89-134 Creegan & D'Angelo engineering and surveying services for misc. Water Main Replacements Project 89-107 AGREEMENT by o00 0 CITY OF CUPERTINO oQo o-' P.O. Box 580 y 4Pon Cupertino, CA 95015 Acct. #610-790 - ' 252-4505 N0. __if BY THIS AGREEMENT made and entered into on the day of 19 by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and Name (1) CREEGAN & D'ANGELO (2) Address n-nnnx?6220 City- S�Ai ;Q29 Zip 1 .o Phone knA)99 —1234 (Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties hereto agree as follows: CONTRACTOR Shall provide or furnish the following specified services and/or materials: ENGINEERING & SURVEYING SERVICES FOR MISCELLANEOUS WATER FAIN REPLACEMENTS PROJECT 89-107 EXHIBITS: The following attached exhibits hereby are made part of this Agreement: REQUEST FOR PROPOSAL — EXHIBIT A — PROPOSAL — EXHIBIT B r materials furnished under this Agreement shall commence on JULY 10� 1989 TERMS The services and/_9 and shall be completed,before . SEPTEMBER 1989- COMPENSATION 989-COMPENSATION For the full performance of this Agreement,CITY shall pay CONTRACTOR: $35,900 GENERAL TERMS AND CONDITIONS Hold Harmless. Contractor agrees to save and hold harmless the City, its officers, agents and employees from any and all damage and liability of-every nature, including all costs of defending any claim, caused by or arising out of the negligent acts, errors or omissions of the Contractor in the performance of this Agreement. City shall not be liable for acts of Contractor in performing services described herein. Insurance. Should the City require evidence of insurability Contractor shall file with City a Certificate of Insurance before commencing any services under this agreement.Said Certificate shall be subject to the approval of City's Director of Administrative Services. Non-Discrimination. No discrimination shall be made in the employment of persons under this agreement because of the race, color, national origin,ancestry,religion or sex of such person. Interest of Contractor. It is understood and agreed that this agreement is not a contract of employment in the sense that the relation of master and servant exists between City and undersigned.At all times Contractor shall be deemed to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in executing this agreement.Contractor certifies that no one who has or will have any financial interest under this agreement is an officer or employee of City. Changes. This agreement shall not be assigned or transferred without the written consent of the City.No changes or variations of any kind are authorized without the written consent of the City. CONTRACT CO-ORDINATOR and representative for CITY shall be: NAME TRAVICE WHITTEN DEPARTMENT PUBLIC WORKS a This Agreement shall become effective upon its execution by CITY, in witness thereof,the parties have executed this Agreement the day and year first written above. CONTRA OR: CITY OF CUPERTINO: By Title ZC. - e e e,,iTitle APPROVALS Depart m ead Date CiW tl ate June 2, 1989 Re: Request for Proposals-Miscellaneous Water Main Replacements Project 89-107 Gentlemen: The City of Cupertino Public Works Department requests engineering proposals for water main and house service replacements on the following streets (see attached location map) . 1. Foothill Blvd. - Stevens Creek Blvd. to Alcalde Rd. approximately 2200 L.F. 8" ductile iron pipe. 2. Santa Paula Ave. - Foothill Blvd. to Mira Vista Ave. approximately 1000 L.F. 1011 ductile iron pipe. 3. Ainsworth Dr. - Hartman Dr. to Varian Way approximately 1300 L.F. 811 ductile iron pipe. 4. Mann Dr. - Dos Palos Ct. to 200 feet south of Oakview Lane - approximately 2300 IF 12" ductile iron pipe. The engineering consultant shall provide the following items: 1. Complete plan and profile drawings of the work showing existing utilities including but not limited to existing water meters, valves, crossings and landscaping. 2. Plans at preliminary and final stages for review by City staff and all utility companies. 3. Specifications as follows: Section A - Bid Documents Section C- Special Provisions Section D -' Technical Provisions (The City will provide only Section B - General Provisions) 4. Provide preliminary and final cost estimates for the work. 5. - Provide all necessary construction staking including but not limited to PK'S at 5' offsets & cut sheets. EXHIBIT A 7 Request for Proposals Water Main Replacement Project 89-107 (Continued) Page #2 6. Coordination with all utilities and other public agencies. - Send all utilities & affected Agencies (PG&E, Pacific Bell, United Cable, Cupertino Sanitary) preliminary and final plans. - Request verification of all utility locations in writing and a schedule from companies for utility relocation if found necessary. The City will provide the following items: 1. All information available in City Records. (City will furnish record drawings only, not as-builts) 2. Review of preliminary plans, specifications, estimates, and other documents presented by the Engineer and render decisions in writing within a reasonable time. Give prompt written notice to Engineer at any time City observes or otherwise becomes aware of any error, omission, or defect in the project. 