B-2016-1947CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS:
CONTRACTOR:
PERMIT NO: B-2016-19,47
10330 MENHART IN CUPERTINO, CA 95014-3631 (375 16 017)
GRAND - NEST
CONSTRUCTION
SARATOGA, CA 95070
OWNER'S NAME: MENHART PRIME LLC
DATE ISSUED: 08/30/2016
OWNER'S PHONE: 408-829-6083
PHONE NO: (408) 891-8059
LICENSED ONT A TOR' ARATION
BUILDING PERMIT INFO:
License Class a Lie. #965419
Contractor GRAND - NEST CONSTRUCTION. Date 09/30/2017
X BLDG _ELECT _ PLUMB
I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing
_
MECH X RESIDENTIAL _ COMMERCIAL
with Section 7000) of Division 3 of the Business & Professions Code and that my
license is in full force and effect.
JOB DESCRIPTION:
(N) 2 STORY HOME 2197 SQ FT, (I) GARAGE 425 SQ FT, (N)PORCH
I hereby affirm under penalty of perjury one of the following two declarations:
50 SQ FT
1. I have and will maintain a certificate of consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
r. performance of the work for which this permit is issued.
: ' I have and will maintain Worker's Compensation Insurance, as provided for by
-;L/0Section 3700 of the Labor Code, for the performance of the work for which this
Sq. Ft Floor Area:
Valuation: $500000.00
permit is issued.
APPLICANT CERTIFICATION
certify that I have read this application and state that the above
information is correct. I agree to comply with all city and county ordinances
APN Number:
Occupancy Type:
and state laws relating to building construction, and hereby authorize
375 16 017
R-3 (Custom),R-3 (Custom),U (Private Gar /Ag Bldg),U
representatives of this city to enter upon the above mentioned property for
(Private Gar /Ag Bldg)
inspection purposes. (We) agree to save indemnify and keep harmless the
City of Cupertino against liabilities, judgments, costs, and expenses which
may accrue against said City in consequence of the granting of this permit.
PERMIT EXPIRES IF WORK IS NOT STARTED'
Additionally, the applicant understands and will comply with all non -point
WITHIN 180 DAYS OF PERMIT ISSUANCE OR
source regulations per the Cupertino Municipal Code, Section 9.18,
180 DAYS FROM LAST CALLED INSPECTION.
Signature Z' J Date 8/30/2016
'
Issued by: Abby Ayende
OWNER -BUILDER DER DE RATION
Date: 08/30/2016
I hereby affirm that I am exempt from the Contractor's License Law for one of the
following two reasons:
RF ROOFS:
1. I, as owner of the property, or my employees with wages as their sole
All roofs shall be inspected prior to any roofing material being installed. If a roof is
compensation, will do the work, and the structure is not intended or offered for
installed without first obtaining an inspection, I agree to remove all new materials for
sale (Sec.7044, Business & Professions Code)
inspection.
2. I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project (Sec.7044, Business & Professions Code),
Signature of Applicant:
Date: 8/30/2016
T hereby affirm under penalty of perjury one of the following three declarations:
1. I have and will maintain a Certificate of Consent to self -insure for Worker's
ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
z. 1 have and will maintain Worker's Compensation Insurance, as provided for by
HAZARDOUS MATERIALS DISCLOSURE
Section 3700 of the Labor Code, for the performance of the work for which this
I have read the hazardous materials requirements under Chapter 6.95 of the
permit is issued.
California Health & Safety Code, Sections 25505, 25533, and 25534. I will
s. I certify that in the performance of the work for which this permit is issued, I
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
shall not employ any person in any manner so as to become subject to the
Health & Safety Code, Section 25532(a) should I store or handle hazardous
material. Additionally, should I use equipment or devices which emit hazardous
Worker's Compensation laws of California. If, after making this certificate of
air contaminants as defined by the Bay Area Air Quality Management District I
exemption, I become subject to the Worker's Compensation provisions of the
will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and
Labor Code, I must forthwith comply with such provisions or this permit shall
the Health & Safety Code, Sections 25505, 25533, and 25534.
be deemed revoked.
f,
APPLICANT CERTIFICATION
I certify that 1 have read this application and state that the above information is
Owner or authorized agent:
Date; 8/34/2016
correct. I agree to comply with all city and county ordinances and state laws
relating to building construction, and hereby authorize representatives of this city
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance
to enter upon the above mentioned property for inspection purposes. (We) agree
of work's for which this permit is issued (Sec.. 3097, Civ C.)
to save indemnify and keep harmless the City of Cupertino against liabilities,
Lender's Name
judgments, costs, and expenses which may accrue against said City in
consequence of the granting of this permit. Additionally, the applicant understands
Lender's Address
and will comply with all non -point source regulations per the Cupertino Municipal
Code, Section 9.18.
