1,900,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 22 of 54
Storm Drain Master Plan Update
DESCRIPTION
Prepare a master plan for the City’s storm drainage system which will identify areas for improvement to bring
the current system into compliance with current laws and regulations, and current land use and proposed future
land use.
PROJECT JUSTIFICATION
The storm drain master plan has not been updated since March 1993. With changes in State laws governing
storm water and land use changes, it is necessary to update the storm drain master plan to determine system
deficiencies and track changes to the storm drain system. The updated SDMP will provide guidance for
programming future CIP storm drain improvement projects.
STATUS
The initial phase of this project, which kicked off in December 2015, consists of analysis of the existing system and
reporting on the areas and segments of the system that require upgrades.
Prior Years: $ 330,000
FY 2017: $ 50,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 23 of 54
Street Median Irrigation & Plant Replacement
DESCRIPTION
Design and construct replacement irrigation and plantings of street medians.
PROJECT JUSTIFICATION
Since the installation of many of the City’s planted median islands, the approach to grading, planting, and
maintaining them has changed as the desire to conserve resources has increased. Over that same time, irrigation
products and systems have also improved efficiency. In addition, landscape plantings need to be replaced as they
age out over time. Projects to renovate the median islands will refresh the plantings and improve the efficiency in
the use of water and labor to maintain the systems.
STATUS
Consultant has been retained to prepare a master plan for the renovation of median islands on De Anza
Boulevard. Upon completion, annually develop specific project improvement plans in the fall for construction in
the following spring of each budget year.
Prior Years: $ 440,000
FY 2017: $ 220,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 24 of 54
Priority 2 Projects
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 25 of 54
Retaining Wall Repair – Cordova Road
DESCRIPTION
Design and construct a project to replace the wood planks in the existing retaining wall.
PROJECT JUSTIFICATION
There is an existing wall along Cordova Rd. that retains soil adjacent to private property. Some of the
wood planks in the existing retaining wall have failed while most others have a pronounced bow,
indicating that the surcharge is pushing the existing wall to its design limits and the risk of failure is high.
STATUS
Initiate the project in winter of FY 2016-17.
FY 2017: $ 350,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 26 of 54
Retaining Wall Replacement – Regnart Road
DESCRIPTION
Design and construct a new retaining wall to replace existing, including new surface and subsurface
drainage facilities.
PROJECT JUSTIFICATION
Portions of an existing wood retaining wall that is adjacent to the roadway are rotting and beginning to
fail. Since Regnart Road is the only means of public vehicular access beyond this point, failure of the wall
could obstruct access to the residential properties.
STATUS
Initiate the project in winter of FY 2016-17.
FY 2017: $450,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 27 of 54
Tennis Court Resurfacing – Various Parks
DESCRIPTION
Over successive years, design and construct the resurfacing of the tennis courts at Memorial Park, Varian
Park and Monta Vista Park.
PROJECT JUSTIFICATION
The tennis courts a three park locations in the City provide active recreation to residents and they are
well used. In order to maintain the quality of play the courts must be resurfaced periodically.
STATUS
Initiate design for first site in winter of FY 2016-17.
FY 2017: $ 588,000
FY 2018: $ 280,000
FY 2019: $ 235,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 28 of 54
Priority 3 Projects
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 29 of 54
Blackberry Farm – Splash Pad
DESCRIPTION
Design and construct a splash pad of approximately 2000 square feet.
PROJECT JUSTIFICATION
Blackberry Farm currently provides aquatic amenities for children and adults, but doesn’t have an
element to serve very young children and toddlers. Adding an element that will serve the youngest
family members will enhance the attraction of the facility for families with children of various ages.
STATUS
Project initiation and schedule is subject to the outcome of the Stevens Creek Corridor Park Chain Master
Plan.
Prior Years: $ 70,000
FY 2018: $ 620,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 30 of 54
McClellan Ranch – Community Garden Improvements Design
DESCRIPTION
Prepare design for improvement of the existing community garden, including perimeter fence replacement,
water/irrigation distribution system, garden paths, and accessibility to and within the garden. The initial
conceptual design is for coordination with gardener community, and will be followed by design development
plans for design refinement and construction cost estimate.
PROJECT JUSTIFICATION
The existing fence around the community garden is failing in many places and is otherwise inconsistent in design
and unreliable as a secure enclosure. The garden irrigation system is maintenance intensive and insufficient to
meet the needs of the garden. The garden layout has been reconfigured to increase the number of plots.
