Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
14030061
I CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 1111 S STELLING RD OWNER'S NAME: GURUDATTA AND SWATI SAVALE PERMIT NO: 14030061 DATE ISSUED: 05/23/2014 OWNER'S PHONE: 4085977991 I , I PHONE NO: 0 LICENSED CONTRACTOR�'SS DECLARATION License Class ( _ Lic. # 1600 2— Contractor I \\ &W Date 5-. 23.20 C� I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. (-\„ JOB DESCRIPTION: RESIDENTIAL E] COMMERCIAL CONSTRUCT ONE STORY ADDITIONS (384 SQ FT); ATTACHED GARAGE (415 SQ FT); FRONT COVERED PORCH (36 SQ FT); REMODEL (E) GARAGE AND BEDROOM (662 SQ Sq. Ft Floor Area: I Valuation: $90000 APN Number: 36222008.00 1 Occupancy Type: PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DA LLED INSPECTION. / RE -ROOFS: Date 20 /4- All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. ❑ OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). I hereby affirm under penalty of perjury one of the following three declarations: I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 1 have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must t'orthwith comply with such provisions or this permit shall be deemed revoked. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Signature Date Signature of Applicant: Date: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Sections 25505, 25533, and 25534. Owner or authorized agent Date: r--�\kW� A14& CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's ARCHITECT'S DECLARATION I understand my plans shall be used as public records. Licensed Professional CUPERTINO ❑ NEW CONSTRUCTION CONSTRUCTION PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 v bo (408) 777-3228 • FAX (408) 777-3333 • buildingQcupertino.org 9 ADDITION X ALTERATION / TI ❑ REVISION / DEFERRED ORIGINAL PERMIT # PROJECT ADDRESS II s,S LI Gr Z), . G11,p6cINO of AFN # 362 - 22 -008 OWNER NAME PHONE u r�u�ATTA 5WATI SAVALo- 5 - q E-MAIL seLV'�t_te G a %tom , Gorn STREET ADDRESS 1 { 1 I 576LG l NC -f p�D . CITY, STATE Gel Per -TIN 0, CA '115014 FAX - CONTACT NAME lkNCNAW GRJVAsTAVA PHO D -7O -O 13 E-MAIL �anC�lc�% ScZti1 rn�eYrbr S. DRESS 4 W_FAZA bA DA. CITY, STATE, ZIP s N CA-- FAX DIiSiI�NE� ❑ OWNER ❑ OWNER -BUILDER OWNER AGENT ❑CONTRACTOR ❑CONTRACTOR AGE T ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑TENANT CONTRACTOR NAME M,ITu PAT �L LICENSE NUMBER © LICENSE TYPEBUS. g LIC # COMPANY NAME 5 A GoNST�C7toN INC hnlI-u '� �SaaJr. AGO G'`C7Y1 FAX STREET ADDRESS I i�lo r L CITY, STATE, ZIP o CA eltoo � PHONE 0 r _ 2q o .3 A CHTTECT INEER NAME �v� LICENSE NUMBER BUS. LIC # +C9) C�JALI / `AX COMPANY NAME E-MAILSAN E -MAI /I // Y 12I rp- Gl C-fN SGIYId hcLG<<— STREET ADDRESS A eA piz. CITY, STATE, ZIP SAN SQeE CA 9512-C PHONE 400 - 70 5 - D44 B DESCR ONOFWORK �j('IDJJ C� �N) r'iASt£�. ���BATHIWA�� - IN CL©., CN) LAaNmy kent-J, ' ON V er-'sico ot- �'� Dr - (F_) 6rA�76 /NTe 1l�gJTi o&PE oi'wr-,.' coilvQ2-S'IoN op Ar CS M' To (N) LIVJN6f, (N) F,�YiP 1x eOWZA, RU.04A-CION or- shrp,t-y .h EXISTING USE cJlP� �Y H PROPOSED USE CONSTR. s,. 1 FAH. TYPE a /� �J # STORIES �1 14'3 USE TYPE OCC. SQ.FT. VALUATION (S) p�/ �'EXIS4 G of � FLOOR s AREA NETAL T AREA I 1 - BATHROOM - KITCHEN. OTHER 11 7-V REMODEL AREA REMODEL AREA REMODEL AREA z G PORCHAREA y 31O DECK AREA TOTAL DECKIPORCH AREA GARAGE AREA. - DETACH -Sr ATTACH 77� 36 Sr # DWELLING UNITS: IS A SECOND UNIT ❑YES SECOND STORY ❑ YES 1 BEING ADDED? 'NO ADDMON? )RNO PRE -APPLICATION ❑ YES IF YES, PROVIDE COPY OF IS THE BLDG AN ❑ YES RECEIVE ON: PLANNING APPL #'ONO PLANNING APPROVAL LETTER EICHLER HOME? Gel NO ljD By my signature below, I certify to each of the following: I am the property owner or autlW ' agent to act on owner's behalf. I have read this application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating to building construction. I authorize representatives of Cupertino to enter the above -identified propertyfor inspection purposes. Signature of Applicant/Agent- Date: 04A D I SUPPLEMENTAL INFORMATION REQUIRED PLAN CHECK TYPE ROUTING SLIP ❑ OVER-THE-COUNTER ❑ BUILDING PLAN REVIEW _ New SFD or Multifamily dwellings: Apply for