Loading...
S1736i CERTIFICATE OF COMPLIANCE Part 1 of 2 ENV -1 PROJECT NAME DATE Great Western Bank 7/9/98 PROJECT ADDRESS 10250 DeAnza Boulevard Cupertino ::;idii�yDecirotd:::;::::::: PRINCIPAL DESIGNER - ENVELOPE TELEPHONE Callison Architecture 206.623.4646 DOCUMENTATION AUTHOR TELEPHONE ...... j jet .::::::::::::::::::::: Builder's Energy Services (408) 842- 82414ni.; rY.: DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 1 ,050 Sq.Ft. 4 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTELIMOTEL GUEST ROOM PHASE OF CONSTRUCTION NEW CONSTRUCTION ® ADDITION [:] ALTERATION EXISTING I ADDITION METHOD OF ENVELOPE ❑ COMPONENT ® OVERALL ENVELOPE PERFORMANCE COMPLIANCE • This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building envelope requirements. The documentation preparer hereby certifies that the document is accurate and complete. DOCUMENTATION AUTHOR SIGNATURE DATE Darrel E. Kelly '7)Orrc_°/ . 719/98 The Principal Envelope Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the envelope requirements contained in Sections 110, 116 through 118, and 140, 142, 143 or 149 of Title 24, Part 6, Chapter 1. Please check one: I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a civil engineer or architect. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. ❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section of the Code to sign this document as the person responsible for its preparation; and for the following reason: PRINCIPAL ENVELOPE DESIGNER - NAME LIC. NO, DAT Callison Architecture 'Q0 .- v .- Indicate location on plans of Note Block for Mandatory Me sures CT ON e APPLICANT For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manual published by the California Energy Commission. ENV -1: Required on plans for all submittals. Part 2 may be incorporated in schedules on plans. ENV -2: Used for all submittals; choose appropriate version depending on method of envelope compliance. ENV -3: Optional. Use if default U- values are not used. Choose appropriate version for assembly U -value to be calculated. EoergyPro 10 By EnergySoR User Number 1239 Job Number 98167 Page' lot 7 Great Western Bank ASSEMBLY NAME VALUE CONSTRUCTION TYPE (e.g. Wall -1. Floor -1) e.g. Block, Wood, Metal) Slab On Grade 0.900 n/a -13 Wall .13.2x4.16 0.088 Wood 19 Built -up Roof 0.052 Wood aff-EST LOCATION /COMMENTS: (e.g. Suspended Ceiling, Demising, etc.) Exposed Slab w/R -10.0 PedmelerInsulatlon Exterlor Wall EAodor Roof 7/9/98 ORIENTATION NO. OF PANES U- VALUE FRAME TYPE Metal. Wood, eic.) EXTERIOR SHADE OVERHANG L Yes / No SIDEFIN Yes / No GLAZING TYPE (e.g. Clear. Tlnled) efl (South 2 0.72 Metal o ne pec e � Double Low E ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ nn nn EnergyPro 10 By EnergySott User Number 1239 Job Number 98167 Page: 2 of 7 NAME Great Western Bank DATE 7/9/98 ATRIUM HEIGHT Q FT F c= 55' IF > 55' ALLOWED = 5 ALLOWED % = 10 0.0bl x 1,0501= 52 ALLOWED % GR. ROOF AREA STANDARD SKYLIGHT AREA W 0 PROPOSED SKYLIGHT AREA IF THE PROPOSED SKYLIGHT AREA IS GREATER THAN THE STANDARD SKYLIGHT AREA, PROCEED TO THE NEXT CALCULATION FOR THE SKYLIGHT AREA ADJUSTMENT. IF NOT, GO TO PART 2 OF 4, 1 IF PROPOSED SKYLIGHT AREA > STANDARD SKYLIGHT AREA, SKYLIGHT STANDARD SKYLIGHT AREA PROPOSED SKYLIGHT AREA ADJUSTMENT FACTOR GO TO PART 4 OF 4 TO CALCULATE ADJUSTED AREAS. EnergyPra 10 By EnergySoft User Number: 1239 Jab Number. 