Loading...
B-2016-1215CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO: B-2016-1215 10110 CALIFORNIA OAK WAY CUPERTINO, CA 95014 (342 12 030) C B A SITE SERVICES INC OAKLEY, CA 94561 OWNER'S NAME: PACIFIC GAS AND ELECTRIC CO DATE ISSUED: 06/23/2016 OWNER'S PHONE: 800-743-5000 PHONE NO: (925) 754-7633 LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: License Class ELECTRICAL Lic. #455726 Contractor C B A SITE SERVICES INC Date 04/30/2018 X BLDG _ELECT _PLUMB MECH RESIDENTIAL X COMMERCIAL I hereby affirm that I am licensed under the provisions of Chapter (commencing _ with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. JOB DESCRIPTION: Install (I) antenna, DC6 unit, DC12, Purcell cabinet, DUS411, XMU I hereby affirm under penalty of perjury one of the following two dleclarations: inside (N) Purcell cabinet, H1 -CAP retrofit, fiber/DC trunk. 1. I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labo I Code, for the performance of the work for which this permit is issued. k�' I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the ork for which this Sq. Ft Floor Area: Valuation: $25000.00 permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above Number: Occupancy Type: information is correct. I agree to comply with all city and county ordinances 342 12 030 3 42 A (Tenant Improvements) and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue against said City in consequence of the granting of this permit. WITHIN 180 DAYS OF PERMIT ISSUANCE OR Additionally, the applicant understands and will comply with all nc n -point source regulations per the Cupertino Municipal Code, Section 9.'8. 180 DAYS FROM LAST CALLED INSPECTION. Signature Date236/ /2016 Issued by: Abby Ayende Date: 06/23/2016 O ER -B LDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the RF. -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is following two reasons: 1. I, as owner of the property, or my employees with wages as their sole installed without first obtaining an inspection, I agree to remove all new materials for compensation, will do the work, and the structure is not intended or offered for inspection. sale (Sec.7044, Business & Professions Code) 2. I, as owner of the property, am exclusively contracting with icenscd Signature of Applicant: contractors to construct the project (Sec.7044, Business & P ofessions Code). Date: 6/23/2016 I hereby affirm under penalty of perjury one of the following three I eclarations: for Worker's ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER 1. I have and will maintain a Certificate of Consent to self -insure Compensation, as provided for by Section 3700 of the Labo Code, for the performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance, as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code, for the performance of the ork for which tbis California Health & Safety Code, Sections 25505, 25533, and 25534. I will permit is issued. maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the 3. I certify that in the performance of the work for which this p rmit is issued, I Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of air contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and exemption, I become subject to the Worker's Compensation rovisions of the the Health & Safety Code, Sections 25505, 25533, and 25534. Labor Code, I must forthwith comply with such provisions o r this permit shall be deemed revoked. Owner or authorized agent: APPLICANT CERTIFICATION Date: 6/23/201 I certify that I have read this application and state that the above 'information is STR IO LENDING AGENCY correct. I agree to comply with all city and county ordinances and state laws I hereby affirm that there is a construction lending agency for the performance relating to building construction, and hereby authorize representatives of this city of work's for which this permit is issued (Sec. 3097, Civ C.) to enter upon the above mentioned property for inspection purposes. (We) agree Lender's Name to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in Lender's Address consequence of the granting of this permit. Additionally, the applicant understands regulations the Cup I rtino Municipal ARCHITECT'S DECLARATION and will comply with all non -point source per Code, Section 9.18. 