ARCHITECT'S DECLARATION
I understand my plans shall be used as public records.
Signature Date 8/30/2016
Licensed
Professional
CONSTRUCTION PERMIT APPLE .1 --
COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION
10300 TORRE AVENUE - CUPERTINO, CA 95014-3255
(408) 777-32218 - FAX(408) 777-3333 . t..;1,41 IF
hEv
"V.Urq
I
[I NEW CONSTRUCTION El ADDITION [--IALTERATION /TI El REVISION /DEFERRED
-wtMCUPERTINO4,+
ORIGINAL PERMIT #
PROJECT ADDRESS/`jlU
GARAGE AREA: 0 DETACH
,41_ —
R I",]
I AIN
�-
.,
CANINER NAME
PHO
P -MAIL
tv a! 140piA
STREFTADDRESS lq
CITY, STATE ZIPAX
C44 ql:�-()
V DWELLINI, UNITS:
IS ASEC ND UNIT L] YESC11-
CONTACT NAME
1 60 'at
PHONE
_ S�Q
E-MAIL
P
STREBTADDRESS
K034
REINGAI)DW? 0
ADDITION? NO
CITY, STATE, ZIP
.
. .... . ... .. . . .......
FAX
OWNER El OWNER-BUITI)ER
❑ OWNERAGENT
❑ CONTRACTOR 11 CONTRACTORAGENT ARCHITECT
El FNGDJEER El DEVELOPER L3 TENANT
CONTRACTORNAME
NTIQ
VI
By jity signature below, I certify to each of the following: I am the property Owner & authorized agent to act On the propelty Owner's bf-,balf. I have read this
LICENSENUMBER
LICENSE TYPE
Signature ofApplicant/Agent- % 17�!� —
BUS. LTC 0
COMPANY NAME
. . .... ....
E-MAIL
:.E OVER' tH&
FAX
STREET ADDRESS
permit for now building.
CITY, STATE, ZIP
fes, q
Commercial Bldgs: Provide a completed Hazardous Material; Disclosure
PHONE
ARCHMECT/ENGINEER NAM
forinifany Hazardous Materials are being used as part ofthis project.
LICENSE NUMBER
Copy of Planning Approval Letter or Meeting with PI anifin g prior to
BUS. LTC
COMPANY NAME w6rl
submittal dBuilding Permit applicatioD.
...... . ....
E-MAIT, 4) &-c;
FAX
STREET ADDRESS7
-->
6
CITY, Z0
CA-
/
q
PHONE
g?
DESCRIPTION -OF -WORK -
el - . - — 4=r A L
EXIS USE PROPOSED USE
TINQ CONSTR.TYFE tSTOIMS
EXISTO 'NEW FLOOR DUIO'7OTAL
AREAJ AREAZ AREA NET AREA K071z,
REMODELAREA
BATIMOOM KITCHH1 OTHER
REMODELARBA/VREMODEL. AREA
FORCE AREA
TOTA LDECYJFORCH AREA
GARAGE AREA: 0 DETACH
3.
.
. . . . . . . .. . .. .
C—A
471's E�'ATTACH
................ .
V DWELLINI, UNITS:
IS ASEC ND UNIT L] YESC11-
STORY ff`Rs
...........
REINGAI)DW? 0
ADDITION? NO
.
. .... . ... .. . . .......
. ..
. . . .... ..
..... ...
PRE -APPLICATION,
YLANNINGAPPL9 NO
IrYES.PROVIDECOPYOF PLANNER'S PAW'.