STATUS
Project schedule is subject to the outcome of the Stevens Creek Corridor Park Chain Master Plan.
FY 2017: $ 30,000
FY 2018: $ 66,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 31 of 54
McClellan Ranch – Construct Trash Enclosure
DESCRIPTION
Install a wood fence structure with gates on 3 sides of the existing trash and debris boxes. This would
include a concrete pad for the boxes.
PROJECT JUSTIFICATION
Currently, the trash containers are in the open, visible from McClellan Road, and attract illegal dumping.
Screening the trash containers will help discourage illegal dumping at McClellan Ranch Preserve.
STATUS
Project schedule is subject to the outcome of the Stevens Creek Corridor Park Chain Master Plan.
FY 2017: $ 154,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 32 of 54
Memorial Park Master Plan & Parking Study
DESCRIPTION
Develop a master plan for the renovation Memorial Park and evaluate the parking needs for Memorial
Park, Senior Center, Sports Center and the Quinlan Community Center. The project may result in a
future renovation project.
PROJECT JUSTIFICATION
A process to obtain community input and consensus will assist in formulating plans to renovate portions
of the park including parking requirements and upgrades for surrounding facilities.
STATUS
Initiate project in the spring of FY 2016-17.
FY 2017: $ 150,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 33 of 54
Recreation Facilities Monument Signs
DESCRIPTION
Design and construct new monument signs with lighting at the following locations: McClellan Ranch Preserve,
McClellan Ranch West, Blackberry Farm, Memorial Park and Sports Center
PROJECT JUSTIFICATION
The McClellan Ranch Preserve and Stevens Creek Corridor Signage Program was approved by Council in
December 2014. The Signage Program prescribes a standardized and consistent look and feel for all signage along
Stevens Creek. The Signage Program provides a signage convention that can be applied to other recreation
facilities in the city. The existing monument signs at several city facilities are outdated, worn, and in need of
repair. This project will install new monument signs at five city facilities consistent with the Signage Program.
STATUS
Initiate the project in the spring of FY 2016-17.
FY 2017: $ 385,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 34 of 54
Sports Center – Children’s Play Area
DESCRIPTION
Design and construct an outdoor play area in the space between the Multipurpose Room and the tennis
courts.
PROJECT JUSTIFICATION
The demand for child care at the Sports Center is increasing. The addition of a play area to serve young
children will enhance the level of service provided by the Sports Center to members with children and
can potentially increase membership among families with small children.
STATUS
Initiate the project in the spring of FY 2016-17.
FY 2017: $ 470,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 35 of 54
Sports Center – Exterior Upgrades
DESCRIPTION
Upgrades could include painting the building, possibly including a mural on the Stevens Creek Blvd.
side, landscape upgrades, aesthetic treatment to the outside decking, and possible installation of an
electronic monument sign.
PROJECT JUSTIFICATION
The last major upgrades to the building were in 2004 so the facility is in need of some minor upgrades,
due to wear-&-tear and weathering, and a desire to improve the character of the building to appeal to
customers.
STATUS
Initiate project in spring of FY 2016-17.
FY 2017: $ 270,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 36 of 54
Sports Center – Interior Upgrades
DESCRIPTION
Improvements could include moving the free weight and associated equipment to the lower level,
adding rubberize flooring, remodel the restroom including the locker areas, possible modifying the
reception area.
PROJECT JUSTIFICATION
The building was last upgraded in 2004 and, due to changes in customer demand; the building needs to
have some interior modifications and remodeling for it to continue to improve the level of service to the
community and to address on-going maintenance and operation issues.
STATUS
Initiate project in spring of FY 2016-17.
FY 2017: $ 20,000
FY 2018: $ 250,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 37 of 54
Priority 4 Projects
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 38 of 54
Blackberry Farm Pool Building Modification Feasibility Study
DESCRIPTION
Conduct a feasibility study to identify options for updating and modernizing the existing pool building.
This project may result in a future renovation project.
PROJECT JUSTIFICATION:
The existing pool building is outdated and difficult to maintain. Users have complained that it is dark
inside. Upgrading the existing building will provide a more maintainable and user-friendly building that
will enhance the enjoyment of the Blackberry Farm pool complex.
STATUS
Initiate the project in FY 2017-18.
