88-022 Louis and Diedrich, Inc., Stevens Creek Blvd. Orange Ave to Phar Lap, Project 4002 AGREEMENT b
AaDg
OQ'<o CITY OF CUPERTINO
1 Oa°p° P.O. Box 580
Cpoer Cupertino, CA 95015
252-4505 NO.
BY THIS AGREEMENT made and entered into on the 21st day of April 19 88
by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and
Name (1) LOUIS & DIEDERICH, INC. , Consultant oagineering
Address 778 N. First Street City San Jose Zip 95112 Phone(408)29/-3100
(Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties hereto agree as follows:
CONTRACTOR Shall provide or furnish the following specified services and/or materials:
Engineering services for preliminary design, final design and construction staking
of rough grades and curb grades.
EXHIBITS:The following attached exhibits hereby are made part of this Agreement:
•
Proposal submitted 4-8-88
TERMS The services and/or materials furnished under this Agreement shall commence on 4-21-88
and shall becompleted before 6-13-88
25% completion of prelim. plans, 50% completion of final plans, 25% completion of final
COMPENSATION For the full performance of this Agreement,CITY shall pay CONTRACTOR: grade staking.
Total compensation $48,100. Extras at standard per diem rate schedule.
GENERAL TERMS AND CONDITIONS
Hold Harmless. Contractor agrees to save and hold harmless the City, its officers;agents and employees from any and
all damage and liability of every nature, including all costs of defending any claim,caused by or arising out of the per-
formance of this agreement.City shall not be liable for acts of Contractor in performing services described herein.
Insurance. Should the City require evidence of insurability Contractor shall file with City a Certificate of Insurance
before commencing any services under this agreement.Said Certificate shall be subject to the approval of City's
Director of Administrative Services.
Non-Discrimination. No discrimination shall be made in the employment of persons under this agreement because of
the race, color, national origin,ancestry, religion or sex of such person.
Interest of Contractor. It is understood and agreed that this agreement is not a contract of employment in the sense
that the relation of master and servant exists between City and undersigned.At all times Contractor shall be deemed to
be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in
executing this agreement.Contractor certifies that no one who has or will have any financial interest under this
agreement is an officer or employee of City.
Changes. This agreement shall not be assigned or transferred without the written consent of the City.No changes or
variations of any kind are authorized without the written consent of the City.
CONTRACT CO-ORDINATOR and representative for CITY shall be:
NAME TRAVICE WHITTEN DEPARTMENT PUBLIC WORKS
This Agreement shall become effective upon its execution by CITY, in witness thereof, the parties have executed this
Agreement the day and year first written above.
CONTR OR: I CITY OF CUPERTINO:
By Byc
Title Aei/ ' /6f/nitadake!/{T tle ATs/S?R3.✓r Orr aret/l
Soc. Sec. /
APPROVA S
Departu /
a. . Ci 1 ate Clerk Date
p �
I
White-City Clerk Copy .reen-Finance Canary-Contractor's Copy Pink-Receiving Copy Goldenrod-Department Copy
PROPOSAL
Professional Engineering
Services
City of Cupertino
Stevens Creek Boulevard
Project No . 4002
1
•
phone (4097 297-3100
LOUIS Fn.d
LIEIERICH , inc .
77S N . First St. San Jose, CA 95112
April 8 , 1988 JOB NO. 88311P
Mr. Bert J . Viskovich, Director of Public Works
City of Cupertino
10300 Torre Avenue
Cupertino , CA. 95014
Attn : Mr . Travice Whitten
Assistant City Engineer
Dear Bert ,
We are submitting 6 copies of our proposal to provide
Professional Civil Engineering Services for the items listed
in your request for improvements on Stevens Creek Boulevard
Project 4002 dated March 16 , 1988 .
We have picked a team of sub—consultants that are
experienced in their respective feilds of operation and have
done a considerable number of projects in the area.
We are attaching a brief resume for our firm and of the
sub—consultants that you can review and verify our qualifications
to provide you with Professional Engineering Services that
will meet your time schedule and budget .