PLANNINGAPPItOVALL]TITIM El rrz
I
-- ---- - -------
NTIQ
VI
By jity signature below, I certify to each of the following: I am the property Owner & authorized agent to act On the propelty Owner's bf-,balf. I have read this
application and the information lhave provided isrolTect. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to building con ction, I authorize representatives of Cupertino to enter the above}-Idan)L*fjed rop or inspection put -poses.
Signature ofApplicant/Agent- % 17�!� —
- -- --- - Date: (7% 171
SUPPLEMENTAL INFORMATION REQUIRED
. . .... ....
New Sl D or Multifamily dwellings: Apply for demolition peri -nit for
:.E OVER' tH&
existing building(s). Demolition permit is required prior to issuance of building
permit for now building.
fes, q
Commercial Bldgs: Provide a completed Hazardous Material; Disclosure
... .... ...
STANDAREk
PiJBITC WORKS
forinifany Hazardous Materials are being used as part ofthis project.
Copy of Planning Approval Letter or Meeting with PI anifin g prior to
-Q
iLVE&DISTRICT ;;W.e
submittal dBuilding Permit applicatioD.
...... . ....
SANITARY. SE
.... ..... ... ....
BldgApp. 2011. doe revised 03116111
t,aM
CAPER ENGINEERING INC
RO BOX 14198, T1tCMONT, GA 94530
Td(510)668-1815 Far. (10) 490-8690
September 7, 2016
Tro ect No, 1,0581
Building Department
City of Cupertino
10300 Torre Avenue
Cupertino. CA 95014-3232
Subject.- Proposed New Residence at
10330 Menhart Ln.
Cupertino, CA
FOOTING EXCAVATION (GRADE BEAMS +& SPREAD
FOOTINGS) AND PREPARATION OBSERVATION RE PORT
Dear Sir;..
APEXE GINEER NG INC., has provided inspection service for footing excavation and
preparation. Footing depth and Nidth were excavated adequate, i accordance with
approved foundation plan and specifications. The exposed soil conditions of excavated
foundation are beyond design bung capacity and acceptable.
Any questions, please call our office at your convenience.
Sincerely,
C R INC.,
air slip
Principal., $ S
CO
OF
A,
CA PEVENGINEENNG INC.
RW Engineering, Inc.
505 Altamont Drive, Milpitas, CA 95035
Tel: (408) 262-1899 Fax: (408) 942-0898
Email: rwengineering@gamil.com
September 9, 2015
City of Cupertino — Building Division
10300 Torre Avenue
Cupertino, CA 95014
Re: Building setback verification
Project Site: 10300 Menhart Lane, Cupertino, California
To Whom It May Concern:
U MIN
Wl� mov
This letter is to confirm in writing that RW Engineering, Inc. has provided staking for the house
on 10300 Menhart Lane. The stakes have been placed in accordance with the plans approved by
the City of Cupertino. We have subsequently done a foundation verification site visit, and have
determined that the contractor has formed the foundation stem walls in accordance with the
stakes and the approved plans.
Please feel free to call me if you have any questions.
Sincerely
Robe Wg, E-, P.L.S.P-U
tAND
ROBE 0
-J WANG W
cp No.8931
:A 11.
OPC
September 1-6,2016 File: 16021811
Wesley Liu,
Wesley Liu Engineerin
7246 Sharon Drive, Suite O, San Jose, CA 95129
December 23, 2016
Re:/,- ramina Whlk/Revi
New Cust m Home
10330 Xenhart Lane
Cupoffino, CA 95014
Whom It May Concern:
Inc.
tel & fax: 408-973-1839
n
E -3'O 16 - 17q 7
File: 160218.L2
As requested, we have made the structural framing walk for the project entioned above on 12/15/2016
and rechecked on 12/23/2016. All of the items that we brought up on the first walk were addressed per
our recommendations.
Based on our observation, we concluded that the framing was in general
plans and specifications. This review is conceptual and qualitative. It is
of major structural connections and to identify major deficiencies. Accu
and grade of the materials, and similar features of the work were not the
undertake the guarantee of the construction or relieve the contractor of h
produce a completed project conforming to the plans.
We appreciate the opportunity to have been of service. If you have any
information, please feel free to contact us at your convenience.