3. All necessary provisions for the Engineer to enter upon public and private property as required in the performance of his services under this agreement. 4. Size,and. type of water mains to be used. 5. Size, and type of house water services to be used. 6 Details for trench backfill. 7. Type, location;--and specifications for fire hydrants and water valves: • 8. The City will administer the bidding process. 9. Traffic, control. plan. for construction. t , n a Request for Proposals-Miscellaneous Water Main Replacement Project 89-107 (Continued Page #3 Written proposals are due prior to June 19, 1989, 2:00 PM in the Public Works Departxlent, to the attention of Lavenia Millar. Please provide all costs associated with providing plans, specifications and staking and a complete schedule for completion of the work. Once the schedule for completion of work has been accepted by the City all dates must be met. If the completion dates are not met, the City will assess the engineering consultant $150.00 per calendar day in liquidated damages for each day's delay beyond the completion date. The City anticipates construction to begin in September. If you have any questions contact Lavenia Millar at (408)252-4505. Very truly yours, CITY OF CUPERTINO Bert J. Viskovich Director of Public Works Travice Whitten Assistant City Engineer Iwlsm ami �j •�► .�/��r�� �s��.�b�� �e ����♦`•y ��•ai �� ani - - �■�I��r■■■■■ Fla rM mom FANN ,���� ,•��`��� "� '�•� �� ���' ���,• AD s� •��.'i,' ��� _ �I�lo�'a Q�j �� X11, • ',•� ��•�����'9 ��'�� . ��II.` •r� W'vY�`��j,,��.�.►����:�����, °'°ill � �� 1■11 l: � CIp♦��°'t� �� �� . �♦ �z�9: Vilma �; a� ��a,�o �,�i �i � b :■eeeeee � apses fl � .� ��'.►� ■ee �� •til �l� � ai ® ��� i� I'�� rw -1•nul s =+ ntify�ti"-•t III i� i � � �® ��® ■ 1 �`©�' u. ��T■s=1 ....tl�n quu �u ui (`�\��`�e\``1��■ ��7��6� � � f��lllO C.�!�1■ �■ L, urrr nrr a=w =� = � _ �II � �r� - �■■I. u11_ r c•r Cp X67 _�� Of9 =ti5s■ acs w .� "'■� MR, �"1 ��' p .� % 1■/�� ���� ® ■■ D u ���m �� �� �}S��,I . .� ��, ■■■i<ilr � Ate! iPAW� ■� w w� / REVIEW ���OooiO■�� m = t ■rt/E� � � s � �� w �m Y '■ d !des �. >:d � WIN MW !�� � .. .a "■' � _...._�; � hI� ����� � �a III— . Pla 1 ■ � � Ire �/��$��+�� � �.���Z,��A � morel= .,■ ■■■■■ ■ ■Ie : +ms •III�Il:`� � �j ■a ■■A �■■ �� � ■ ��,�ira `moo e ' L~ CREEGAN+ DANGELO L PROPOSAL TO PROVIDE ENGINEERING SERVICES FOR MISCELLANEOUS WATER MAIN REPLACEMENTS PROJECT 89-107 SUBMITTED TO: CITY OF CUPERTINO JUNE 1989 EXHIBIT B Engineers Planners Surveyors 1046 West Taylor Street San Jose,CA 95126 i 408 998 1234 ` Mailing Address: P.O.Box 26220 San Jose,CA 95159 Offices Located in San Jose,CA Pleasanton, CA Fairfield, CA Monterey,CA Phoenix,AZ __. June 19, 1989 122116 City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 Attention: Bert J. Viskovich Director, Public Works Subject: Request for Proposals Miscellaneous Water Main Replacements Project 89-107 Gentlemen: Creegan + D'Angelo is pleased to respond to your request for proposals for design of your water main replacements. We understand the complexities of replacing existing water mains in existing residential areas. The Firm is now completing construction services on an essentially identical project for the City of Burlingame. Our experienced staff that have provided the service you requested on very similar projects is available for your project. All of the services the City of Cupertino needs are available with in-house staff. Our experience and familiarity with this type of work will insure a very complete set of construction documents in a timely manner. We would be pleased to answer any questions you may have and we look forward to working with you on this project. Very truly yours, George B. O' tte Project Manager GBO:Imr J CREEGAN + DANGELO CITY OF CUPERTINO MISCELLANEOUS WATER MAIN REPLACEMENTS PROJECT 89-107 BACKGROUND The City of Cupertino is actively working on maintaining and upgrading their water distribution system. This work which has continued for several years has currently identified four water mains for replacement. These