Our team is pleased to submit this proposal and wishes
very much to help continue your outstanding development
features for the City of Cupertino.
Very Truly Yours ,
/0 . 400101111011.
Ireph Louis , President
Louis and Deiderich, Inc .
cc: tw
4
Engineering Proposal
Our Approach to Provide Services
Our approach to this project if . awarded the contract
will be to confer with the City Agencies in assembling all
pertient information to prepare preliminary base map and
right of way plan and to acquire Prelimanary Title Reports
for plats , right of way and easement acquisitions . The
land surveyor will start topographical surveys including
surveys for lot corners and existing right of way , original
cross sections for roadway , sanitary , storm drains , utilities
and conforms of all existing improvements which will
remain in place or require construction.
Once the field information has been plotted on
topographic map and calculated @ 20 scale, topographic maps
shall be prepared delineating the existing topography and
then a preliminary right of way and acquisition plan shall
be submitted to the city for review and for approval . If
an alternate is required , the. plan shall be revised -and
preliminary plan prepared including preliminary geometric
alignments. Upon review of preliminary design and its
approval , the final design shall be prepared including
roadway improvements , sanitary sewer extension, storm sewer
extension and water line replacement . .
Upon approval of final design 25 sets of plans and
specifications along with construction cost estimates will
be submitted and contract documents prepared including
specifications , general provisions and special provisions .
We would expect to confer with the city staff at all
major approval points and through out the work as it progress
to confirm that we are on schedule and compliance with their
directions .
At award of contract the successful bidder will be
contacted and rough grade stating performed as needed with
curb and gutter to be stated when contractor requests
them all as will be called out in contract bid documents .
6
•
PRELIMINARY PROJECT SCHEDULE
DESCRIPTION ACTION Start of Contract SCHEDULE
Collect and Review Review existing information to
Existing Preliminary determine extent and nature of
Engineering Data planned improvements . Determine
extent of existing utility and
drainage improvements and identify
potential conflicts for construction
and related improvements for future
maintenance considerations .
Verify accuracy of records and locate
areas where additional information is
required or previous data needs
supporting documentation.
Establish Project Analyze information data available for
Requirements technical reports . Coordinate with
City of Cupertino Agencies to
ascertain identifiable projects
requirements for alignment
(horizontal and vertical) , drainage,
and other improvements , especially
as they pertain to work areas .
Establish Scheduling Because of the number of agencies
Requirements involved and the reality of time
contraints on the part of the General
Design Consultant and the City of
Cupertino review staff, it will
be necessary to identify schedules
which will allow both the design
and review groups to perform most
efficently.
•
7
DESCRIPTION ACTION SCHEDULE
PROJECT DESIGN Finalize project layout , determine
locations of utility conflicts and
30% Submittal design alternative solutions ,
identify boundary requirements
(for alternates , as appropriate ) .
Determine typical sections . Prepare
engineering plans and details .
PROJECT DESIGN Act on comments and new information
obtained through 30% Review.
60% Submittal Calculate project geometrics , detail
typical sections , prepare plats and
descriptions required for property
acquisition, detail intersection layouts ,
prepare landscape architectural plans
for planting, irrigation, and
pedestrian facilities for project .
Design utility and drainage facilities
required to serve the project .
Provide cost estimate for project.
PROJECT DESIGN Act on comments and new information
resulting from design review (of 60%,
85% Submittal Submittal) . Detail all Structures ,
projects facilities, surface improve-
ments , structure modifications ,
landscape architectural plans .
Submit cost estimate and preliminary
specifications .
PROJECT DESIGN Finalize Construction Plans ,
Specifications and Estimates required
100% Submittal for bidding and construction purposes.
Accommodate design changes as required
for implementation of project
engineering details prepared others .
