Loading...
10040140_ CITY OF ICUP EBB' INO BUILDING PERMIT I BUILDING ADDRESS: 1 INFINITE LOOP FLR 2 N CONTRACTOR: DPR CONSTRUCTION INC I PERMIT NO: 10040140 OWNER'S NAME: APPLE INC 11450 VETERANS BLVD Y DATE ISSUED: 04/22/2010 1 OWNER'S PHONE: 5104323868 1 REDWOOD CITY, CA 94063 1 PHONE NO: (650)474 -1450 1 LICENSED CONTRACTOR'S DECLARATION License Class to�i Lic.# �9 2SrY Contractor t°2 Date ly 1-7—:q 1 hereby affirm that 1 am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. BUILDING PERMIT INFO: BLDG r ELECT f— PLUMB r MECH r RESIDEN'T'IAL r- COMMERCIAL i- JOB DESCRIPTION: COMM'L- DEMO NON BEARING PARTIONS & BUILD 10 NEW OFFICES WITH NON BEARING PARTIONS (4176SQ) 1 hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self - insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this Sq. Ft Floor Area: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. If _ FE] hereby affirm that 1 am exempt from the Contractor's License Law for one of the following two reasons: I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Sec.7044, Business & Professions Code). 1 hereby affirm under penalty of perjury one of the following three declarations: I have and will maintain a Certificate of Consent to self - insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, 1 must forthwith comply with such provisions or this permit shall be deemed revoked. .< APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. / Signal ure /l .L�_ _ _r Hate Valuation: $264 APN Number: 31602105.FLR2 S Occupancy Type: PERMIT EXPIRES E F WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROM LAST CALLED INSPECTION. Issued by: Date: �'f 7• C9 RE- ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, 1 agree to remove all new materials for inspection. Signature of App Date: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE 1 have read the hazardous materials requirements under Chapter 6.95 of the California health &r Safety Code, Sections 25505, 25533, and 25534. I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health &c Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should 1 use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Sections 25505, 25533, and 25534. or autizet gent: 4 / / CONSTRUCTION LENDING AGENCY 1 hereby affir(n that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's ARCHITECT'S DECLARATION I understand my plans shall be used as public records. Licensed Professiona PCITYOp-F N i c-��'C44 � ` c) APN # J [ �0 0 1 0 S �_ L �_ �_ Date: �/ a r Building Address: / //VA /JJi`&-- e- 0,9 2v-4 X- to a Mailing Address (if different from building address): S>f,W&e-- Tenant ❑ (If tenant please provide a letter from the building owner approving the tenant improvement.) Building Owner Are Hazardous Materials being used as part of this project? Yes No Tenant/Building Owner's Name: Phone #: e � '3 4APIL &' / N G S/ 3 Z_ Contractor: Phone #: y/S Z6r o3z_�/ ,J°x Fax #: -Z- 757 S� Contractor License #: Cupertino Business License #: Contact: Phone #: re /s- D Fax #: Alternate Contact: Phone #: GS e Zy S - 7b Z P4,41 j4 / Fax #: - Z 2- -- Valuation (cost of project): `t 2 Job Description (be specific): rr &-Pqo /V BnJ /3G�/%lc'9l✓L� ��eE'Y/ %J O�VS Tenant Improvement Includes Re -Roof: Yes ❑ No E9- If yes, number of squares Tenant Improvement Includes Structural Yes ❑ No 0� Type of Construction (Usage Class): Occupancy Type: 1 -A, 1 -B --- II/III/V -A ❑ II/III B, IV -HT, V -B ❑ Project Size: Express Standard Large ❑ Major Green Building: Please complete Leedl for commercial interiors checklist & attach it to the application or if applicable, include in plans & sheet index LEER Points Achieved * ** For Office Use Only * ** Over The Co enter ❑ Revised 07/06/09 CffTY (DIF C lU YERTffN TENANT RMI RGVEM ENT Y EIE SCHEDULE