1 understand my plans shall be used as public records. Licensed Signature Date 6/23/2016 Professional CONSTRUCTION PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 CllRI:f2TfN0 (408) 777-3228 • FAX (408 777-3333 • buildingOcupertino.ora 13 2-016 ❑ NEW CONSTRUCTION El ADDITION ❑ ALTERATION/TI ❑ REVISION/DEFERRED ORIGINAL PERMIT PROJECT ADDRESS 10110 California Oak Way APN0 342-63-001 OWNERNAME PG&E PHONE 800-743-5000 E-MAIL STREET ADDRESS 245 Market Way CITY, STATE, ZIP San Francisco FAX CONTACT NAMEon behalf of AT&T Mobility PHONE 925-510-5081 EMAII 2pitskies@sbcglobal,net STREETADDRESS 4780 Chabot Dr., Ste. 104 CITY, STATE, ZIP Pleasanton, CA 94588 FAX ❑ OWNER ❑ OWNER -BUILDER 11OWNER AGENT ❑ CDI TRACTOR O CONTRACTOR AGENT IN ARCHITECT ❑ ENGFNB13R 111 DEVELOPER ❑ TBNANT CONTRACTORNAME TBD LICBNSENUMBER LICENSETYPE BUS. LTC 9 COMPANY NAME B -MAIL FAX sTRBE'r ADDRESS CITY, STATE, ZIP PHONE ARCHITECTIHNGINEERNAME Joshua YJ Kang ICENSENUMBER C63216 BUS, LIC'4 COMPANYNAMB Byers Engineering CO. E-MAIL FAX STRBETADDRESS 4780 Chabot Dr., Ste. 104 cITY,STATE,ztP Pleasanton, CA 94588 PHONE 925-785-7431 DESCRIPTION OF WORK I 6 6 - t , CIA lA+/ Vl T pus ._ 1 (/ S -Vl r1 C a bf tom. _ cxt '+A,6-er BXISTING•USB PROPOSED USE CONSTR.TYIE 8S RIES PG&E EIec.Tower Wireless Telecom USE TYPE OCC. SQ.F'I'. VALUATION ($) EXISTG NEW FLOOR DEMO TOTAL AREA AREA AREA ETAREA BATHROOM KITCHEN OTHER REMODELAREA REMODBLARRA RHMODH AREA PORCH AREA DECK ARBA TOTAL DECK/PORCIf Ali aA G B ARRA; ❑ DErrACH I I O ATTACH 6 DWELLING UNITS; IS A SECOND UNIT 0 YES SRCONq STORY J] 'ns BEING ADDED? ONO ADDITI i N? ONO PRH -APPLICATION ❑YES IF YES, PROVIDE COPY OF IS THE OLDG AN OYES ' RECE] VE Y:.. TOTAL VALUATION; PLANNINGAPPL# ONO PLANNING APPROVAL LETTER EICHLERROME? ONO'. $25,000 By my signature below, I certify to each of the following: I am the property owner or authorized agent to act onhe p perry owner's behalf. I have read this application and the information I have provided is correct. I have road the Description of Work and verify it is acbu c. I agree to comply with all applicable local ordinances and state laws relati to build' g c nstruction. I autholze r presentatives of Cupertino to enter the above -identified property for inspection purposes. Signature Applicant/Agent: ' Date: of I• � SUPPLEMENTAL INFORMATION REQUiZED . „PLAN,CHEC&TYPE .- '.-. ..",.. ROUTING SLI P.'•,. ❑ OVER -THF -.COUNTER 1'LANREVn3W ..'. Now SFD or Multifamily dwellings: Apply for demolition permit for existing building(s). Demolition permit is required prior to issuance of building .BIIII7)iNG ...`•. .. permit for new building, ❑ EXPRE§S ' ' ❑ PLANNING PLA N' REVIEW: . _ Commercial Bldgs: Provide a completed Hazardous Milterials Disclosure ❑ '.STAiMAzin . ❑PuDyic woitJr§ '• . Porin if any Hazardous Materials are being used as part of this project..: Q �nIE TJEPT _ Copy of Planning Approval Letter or Meeting with Plan) Ing prior t0 ~: ❑ El: YSEN submittal of Building Permit application. MAJOR SANITARY EI1 DIS Tf CT ' EI' ENVI[iON ENTAL IIEALTB,. • ' .. •. BldgApp_2011.doc revised 06/21/11 Rai Pacific Gas and Telecommunications us Mall: Pa Business Development Pacific Gas and Electric Company Electric Company.., 246 Market Street Mall Code N10D San Francisco, CA 94105-1702 WE DELIVER ENERGY,' Fax: 415-973-3884 Letter of Authorization Wireless Provider: AT&T Location: 10110 California Oak APN: N/A SBE: 135-43-038C Parcel 1 Pacific Gas and Electric Comnpar above, and pursuant to the term,, Antenna Attachments entered in PCS, LLC (LICENSEE) dated Fe the Wireless Provider, its agents, • Access the PG&E Land Fee Property ay, Cupertino, CA (PG&E), as the owner of the property referenced and conditions of Master License Agreement for o by and between PG&E and New Cingular Wireless )ruary 17, 2005 (Wireless Provider), hereby authorizes contractors to: above, following advanced notice to PG&E. • Conduct necessary activities such as site design visits, radio frequency tests subject to PG&E's prior review and approval. • Apply for and obtain all land use approvals and permits, to order building permit plans and architectural/engineering drawings which are appropriate for the installation, construction, and continued operation of a wireless communications site (including antennas and all ancillary equipment and structures). This Letter of Authorization is subject to the following conditions: • The Wireless Provider shall be sol�ly responsible