Completion of Contract
8
TOTAL WORK DAYS = 39
START 04/ 15/88 May Complete 06/ 13 /88
Working 10 Days 21 Working Days 8 Working Days
•
OFFICE ********************r ****************
LAND ACQUISITION ********************
SURVEYING AND ********************
TOPOGRAPHICAL
PRELIMINARY DESIGN **************** k******V **
FINAL DESIGN ********* k******1 ********** ************ k***********k***************
SOILS ********************
STRUCTURAL ENGINEERING ***********k******1 ********** k*********** k***********
LANDSCAPING
ARCHITECTURE
9
ESTIMATED MANHOUR COMMITMENT
SUPERVISION SURVEYING PRELIMINARY FINAL CONSTRUCTION TOTALS
LAND ACQUISITION DESIGN DESIGN STAKING
CIVIL ENG . l0, 08O,— &17W 0 45560 icS`�"5v '3yoo 134 7x0
LOUIS & 14460 70 130 c60 464
DIEDERICH .�it-70/4)it-70/4), �l 1IzA. (064, 4661t1/2. 1565/x„
Hoo
SOILS ENG . Alr
48
s��/�-
STRUCTURAL �Cs�F- 48
ENGINEER
ARCHITPING 48
ARCHITECT
TOTAL HOURS 144 60 70 274 60 608
• 10
phone (4OB] 297-3100
LOUIS and DIES RIC 9bnco
:s;_.;:^ ....'a irmizi n: nin
779 N. First- St_. _ ----San—Jose, CA- 95822
HOURLY CHARGE RATES
PROFESSIONAL & OFFICE
Principal Engineer $ 85 .00
Civil Engineer $ 70 . 00
Land Surveyor $ 65 . 00
Chief of Survey $ 60 . 00
Associate Engineer/Planner $ 60 .00
Assistant Engineer/Planner $ 53 .00
Junior Engineer/Planner $ 50 . 00
Surveying Technician $ 48 .00
Engineering Technician $ 48 .00
Technician/Computer. Draftsman $ 42 . 00
Draftsman $ 35 .00
Clerical (Technical Typing) $ 24.00
FIELD
2—man Field Party $112 .00
3—man Field Party $140 .00
Field Engineer/ Inspector $ 60 . 00
MISCELLANEOUS COSTS
Blueprints , Reproductions , Monuments & Materials at cost ,
plus 15%
Transportation at $0 . 40 per mile .
Electronic Distance Measuring Equipment at $30 .00 per hour .
Other Outside Services at Cost , Plus 15
11
phone 04091297-3100
LOUIS and DIEDERICH ,inc.
p: cnn Png c '.t_Dr-^�=l
778 N . First St. San Josg Eta i312
APR T: ^ 16C
PI IkdLIP 1►'A914fil
April 11, 1988
Mr. Bert J. Viskovich
Director of Public Works Project No. 88311
City of Cupertino
10300 Torre Avenue
Cupertino, Ca. 95014
Attn: Mr. Travice Whitten — Assistant City Engineer or
Ms. Carmen Lynaugh
Dear Bert,
Enclosed is a copy of the estimated manhour commitment form showing
in red the dollar amount of estimate. Note that the Soils Engineering,
Structural Engineering and Landscape Architectural fees are based upon a
rate schedule of $100.00 per hour depending upon the work the city would
like done. In the case of the Soils Engineer, they could save the city
considerable money by checking existing pavement to see if it could be
overlaid instead of removing.
Please advise if you need any other information.
Very Truly Yours,
Lloyd Whit:. P. .
Louis and Diederich, Inc.
cc:tw
ESTIMATED MAN{{OUR COMMITMENT
SUPERVISION SURVEYING PRELIMINARY FINAL CONSTRUCTION TOTALS
LAND ACQUISITION DESIGN DESIGN STAKING ,
CIVIL ENG . - /
LOUIS & 144Cap7b 6-00e//z' 700i(O.S c�113,0/&65 > 60e6. z4664�/
DIEDERICH $10 080 X&700 -1¢S S� �8c So $ 37o0 '33700
SOILS ENG . / K 48 s420
Ize no
STRUCTURAL - /
ENGINEER 74.31
48&/00
4'000
L.ANSCAP1N13 •
ARCHITECT 48e/t0
ifga6
TOTAL HOURS 144 60 70 / 60 08
/a/ °So 67Z0 SCS s'O 8 c4.So
3g6'6' Plyie/CYC I� t
• Pi