Loading...
88-022 Louis and Diedrich, Inc., Stevens Creek Blvd. Orange Ave to Phar Lap, Project 4002 AGREEMENT b AaDg OQ'<o CITY OF CUPERTINO 1 Oa°p° P.O. Box 580 Cpoer Cupertino, CA 95015 252-4505 NO. BY THIS AGREEMENT made and entered into on the 21st day of April 19 88 by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and Name (1) LOUIS & DIEDERICH, INC. , Consultant oagineering Address 778 N. First Street City San Jose Zip 95112 Phone(408)29/-3100 (Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties hereto agree as follows: CONTRACTOR Shall provide or furnish the following specified services and/or materials: Engineering services for preliminary design, final design and construction staking of rough grades and curb grades. EXHIBITS:The following attached exhibits hereby are made part of this Agreement: • Proposal submitted 4-8-88 TERMS The services and/or materials furnished under this Agreement shall commence on 4-21-88 and shall becompleted before 6-13-88 25% completion of prelim. plans, 50% completion of final plans, 25% completion of final COMPENSATION For the full performance of this Agreement,CITY shall pay CONTRACTOR: grade staking. Total compensation $48,100. Extras at standard per diem rate schedule. GENERAL TERMS AND CONDITIONS Hold Harmless. Contractor agrees to save and hold harmless the City, its officers;agents and employees from any and all damage and liability of every nature, including all costs of defending any claim,caused by or arising out of the per- formance of this agreement.City shall not be liable for acts of Contractor in performing services described herein. Insurance. Should the City require evidence of insurability Contractor shall file with City a Certificate of Insurance before commencing any services under this agreement.Said Certificate shall be subject to the approval of City's Director of Administrative Services. Non-Discrimination. No discrimination shall be made in the employment of persons under this agreement because of the race, color, national origin,ancestry, religion or sex of such person. Interest of Contractor. It is understood and agreed that this agreement is not a contract of employment in the sense that the relation of master and servant exists between City and undersigned.At all times Contractor shall be deemed to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in executing this agreement.Contractor certifies that no one who has or will have any financial interest under this agreement is an officer or employee of City. Changes. This agreement shall not be assigned or transferred without the written consent of the City.No changes or variations of any kind are authorized without the written consent of the City. CONTRACT CO-ORDINATOR and representative for CITY shall be: NAME TRAVICE WHITTEN DEPARTMENT PUBLIC WORKS This Agreement shall become effective upon its execution by CITY, in witness thereof, the parties have executed this Agreement the day and year first written above. CONTR OR: I CITY OF CUPERTINO: By Byc Title Aei/ ' /6f/nitadake!/{T tle ATs/S?R3.✓r Orr aret/l Soc. Sec. / APPROVA S Departu / a. . Ci 1 ate Clerk Date p � I White-City Clerk Copy .reen-Finance Canary-Contractor's Copy Pink-Receiving Copy Goldenrod-Department Copy PROPOSAL Professional Engineering Services City of Cupertino Stevens Creek Boulevard Project No . 4002 1 • phone (4097 297-3100 LOUIS Fn.d LIEIERICH , inc . 77S N . First St. San Jose, CA 95112 April 8 , 1988 JOB NO. 88311P Mr. Bert J . Viskovich, Director of Public Works City of Cupertino 10300 Torre Avenue Cupertino , CA. 95014 Attn : Mr . Travice Whitten Assistant City Engineer Dear Bert , We are submitting 6 copies of our proposal to provide Professional Civil Engineering Services for the items listed in your request for improvements on Stevens Creek Boulevard Project 4002 dated March 16 , 1988 . We have picked a team of sub—consultants that are experienced in their respective feilds of operation and have done a considerable number of projects in the area. We are attaching a brief resume for our firm and of the sub—consultants that you can review and verify our qualifications to provide you with Professional Engineering Services that will meet your time schedule and budget . Our team is pleased to submit this proposal and wishes very much to help continue your outstanding development features for the City of Cupertino. Very Truly Yours , /0 . 