98167 Page 3 of 7 KRP�A TES A. DISPLAY PERIMETER Q ft X 6 = Q st DISPLAY AREA B. GROSS EXTERIOR WALL AREA 56 Q sf X 0.40 = 2 24 sf 40% AREA C. GROSS EXTERIOR WALL AREA 560 sf X 0.10 = 56 st MINIMUM STND. AREA D ENTER LARGER OF A or B 2 24 sl MAXIMUM STND AREA E ENTER PROPOSED WINDOW AREA 232 st PROPOSED AREA IF E IS GREATER THAN D OR LESS THAN C, PROCEED TO THE NEXT CALCULATION FOR THE WINDOW AREA ADJUSTMENT. IF NOT, GO TO PART 2 OF 4 1, IF GREATER THAN D: WINDOW D. MAXIMUM STANDARD AREA E. PROPOSED AREA ADJUSTMENT FACTOR 224 _ 232 = 0.966 (IF E =0, THEN ENTER C) GO TO PART 4 OF 4 TO CALCULATE ADJUSTED AREAS. 2. IF LESS THAN C WINDOW C. MINIMUM STANDARD AREA E. PROPOSED AREA ADJUSTMENT FACTOR GO TO PART 4 OF 4 TO CALCULATE ADJUSTED AREAS. ATRIUM HEIGHT Q FT F c= 55' IF > 55' ALLOWED = 5 ALLOWED % = 10 0.0bl x 1,0501= 52 ALLOWED % GR. ROOF AREA STANDARD SKYLIGHT AREA W 0 PROPOSED SKYLIGHT AREA IF THE PROPOSED SKYLIGHT AREA IS GREATER THAN THE STANDARD SKYLIGHT AREA, PROCEED TO THE NEXT CALCULATION FOR THE SKYLIGHT AREA ADJUSTMENT. IF NOT, GO TO PART 2 OF 4, 1 IF PROPOSED SKYLIGHT AREA > STANDARD SKYLIGHT AREA, SKYLIGHT STANDARD SKYLIGHT AREA PROPOSED SKYLIGHT AREA ADJUSTMENT FACTOR GO TO PART 4 OF 4 TO CALCULATE ADJUSTED AREAS. EnergyPra 10 By EnergySoft User Number: 1239 Jab Number. 98167 Page 3 of 7 �r J PROJECT NAME =719/98 Great Western Bank o Loss LL ❑ ❑ ❑ PROPOSED STANDARD TABLE ASSEMBLY NAME HEAT VALUES UA AREA UA (e.g. Wall -1, Floor -1) AREA' CAPACITY U -VALUE Y N (B X D) (Adjusted) 11VALUE IF X G) ront Wall 328 2.87 0.088 ® ❑ 29.0 336 0.092 30.9 Window 232 0.720 ❑ ® 167.0 224 1.230 275.5 oof 1.050 2.03 0.052 C ❑ 54.6 1.050,',,, 0.057 59.6 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ El ❑ ❑ E] [I ❑ ❑ ❑ Eli ❑ El ❑ ❑ El ❑ ❑ ❑❑ ' If Window and/or Skylight Area Ad Adjustment is Required. a use Adjusted Areas from Part 4 of 4. Column E shell be no greater than Column H 251 251 This Page Total Building Total 3s6 366 EnergyPro 1.0 By EnergySolt User Number: 1239 Job Number: 98167 Page 4 of 7 • VERALL ENVELOPE •D Part 3 of 4 ENV-2 PROJECT NAME DATE Great Western Bank 7/9198 A] B❑ C❑ 0 0 0 0 [] I❑ K❑ PROPOSED STANDARD WDWS /SKYLGT NAME (e.g, Wall-1, Floor -1) ORIENT. WEIGHTING FACTOR AREA SC OVERHANG TOTAL (BxCxDuG) AREA' (ADJUSTED) RSHG (or SC") TOTAL (BXI %J) H V WV OHF Window S 1.24 232 0.65 187.0 224 0.71 197.2 "Only SC used Column H shall be 107 This Page Total 197 for Skyliyltts no greater than 87 Building Total 197 Column K ° It Window and/or Skylight Area Adlushnent ,, Required, use Adjusted Areas from Part 4 of 4. EnergyPro 1,0 By EnergyPro User Number, 1239 .lob Number 981137 Page: 5 of 7 DATE Great Western Bank 