segments of water main are generally located in various older developments and streets throughout the City. One segment is in the narrow part of Foothill Boulevard which will require careful attention to pipe location so as to minimize traffic disruption. Replacing these mains will be continuing work in this area that has been ongoing for several years. Creegan + D'Angelo visited the sites and the brief walk-through of the sites indicated several key factors in main replacement work. Locating existing utilities in the field, on the drawings and through existing record drawings is very important. In existing developed areas like these, the design and installation as documented in the construction records must be sensitive to the individual homeowners that will be impacted by the work. Driveways must be maintained open, existing vegetation must be. preserved and both pedestrian and vehicfe4 safety must be rigorously protected. ENGINEERING SERVICES Creegan + D'Angelo would provide the engineering services requested by the City of Cupertino. These services would provide a complete and well coordinated set of construction documents. The tasks requested by the City will be presented to illustrate the Firm's understanding of the proposed work. 1 CREEGAN + D'ANGELO Task 1. Preparation of Base Maps Creegan + D'Angelo recommends the use of rectified aerial photographs for the plan portion of the plan and profile sheets for this type of project. The use of aerial photographs permits full visualization of the potential conflicts and site conditions. As a practical matter care must be taken in the production of this type of base map to insure that the background is properly screened so that design information is not lost or obscured by shadows. Creegan + D'Angelo would perform all surveying and field measurements required to prepare the base maps and document the location of existing facilities. The survey services would be provided by in-house crews that are familiar with the requirements of a waterline replacement project. These crews have worked directly for the engineering staff on similar projects in the past thus insuring continuity and the depth of understanding that will eliminate wasted effort and poor data. The profile information will be compiled after the preliminary design is completed. The surveyors will: take lelevations along the center line of the proposed alignment. - Exact elevation of possible conflicting storm and sanitary sewers will also be collected at this time. Task 2. Preliminary Design When the plan and profile base sheets are available, red line drawings will be prepared indicating Creegan + D'Angelo's recommended alignment. This alignment will be submitted to the City of Cupertino's Engineering Staff and Water Department Staff for review and comment. A meeting with the staff to discuss these comments would facilitate the smooth transition into an accurate final design. 2 CREEGAN + DIANGELO — Task 3. Final Design The final design will be based on the completely reviewed preliminary design. This final design will include service and fire hydrant locations and will detail tie-ins to existing lines. The proper detailing of the connection of new facilities to the existing system is the most important part of main replacement design. This detail should facilitate the following three key elements: The tie-in should permit extending the new line in the future in a cost effective and expeditious manner. The tie-in should permit the installation, testing, and sterilization of the new line without interfering with the existing system. The tie-in should minimize and eliminate, if possible, useless and redundant "fi{tings that introduce excess head loss and invite continued corrosion and maintenance problems. Task 4. Specifications Complete Contract Construction Specifications will be prepared for the project. Creegan + D'Angelo has available complete sets of water main replacement technical specifications and bid documents that have been used several times in the recent past. A review of the specifications will be made to make them match the current project. In addition Creegan + D'Angelo will sychronize these Special and Technical Provisions and Bid Documents with the General Provisions provided by the City. Task 5. Construction Cost Estimate An estimate of construction costs will be prepared based on the final construction documents. Task 6. Construction Staking Creegan + D'Angelo will.provide the requested reference line for constructing the new pipe. It is important-to; provide for the Contractor and for future City records a 3 CREEGAN + D'ANGELO specific, dimensioned