FY 2018: $ 25,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 39 of 54
Blackberry Farm Pool Modification Study
DESCRIPTION
Conduct a feasibility study to identify options for modifying the existing pool to allow lap swimming.
This project may result in a future renovation project.
PROJECT JUSTIFICATION
The outreach conducted for the Stevens Creek Corridor Master Plan suggests that there is strong desire
for a community lap pool. The existing pool however is not deep enough at one end to permit flip turns
to be done safely and does not currently have lane lines and the required hardware to allow the pool to
be sectioned off for lap swimming.
STATUS
Initiate the project in FY 2017-18.
FY 2018: $ 25,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 40 of 54
Blackberry Farm Maintenance & Restroom Building Replacement
Feasibility Study
DESCRIPTION
Conduct a study to determine the feasibility of building a new maintenance and restroom building along the trail
between the Blackberry Farm pool complex and McClellan Ranch Preserve. This project may result in a future
construction project.
PROJECT JUSTIFICATION
The need for a new maintenance and restroom building along the trail between the Blackberry Farm pool
complex and McClellan Ranch Preserve was identified in the 2006 Master Plan since the existing facilities have
been deemed inadequate. This enhancement will allow for more effective maintenance of the Blackberry Farm
Park and will provide a much-needed additional restroom facility along the trail.
STATUS
Initiate the project in FY 2017-18.
FY 2018: $ 25,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 41 of 54
Blackberry Farm San Fernando Drive Entry Feasibility Study
DESCRIPTION
Conduct a feasibility study to identify options for improving bicycle and pedestrian access along the San
Fernando Drive entry driveway into Blackberry Farm. This project may result in a future renovation
project.
PROJECT JUSTIFICATION
Safe entry to and exit from Blackberry Farm at San Fernando Drive was identified as a concern in the
Stevens Creek Corridor Master Plan. Currently, vehicles, bicycles and pedestrians share the same
driveway that leads to and from Blackberry Farm off San Fernando Drive.
STATUS
Initiate the project in FY 2017-18.
FY 2018: $ 35,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 42 of 54
Memorial Park Phase 1 – Design
DESCRIPTION
Design and prepare construction documents and cost estimates for park improvements.
PROJECT JUSTIFICATION
The Memorial Park Master Plan & Parking Study will identify capital improvements for Memorial Park.
A conceptual plan for improvement of the park will make the implementation of the project more eligible
and attractive for potential grant funding.
STATUS
Subject to the outcome of the Memorial Park Master Plan & Parking Study, initiate design in FY 2017-18.
FY 2018: $ 250,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 43 of 54
Memorial Park Phase 1 – Construction
DESCRIPTION
Construct improvements at Memorial Park.
PROJECT JUSTIFICATION
Subject to the approval of a master plan and final design, construction of improvements will implement
the master plan.
STATUS
Subject to the outcome of the Memorial Park Master Plan & Parking Study, initiate design in FY 2017-18
and construction in FY 2018-19.
FY 2019: $ 1,000,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 44 of 54
Memorial Park – Tennis Court Restroom Replacement
DESCRIPTION
Evaluate options for providing a restroom in the vicinity of the tennis courts, by modification of the
existing or replacement. Design and construct the restroom improvements.
PROJECT JUSTIFICATION
The public restroom near the Memorial Park Tennis Courts needs upgrading for improved performance
and to improve accessibility.
STATUS
Initiate project in spring FY 2018-19.
FY 2019: $ 148,000
FY 2020: $ 300,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 45 of 54
Monta Vista Park Master Plan
DESCRIPTION
Develop a master plan for the renovation of Monta Vista Park. This project may result in a future
renovation project that could range from $ 500,000 to $ 2,000,000, subject to the outcome of the master
plan process.
PROJECT JUSTIFICATION
Monta Vista Park has some facilities from the original construction in the 1960s that can no longer be
used as intended. Areas of the park are underutilized for this reason. A process to obtain community
input and consensus will inform future plans to renovate portions of the park.
STATUS
Initiate project FY 2017-18.
FY 2018: $ 55,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 46 of 54
Portal Park – Renovation Master Plan
DESCRIPTION
Develop a master plan for the renovation of Portal Park. Include a community outreach process to
inform the plan. This project may result in a future renovation project that could range from $ 500,000 to
$ 2,000,000, subject to the outcome of the master plan process.