400101111011. Ireph Louis , President Louis and Deiderich, Inc . cc: tw 4 Engineering Proposal Our Approach to Provide Services Our approach to this project if . awarded the contract will be to confer with the City Agencies in assembling all pertient information to prepare preliminary base map and right of way plan and to acquire Prelimanary Title Reports for plats , right of way and easement acquisitions . The land surveyor will start topographical surveys including surveys for lot corners and existing right of way , original cross sections for roadway , sanitary , storm drains , utilities and conforms of all existing improvements which will remain in place or require construction. Once the field information has been plotted on topographic map and calculated @ 20 scale, topographic maps shall be prepared delineating the existing topography and then a preliminary right of way and acquisition plan shall be submitted to the city for review and for approval . If an alternate is required , the. plan shall be revised -and preliminary plan prepared including preliminary geometric alignments. Upon review of preliminary design and its approval , the final design shall be prepared including roadway improvements , sanitary sewer extension, storm sewer extension and water line replacement . . Upon approval of final design 25 sets of plans and specifications along with construction cost estimates will be submitted and contract documents prepared including specifications , general provisions and special provisions . We would expect to confer with the city staff at all major approval points and through out the work as it progress to confirm that we are on schedule and compliance with their directions . At award of contract the successful bidder will be contacted and rough grade stating performed as needed with curb and gutter to be stated when contractor requests them all as will be called out in contract bid documents . 6 • PRELIMINARY PROJECT SCHEDULE DESCRIPTION ACTION Start of Contract SCHEDULE Collect and Review Review existing information to Existing Preliminary determine extent and nature of Engineering Data planned improvements . Determine extent of existing utility and drainage improvements and identify potential conflicts for construction and related improvements for future maintenance considerations . Verify accuracy of records and locate areas where additional information is required or previous data needs supporting documentation. Establish Project Analyze information data available for Requirements technical reports . Coordinate with City of Cupertino Agencies to ascertain identifiable projects requirements for alignment (horizontal and vertical) , drainage, and other improvements , especially as they pertain to work areas . Establish Scheduling Because of the number of agencies Requirements involved and the reality of time contraints on the part of the General Design Consultant and the City of Cupertino review staff, it will be necessary to identify schedules which will allow both the design and review groups to perform most efficently. • 7 DESCRIPTION ACTION SCHEDULE PROJECT DESIGN Finalize project layout , determine locations of utility conflicts and 30% Submittal design alternative solutions , identify boundary requirements (for alternates , as appropriate ) . Determine typical sections . Prepare engineering plans and details . PROJECT DESIGN Act on comments and new information obtained through 30% Review. 