location for the pipeline. These dimensions will be tied to features of the infrastructure which are permanent. Task 7. Coordination with Other Utilities and Agencies Creegan + D'Angelo routinely contacts all other utility purveyors to eliminate insofar as possible conflicts in' alignments. At this time the identified utilities are water, sewer, storm drain, gas,,,electric, telephone, and cable television. SPECIFIC EXPERIENCE Creegan + D'Angelo has been involved in the design and planning of Water Works since the Company was formed in 1956.. Its clients for water system design range from Cities like Burlingame, Mountain View, Fairfield, Tracy and Santa Cruz to , Special - Districts like Santa Clara Valley Water District and Santa Cruz County Flood Control and Water Conservation District to Federal Government Agencies like the National Park Service and the U.S. Navy. The Firm has also worked on many land development projects for private clients often requiring main extensions through developed areas as well as onsite design efforts. Creegan + D'Angelo is,currently providing construction service to the City of Burlingame for "Water System Improvements 1987". This project was also designed by Creegan + D'Angelo. This.;,project covered work at five different sites with a total of 2,100 feet of eight inch pipe;' 600' feet of other sizes (4"-1211), 61 services, six hydrants and 14 different tie-ins. The total bid price was $310,000. This project involved extensive coordination with CALTRANS to cross the El Camino Real (Highway 82) in two places as well as to be parallel-and within the roadway for 700 feet. The traffic control plan for this project required CALTRANS approval. 4 CREEGAN + D'ANGELO Creegan + D'Angelo provided full design and construction engineering services for another water main replacement project for the City of Burlingame. This project required the installation .of 3,900 feet of water line, reconnecting 53 services, and the installation of eleven new fire hydrants. Some of the highlights of the project include the design of a Southern Pacific Railroad crossing, including acquisition of the permit and the complete redesign and expansion of the City of Burlingame's water main standard details. The Firm also provided a hydraulic network analysis of the area influenced by the main replacement to confirm pipe line size selection. One of the most significant projects the Firm has been performing is the planning and design and construction management of the facilities to provide San Felipe Water to San Benito County. This project has a construction cost in excess of $22 million. It contains over 78 miles of distribution system pipe and six pump stations. This project is now nearing completion and is delivering water in a manual operating mode pending final testing of the automated control system. Creegan + D'Angelo has been providing the full spectrum of engineering services starting with planning through design, construction staking, construction inspection and construction administration all the -- way to the finished as-built drawings. PROJECT STAFFING, The staff for this project will be Mr. Mark Kenning, Principal-In-Charge, Mr. George B. Otte, Project Manager, and Ms. Tracie Sakakihara, Senior Engineer. The detailed resumes of this staff are included in the back of this proposal. This team of engineers has worked together on water resources projects for several years. Specifically all of the water main replacement work for the City of Burlingame, the pump station design for the Navy and work for San Benito County Water Conservation 5 CREEGAN + D'ANGELO and Flood has been performed by this engineering team. This team is further supported by the engineering, drafting and clerical staff of the San Jose Office. The structural department and survey departments in San Jose are also available to resolve any specific problems that may arise. With the exception of the preparation of the aerial photographs, all of the expertise required by the City of Cupertino, including construction services, is available with Creegan + D'Angelo personnel who have worked together on many projects. PROJECT BUDGET AND SCHEDULE Creegan + D'Angelo will provide all of the engineering and surveying services for an _ estimated fee of $35,900. A proposed schedule for the project is attached. This schedule is dependent upon when the City o'f 'Cupertino will be able to issue a Notice to Proceed as well as the time required for City review and utility company responsiveness. { 6 CREEGAN + D'ANGELO PROJECT SCHEDULE COMPLETE TASK WEEK ENDING NOTICE TO PROCEED JULY 7 PRELIMINARY DESIGN FOR