Loading...
89-132 H.J. Degenkolb Associates assist in implementing the requirements of the Unreinforced Masonry Building Law SB547 Citil of Cuptrti"o 10300 Torre Avenue P.O. Box 580 Cupertino, California 95014 Cupertino,California 95015 Telephone: (408) 252-4505 DEPARTMENT OF THE CITY CLERK July 10, 1989 H. J. Degenkolb Associates 350 Sanscmtie Street Suite #900 San Francisco, CA 94104 AGREEMENT - CITY OF CUPERTINO We are enclosing to you one (1) copy of the Agreement by and between the City of Cupertino and H. J. Degenkolb Associates, which has been fully executed by City Officials, this agreement shall begin on July 1, 1988 and be ccupleted before December 1, 1989. Sincerely, DORDIHY CORE= CITY C ERK CITY OF CUPERTINO DC/so encl. cc: Bob Cowan, Director of Community Development AGREEMENT IZO110--75 - 761 Dap 1 CITY OF CUPERTINO p O® o0 P.O. Box 580 CpaoQ Cupertino, CA 95015 Z 252-4505 NO. BY THIS AGREEMENT made and entered into on the 22nd day of June 19 89 4 .9 by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and Name (I) H.J . Degenkolb 4ssaciatesq . (2) Address T50 Sansome St . #900 City_ San Francisco Zip 94104 Phone -7 2-6952 (Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties hereto agree as follows: CONTRACTOR Shall provide or furnish the following specified services and/or materials: Consulting Engineering Services to assist in implementing the requirementss of the Unreinforced Masonry Building Law, SB547 . EXHIBITS: The following attached exhibits hereby are made part of this Agreement: Exhibit A - description of terms Exhibit B - Degenkolb proposal dated June 9, 1989 Exhibit C - Deenkolb Ger�er�l Cnditio � and Compensation TERMS The services and//or aterials furnishe un ,de this Agreement s a I commence o 711189 and shall be completed before 1 2/1 .8 9 COMPENSATION For the full performance of this Agreement,CITY shall pay CONTRACTOR: See attached Exhibit A GENERAL TERMS AND CONDITIONS Hold Harmless. Contractor agrees to save and hold harmless the City, its officers,agents and employees from any and �I a and liabilit includi all costs of defending any claimAM?ed&PE'r a14&JU6 A p@Pt or �sg0 t or �v � s ori ct formance o tis agreement. Ay sha not�be is a for acts of Contractor in performing services described herein. Insurance. Should the City require evidence of insurability Contractor shall file with City a Certificate of Insurance before commencing any services under this agreement.Said Certificate shall be subject to the approval of City's Director of Administrative Services. Non-Discrimination. No discrimination shall be made in the employment of persons under this agreement because of the race, color, national origin,ancestry, religion or sex of such person. Interest of Contractor. It is understood and agreed that this agreement is not a contract of employment in the sense that the relation of master and servant exists between City and undersigned.At all times Contractor shall be deemed to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in executing this agreement.Contractor certifies that no one who has or will have any financial interest under this agreement is an officer or employee of City. Changes. This agreement shall not be assigned or transferred without the written consent of the City. No changes or variations of any kind are authorized without the written consent of the City. CONTRACT CO-ORDINATOR and representative for CITY shall be: NAME Jae Antonucci DEPARTMENT Building This Agreement shall become effective upon its execution by CITY, in witness thereof,the parties have executed this Agreement the day and year first written above. CONTRACTOR: CITY 0 CUPERTINO: By -` 1.ytiv- i-� �!a � By �1G�^ Title I^�5�.