B-2016-1369 rc; 1 CAPEX ENGINEERING INC. ' f iii• PO BOX 14198, FREMONT,CA 94539 f Tel:(510)668-1815 Fax:(510)490-8690 September 28, 2016 Building Department City of Cupertino 10300 Torre Ave. Cupertino, CA 95014 Subject: Residence at 1110 Milky Way Cupertino, CA (Permit No. B-2016-1369) SPECIAL INSPECTION SERVICES FINAL AFFMAVIT FOR ALL THREADED ROD BOLTS INSTALLATION WITH EPDXY Dear Sir: CAPEX ENGINEERING INC., has provided testing and special inspection services at the subject site in accordance with section 1704A of the California Building Code (2013 Edition)as listed below: (1) Inspections of(10) 5/8"d2 x 18" min, embedment and (23) 5/8"d2 x 8"min. embedment; all threaded rod bolts installation with Simpson Set-XP Epoxy and embedded into existing concrete for 1-loldown and anchor bolts placement at specific locations. . . (2) All drilled holes for receiving all threaded rod bolts installation were cleaned of dust and debris and adequate in depth to embed into existing concrete. Personnel under the general supervision of a registered Civil Engineer performed this inspection. Based on the inspections performed and upon our substantiate reports that the inspected work was performed,to the best of our knowledge, in conformance with the approved plans and specifications and the applicable workmanship provisions of the California Building Code. Sincerely, CAPEX.,,NGINEERING INC,, 2 it q- s 0 Gar s ., RE 4 ' (oil treD,,CAT7W „,,, IS Pri cipal ( \\:-N. , l; t, -,-z-z,-.,..------- " g ILE November 24,2016 File No. M-002 Ms. Melly 1110 Milky Way Cupertino, CA 95014 RE: Shear Walls Construction and Nailing Inspection May Residenee - _ 1 1 l 0 Milky Way Cupertino, CA 95044 Dear Ms. Melly, Per City Inspector's request and the"Special Inspection Notes Item 4- Shear Wall Construction and Nailing"on structural plan sheet Si, we visited the house referenced above on November 24,2016 to inspect the shear walls grades, edge nailing, field nailing, sill nailing, structural framings, metal clips, metal straps and hold-downs installed at site. Based on our job site review, all the above items applied on the shear walls were in conformance with the plans specifications and meet the design requirements. Sincerely, 7 7 _ 2 -2, \c, A e's Eric Keng I No 23184 • ) Op-