REVIEW JULY 28 REVIEW BY CITY AUGUST 4 FINAL DESIGN FOR REVIEW SEPTEMBER 4 REVIEW BY CITY SEPTEMBER 22 RELEASE FOR BID SEPTEMBER 29 7 CREEGAN + DIANGELO GENERAL QUALIFICATIONS Creegan + D'Angelo, Consulting Engineers, was established in San Jose in 1956. Since 1956, Creegan + D'Angelo has opened branch offices in Pleasanton, Fairfield, and Monterey, California. . Currently, the Firm employs over 120 professional, technical and support personnel. Engineering and planning services, from preliminary concept through construction, are provided in disciplines of: Civil The firm has extensive experience carrying out public and private projects from initial concept through completion, including: o Land Planning o Site Engineering o Traffic Engineering o Highway Design o Utility Systems o Construction Inspection Structural Creegan + D'Angelo has a complete structural staff with broad experience in design and construction supervision for a wide range of projects which include: o Bridges and Interchange Projects o Structure Rehabilitation and Seismic Retrofit Projects o Educational Facilities o Municipal Structures o Parking Structures o Industrial, Manufacturing and Commercial Buildings o Office and Shopping Center Complex Water Resources In the areas of.water. supply, wastewater and drainage, Creegan + D'Angelo has specific expertise in:, o Hydrologic :Analysis o Planning of Distribution Facilities o Pumping and Storage Facilities o Wastewater Collection, Pumping and Treatment Facilities -- o Planning for Flood Protection including Flood Plain Management, Channel Improvements, Control Structures, and Floodproofing o Irrigation and Drainage Facilities. Surveying In the fields of land and hydrographic surveying, the Firm has background and experience ranging from large scale cadastral, topographic and high order control surveys through the, total range of construction surveys. Types of construction projects surveyed include: CREEGAN + D'ANGELO o Power Plants, 'Pipelines, Electric Transmission Lines o Quality Assurance/Quality Control Surveying o As-built Surveys - Structural Steel Construction The surveying procedures and methodologies developed, coupled with the most advanced precision surveying instruments available on the market today, enables Creegan + D'Angelo to provide state-of-the-art survey service. The people who work in the Firm's various offices include civil, structural and traffic engineers, land surveyors, technicians and support personnel. Project responsibility is assigned to key members of the Firm throughout the entire assignment and as a medium size Firm, all projects receive personal attention from one of the Firm's principals. All personnel have developed versatility as well as specialized fields of interest from extensive experience. To back up this experience, a computer capability is maintained in-house for mapping, design, drafting and data management. Creegan + D'Angelo uses a very compact design team. The team consists of a Principal- in-Charge, Project Manager, Project Engineer and Drafting Staff. The close working relationship between the Principal-in-Charge and the Engineering Manager assists in providing excellent response to the County's inquiries and provides rigid quality control. The Principal-in-Charge, Mark Kenning, ensures that the commitments of the Firm are met. He therefore ensures that the project manager maintains the project on schedule and within budget. As the Office Manager for the San Jose, Office, Mr. Kenning allocates the staff resources to meet the agreed upon schedule. He also ensures that the product which is produced meets the Client's needs and is of a quality consistent with the standards of Creegan + D'Angelo. CREEGAN + D'ANGELO WATER SYSTEM IMPROVEMENTS 1987 Client: City of Burlingame Description: 1500 feet of 8" Water Main Replacement on Bayswater Avenue. 680 feet of 8" Water Main Replacement on El Camino Real (Highway 82). 250 feet of 8" Water Main Replacement with 155 feet of Casing across EI Camino Real (Highway 82). Two Meter connections between San Francisco Water Department Meters and the distribution system. Engineering Services Performed: Preliminary Design Final Design and Specifications Unique Significance: These projects covered five different project sites and included four different encroachments into the Right-of-Way of State Highway 82. Each encroachment required a separate encroachment permit. Creegan + D'Angelo, on behalf of the ,City, negotiated with CALTRANS each of the permits including the '640 encroachment along the length of the Right-of-Way. Agencies Involved: City of Burlingame San Francisco Water Department CALTRANS Pacific Gas & Electric Company Pacific Bell Completion Date: 1987 Construction Cost: $300,000 Contact: Ralph Kirkup City of Burlingame (415) 342-8931 CREEGAN + D'ANGELO WATER MAIN TO ANZA AREA Client: City of Burlingame Description: Approximately 3600 ft of new 12" Water Transmission Inc. 800 ft of 6" water replacement, 400 ft of 8" water main replacement. 