demolition permit for existing building(s). Demolition permit is required prior to issuance of building permit for new building. ❑ EXPRESS ❑ PLANNING PLAN REVIEW _ Commercial Bldgs: Provide a completed Hazardous Materials Disclosure ❑ STANDARD ❑ PUBLIC WORKS form if any Hazardous Materials are being used as part of this project. ❑ LARGE ❑ FIRE DEPT _ Copy of Planning Approval Letter or Meeting with Planning prior to ❑ MAJOR ❑ SANITARY SEWER DISTRICT submittal of Building Permit application. ❑ ENVIRONMENTAL HEALTH Bldg,4pp_2011.doc revised 06/21/11 'caavn ,����� � CITY OF CUPERTINO ll�"_�l►�I. 11TIPF. FQTTMATOR — RITILDING DIVISION ki,ADDRESS: 1111 S STELLING RD DATE: 03/10/2014 REVIEWED BY: MELISSA PC FEE ID APN: 362 22 008 Bm /V'030p(p `VALUATION: 1$90,000 *PERMIT TYPE: Building Permit PLAN CHECK TYPE: Addition PRIMARY USE: SFD or Duplex 2nd Unit? Yes • No OTC? 0 Yes E) No PENTAMATION 1 R3SFDADD PERMIT TYPE: i WORK ADD 384 S.F. TO FRONT & REAR OF SFD TO CREATE N ATTACHED GARAGE 2 N SCOPE I BEDROOMS, 1 (N) BATHS,1 (N) LAUNDRY RM & 36 S.F OF PORCH AREA. REMODEL (E) p OCCUPANCY TYPE: TYPE OF CONSTR. FLR AREA s.f. PC FEES PC FEE ID BP FEES BP FEE ID R-3 (Custom) II-B,III-B,NN-B 384 $1,579.00 IADDPLCK $1,284.00 1ADDINSP U (Private Gar/Ag Bldg) II-B,III-B,IV,V-B 415 $0.00 IUIPLNCK $1,252.00 1UIINSP Suppl. Insp. Fee -0 Reg. Q OT 0.0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $47.00 TOTALS: 799 $1,579.00 $2,536.00 MECH, HOURLY 0 Yes (F) No PLUMB, HOURLY Q Yes Q No ELEC, HOURLY Q Yes Q No MISC ITEMS Plumb. Plan Check 0.0 1 hrs $0.00 Plan Check Fee: $1,579.00 Plumb. Permit Fee: IPPERMIT Remodel, Other IREMRESOTH Other Plumb Insp.E0.0 $47.00 Rol NOTE: This estimate does not include jees due to other Departments (i.e. rtanntng, ruouc works, rue, ,3anuury Sewer uiurtu, JA[VVt .,:._: , 1 TG ... r ..� A r-1 nn A. nrgfi— Nnn, infnrMatinn availahle and are anly an estimate. Contact the Dent for addn 7 info. FEE ITEMS (Fee Resolution 11-053 U.'71'1113) FEE QTY/FEE MISC ITEMS Plan Check Fee: $1,579.00 F 662 1 s.f. $558.00 Remodel, Other IREMRESOTH Suppl. PC Fee: Q Reg. Q OT Rol hrs $0.00 PME Plan Check: $0.00 F 1 # $28.00 Plumbing /PRWHEATR Water Heater Permit Fee: $2,536.00 Suppl. Insp. Fee -0 Reg. Q OT 0.0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $47.00 0 0 Work Without Permit? 0 Yes No $0.00 Advanced Planning Fee: 1PLLONGR $111.86 Select a Non -Residential Building or Structure 0 A Travel Documentation Fee: ITRA VDOC $47.00 Strong Motion. Fee: IBSEISMICR $9.00 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $4.00 SUBTOTALS: $4,333.86 $586.00 TOTAL FEE: $4,919.86 Revised: 01/15/2014 Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 C U P E RT I N O Fax: 408-777-3333 CONTRACTOR / SUBCONTRACTOR LIST JOB ADDRESS: I I , VQ ut)060. CA PERMIT # / `' U 3 U U(, OWNER'S NAME: U PHONE # SO GENERAL CONTRACTOR.56t. 01 Cpl c AC BUSINESS LICENSE # ADDRESS: 0 �(p S0I CITY/ZIPCODE: i►o So *Our municipal code requkjs all businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: f wne r/ Contractor Signature SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing r" ?j Electrical Excavation Fencing Flooring / Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing - Masonry Painting / Wallpaper Paving Plastering Plumbing Roofing , Z L ice Septic Tank Sheet Metal Sheet Rock Tile f wne r/ Contractor Signature T� iL, `1 F I L r CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 8 ) Project Name: Swati Savale Enforcement Agency: Cupertino Building Department Permit Number: 14030061 Dwelling Address: 1111 S Stelling Rd City: Cupertino Zip Code: 95014 A. General Information O1 Dwelling Unit Name Swati Savale 02 Climate Zone 4 Dwelling Unit Total Conditioned Floor Number of space conditioning (SC) 03 Area (ft2) 500 04 systems being altered in this dwelling 1 unit. 05 Certificate of Compliance Type Prescriptive alterations (CF1R-ALT) 06 Method used to calculate HVAC loads ACCA_ManualJ Calculated dwelling unit Sensible Calculated Dwelling Unit Heating Load 07 Cooling Load (Btuh) 24000 08 (Btuh) 35000 09 Dwelling Unit Number of Bedrooms 2 MCH -01b Prescriptive Alterations - Space Conditioning Systems Ducts and Fans Registration Number: 316-A1018963A-M0113394A-0000 U.S. Energy Raters Association Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39 Schema Version: 2013.1.006 CERTIFICATE OF COMPLIANCE CF1R-ALT 02-E Alterations to Space Conditioning Systems (formerly CF -IR -ALT -HVAC) (Page 2 of 3 ) D. Altered Space Conditioning System (Sections 150.2(b)IE and F) This section does not apply to this project. E. Entirely New or Complete Replacement Duct System, with or without Equipment Changeout (Sections 150.2(b)lDiia and 150.2(b)lE, F) This section does not apply to this project. F. Entirely New or Complete Replacement Space Conditioning System (Section 150.2(b)1C) 01 02 03 04 05 06 07 08 09 10 it Heating Cooling System Heating Minimum Cooling Minimum Required Identification or Heating System Altered Heating Efficiency Efficiency Cooling Altered Cooling Efficiency Efficiency Thermostat New Duct Name Type Component Type Value System Type Component Type Value Type R -Value System 1 Central gas All new heating AFUE 78 No cooling No cooling SEER 14 SetbackTher R-6 furnace components component altered mostat Required Documentation: CF2R-MCH-03-E - Space Conditioning Systems Ducts and Fans -Duct insulation requirement for new plenums: R6. CF2R & CF3R-MCH-20 } ... ct Leakage Verification required. -Leakage rate complia 6%. CF2R & CF3R-MCH 22 fficacy Verifon CF2R & CF3R-MCH 23 Air Flowfete Verii tion -Compliance: Fan Effica "'7d Sys m/ton. - Alternative Compliance. C Y� MCH -28 Ret ur esign Verification is an alternative to MCH -22 and MCH -23 verification. CF2R & CF3R-MCH-25-H Refrigerant Charge Verification required when rrape�fnt c�T�Wi�ir a�¢ t}�d q�a(r�di•�ppl � Exceptions: -+•a7• GIF4 �liil f.3 H.7.7VL Heating -only systems are exempt from the 0.58 W/cfm and 350 cfm/ton requirements. Note: An "entirely new or replacement duct system" means at least 75 percent of the duct system is new duct material, and up to 25 percent may consist of reused parts from the dwelling unit's existing duct system (e.g., registers, grilles, boots, air handler, coil, plenums, duct material) if the reused parts are accessible and can be sealed to prevent leakage Registration Number: 316-A1018963A-000000000-0000 Registration Date/Time: 2016-01-24 12:30:39 HERS Provider: USERA CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-24 12:31:44 Schema Version: 0.555SDD - ,. CERTIFICATE OF COMPLIANCE CF1R-ALT-02-E Alterations to Space Conditioning Systems (formerly CF -IR -ALT -HVAC) (Page 3 of 3 ) Documentation Author's Declaration Statement 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Minxuan Liu Documentation Author Signature: Signature Date: Y Y �►�- (J`' "_ Company: Santa Clara HERS 2016-01-24 Address: CEA/ HERS Certification Identification (if applicable): 1181 Sundown Ln 410231431 City/State/Zip: Phone: San Jose CA 95127 408-883-3865 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensere that a registered copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this dertificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Responsible Designer Signature:(� Mitul Patel / 1 iTt,L ILTeL Company: Date Signed: Saanya Constructi 2016-01-24 Address: 10343 Mary Ave U.S. Energy Ra License: oaAssociation City/State/Zip: Phone: Cupertino CA 95014 650-996-4083 US Registration Number: 316-A1018963A-000000000-0000 RA U.S. Energy Raters Assoclatlon "This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.' Registration Date/Time: 2016-01-24 12:30:39 HERS Provider: USERA CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-24 12:31:44 Schema Version: 0.555SDD CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3 ) Project Name: Swati Savale Enforcement Agency: Cupertino Building Department Permit Number: 14030061 Dwelling Address: 1111 S Stelling Rd City: Cupertino Zip Code: 95014 A. System Information 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Location or Area Served Whole house 03 Building Type from CF -1R Single family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 j Duct System Compliance Category Replacement MCH -20d - Complete