7/9/98 yr ❑ �•r1 , era � CHECK IF NOT APPLICABLE (See Part i of 4.) ❑ WALL NAME ORIENiATiON (e.g. Wall -t, Wall-2) N E S W ❑ GROSS DOOR AREA AREA WINDOW AREA ❑ IDW ADJUST. FACTOR (From Part 1) ADJUSTED INDOW D X E (D X E) ❑ ADJUSTED WALL AREA B - (F + C) Frort Well ❑ ❑ ® ❑ 1:10 ❑ ❑ 1:11:11:1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1:11:101:1 ❑ 1:11:11:1 1:11:11:11:1 ❑ ❑ ❑ ❑ ❑❑❑❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑❑❑❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑❑❑❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 560 0 232 0.966 224 336 TOTALS 560 0 232 N/A 224 336 EK Gkt;kkEAAbius-rMt�Nt(fALcLiLATi6ris ® CHECK IF NOT APPLICABLE (See Part 1 of 4,) ROOF NAME (e.g. Roof -f, Roof -2) GROSS AREA ❑ SKYLIGHT AREA SKYLIGHT ADJUST FACTOR (From Part 1) ❑ ADJUSTED SKYLIGHT AREA (C X D) ❑ ADJUSTED ROOF AREA (B - E) TOTALS N/A EnargyPro 1.0 By EnergySoff User Number 1239 Job Number: 98167 Page 6 of 7 PROJECT NAME DATE Great Western Bank 7/9/98 DESCRIPTION Designer Enforcement ® § 118(.) Installed Insulating Material shall have been certilied by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. ® § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of the Title 24. Part 2. ® § 117(.) All Extenor Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weattlerstnpped or otherwise seated. § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, arid shall be weatherslnpped (except for unframed glass doors and fire doors) ® § 116(a)1 Manulactured Doors and Windows Installed shall have air Infiltration rates not exceeding those shown in Table Number 1 -E of the Standards. Manulactured fenestration products must be labeled for U-value according to NFRC procedures. § 118(e) Demising Walls in Nonresidential Buildings' The opaque potions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R -11 between framing members. EnergyPro 10 By Energy5off User Number. 1239 Job Numbet: 98167 Page. 7 of 7 Vol III VV AV. V. .VV - OVbtl WWI AD. 0. ay.6.. dvv.. I ... A to AN MM A Sprinkler sysmzn dcsij.=d for hW- cmpw MU .1-. -. _r:ISes : W). Wi Uv �/��F/b 20. x • 0 x ra/0757 .102 12.4- x - X 1210i,!�;- VA6660V4 Mbbb Y.VO OAOC C..V 378 y,MV.I tl6tl • (� 14. ill quinkier beads have serviceable Y' Check valves where vlrwtiondcf=o- A to 15. Sprinkler sysmzn dcsij.=d for hW- eo -head coverage 16. ComacHes has multiple pmpammin °, [t r ® 1�. er I L M C. p.M. and 10:00 azi. etnd cop* with ram shut -old' device Y"011. Mommy irrigation scheduls given to c r r Q 19. IV" Conn acoor Wow budzu included with pleat (aanuaD 0 20. u - �u�sigee wfY.r� UWMN�NrY owed &Howmw all r .1-. -. _r:ISes : W). Wi Uv �/��F/b 20. x • 0 x ra/0757 .102 12.4- x - X 1210i,!�;- VA6660V4 Mbbb Y.VO OAOC C..V 378 y,MV.I tl6tl • (� 14. ill quinkier beads have serviceable Check valves where vlrwtiondcf=o- dal will cause lour had drainage 15. Sprinkler sysmzn dcsij.