Sincerely,
7 C 60570
Wesley W. Lill --F-
mformance with the approved
tended to verify the presence
cy of the dimensions, type
:ed in detail. We do not
primary responsibility to
or require additional
CUPERTINO
CONTRACTOR / SUBCONTRACTOR LIST
Building Department
City Of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
Telephone: 408-777-3228
Fax: 408-777-3333
JOB ADDRESS:
PERMIT # p
OWNER'S NAME: ,L L C h4,tz
PHONE # 9a
GENERAL CONTRACTOR:
BUSINESS LICENSE #
1
ADDRESS: U Q 2e C
CITY/ZIPCODE: Uo
*Our municipal code requires all businesses working in the city to have a City of Cupertino business license.
NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO
BUSINESS LICENSE.
/ 7,
I am not using any subcontractors:
I/ ic-001 Signature Date
Please check applicable subcontracto s and complete the following information:
Owner / Contractor Signature
Date
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring / Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner / Contractor Signature
Date
xiACTOR`1, SUBcoNNTRA
Building Department
City Of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
Telephone: 408-777-3228
Fax: 408-777-3333
R LIST
.wrs ADDRESS: _ l� a PERMIT
OWNER' S NAME: -PHONE # u r: �) � q s . � P � S
GENERAL CONTRACTOR t YUP. '�/--y BUSINESS LICENSE
ADDRESS: L/ CITY'ZIPCODE: T5 iZ
*Our municipal code requires all bu l"nesses working in the city to have a Cite of Cupertino business license.
NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO
BUSINESS LICENSE. =
I am not using any subcontractors:
Signature
Please check applicable subcontractors and complete the followinu in€nrrnatinn•
Date
✓
SUBCONTRACTOR
BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
U YOB
C)
Electrical
Excavation
Fencing
Flooring / Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Contractor Signature
Date
�10 �j m► -
(�'�-��1 Y� ��sT �' lJ�p�c�rxtoN•
7/w /7
,���yb �sj
,Mj.It/ ST
CERTIFICATE OF INSTALLATION
-MCH-20-H
Duct Leakage Diagnostic Test
(Page 1 of 3) .
Project Name: Menhart Prime Residence
Enforcement Agency: City of
Cupertino
Permit Number:
82016-1947
Dwelling Address: 10330 MenhartLane
City: Cupertino
'Zip Code:
95014
A. System Information
01
Space Conditioning System Identification or Name
System 1
02
Space Conditioning System Location or Area Served
upstairs
03
Building Type from CF -113
Single family
-04
Verified Low Leakage Ducts in Conditioned Space
(VLLDCS) Credit from CF1R?
No, credit is not taken
05
Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06
Duct System Compliance Category
New
MCH -20a - Completely New Duct System =
B. Duct Leakage Diagnostic Test -
01
Condenser Nominal Cooling Capacity (ton)
0
02
Heating Capacity (kBtu/h)
58
03
Conditioned Floor Area served by this HVAC system (ftz)
1000
04
Duct Leakage Test Condition
Test final
05
Duct Leakage Test Method
Total leakage
06
Leakage Factor
0.06
07
Air Handling Unit Airflow (AHUAirflow) Determination
Method
Heating system method
08
Measured AHUAirflow
This field or section is not applicable
09
Calculated Target Allowable Duct Leakage (cfm)
76
10
Actual duct leakage rate from leakage test measurement
(cfm)
48
11
Compliance Statement: System passes leakage test
Registration Number: 216-N0100604A-M2000002A-0000 Registration DateMme: 2017-05-23 09:08:42 . HERS Provider: CWCERTS
CA Building Energy Efficiency Standards. Report Version: 2013 Rev 1.008 Report Generated: 2017-05-15 18:56:56
2013 Residential Compliance Schema Version: 2013.1.007
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3 )
Documentation Author's Declaration Statement
1.1 certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Documentation Author Signature: as me,&
Jose Novelo
l/v/
Company:
Signature Date: 2017-05-15 18:57:16
California Air Duct Testers
Address:
CEA/ HERS Certification Identification (if applicable):
5279 Eggers Dr
City/State/Zip:
Phone:
Fremont CA 94536
408-824-0740
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Installation is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,
construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of
Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the
responsible builder/installer.