145 ft casing under Southern Pacific right-of-way. Engineering Services Performed: Feasibility Analysis Preliminary Design Final Design and Specifications Construction Management Construction Inspection Unique Significance: This Water line extends reliable water flows and pressures from the center of the City out to the freeway for future connections to a high value commercial area. This project required Creegan + D'Angelo to acquire all permits fo'r the project (including Southern Pacific Railroad Company) and provide complete construction management. Agencies Involved: City of Burlingame San Francisco Water Department - Southern Pacific Railroad Company Pacific Gas & Electric Company Pacific Bell Completion. Date: 1985 Construction Cost: $553,000 CREEGAN + D'ANGELO SAN BENITO WATER DISTRIBUTION SYSTEM Client: San Benito Water Conservation and Flood Control District Location: San Benito County, California Description: The project is part of the $200,000,000 San Felipe Project to deliver 150,000 acre feet of water to San Benito and Santa Clara Counties. The San Benito section is a county-wide water distribution system to supply 45,000 acre-feet of water annually to 21,000 acres. The system includes 90 miles of 6-inch through 30-inch pipe and 4 pumping stations with a total of 3,500 horsepower. The water will be supplied at a rate of 150 cubic feet per second (67,000 gallons per minute) to 700 farms, four ground water percolation sites, and the cities of Hollister and San Juan Bautista. The water will be delivered at a pressure suitable for sprinkler operation - 60 pounds per square inch or greater. Engineering Services Performed: Conceptual design and preparation of preliminary plans, financing concepts, Federal PL 130 Loan Applications, plans and specifications, and a project budget Construction of the. pipeline was accomplished by eight contractors working under Creegan & D'Angelo's supervision. Unique Significance: The project required liaison and negotiation with the U.S. Bureau of Reclamation, the federal agency that supplied the funding for the project. Coordination was required so that all San Benito County facilities were designed compatible with other San Felipe Project facilities. Agencies Involved: U.S. Bureau of Reclamation San Benito Water Conservation and Flood Control District San Benito County City of Hollister City of San Juan Bautista Completion Date: 1985 Construction Cost: $22,000,000 CREEGAN + D'ANGELO BOOSTER PUMP PIER 2 do 3 Client: U.S. Navy Public Works Center, Oakland Location: Naval Air Station, Alameda Description: Provide a new 1000 gpm water booster pump station. Engineering Services Performed: Preliminary Design Final Design and Specifications Construction Support Services Unique Significance: Design Criteria required constant output pressure with range of inlet pressures from 25 psi to 60 psi. Design also required pump station to be portable as well as operating in a fixed installation. Completion Date: 1987 Construction Cost: $250,000 CREEGAN + D'ANGELO -- WATER SYSTEM IMPROVEMENTS Client: Kurtzman & Kadoma Location: Genoa, Nevada Description: Modification and upgrading of existing domestic water system to provide reliable fire flow and domestic supply. The system required the design of new water well, storage reservoir, booster pump station, distribution piping and electronic control system. E ngi neer,ing Services Preliminary Engineering Performed: Final Design and Specifications Construction Consultation — Agencies Involved: Douglas County, Nevada State of Nevada Department of Transportation Completion Date: 1985 Construction Cost: $125,000 CREEGAN + D'ANGELO HAYES PARK HOUSING AREA DOMESTIC WATER SYSTEM -. Client: Directorate of Engineering and Housing Location: Fort` Ord, California Description: Analysis of water main at Hayes Park for possible renovation or replacement of system Engineering Services Performed: Site investigation Review hydraulic flow network System analysis Determine problems and recommend alternative solutions Review maintenance repair records C factor flow analysis Report with recommendations Cost estimates for each alternative Agencies Involved: Directorate of Engineering and Housing _ Fort Ord Fire Department Completion Date: 1987 