Loading...
B-2016-1473CITY OF CUPERTINO BUILDING PERMIT BUILDINGADDRESS: CONTRACTOR: PERMIT NO: B-2016-1473 22643 WOODRIDGE CT CUPERTINO, CA 95014-2686 (342 15 072) OMEGA CONSTRUCTION SAN JOSE, CA 95117 OWNER'S NAME: HUANG AN-CHENG AND CHEN SZU-NING DATE ISSUED: 06/13/2016 OWNER'S PHONE: 408-540-4078 PHONE NO: (408) 605-8113 LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: License Class GENERAL BUILDING CONTRACTOR Lic. #586016 X BLDG Contractor OMEGA CONSTRUCTION Date 01/31/2018 —ELECT _PLUMB MECH X RESIDENTIAL _ COMMERCIAL I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. JOB DESCRIPTION: CONSTRUCT (N) 2ND STORY ADDITION (530 S.F.); INTERIOR I hereby affirm under penalty of perjury one of the following two declarations: REMODEL OF FOYER AND BATHROOM (60 S.F.) AND REPLACE 3 1. I have and will maintain a certificate of consent to self-insure for Worker's SKYLIGHTS Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. /10 I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this Sq. Ft Floor Area: 1060 Valuation: $180000.00 permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above APN Number: Occupancy Type: information is correct. I agree to comply with all city and county ordinances 342 15 072 342 Deferred Submittal (R-3),R-3 (Custom) and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue against said City in consequence of the granting of this permit. WITHIN 180 DAYS OF PERMIT ISSUANCE OR Additionally, the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code, Section 9.18. 180 DAYS FROM LAST CALLED INSPECTION. Signature _- Date /13 2016 Issued by: Abby Ayende p� �y ��Qy AA Date: 06/13/2016 `/ ►� v OWNER-BUILDER DER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the RE.-ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is following two reasons: t. I, as owner of the property, or my employees with wages as their sole installed without first obtaining an inspection, I agree to remove all new materials for compensation, will do the work, and the structure is not intended or offered for inspection. sale (Sec.7044, Business & Professions Code) z. I, as owner of the property, am exclusively contracting with licensed Signature of Applicant: contractors to construct the project (Sec.7044, Business & Professions Code). Date: 6/13/2016 I hereby affirm under penalty of perjury one of the following three declarations: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER t. I have and will maintain a Certificate of Consent to self-insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance, as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code, for the performance of the work for which this California Health & Safety Code, Sections 25505, 25533, and 25534. I will permit is issued. maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the 3. I certify that in the performance of the work for which this permit is issued, I Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous shall not employ any person in any manner so as to become subject to the air contaminants as defined by the Bay Area Air Quality Management District I Worker's Compensation laws of California. If, after making this certificate of will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and exemption, I become subject to the Worker's Compensation provisions of the the Health & Safety Code, Sections 25505, 25533, and 25534. Labor Code, I must forthwith comply with such provisions or this permit shall �1 be deemed revoked. Owner or authorized agent: APPLICANT CERTIFICATION Date: 6/13/2016 I certify that I have read this application and state that the above information is CONSTRU TION LEND F Y correct. I agree to comply with all city and county ordinances and state laws I hereby affirm that there is a construction lending agent a performance relating to building construction, and hereby authorize representatives of this city of work's for which this permit is issued (Sec. 3097, Civ C.) to enter upon the above mentioned property for inspection purposes. (We) agree Lender's Name to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in Lender's Address consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal ARCHITECT'S DECLARATION Code, Section 9.18. I understand my plans shall be used as public records. Licensed Signature Date 6/13/2016 professional MA kLrc�e-�ioia ISM 1IT I 3 ourMut�tw r vi tL ,bOOA. NV!8uiLts X0 04 ioi sari i M P. RTIN01,;3k as 2 ' IJS 711 + F1fiX 408 7 fi33w'buildirt4ia cuerkincs