=d for hW- eo -head coverage 16. ComacHes has multiple pmpammin °, mpm cycle mpabairy, flexibk Won - dar prop= and monthly lrrigaticn ® 1�. rcbednk CathtmUor set to wales berwom 5.:00 p.M. and 10:00 azi. etnd cop* with ram shut -old' device Y"011. Mommy irrigation scheduls given to landtr= manager atuvar maiwc* Q 19. IV" Conn acoor Wow budzu included with pleat (aanuaD 0 20. TTo��tya�lyy water doesesl�not exceed the �u�sigee wfY.r� UWMN�NrY owed &Howmw all II hemby ccrdiy mere the ;boys Intmoation Is awmate in compWite with tiro lhutdsc" samdar& of the City-of Cepeatiao�Ld landscape �g� -� ►.�`� ice` � � �.. 1' -�� STATE OF WMHINGTOM iia5,,� d 6FRED LANDSAFE ARCHITECT KENNETH E. L Y �I]0b 0 �eu�'A+4 -a -utWi 1 -, -7 _jGt VtlI bbd O.D cJtl r bV `U* Otlba e 1 tltlticJ a l= A V0 &0044" VO dO WVO OAO ®A• \b V11 Vrrra s6V -- � y A 20.X - 9; x 12075'1 •l02 12.4- X - 5 x 1Z,0 -7 379 a IS. IW H" a I .I. Y" U it. e a 19. AD quiuicler heads have serviceable chak valets whoa vlmdan defereo- dal will caase low bead dreiWa SprWder system desipad for head - Wbead Covasae Coatrolla has multiple proPaaimluoo aTm cycle capabclity, flexible ealea- dar grog a and monthly irription 'cbednle Cmaeller sec to w4mr batweau S:OQ P.M aad 10:00 jc-m. cwd equipped wit>b min shut-off device Monthly isrigavon schedule given to landampc rnabaW mWor nmitwa- WAS cmalictar wow twd6et included with plops (&Mal) Told water usip does not ext.eed the &t1axlm= dawad w W gnaw e 9 homby certify that the abova iAt'mUdop is WW= is compliII wish des smadacds of the City-of Cupertino" aside Ascblct: Due; e ° /1 ° qg 8!i"FM STAUP IBM e"a ATE ®V LANDSC APE WHIM., y� KENNETH Er LONE l C ERTWIC;ATE ®o 7wi gl� �GlG�a1.1y 07� CI t, Le Lr�T. f,� i'I •. I U I �ITiI• 1 � a , 7T. Lj ) Vi V- W l i 1 -- � y A 20.X - 9; x 12075'1 •l02 12.4- X - 5 x 1Z,0 -7 379 a IS. IW H" a I .I. Y" U it. e a 19. AD quiuicler heads have serviceable chak valets whoa vlmdan defereo- dal will caase low bead dreiWa SprWder system desipad for head - Wbead Covasae Coatrolla has multiple proPaaimluoo aTm cycle capabclity, flexible ealea- dar grog a and monthly irription 'cbednle Cmaeller sec to w4mr batweau S:OQ P.M aad 10:00 jc-m. cwd equipped wit>b min shut-off device Monthly isrigavon schedule given to landampc rnabaW mWor nmitwa- WAS cmalictar wow twd6et included with plops (&Mal) Told water usip does not ext.eed the &t1axlm= dawad w W gnaw e 9 homby certify that the abova iAt'mUdop is WW= is compliII wish des smadacds of the City-of Cupertino" aside Ascblct: Due; e ° /1 ° qg 8!i"FM STAUP IBM e"a ATE ®V LANDSC APE WHIM., y� KENNETH Er LONE l C ERTWIC;ATE ®o 7wi gl� �GlG�a1.1y 07� CI Testing Engineers, Mc. WORK REQUEST NUMBER 40818 PROJECT NUMBER 40818 Quality Assurance Services Materials Consulting Since 1954 COMPRESSRON TEST REPORT CLIENT— DEB000 SAMPLE NUMBER 204433 PROJECT NAME WAMUU(WASHINGTON MUTUAL)INTEGRATION PROJ 10250 Se DE ANZA BLVD., CUPERTINO, CA DATE 11/10/98 TYPE OF SAMPLE REG. CONCRETE OSA #dPERMIT S1256 _ P.O. #:N98 -012 SUPPLIER (CONCRETE) CENTRAL CONCRETE SPECIMENS MADE BY TUTTLE, TEI MIX NUMBER 1255 WITNESSED BY DATE SAMPLED 10/03/98 TICKET NO.: 433740 TIME SAMPLED 8 0 30 DATE RECEIVED 10/08/98 