B-2016-1369 rc;
1
CAPEX ENGINEERING INC. ' f iii•
PO BOX 14198, FREMONT,CA 94539 f
Tel:(510)668-1815 Fax:(510)490-8690
September 28, 2016
Building Department
City of Cupertino
10300 Torre Ave.
Cupertino, CA 95014
Subject: Residence at
1110 Milky Way
Cupertino, CA
(Permit No. B-2016-1369)
SPECIAL INSPECTION SERVICES FINAL AFFMAVIT FOR ALL
THREADED ROD BOLTS INSTALLATION WITH EPDXY
Dear Sir:
CAPEX ENGINEERING INC., has provided testing and special inspection services at
the subject site in accordance with section 1704A of the California Building Code (2013
Edition)as listed below:
(1) Inspections of(10) 5/8"d2 x 18" min, embedment and (23) 5/8"d2 x 8"min.
embedment; all threaded rod bolts installation with Simpson Set-XP Epoxy and
embedded into existing concrete for 1-loldown and anchor bolts placement at
specific locations.
. .
(2) All drilled holes for receiving all threaded rod bolts installation were cleaned of
dust and debris and adequate in depth to embed into existing concrete.
Personnel under the general supervision of a registered Civil Engineer performed this
inspection. Based on the inspections performed and upon our substantiate reports that the
inspected work was performed,to the best of our knowledge, in conformance with the
approved plans and specifications and the applicable workmanship provisions of the
California Building Code.
Sincerely,
CAPEX.,,NGINEERING INC,,
2 it q- s 0
Gar s ., RE
4
' (oil treD,,CAT7W „,,, IS
Pri cipal (
\\:-N. , l;
t,
-,-z-z,-.,..------- "
g
ILE
November 24,2016 File No. M-002
Ms. Melly
1110 Milky Way
Cupertino, CA 95014
RE: Shear Walls Construction and Nailing Inspection
May Residenee - _
1 1 l 0 Milky Way
Cupertino, CA 95044
Dear Ms. Melly,
Per City Inspector's request and the"Special Inspection Notes Item 4- Shear Wall
Construction and Nailing"on structural plan sheet Si, we visited the house referenced
above on November 24,2016 to inspect the shear walls grades, edge nailing, field
nailing, sill nailing, structural framings, metal clips, metal straps and hold-downs
installed at site. Based on our job site review, all the above items applied on the shear
walls were in conformance with the plans specifications and meet the design
requirements.
Sincerely,
7 7
_
2
-2, \c,
A e's
Eric Keng I No 23184
• )
Op-