Replacement or Altered buct System B. Duct Leakage Diagnostic Test' 01 Condenser Nominal Cooling Capacity (ton) U.S. Ervergy Raters Association 02 Heating Capacity (kBtu/h) 39.00 03 Conditioned Floor Area served by this HVAC system (ft2) 500 04 Duct Leakage Test Condition Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor .06 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Heating system method 08 Measured AHUAirflow 0 09 Calculated Target Allowable Duct Leakage (cfm) 50 10 Actual duct leakage rate from leakage test measurement 44 L(cfm) 11 Compliance Statement System passes leakage test Registration Number: 316-A1018963A-M20009631A-0000 Registration Date/Time: 2016-01-29 13:49:30 HERS Provider: USERA CA Building Energy Efficiency Standards Report Version: 2013-1.006 Report Generated: 2016-01-29 13:51:09 2013 Residential Compliance Schema Version: 2013.1.006 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3 ) C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. Outside air (OA) ducts for Central Fan Integrated (CFI) ventilation systems, shall not be sealed/taped off during duct leakage 02 testing. CFI OA ducts that utilize controlled motorized dampers, that open only when OA ventilation is required to meet ASHRAE Standard 62.2, and close when OA ventilation is not required, may be configured to the closed position during duct leakage testing. 03 If a complete replacement, all supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. If the system complies using the Smoke Test method, the smoke test was conducted in accordance with the requirements 07 of Reference Residential Appendix RA3.1.4.3.6. Systems that comply using smoke test shall not be included in sample groups for HERS verification compliance. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. U.S. Energy Raters Association Registration Number: 316-A1018963A-M20009631A-0000 Registration Date/Time: 2016-01-29 13:49:30 HERS Provider: USERA CA Building Energy Efficiency Standards Report Version: 2013-1.006 Report Generated: 2016-01-29 13:51:09 2013 Residential Compliance Schema Version: 2013.1.006 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3 ) Documentation Author's Declaration Statement 1. 1 certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Minxuan LiuW Signature Date: Company: Santa Clara HERS 2016-01-29 Address: CEA/ HERS Certification Identification (if applicable): 1181 Sundown Ln 410231431 City/State/Zip: Phone: 1408-883-3865 San Jose CA 95127 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Installation is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the responsible builder/installer. 3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to al] applicable, codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by the enforcement agency. 4. 1 understand that a HERS rater will check the installation to verify compliance, and that if such checking identifies defects; I am required to take corrective action at my expense. I understand that Energy Commission and HERS Provider representatives will also perform quality assurance checking of installations, including those approved as part of a sample group but not checked by a HERS rater, and if those installations fail to meet the requirements of such quality assurance checking, the required corrective action and additional checking/testing of other installations in that HERS sample group will be performed at my expense. 5. 1 reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the construction or installation have been met. U.S. Enerav Raters Association 6. 