��- e-- Title .Arm Soc. Sec.4/ APPROVALS Depa ent Head DateC rk Date White-City Clerk Copy Green-Finance Canary-Contractor's Copy Pink-Receiving Copy Goldenrod-Department Copy . EXHIBIT A TO THE AGREEMENT BETWEEN THE CITY OF CUPERI 0 AND DEGENEOLB ASSOCIATES DATED JUNE 22, 1989 TERMS: For the full performance of this Agreement, City shall pay Contractor $7,000 for the work outlined in Exhibit B. $350 shall be paid to Contractor for waiver fee described in Exhibit C, Paragraph 4. Contractor shall consider this Exhibit the City's written request to waive Contractor's $50,000 limitation of liability, as described in Exhibit C, Paragraph 4. A contingency of $2,650 over and above the $7,000 for work performed will be available only upon written authorization from the City. 350 Sansome Street Suite 900 ' San Francisco,CA 94104 415-392-6952 Fax 415-961-3157 EXHIBIT B H.J.Degenkolb Associates,Engineers A California Corporation Degenl(olh practicing in the broad field of Structural Engineering Henry J.Degenkolb Thomas D.Wosser Loring A.Wyllie,Jr. Chris D.Poland David R.Bonneville June 9, 1989 , Ted J.Canon George E,Greenwood R.Jay Love Maryann T.Phipps City of Cupertino David W.Cocke 10300 Torre Avenue James 0,Malley Cupertino, California 95014 Attention: Joseph Antonucci, Chief Building Official Reference: PROPOSAL TO PROVIDE CONSULTING SERVICES FOR COMPLIANCE WITH SB547 Dear Mr. Antonucci: Following our telephone conversation, I am pleased to submit this proposal to provide consulting engineering services to the City of Cupertino to assist the City in implementing the requirements of the Unreinforced Masonry Building Law, SB547. Our proposal is based on the assumptions that there are twelve unreinforced masonry buildings in Cupertino, that the mitigation program will be limited to "notification only" and that the City will provide all available records that may be of assistance in the identification process. Our work will involve three basic tasks and we will generally follow the outline of the procedures in the Seismic Safety Commission's Guidebook "To Identify and Mitigate Seismic Hazards in Buildings". Task One: Identifying Hazardous Buildings On the basis of available resources and a field survey, potentially hazardous buildings (URM) will be identified and simple record data concerning those buildings will be reported. Owners of those buildings will be notified, with an opportunity to respond. Responses will be reviewed and evaluated and the list of potentially hazardous buildings will be revised if necessary. The final listing will then be analyzed and summarized, using appropriate categories. t ' H.J.Degenkolb Associates,Engineers Page 2 June 9, 1989 Task Two: Mitigating the Hazards The mitigation program is to be limited to "notification only". Therefore, Task Two is condensed to discussions with City Staff and Officials to clarify possible subsequent steps and preparation of notification to Owner's of the potentially hazardous buildings on the final list. Task Three: Reporting to the Commission The data compiled will be forwarded to the Seismic Safety Commission, along with a description of the "notification only" mitigation program and of any intent for development of a future program. We propose to provide our services on an hourly and reimbursable basis, in general accord with our "Consulting Engineering Services - General Conditions and Compensation". We estimate that our total charges may be in the order of $6,000 to $7,000 and we suggest that you budget $7,000. We will not exceed this amount without prior authorization. We will bill monthly and expect payment within thirty days of billing. We look forward to the opportunity to be of service to the City of Cupertino. If this proposal meets with your approval, kindly sign one copy and return it to us for our files. Very truly yours, H. J. DEGENKOLB ASSOCIATES, ENGINEERS Thomas D. Wosser Chris D. Poland President Vice President APPROVED: CITY OF CUPERTINO DATE: �! TDW/dq attachments d/m-r.8 fice metropolitan area, and postage other than for general correspondence. c. Plan check permit and inspection fees required by governing bodies d. Photographic services e. Identifiable printing.and reproduction costs ap- plicable to the project f. Engineering computer services. The basic charge includes pro-rated costs of develop- ment, preparation and verification of programs utilized on the project g. Subcontracted services- Method ervicesMethod of Payment Invoices are submitted at the end of each calendar month for services performed during the month or as otherwise agreed to by the client These are pay- able on receipt. Interest of 1-1/2% per month(but not-exceeding the maximum rate allowable by law) will be payable on . any amounts not paid-within 30 days` payment there- after to be applied first to accrued interest and then _ to the principal unpaid amount Any attorneys fees or other cost incurred in collecting 'any-delinquent amount shall be paid by the client Modification of Agreement The foregoing conditions may be modified only by written agreement EXHIBIT C H. 