PROJECT JUSTIFICATION
Portal Park has some facilities from the original construction in the 1960s that can no longer be used as
intended. Areas of the park are underutilized for this reason. A process to obtain community input and
consensus will inform future plans to renovate portions of the park.
STATUS
Initiate project FY 2018-19.
FY 2019: $55,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 47 of 54
Quinlan Community Center –
Turf Reduction/Landscape Modifications
DESCRIPTION
Evaluate the turf spaces at around Quinlan Community Center to identify suitable areas for turf reduction.
Design and construct replacement landscape with alternative low-water demand plantings and drip irrigation.
PROJECT JUSTIFICATION
Conventional turf, such as that around the boundary of Quinlan Community Center, requires regular water
throughout the year and especially so during the warm, dry summer months. Reducing the amount of turf in
these inactive areas will save water, maintenance, and expense. Retaining turf in areas of active recreation and
play while reducing turf where it serves primarily as a cosmetic treatment will save resources.
STATUS
Initiate project in FY 2018-19.
FY 2019: $ 750,000
FY 2020: $ 743,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 48 of 54
Stevens Creek Bank Repair – South of SCB
Conceptual Design
DESCRIPTION
Prepare a conceptual design for repairs to creek banks that will protect property from further erosion and
stabilize the bank, and is compatible with existing goals and requirements for the creek corridor.
PROJECT JUSTIFICATION
In 2014, the City purchased a residential parcel (Blesch) on Stevens Creek Boulevard that lies between the
Stocklmeir site and the Blackberry Farm Golf Course. Before this parcel is improved, its bank should be
stabilized in order to protect the City’s investment. A conceptual plan for improvement of the bank and
channel will make the implementation of the project more eligible and attractive for potential grant
funding.
STATUS
Initiate project in FY 2017-18.
FY 2018: $ 100,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 49 of 54
Storm Drain Improvements –
Byrne Ave. & Stevens Creek Blvd.
DESCRIPTION
Design and construct new storm mains at the designated locations to increase the capacity of the
downstream portion of the system and allow the newer upstream portion of the system to connect to it.
PROJECT JUSTIFICATION
The storm drain system along Byrne Ave. is currently split into two separate systems, a newer upper
section and a lower section. In order to maximize the capacity of the recently installed section, the
existing downstream portion must be upgraded or supplemented. Increasing the capacity of the existing
downstream system on Byrne Ave. will allow the two systems to be connected thereby reducing the
storm water flow that is currently diverted to the Blackberry Farm Golf Course.
STATUS
Initiate the project in FY 2017-18.
FY 2018: $ 1,200,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 50 of 54
Storm Drain Improvements – Homestead Road
DESCRIPTION
Design and construct a parallel system to the existing storm system to provide additional capacity as
identified in the City’s Storm Drainage Master Plan (SDMP).
PROJECT JUSTIFICATION
Alleviate local flooding and provide adequate downstream capacity for the buildout of the SDMP. This
project is Priority No. 2 in the SDMP.
STATUS
Initiate the project in FY 2019-20.
FY 2019: $ 2,398,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 51 of 54
Traffic Signal: Foothill/I-280 SB Off-ramp
DESCRIPTION
Match funding for the design and installation of a new traffic signal at the intersection of Foothill
Expressway and the Interstate 280 southbound off-ramp.
PROJECT JUSTIFICATION
The County of Santa Clara Roads and Airports Department has identified a new traffic signal at the
intersection of Foothill Expressway and the Interstate 280 southbound off-ramp as a project in their draft
Expressway Plan 2040. A local match of 20% is required in order to place the project within their Tier 1
category, from which the first round of projects will be funded.
STATUS
Initiate project in FY 2017-18.
FY 2018: $ 100,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 52 of 54
Wilson Park Renovation Master Plan
DESCRIPTION
Develop a master plan for the renovation of the east side of Wilson Park. The project may result in a
future renovation project.
PROJECT JUSTIFICATION
Wilson Park has sport fields on the west side of the park and the east side of the park is potentially
underutilized. A process to obtain community input and consensus will assist in formulating a plan to
renovate portions of the park.
STATUS
Initiate project in FY 2018.
FY 2018: $ 55,000
City of Cupertino ~ City Council ~ Proposed FY 2017 Capital Improvement Program ~ May 17, 2016 Page 53 of 54
Ci
t
y
Co
u
n
c
i
l
Ma
y
17
,
20
1
6
C
I
P
F
Y
2
0
1
7
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
g
r
a
m