for satisfying all conditions of approval that may be contained in a conditional use permit issued by the responsible jurisdiction on behalf of "owner," "applicant" and/or "development permit holder" as referenced in the conditional use permit for as long as the same may exist (without regard to the term of the Master License Agreement). Prior to the issuance of any conditional use permit, all conditions of approval, associated with permit must be reviewed and approved by PG&E's Land Department. • As the applicant, the Wireless ProSider shall be solely responsible for the payment of all agency fees including, but not limited to application fees, costs of agency review and permitting fees. • Before entering the PG&E Land, the Wireless Provider, shall ftrrnish PG&E's Land Department with satisfactory evidence that the Wireess Provider has procured the insurance policies and coverages set forth in the Master License Agreement. • The Wireless Provider shall pr the PG&E Land by contacting o The Wireless Provider, its agents the PG&E Facilities and Land. • The Wireless Provider's activities terms and conditions set forth the T Date: /!� r l� l�'�vt�l�'L� a;. X, Ralph Medina Manager, Land Management Pacific Gas and Electric Company 124 -hour advanced notice to PG&E's Land Department prior to entry on Toy at (415) 973-0622. contractors shall not interfere with or impair PG&E's use of this Letter of Authorization are subject to all of the License Agreement. Site #: ATT-CNU2037 LTE 3C Site Name: Ranch S ^v°4 _ CustoEngineering u ,m ` SOLUTIONS November 25, 2015 AT&T Mobility c/o Ronald Keller Byers Engineering - California 4780 Chabot Dr., Suite 104 Pleasanton, CA 94588 Reference: Structural Analysis of PG&E 1 kV Transmission Line, AT&T APN: 342-63-001; SBE 135.4 Dear Mr. Keller: Cofijornia. Custom Engineering Solutions 2603 Camino Ramon, Suite 200 San Ramon, CA 94583 Headquarters. Custom Engineering Solutions 1060 Windward Ridge Pkwy, Suite 150 Alpharetta, GA 30005 :r No. 40752557 (181114); Lawrence -Monte Vista, Newark -Britton, 115 No, ATT-CNU2037 located 10110 California Oak Way, Cupertino, CA; 2C-1 PG&E and its' engineering consultants, h ve in accordance with the California Public Utility Commission's (CPUC) general orders, performed a structural ana ysis on the above referenced lattice steel tower and have determined that the tower meets or exceeds CPUC and P�&E strength requirements for your proposed antenna installation. For the reasons stated below, structural calculations need not be provided to Santa Clara County. The following Information should clarify on transmission towers. PG&E is a pul electric transmission towers and poles PG&E is responsible to the CPUC to en its towers. Local jurisdictions are "preer utility to submit to their permitting proce In order to comply with CPUC regulation mounting PCS or cellular antennas to a consultants must thoroughly review the stl the structural engineer's responsibility to mounting arrangements are suitable. In m (both wind and weight) are so insignific calculations nor modifications to the tower or mounting arrangement are required installation, PG&E inspects the workmans with PG&E design requirements. Sincerely, dr Stephan Tremblay Civil Engineer, P.E, Custom Engineering Solutions Inc, for PG v PG&E interacts with local permitting agencies when installing antennas utility, therefore, the design and construction of utility structures such as e under the jurisdiction of the CPUC rather than under local jurisdictions. the use of sound engineering principles in the design and construction of T by State Law under the Public Utilities Code and cannot require a public i when doing work on utility structures, > and standards PG&E has established the following procedures; before iy transmission tower, PG&E's structural engineers and its engineering ictural Integrity of the tower and the proposed mounting arrangement. It is determine whether modifications to the tower are required and that the ist cases, the additional loading due to the antennas and associated cable int compared to the strength of the tower that neither actual structural .re necessary. In some cases, however, structural modifications to the tower nd must be done before any antenna may be attached. Following the lip of the mounting to ensure that the installation was made in accordance r,