LOCATION IN STRUCTURE SLUMP 3 -3/4 SLAB ON GRADE @ NEW ADDITION FRESH UNIT WGT PCF= N/A AIR TEMPERATURE OF 55 MIXTURE TEMPERATURE °F: 79 AIR CONTENT gib: N/A DATE TESTED 10/10/98 11/02/98 11/02/98 00 /00 /00 ID NUMBER 3A 3B 3C 3D MARK SPECIMEN DIMENSION, inches 6X12 AREA, sq. inches 28.0 ULTIMATE LOAD,Ibs. 58000 94000 98000 ULTIMATE STR.. Psi 2070 336.0 3500 AVERAGE STR., psi 3430 AGE TESTED, DAYS 7 28 28 HOLD DRY UgIT WEIGHT, Rd SPXIRED 3000 3 0 0 0 SPECIMENS NOT SCHEDULED FOR TESTING WILL BE DISCARDED AFTER 28 DAYS OLD REMARKS: SAMPLES TESTED IN ACCORDANCE WITH ASTM C -39 -96 CCo 01 DEB CONSTRUCTION O1 DEB CONSTRUCTION REVIEWED BY 01 CITY OF CUPERTINO ANTHONY WOODBECK CONCRETE LAB SUPERVISOR Corporate Office - 2811 Adeline Street, Oakland, California 94608 - (510) 835 -3142 - FAX (510) 834 -3777 Quality Assurance Services Materials Consulting W .i� — . _ A�� I(�� Since 1954 IW OCT 13 1998 Testing Engineers, hc. COPAPRESSOON TEST REPORT WORK REQUEST NUMBER 40818 CLIENT— DEB000 SAMPLE NUMBER 204433 PROJECT NUMBER 40818 PROJECT NAME WAMU(WASHINGTON MUTUAL)INTEGRATION PROJ 10250 So DE ANZA BLVD., CUPERTINO, CA DATE 10/27/98 TYPE OF SAMPLE REG. CONCRETE OSA #PERMIT S1256 IP.O. #:N98 -012 SUPPLIER (CONCRETE) CENTRAL CONCRETE SPECIMENS MADE BY TUTTLE, TEI MIX NUMBER 1255 WITNESSED BY DATE SAMPLED 10/03/98 TICKET NO.: 433740 TIME SAMPLED 8.30 DATE RECEIVED 10/08/98 LOCATION IN STRUCTURE SLUMP 3 -3/4 SLAB ON GRADE @ NEW ADDITION FRESH UNIT WGT. PCF= N/A AIR TEMPERATURE OF 55 MIXTURE TEMPERATURE °F: 79 AIR CONTENT No: N/A DATE TESTED 10/10/98 11/02/98 11/02/98 00/00/00 ID NUMBER I 3A 3B 3C 3D MARK SPECIMEN DIMENSION, inches I 6X12 AREA, sq. inches 28.0 ULTIMATE LOAD, lbs. 58000 ULTIMATE STR., psi I 2070 AVERAGE STR., psi AGE TESTED, DAYS 17 1 28 1 28 1 HOLD ORT UOIT WEIGHT, ®d SGXIGI® 2Tm111 .0 R111 111 SPECIMENS NOT SCHEDULED FOR TESTING WILL BE DISCARDED AFTER 28 DAYS OLD REMARKS: SAMPLES TESTED IN ACCORDANCE WITH ASTM C -39 -96 CC* 01 DEB CONSTRUCTION 01 DEB CONSTRUCTION REVIEWED BY 01 CITY OF CUPERTINO ANTHONY WOODBECK CONCRETE LAB SUPERVISOR Corporate Office - 2811 Adeline Street, Oakland, California 94608 - (510) 835 -3942 - FAX (690) 834 -3777 o . TESTING ENGINEERS, INC. 2811 Adeline St. '� '� �, ��;` PO Box 24075 510 835 -3142 510 834 -3777 fax Oakland, CA 94608 Oakland, CA 94623 800 660 -3142 Oakland a Santa Clara a Diablo Valley INSPEC'T'ION REPORT Week Ending: 10/09/98 PROJECT # 40818 TYPE OF INSPECTION: Concrete Placement PROJECT: PLACE OF INSPECTION: WAMU (Washington Mutual) Integration Project Jobsite 10250 S. De Anza Blvd. Cupertino, CA Permit # S1256j DATE HOURS INSPECTOR 10/03/98 4a R. Tuttle ICBO # 39704 Reported to Bob Shue of DEB Construction at the jobsite as requested. Monitored loads arriving at the jobsite for correct mix and proper slump. Inspected placement operations and vibrating procedures. Performed 1 slump test ( 3 -3/4 ") and cast 1 set of compression test specimens (4 each), Sample # 204433, for Concrete Mix # 1255 from Central Concrete Supply Company #1, Inc., (specified strength 3000 psi, slump 4 ") for concrete placed at slab on grade and footings at new addition at rear of structure. Total cubic yards placed: 33. Inspected the placement of reinforcing steel for the above. Work inspected was in compliance with approved job plans and specifications including drawing number number S1 and S2. Reviewed by David iH Palfiru Special Inspection Division Manager 1c: DEB Construction /J. Aude DEB Construction /B. Shue City of Cupertino /Bldg. Inspection Dept. Its Testing Engineers, Inc. Quality Assurance Services Materials Consulting '.�I,w 0 199 Since 9 954 COROPRESSOON TEST REPORT WORK REQUEST NUMBER 40818 CLIENT— DEB000 SAMPLE NUMBER PROJECT NUMBER 40818 PROJECT NAME WAMU(WASHINGTON MUTUAL)INTEGRATION PROJ 10250 So DE ANZA BLVD., CUPERTINO, CA SUPPLIER (CONCRETE) MIX NUMBER 3 TICKET RIO.: 24523 LOCATION IN STRUCTURE DEPRESSED VAULT SLAB X DATE 05/08/98 TYPE OF SAMPLE REG. CONCRETE #:PERMIT S1256 0e #:N98 -012 SPECIMENS MADE BY UXUIXIMOlvU, WITNESSED BY DATE SAMPLED 04/23/98 TIME SAMPLED 7.50 DATE RECEIVED 04/24/98 SLUMP 3 1/4 FRESH UNIT WGT. PCF- N/A AIR TEMPERATURE OF 52 MIXTURE TEMPERATURE OF.: 71 AIR CONTENT %: N/A DATE TESTED .ID_Ni MB 04/30/98 --1A 05/21/98 1B 05/21/98 1C MARK SPECIMEN – — DIMENSION, inches 6X12 AREA, sq. inches 28.3 ULTIMATE LOAD. Ibs. 83000 ULTIMATE STA.. psi 2930 AVERAGE STA., psi AGE TESTED, DAYS 7 28 28 DRY WIT MIGHT. 5d WEIRS) $mm, c, 3000 3 0 0 0 SPECIMENS NOT SCHEDULED FOR TESTING WILL BE DISCARDED AFTER 28 DAYS OLD REMARKS :SAMPLES TESTED IN ACCORDANCE WITH ASTM C -39 -86 CC: 01 DEB CONSTRUCTION 01 DEB CONSTRUCTION REVIEWED BY -4 01 CITY OF CUPERTINO ANTHONY WOODBECK CONCRETE LAB SUPERVISOR Corporate Office - 2811 Adeline Street, Oakland, Califomia 94608 - (590) 835 -3942 - FAX (590) 834 -37l7 JUG 9 1999 .1 ° r TW7CIhT_cG ]ENGINEERS, INC. f � 3 2811 Adeline St. PO Box 24075 510 835 -3142 510 834 -3777 fax Oakland, CA 94608 Oakland, CA 94623 800 660 -3142 Oakland o Santa Clara o Diablo Valley INSPECTION REPORT Week Ending: 4/24/98 PROJECT # 40818 TYPE OF INSPECTION: Concrete Placement PROJECT: PLACE OF INSPECTION: WAMU (Washington Mutual) Integration Proj. Jobsite 10250 S. De Anza Blvd., Cupertino, CA Permit # S1256 DATE 4/23/98 HOURS 4 INSPECTOR D. Drummond ICBO # 36974 Reported to Jim Aude of Deb Construction at the jobsite as requested. Monitored loads arriving at the jobsite for correct mix and proper slump. Inspected placement operations and vibrating procedures. Performed 1 slump test (3 -1/4 ") and cast 1 set of compression test specimens (3 each), Sample # 202194 for Concrete Mix from Concrete Ready Mix Inc. at strength 3000 psi, slump 4 ") for concrete placed.at depressed vault slab. Total cubic yards placed: 10. Inspected the placement of reinforcing steel for the above. Work inspected was in compliance with city approved job plans and specifications. Reviewed by: Terr . Egland C.E. # 34132, exp. 6/30/99 lcc: DEB Construction /J. Aude DEB Construction/ B. Shue City of Cupertino /Bldg. Insp. Dept.