Construction Cost: $260,000 CREEGAN + D'ANGELO ZONE 2 - WATER STORAGE AND DISTRIBUTION PROJECT Client: City of Fairfield Location: Fairfield, California Description: A 2,700,000 gallon storage reservoir, a 22 mile 16" distri-bution pipeline and a major pump station with connections to the existing water treatment plant Engineering Services Performed: Feasibility study Preliminary design Improvement plans Construction staking services Unique Significance: Project provides water for the future development of the northern part of Fairfield which requires a second pressure zone Agencies Involved: City of Fairfield Solano County Irrigation District CalTrans Completion Date: 1982 Construction Cost: $1,400,000 CREEGAN + D'ANGELO CASTRO CITY IMPROVEMENT PROJECT — Client: City of Mountain View Location: Mountain View, California Description: Reconstruction of streets (College, Fairoaks, University, Stanford, and Leland Avenues) and utilities within a ten- square block area Engineering Services Performed: Preliminary engineer's report Contract documents including grading and drainage Lighting and signs Construction administration Utility relocation Landscaping Assessment district engineering Construction staking services as required Agencies Involved: City of Mountain View Pacific Gas and Electric Company Pacific Telephone Company Completion Date: 1983 Construction Cost: $586,000 CREEGAN + D'ANGELO AGNEW VILLAGE IMPROVEMENT PROJECT -- Client: City of Santa Clara Description: Reconstruction of streets and utilities including curbs, gutters, and sidewalks within an 18 square block area Engineering Services Performed: Prepared conceptual reports - Master storm drainage management plan Plans and specifications Assessment district engineering Acquisition plots Construction administration Construction staking services Organized neighborhood meetings in a success effort to sell the project to property owners Agencies Involved: City of Santa Clara Southern Pacific Railroad Company Pacific Gas and Electric Company Pacific Telephone Company Completion Date: 1982 Construction Cost: $1,585,000 CREEGAN + D'ANGELO TYRELLA-GLADYS AVENUE IMPROVEMENTS Client: City of Mountain View Location: Mountain View, California Description: Reconstruction of Tyrella Avenue and Gladys Avenue Engineering Services Performed: Preliminary engineer's report Assessment diagram and spread Preparation of contract documents including: utility undergrounding, grading and drainage, lighting and signs, utility relocation, and landscaping Acquisition of plats and descriptions Construction Administration Construction Staking Agencies Involved: City of Mountain View Pacific Gas and Electric Company Pacific Telephone and Telegraph Company County of Santa Clara Completion Date: October 1981 Construction Cost: $233,000 CREEGAN + D'ANGELO MARK A. KENNING San Jose Office Manager Mr. Kenning joined the Firm in 1958 and became San Jose Office Manager in 1983. In addition to his responsibilities as Manager of the San Jose Office, Mr, Kenning has been responsible for a variety of projects during his 28 years experience with the Company including industrial and commercial complexes, schools, municipal structures, highway interchanges and water/sewage treatment related facilities. Mr. Kenning's design construction responsibilities include multi-level parking structures for the Cities of'San Jose, Santa Clara and Santa Barbara, major industrial buildings for Lockheed Missiles & Space Company, grade separations and interchanges for the Cities of San So°se "and `§&ia Clara, and light rail projects for the Santa Clara. His experience also,covers.such major projects as the San Jose Transit Mall, Guadalupe Corridor Light Rail Project, and the Santa Clara Convention Center Project. -- EDUCATION BSCE - University of Santa Clara, California REGISTRATION - Registered Civil Engineer - California, Washington Registered Structural Engineer - California, Nevada, Washington PROFESSIONAL AFFILIATIONS American Society of Civil Engineers Structural Engineers Association of Northern California American Concrete Institute Prestressed Concrete Institute CREEGAN + D'ANGELO GEORGE B. OTTE . Project Manager Mr. Otte is a Project Engineer for Creegan + D'Angelo with thirteen years professional experience in civil and sanitary engineering. lie has developed experience in planning and design of wastewater facilities, water works, and flood control projects. A selected summary of, h,is experience with various water projects is presented. o Navy Public Works Center, Oakland - Design of a new booster pump station capable of delivering 1000 gpm at 60 psi of discharge