Quantity Fee ID Fee Description Fee Group Fermat Type IATINSP Tenant Improvement B 1A') I Inspection IATIPLNCK Tenant Improvement Plan B Check 1BTIINSP Tenant improvement B 1B TI Inspection 1BTIPLNCK Tenant Improvement Plan B =(��v Check 1 ETIINSP Tenant Improvement B I E TI Inspection-Preschool IETIPLNCK Tenant Improvement Plan B Check - Preschool 1 FTIINSP Tenant Improvement B 2F TI Inspection-Factory/Indust 1FTIPLNCK Tenant Improvement Plan B Check- Factory /Indust 1HTIINSP Tenant Improvement B 7l>Fl[ 71 Inspection-Hazardous 1HTIPLNCK Tenant Improvement Plan B Check- Hazardous I ITIINSP Tenant Improvement B llI TI Inspection-Institutional IITIPLNCK Tenant Improvement Plan B Check - Institutional 1MTIINSP Tenant Improvement. B IM TI Inspection - Merchandise 1MTIPLNCK Tenant Improvement Plan B Check- Merchandise ISTIINSP Tenant Improvement B IS TE Inspection - Parking Garag 1 STIPLNCK Tenant Improvement Plan B Check - Parking Garage 1 REROOFCOM Re -Roof Commercial B IBCBSC Cal Bldg Standards B ALL PERMIT TYPES Commission Fee 1BSEISMICO Seismic Commercial B 1 BUS LIC Business License B 2 of 2 (I11 I(1)It" (Il Il��(�I(11ft,1 l l Buipfling Department City Of Cupertino 1.0300 Torre Avenue Cupertino, CA 95014 -3255 Telephone: 408 - 777 -3228 Fax: 408-777-3333 JOB ADDRESS: PERMIT # l �j �� 49 OWNER'S NAME: lw'r4&' iRlC- PHONE# 0.32- GENERAL CONTRACTOR: DI BUSINESS LICENSE # ADDRESS: i %Siv CITY /ZIPCODE: *Our municipal code requires all (businesses working in the city to have a City of Cupertino businegs license. NO IBURLDIINC FINAL OR (FINAL OCCUPANCY >INSPIECTiON(S) WELL 181E SCHEDULED UNTRL '1<'1EIIIE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CU? ERT N(D BUSINESS LICENSEE. I am not using any subcontractors: Signature Date Pi ease check appllicalblle subcontractors and comps ete the ff ®ill ®wing Wormti ®n: d Owner / C ®n actor Sign atsnre air '-.,Q- 11Ld ate SUBCONTRACTOR BUSINESS NAN!iIIlE HUMNIESS LICENSE # Cabinets & Millwork Cement Finishing Electrical C C' Excavation Fencing Flooring / Carpeti•ng Linoleum / Wood -T— Glass / Glazing �,��� 3 l.-2 Heating Insulation Landscaping Lathing Masonry - - Painting / Wallpaper G e .--- - - -__ Paving Plastering Plumbing Roofing Septic Tank Sheet Metal j/✓I P �2`7,3� Sheet Rock �- Tile Owner / C ®n actor Sign atsnre air '-.,Q- 11Ld ate Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below ROOM= 1-11 B. Site 9. Install H.E. Irrigation,(details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Ryash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS1 40 points Plan Review Process Work Book Page-12-Revised 3/25/08 ' LEED for Commercial Interiors v2.0 Registered Project Checklist Project Name: Project Address: Yes 7 No Sustainable '9 Credit 1 1 to 3 =Select a LEED Certified Building 3 OR Locate the tenant space in a building with following characteristics: 1 to 3 Option 1A 1 1/2 Option 1 B Stormwater Management: Rate and Quantity 1/2 Option 1C Stormwater Management:Treatment 1/2 Option 1D Heat Island Reduction: Non-Roof 1/2 to 1 Option 1 E Heat-Island Reduction: Roof 1/2 Option 1F Light Pollution Reduction 1/2 Option 1 G Water Efficient Irrigation: Reduce by 50% 1/2 Option 1H Water Efficient Irrigation: No Potable Use or No Irrigation 1/2 Option 11 Innovative Wastewater Technologies 1/2 Option 1J Water Use Reduction: 20% Reduction 1/2 Option 1K Onsite Renewable Energy 1/2 to 1 Option 1 L Other Quantifiable Environmental Performance 1/2 to 3 Credit 2 Development Density and Community Connectivity 1 Credit 3,1 Alternative Transportation: Public Transportation Access 1 Credit 3.2 Alternative Transportation: Bicycle Storage&Changing Rooms 1 Credit 3.3 Alternative Transportation: Parking Availability 1 Yes 7 No MMM,. 