Loading...
R-6568CJ ., PERMIT R_ 656 8 APPLICATION FOR CITY OF CUPERTINO NUMBER INSPECTION DIVISION PERMIT EXPI TIN REROOF PERMIT . (4)777-3228 PERMrr EXPIRES IF WORK IS NOT STARTED Will 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROM LAST CALLED INSPECTION. BUILDINGADDRESS Z 9 ( t{.pIM(PQAr1l 1 �y GA"Ci MAJi - RESIDENnAL-Z COMMERCIAL- OTHER. OWNER''SS HAZARDOUS FIRE AREA / `T' /� ^Y� Vl YES ❑ .Ayes-Iuntlerstandtlata Clal NAME `-'Al .AJ -U:) I �° , ( )., /-t5$OC , mol assembly "Is required. NO Irtthal I.C.B.O. 8 ADDRESS 5/ EXISTING ROOF COVERING // 6 NUMBER OF EXISTING COVERINGS 1 L,4 yeR- PHONE — b CONTR pACTOR' NAME LltNhI $SA-AXe- IAiG LSO, �C, TO BE REMOVED TO BE RETAINED ADDRESS L 6� �i5�z5 CfTY nP 2.2A Z f Ik)� LfJ Ave- TYPE OF ROOF COVERING EXISTING " 6Cla PHONE yO8 444IR oS BUILT-UP ROOF ❑ LICENSE NUMBER SSq 3316. EKP 3/3)/01 � / ( ASPHALT SHINGLES ❑ DCCONTRACTORS DECLARATION hereby affirm that am licensed antler provisions of Chapter (come8col Section WOOD SHAKES - 7000) of DMebn 3 of the Business and Professions Cade, end my licence license 1 e le In In lull force and effect. c 3 9 � SncI 3 WOOD SHINGLES. ❑ Llcerma Coes LbNumber OTHER (SPECIFY) El CanaaclIX OWNER -BUILDER DECLARATION PROPOSED hereby affirm that exempt from the License Law for the reason. (Sec. 7031.5, an e: Any City viresfollowing Cade: Any dry or county which requires a permit to entl Profedemolish, consirud, after, Improve, tlanollM, or repair any structure, prior to 11e Issuance, also requlroa he r, mime or rep BUILT-UP ROOF El lar such permit to file a signed statement that he Ie Ikxineed pursuenl to the provblons of the Contractors License LewChapter B (commencing with Section 7000) of Dlvlston 3 of the Business and Professions Codes or that he is exempt therefrom and the basks for the alleged ASPHALT SHINGLES exemption. Any oblation of Section 7031.5 by any applicant for a permit subiscts the applilcant to Uk�S a civil poneny of not more roan the hundred callers (65110).): the WOOD SHAKES ❑ ❑I, M owner of property, or my employees with wages as bull We comosarsalon, will do (Z. the workeels (S , and the structure le not Intended or offered for ec. 7044, Business and Profim- 30 Y sons Code: The Contractors License Law does not apply to an owner of property who bullds or Improves hereon, and who does such work himsed or through he awn employees, provided that WOOD $ ES C.� W e E x ❑"FAUSUA89 such Improvements are not Intended or offered for sale. If, however, the bUllding or Improvement Is sold within one year of completion, the owner -builder will have the burden of proNng that he did OTHER not bulb or Improve for purpose of eab.). ❑I, as owner of the property, am exduslvety contracting with licensetl contractors to constructZ� project (Sec.70", Business and Profemlons Cade: The Contractors License Lew doss rot Othe PROVID Oapply to en owner of property who bulIcs a Improves thereon, and who contracts for such projectswith a contractors) licened Pursuant to the Contractors Ucenee Law.S. I Sec. PROVID ❑ am exempt under B & P. C. for this reason OmerDate WORKER'$ COMPENSATION DECLARATIDECLARATIONTIO APPLICATIO VALUATION PERMIT F TUCSt�Ay Uldl I hereby affirm under penalty of perjury one of he tolbwing declaration: ❑ I have and will maintain a CertNkate of Consent to eed4raure for Workers Compersation, as pruvil for by Section 3700 o1 the Labor Code, for he performance of the work for which this— px is Inlaid. WAG NA A �I have and will maintain Warkere Compensation Insurance, as required by Section 3700 of iM LEbor Code, for the performance of the woM for which this Is mail My Vja re �/ / permit Compensti Insurance tamer and Policy number er EY I co TO ��)� CamerVir" 'Ll21VSURAakt bYNa.sK-r lyn4 PERMIT AUTHORIZATION TE CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE Nco (This mcdon need not be completed 1 the permit Is for one hundred doikrs ($1 DD) or Iese.) I certify that In the performance of the work lar which Ihls permn Is 1 sued shall of empty arty person In an/ manner so as m become subje to the workers co pe 1 s f. alk All roc hall be inspected prior to any roofing material being fomla, installed. If a roof is installed without first obtaining an Datt 15,a Applicala inspection, I agree to remove all new materials for inspection. NDTIC APDL CANT: II, ansr ma is Certificate of Exemption, you Mould become subject to the Workers' Compeneetlon ions of he Labor Code, you moat forthwith comply Applicant understands and will comply with all non point with such provalons or this permit stal deemed revoked. source regulations. - I certlty het I have reed this application and state that the above Information Is correct.I agree to compy with all city end county ordinances and state laws relating to bullding conetmctlon,end All r6. OVerings to beC y 'C' rbetter. hereby authorize representatives of this city to enter upon the aboe-menlbned property for In- apeWenagrposea. (We) agree to Indemnity keep heroism the Clry Cupertino Inst Ilebllltlea, s/a.� 99 save, and of a dgme and which may in Judgments, t way Clryrn coneng NATURE OF APPLICANT - DATE , any accrue agalrst Bald coneepueroe the ol gamer PRE -INSPECTION: PLYWOOD: IN -PROGRESS: INSP. DATE INSP. DATE INSP. DATE TEAR OFF INSPECTION: BATTENS: FINAL: INSP. DATE INSP. DATE INSP. DATE NOTE: OSHA APPROVED ACCESS TO ROOF SHALL BE PROVIDED FOR INSPECTION • CITY OF CUPERTINO - BUILDING DEPARTMENT RE -ROOFING POLICY 1. Prior to permit issuance, you must agree to comply with U.B.C. standards and Manufacturers specs on re -roofing. 2. New roof coverings shall not be applied without first obtaining all inspections and written Approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re -roofing is completed. 3. All types of roofs shall be inspected prior to any roof being installed. 4. In order to receive a final, you must complete steps 1,2, and 3. I. Pre -inspection or tear -off approval 2. In -progress inspection approval 3. Final inspection approval a. Operable smoke detector verification 5. If plywood is installed, a plywood nail inspection is required. • 6. If any roof is applied without first obtaining an inspection, you will be required to remove all new material down to the sheating and a building inspector will inspect all shearing at that time. IMPORTANT: 1. Flat roofs must have a'/4" per foot slope, or demonstrate that there is no ponding. 2. I.C.B.O. reports are required to be on the job site at the time of inspection. If you do not have one, contact the building department. WE UNDERSTAND THE ABOVE POLICY ON RE -ROOFING AND WILL COMPLY WITH THE POLICY. S -AAI 9 HOMEOWNER'S NAME: AR,Dt',,'J Ile, 2.2,4L H. AsSoc. Pl��z.68- 68i� ADDRESS: (C -u P) RE -ROOFING COMPANY NAMI APPLICANT'S SIGNATURE: • CITY OF CUPERTINO BUILDING DEPARTMENT Re-roof/winword NG. M6,e kk'c'