pressure with variations in the suction pressure from 60 psi down to 25 psi. The design used variable speed pumps modulated on discharge pressure to prevent over pressurizing the discharge lines and for maximum electrical efficiency. The station is designed as a prefabricated semi-permanent unit that can be easily relocated for temporary emergency service. o City of Burtingame - Design and Construction Management of a new 12" water transmission line and two water main replacements. Project required plans, specifications and acquiring permits from Southern Pacific and CALTRANS for the railroad and freeway crossings. Services included preliminary design, design and inspection. o Burlingame California - Design of two water main replacements, two connections __. from San Francisco Water Department to City Distribution systems, relocation of services from an easement water line which was abandoned and replacement of a crossing of E1 Camino. The project required design of all facilities and _ aquisition of four encroachment permits from CALTRANS as well as coordination with San Francisco Water Department. Construction management is also being provided. - o San Benito County Flood Control and Water Conservation District, Hollister, California - Design of Subsystem 7 agricultural water distribution system including over nine miles of pipes ranging from 30 inches to 6 inches in diameter. Design of four percolation pressure reduction stations and outlet facilites. Computuerized hydraulic network and surge analysis of entire distribution system including the simulation of power failure conditions. - o City of, R-1i9 Vista,-. Design of a new 1000 gpm water supply well and chlorination system. .:Contract,:documents were prepared to separate the projects into two phases, test,hole.drilling and well construction, to eliminate costly unknowns in the cons tructionr,documents. The design incorporated an existing 150 HP motor on the new iwell:•,, ,E EDUCATION B.S. Civil Engineering'- University of California, Berkeley M.S. Civil Engineering University of California, Davis - REGISTRATION Registered Civil Engineer - California PROFESSIONAL AFFILIATIONS California Water Pollution Control Association Peninsula Water Works Association CREEGAN + D'ANGELO r s TRACIE K. SAKAKIHARA Senior Engineer Tracie Sakakihara joined Creegan + D'Angelo in 1981 upon completion of her Masters Degree in Hydraulics. Her academic background includes design of hydraulic structures, surface and groundwater hydrology, hydraulic mixing processes, sediment transport and water process design. Her experience in various water resources engineering areas is summarized below. o City of Burlingame, Burlingame, California - Designed water. main replacements and connection to San Francisco Water Department meters. This project required coordination with San Francisco Water Department and CALTRANS. Four encroachment permits were acquired including one encroachment of 600 feet along the length of the right-of-way. Complete plans, specifications and cost estimate were provided. o Navy Public Works Center, Oakland, California - Designed a 1000 gpm booster pump station and integration of pump station into existing hydraulic network. Plans and specifications were provided. The station was designed and specified as a prefabricated system. o San Benito County Flood Control and Water Conservation District, San Benito, -- California - Computer network analysis was provided for each of seven water distribution systems. Water hammer analysis was also provided. .In the water hammer analysis, pump failure and valve closures were considered. o East Bay Dischargers Authority, San Lorenzo, California - Prepared plans and specifications for 7500 feet of force main used to deliver reclaimed wastewater to irrigate Skywest Golf Course. Performed pipe sizing, head loss and water hammer calculations and cost analyses. o Santa Clara County Traffic Authority, San Jose, California - As part of the Route 85 project, a hydraulic study was performed to evaluate the impact of proposed facilities along three creeks in Saratoga. The Corp of Engineers' water surface, profiles...computer program, HEC II, was used to model the hydraulics of ,the creeks. Sediment transport calculations were performed in conjunction with the hydraulic calculations in order to determine siltation or scour problems. EDUCATION BSCE - University of the Pacific MSCE - University of California, Berkeley (Hydraulic Engineering) REGISTRATION Registered Civil Engineer - California PROFESSIONAL AFFILIATIONS American Society of Civil Engineers Society of Women Engineers CREEGAN + D'ANGELO