'J. DEGENKOLB ASSOCIATES. ENGINEERS . CONSULTING ENGINEERING SERVICES General Conditions and Compensation Consulting engineering services include'investigations, research, preparation of reports, eta The scope of these services is defined in the letter of agreement for each project General Conditions for who may perform work in connection with 1. The drawings, specifications, reports and re- any design, report, or study prepared by H. J. productions thereof are instruments of service Degenkolb Associates of such limitation of lia- to be used only for the-specific project cov- bility for design defects, errors, omissions or ered by the agreement between the client and professional negligence, and require.as'a con- H. J. Degenkolb Associates. Tracings and/or dition precedent to their performing the work a special masters, as well as calculations, shall like limitation of liability on their part as against remain the property of H. J. Degenkolb Assoc!- H. J. Degenkolb Associates..In the event that ates, unless set forth in the letter of agree- the client-does not wish to limit our firm's pro- ment, and are not to be reused by the client fesSional liability to this sum; H..J. Degenkolb. for other projects. Associates will waive this limitation:-upon_the 2_ H. J. Degenkolb Associates warrants that its client's written request provided.that.the client agrees to pay for this waiver art:additional con- services are performed within the limits pre- sideration of 5% of our firm's total fee or$200, scribed by its clients with the usual thorough- ness and competence of the engineering pro- fession. No other warranty or representation,. in the event the client makes.a claim against either expressed or implied, is included or in- H.J. Degenkolb Associates,at-law or otherwise,_ tended in H_ J. Degenkolb Associates propos- for any alleged error, omission or other act ar.is- als, contracts, designs or reports.The firm does ing out of the'perormance of professional serv- not guarantee the completion of performance ices, and the client fails to prove such claim., of contracts by the construction contractor(s) then the client shall pay all costs incurred by or other third parties, nor is it responsible for H. J. Degenkolb Associates in defending itself their acts or omissions, nor for the safety of against the claim. the contractors) work 3. Any estimates or,statements of cost referred to in the scope of services are predicted costs. Compensation and are based on professional opinions and Employee's time will be charged to the client based judgment H. J. Degenkolb Associates cannot on the attached schedule of hourly rates.These rates be held responsible for fluctuations in-const ruc- are subject to change upon notification. tion costs and factors which could not be anti- cipated at the time of preparation of a particu- Time spent in traveling, when in the interest of the lar estimate. project, will be charged to the client A maximum charge 4. The client agrees to limit any and all liability or of eight hours per day will be made for trave claims for damages, costs of defense, or ex- Direct non-salary expenses will be charged at cost penses to tie levied against H_ J. Degenkolb plus 10%. Direct non-salary expenses include, but Associates to a sum not to exceed $50,000, or are not limited to: the amount of its fee, whichever is greater, on a. Travel and subsistence when away from the account of any design defect, error, omission, . home office on project business. or professional negligence. Further, the client b. Identifiable communication expense such as agrees to notify any contractor or subcontrac- telephone and telegraph outside the home of- t \ H.J.Degenkolh Associates.Engineers CONSULTING COMPENSATION SCHEDULE The following hourly rates are applicable as of May 1, 1989. These rates are subject to change upon notification. Henry J. Degenkolb $170/hour Senior Principal $130/hour Senior Structural Engineer $101-130/hour Senior Engineer $86-101/hour Project Engineer $76-86/hour Design Engineer $65-76/hour Assistant Engineer $54-65/hour Senior Draftsperson $46-54/hour Project Draftsperson $39-46/hour Computer-Aided Drafting (CAD) $10/hour (Based on Machine-Connect Time) 04/89 d/revsup