3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by
the enforcement agency. -
4. 1 understand that a HERS rater will check the installation to verify compliance, and that if such checking identifies defects; I am required to take
corrective action at my expense. I understand that Energy Commission and HERS Provider representatives will also perform quality assurance checking
of installations, including those approved as part of a sample group but not checked by a HERS rater, and if those installations fail to meet the -
requirements of such quality assurance checking, the required corrective action and additional checking/testing of other installations in that`HERS
sample group will be performed at my expense.,
S. I reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of
construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the construction or
installation have been met.
6. 1 will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Responsible Builder/Installer Signature:
Kevin Dong
SL/
Company Name: (Installing Subcontractor or General Contractor or
Position With Company (Title): OF
Builder/Owner)
owr
GRAND - NEST CONSTRUCTION
Address:
CSLB License:
13428 CHRISTIE DRIVE
965419
City/State/Zip:
Phone:
Date Signed:
SARATOGA CA 95070
408-891-8059 X123
2017-05-23 09:08:42
Third Party Quality Control Program (TPQCP) Status:
Name of TPQCP (if applicable):
Digitally signed by CatCERTS. This digital signature is provided in order to secure the content of this registered document and in noway implies
Registration Provider responsibility for the accuracy of the information.
Registration Number: 216-NO100604A-M2000002A-0000 Registration Date/Time; 2017-05-23 09:08:42 HERS Provider: CaICERTS
CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-05-15 18:56:56
2013 Residential Compliance Schema Version: 2013.1.007
CALGREEN SIGNATURE DECLARATIONS r N
Project Name: MENHART LLC
"E
Project Address: 10330 MENHART LN. CUPERTINO, CA 95014
Project Description: Demolition (e) single story 1249sf to build new 2 stories 2,197sf
SECTION 1 — DESIGN VERIFICATION
Complete all lines of Section 1 — "Design Verification" and submit the completed checklist (Columns 1 and 2) with the
plans and building permit application to the Building Department.
The owner and design professional responsible for compliance with CalGreen Standards have revised the plans and
certify that the items checked above are hereby incorporated into the project plans and will be implemented into the
project in accordance with the requirements set forth in the 2013 California Green Building Standards Code as
adopted by the City of Cupertino.
i
Owner's Signature
TRI HONG
Owner's Name (Please Print)
Design Professional's Signature
TRI HONG
Design Professional's Name (Please Print)
Signature of License Professional responsible for CalGreen compliance
Name of License Professional responsible for CalGreen compliance (Please Print)
Email Address for License Professional responsible for CalGreen compliance
SECTION 2 — IMPLEMENTATION VERIFICATION
Date
02/27/2015
Date
Date
Phone
Complete, sign and submit the competed checklist, including column 3, together with all original signatures on Section
2 to the Building Department prior to Building Department final inspection.
I have inspected the work and have received sufficient documentation to verify and certify that the project identified
above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of
the 2013 California Green Builder Standards Code as adopted by the City of Cupertino.
05/1512017
Signatre of License Professional responsible for CalGreen compliance Date
F L. HO - ARCHITECT - C29889 1408.892.5020
Name of License Professional responsible for CalGreen compliance (Please Print) Phone
FRANKLHO@YAHOO.COM
Email Address for License Professional responsible for CalGreen compliance
Page 5 of 5 CalGreen 2014.doc revised 01115114
� -070 ao - /Y��
,, t;
Electric Company,,
WE DELIVER R
JUNE 27TH, 2017
DANIEL XI
10330 MENHART LN.
CUPERTINO, CA 95014
RE: 10330 MENHART LN. CUPERTINO, CA. 95014
• d,Number:9r
To whom it may concern,
The gas main at the above -referenced address does not have any structural damage. The
gas construction supervisor has confirmed there are no hazards at this property, and the
customer's gas is currently connected and in service. If you have any additional questions
my contact information is listed below.
Sincerely,
i�� A&
6a'�
Justin Pigg
Project Coordinator I Pacific Gas & Electric Co I
DeAnza Division) 10900 N Blaney Ave. Cupertino, CA 95014
J2PY@pge.com (Office: 408.725.2165
M -F 7:OOAM — 3:30PM
**AVAILABLE BY APPOINTMENT ONLY**
"Safety is a full time jab; don't make it a part time practice"
Er,afu Camwv