ar v ERTIN47 �... ' _ .._ W H. YANG STRUCTURAL 'ENGINEERING SERVICE MFILk 10' lb, October 2, 2016 City of Cupertino, Inspection Services 10300 Torre Avenue Cupertino, CA 95014-3255 Attn: City Inspector Re PERMIT #: 2016-1473 - (APN# 342 15 072) pow bnA Owner: HUANG AN-CHENG AND CHEN SZU-NTNG Address: 22643 WOODRIDGE CT This is to certify that in accordance with Section 1710 of the California Building Code, we have provided special inspection for the following construction: High strength bolts for steel moment frame connections tighten to specified torque as specified by EOR. The special inspection were performed by the undersigned Registered Structural Engineer in the State of California. Based upon inspection performed, it is our professional judgment that, to the Voest of our knowledge, the inspected'structural work was performed '*in accordance with the approved plans, specifications, and applicable workmanship provisions of the California Building Code. Very truly yours, 10, S5347 €X UC FC W. H. Yang, PhD, SE CC. Jung Huh/General COntractOr 1164 SUSAN WAY, SUNNYVALE, cA 94087-1659 T: 408.329.8787 F: 408.228.5176 E: w.x YANG@z IOTM kIL.COM W. H. YANG STRUCTURAL ENGINEERING SERVICE F1FAU�Z V)D September 15, 2016 City of Cupertino, Inspection Services 10300 Torre Avenue Cupertino, CA 95014-3255 Attn: City Inspector Re: PERMIT #: 2016-1473 - (APN# 342 15 072) Owner: HUANG AN-CHENG AND CHEN SZU-NING L�- Address: 22643 WOODRIDGE CT This is to certify that in accordance with Section 1710 of the California Building Code, we have provided structural observations for the following construction: Epoxy application for anchorage bolts and hold-down anchor rods at existing concrete foundations; Timber framing and connections; Steel Moment Frame, and welding & bolting. The structural observations were performed by the undersigned Registered Structural Engineer in the State of California. Base upon observation performed, it is our professional judgment that, to the best of our knowledge, the observed structural work was performed in accordance with the approved plans, specifications, and applicable workmanship provisions of the California Building Code. Very truly yours, W. H. Yang, PhD, SE FESS{� LU S5347 EXP .6�� u,!$ CAL� CC. Jung Hun/General Contractor 1164 SUSAN WAY, SUNNYVALE, CA 94087-1659 T: 408.329.8787 F: 408.228.5176 E: W.H YANG@IIOTMAIL.COM Project Name: Project Address: Project Description: CALGREEN SIGNATURE DECLARATIONS 228143 WOODRIDGE CT. REMODEL AND ADDITION 22643 WOODRIDGE CT. INTERIOR REMODEL AND SECOND STORY ADDITION SECTION 1 — DESIGN VERIFICATION Complete all lines of Section 1 — "Design Verification" and submit the completed checklist (Columns 1 and 2) with the plans and building permit application to the Building Department. The owner and design professional responsible for compliance with CalGreen Standards have revised the plans and certify that the items checked above are hereby incorporated into the project plans and will be implemented into the project in accordance with the requirements set forth in the 2013 California Green Building Standards Code as adopted by the City of Cupertino. Owner's Signature Date 5ZU-NTNG CHEN Owner's Name (Please Print) Design Professional's Signature Date SHEN-I CHIOU _ Design Professional's Name (Please Print) _ Signature of License,, /) P, rroffessional responsible for CalGreen compliance Date p th vo Name of License Professional responsible for CalGreen compliance (Please Print) Phone sc,h r "60 o carch. net. Email Address for License Professional responsible for CalGreen compliance SECTION 2 -- IMPLEMENTATION VERIFICATION Complete, sign and submit the competed checklist, including column 3, together with all original signatures on Section 2 to the Building Department prior to Building Department final inspection. I have inspected the work and have received sufficient documentation to verify and certify that the project identified above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of the 2013 California Green Building Standards Code as adopted by the City of Cupertino. S, Cf - 117' Signature of License Professional responsible for CalGreen compliance bate N _z Q 44b''318 311fl f Name of License Professional responsible for CalGreen compliance (Please Print) Phone Email Address for License Professional resoons IGreci REVILWEU £vh� CJDL CO PUANCE Page 5 of 5 Review .d 3y: Phucing Devrie5 Calrreen, 2014.dar reiised 11104/14 Date: 06iG9116