60% Submittal Calculate project geometrics , detail typical sections , prepare plats and descriptions required for property acquisition, detail intersection layouts , prepare landscape architectural plans for planting, irrigation, and pedestrian facilities for project . Design utility and drainage facilities required to serve the project . Provide cost estimate for project. PROJECT DESIGN Act on comments and new information resulting from design review (of 60%, 85% Submittal Submittal) . Detail all Structures , projects facilities, surface improve- ments , structure modifications , landscape architectural plans . Submit cost estimate and preliminary specifications . PROJECT DESIGN Finalize Construction Plans , Specifications and Estimates required 100% Submittal for bidding and construction purposes. Accommodate design changes as required for implementation of project engineering details prepared others . Completion of Contract 8 TOTAL WORK DAYS = 39 START 04/ 15/88 May Complete 06/ 13 /88 Working 10 Days 21 Working Days 8 Working Days • OFFICE ********************r **************** LAND ACQUISITION ******************** SURVEYING AND ******************** TOPOGRAPHICAL PRELIMINARY DESIGN **************** k******V ** FINAL DESIGN ********* k******1 ********** ************ k***********k*************** SOILS ******************** STRUCTURAL ENGINEERING ***********k******1 ********** k*********** k*********** LANDSCAPING ARCHITECTURE 9 ESTIMATED MANHOUR COMMITMENT SUPERVISION SURVEYING PRELIMINARY FINAL CONSTRUCTION TOTALS LAND ACQUISITION DESIGN DESIGN STAKING CIVIL ENG . l0, 08O,— &17W 0 45560 icS`�"5v '3yoo 134 7x0 LOUIS & 14460 70 130 c60 464 DIEDERICH .�it-70/4)it-70/4), �l 1IzA. (064, 4661t1/2. 1565/x„ Hoo SOILS ENG . Alr 48 s��/�- STRUCTURAL �Cs�F- 48 ENGINEER ARCHITPING 48 ARCHITECT TOTAL HOURS 144 60 70 274 60 608 • 10 phone (4OB] 297-3100 LOUIS and DIES RIC 9bnco :s;_.;:^ ....'a irmizi n: nin 779 N. First- St_. _ ----San—Jose, CA- 95822 HOURLY CHARGE RATES PROFESSIONAL & OFFICE Principal Engineer $ 85 .00 Civil Engineer $ 70 . 00 Land Surveyor $ 65 . 00 Chief of Survey $ 60 . 00 Associate Engineer/Planner $ 60 .00 Assistant Engineer/Planner $ 53 .00 Junior Engineer/Planner $ 50 . 00 Surveying Technician $ 48 .00 Engineering Technician $ 48 .00 Technician/Computer. Draftsman $ 42 . 00 Draftsman $ 35 .00 Clerical (Technical Typing) $ 24.00 FIELD 2—man Field Party $112 .00 3—man Field Party $140 .00 Field Engineer/ Inspector $ 60 . 00 MISCELLANEOUS COSTS Blueprints , Reproductions , Monuments & Materials at cost , plus 15% Transportation at $0 . 40 per mile . Electronic Distance Measuring Equipment at $30 .00 per hour . Other Outside Services at Cost , Plus 15 11 phone 04091297-3100 LOUIS and DIEDERICH ,inc. p: cnn Png c '.t_Dr-^�=l 778 N . First St. San Josg Eta i312 APR T: ^ 16C PI IkdLIP 1►'A914fil April 11, 1988 Mr. Bert J. Viskovich Director of Public Works Project No. 88311 City of Cupertino 10300 Torre Avenue Cupertino, Ca. 95014 Attn: Mr. Travice Whitten — Assistant City Engineer or Ms. Carmen Lynaugh Dear Bert, Enclosed is a copy of the estimated manhour commitment form showing in red the dollar amount of estimate. Note that the Soils Engineering, Structural Engineering and Landscape Architectural fees are based upon a rate schedule of $100.00 per hour depending upon the work the city would like done. In the case of the Soils Engineer, they could save the city considerable money by checking existing pavement to see if it could be overlaid instead of removing. Please advise if you need any other information. Very Truly Yours, Lloyd Whit:. P. . Louis and Diederich, Inc. cc:tw ESTIMATED MAN{{OUR COMMITMENT SUPERVISION SURVEYING PRELIMINARY FINAL CONSTRUCTION TOTALS LAND ACQUISITION DESIGN DESIGN STAKING , CIVIL ENG . - / LOUIS & 144Cap7b 6-00e//z' 700i(O.S c�113,0/&65 > 60e6. z4664�/ DIEDERICH $10 080 X&700 -1¢S S� �8c So $ 37o0 '33700 SOILS ENG . / K 48 s420 Ize no STRUCTURAL - / ENGINEER 74.31 48&/00 4'000 L.ANSCAP1N13 • ARCHITECT 48e/t0 ifga6 TOTAL HOURS 144 60 70 / 60 08 /a/ °So 67Z0 SCS s'O 8 c4.So 3g6'6' Plyie/CYC I� t • Pi is