'Water Efficjiency .a Credit 1.1 Water Use Reduction -20% Reduction 1 Credit 1.2 Water Use Reduction -30% Reduction 1 Yes 7 No Prereq 1 Fundamental Commissioning Required r_ Prereq 2 Minimum Energy Performance Required Prereq 3 CFC Reduction in HVAC&R Equipment Required NOTE for EAcl i All LEED for Commercial Interiors projects registered after June 26th,2007 are required to achieve at least two(2)points under EAcl. Projects may earn 2 points from achieving any combinalion of the 4 sub-credits under EAcl. Credit 1.1 O timize Energy Performance-Lighting Power 1 to 3 Option A: Reduce lighting power density to 15% below the standard 1 Option B: Reduce lighting power density to 25% below the standard 2 Option C: Reduce lighting power density to 35% below the standard 3 Credit 1.2 Optimize Energy Performance-Lighting Controls 1 Credit 1.3 O timize Energy Performance-HVAC 1 to 2 Option A: Equipment Efficiency and Zoning&Controls 1 to 2 Option B: Reduce Design Energy Cost 1 to 2 Credit 1.4 O mize Energy Performance-Equipment and Appliances 1 to 2 1ti70%of ENERGY STAR eligible equipment is ENERGY STAR rated 1 90%of ENERGY STAR eligible equipment is ENERGY STAR rated 2 Credit 2 Enhanced Commissioning 1 Credit 3 Energy Use, Measurement&Payment Accountability 1 to 2 eCase A: Projects with area less than 75%of total building area 1 to 2 Case B: Projects with area 75%or more of total building area 2 Credit 4 Green Power 1 Yes ? No Points'Materlals�&Resources 14 Prereq 1 Storage and Collection of Recyclables Required Credit 1.1 Tenant Space, Long Term Commitment 1 Credit 1.2 Building Reuse, Maintain 40%of Interior Non-Structural Components 1 Credit 1.3 Building Reuse, Maintain 60%of Interior Non-Structural Components 1 Credit 2.1 Construction Waste Management, Divert 50% From Landfill 1 Credit 2.2 Construction Waste Management, Divert 75% From Landfill 1 Credit 3.1 Resource Reuse,5% 1 Credit.3.2 Resource Reuse, 10% 1 Credit 3.3 Resource Reuse,30°/6 Furniture and Furnishings 1 ('.,edit 4 1 Recycled Content, 10% (post-consumer+ 1/2 pre-consumer) 1 Credit 4.2 Recycled Content, 20% (post-consumer+ 1/2 pre-consumer) 1 Credit 5.1 Regional Materials, 20% Manufactured Regionally 1 Credit 5.2 Regional Materials, 10% Extracted and Manufactured Regionally 1 Credit 6 Rapidly Renewable Materials 1 Credit 7 Certified Wood 1 Yes ? No Indoor • 17 Ppi6ti, Prereq 1 Minimum IAQ Performance Required Prereq 2 Environmental Tobacco Smoke(ETS) Control Required Credit 1 Outside Air Delivery Monitoring 1 Credit 2 Increased Ventilation 1 Credit 3.1 Construction IAQ Management Plan, During Construction 1 Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1 Credit 4.1 Low-Emitting Materials,Adhesives and Sealants 1 Credit 4.2 Low-Emitting Materials, Paints and Coatings 1 Credit 4.3 Low-Emitting Materials,Carpet Systems 1 Credit 4.4 Low-Emitting Materials,Composite Wood and Laminate Adhesives 1 Credit 4.5 Low-Emitting Materials,Systems Furniture and Seating 1 Credit 5 Indoor Chemical and Pollutant Source Control 1 Credit 6.1 Controllability of Systems, Lighting 1 Credit 6.2 Controllability of Systems,Temperature and Ventilation 1 Credit 7,1 Thermal Comfort-Compliance 1 Credit 7.2 Thermal Comfort-Monitoring 1 Credit 8,1 Daylight&Views-Daylight 75%of Spaces 1 Credit 8.2 Daylight&Views-Daylight 90%of Spaces 1 Credit 8.3 Daylight&Views-Views for 90%of Seated Spaces 1 Yes ? No Innovation DesignProcessi Credit 1.1 Innovation in Design: Provide.Specific Title 1 Credit 1.2 Innovation in Design: Provide Specific Title 1 Credit 1.3 Innovation in Design: Provide Specific Title 1 Credit 1.4 Innovation in Design: Provide Specific Title 1 Credit 2 LEEDTm Accredited Professional 1 Yes ? No TotalsProject • • Points Certified: 21 To 2!3 -pinta, Silver: 27 to 3' points. Gold: 32 to 41 Points. Platinum: 42 to 57 points