1 will ensure that a registered copy of this Certificate of Installation shall be posted, r ade available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Responsible Builder/Installer Signature: Mitul Patel Company Name: (Installing Subcontractor or General Contractor or Position With Company (Title): q -ez Builder/owner) President Mitul Patel (Jan 29, 2016) Saanya Construction Inc. Address: CSLB License: 10343 Mary Ave 968702 City/State/Zip: Phone: Date Signed: Cupertino CA 95014 650-996-4083 12016-01-29 Third Party Quality Control Program (TPQCP) Status: Name of TPQCP (if applicable): This digital signature is provided in order to secure U RA, the content of this registered document, and in no way implies Registration Provider responsibility for U.S. Energy Raters Association the accuracy of the information.' Registration Number: 316-A1018963A-M20009631A-0000 Registration Date/Time: 2016-01-29 13:49:30 HERS Provider: USERA CA Building Energy Efficiency Standards Report Version: 2013-1.006 Report Generated: 2016-01-29 13:51:09 2013 Residential Compliance Schema Version: 2013.1.006 r4b (=--I F I L r CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 8 ) Project Name: Swati Savale Enforcement Agency: Cupertino Building Department Permit Number: 14030061 Dwelling Address: 1111 S Stelling Rd City: Cupertino Zip Code: 95014 A. General Information 01 Dwelling Unit Name Swati Savale 02 Climate Zone 4 Number of space conditioning (SC) 03 Dwelling Unit Total Conditioned Floor 500 04 systems being altered in this dwelling 1 Area (ft2) unit. 05 Certificate of Compliance Type Prescriptive alterations (CF1R-ALT) 06 Method used to calculate HVAC loads ACCA_ManualJ 07 Calculated dwelling unit Sensible 24000 08 Calculated Dwelling Unit Heating Load 35000 Cooling Load (Btuh) (Btuh) 09 Dwelling Unit Number of Bedrooms 2 MCH -01b Prescriptive Alterations - Space Conditioning Systems Ducts and Fans 30 Registration Number: 316-A1018963A-M0113394A-0000 U.S. Energy Raters Association Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39 Schema Version: 2013.1.006 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 8 ) B. Space Conditioning (SC) System Information O1 02 03 04 05 06 07 08 09 10 11 12 CFA served Is the SC Installing a Installing SC System SC System by this SC system a refrigerant Installing new SC Installing more entirely Installing Identification or Location or Area System ducted containing system than 40 feet of new duct entirely new Name Served (ft2) system? component? components? ducts? system? SC system? Alteration Type (CFI) System Altered Heating Minimum Altered Entirely new or Minimum Required Replaced New Ventilation Identification Heating Heating Efficiency complete System 1 Whole house 500 Yes No Yes Yes Yes Yes replacement Component Type Value System Type Component Type Value Type Length space Status This field conditioning System 1 Central gas All new heating AFUE ,�` F J. `.780—' system C. Space Conditioning (SC) System Alterations Compliance Information 01 02 03 04 05 06 07 08 09 10 11 12 13 Central Fan Integrated Heating Cooling New or (CFI) System Altered Heating Minimum Altered Cooling Minimum Required Replaced New Ventilation Identification Heating Heating Efficiency Efficiency Cooling Cooling Efficiency Efficiency Thermostat Duct Duct System or Name System Type Component Type Value System Type Component Type Value Type Length R -Value Status This field This field System 1 Central gas All new heating AFUE ,�` F J. `.780—' ryrye/ d2yoIjQ * L or 6jlatj or jjction is Setback GT40Ft R6 Not a CFI furnace componen rt�oAnAs is not not system altered is applicabl applicabl e e Registration Number: 316-A1018963A-M0113394A-0000 Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39 Schema Version: 2013.1.006 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 8 ) D. Installed Heating Equipment information 01 02 03 04 05 06 07 System Identification or Name Heating Efficiency Type Heating Efficiency Value Heating Unit Manufacturer Heating Unit Model Number Heating Unit serial number Rated Heating Capacity, Output (BTUH) System 1 AFUE 97.000 Carrier 59TP5A0040E14-- 1914A51135 39000 Notes: E. Installed Cooling Equipment information: This section does not apply to this project. F. Extension of Existing Duct System, Greater Than 40 Feet This section does not apply to this project. G. Installed Duct System information 01 02 03 04 05 06 07 08 Method of compliance with duct E p ., eiQy � rat /► "sgiQ ♦♦ ) aiUQQDuct and filter grille sizing SC System SC System Location Sup44•59et requirements in Number of Air Filter Identification or Name or Area Served Location R -Value Location R -Value 150.0(m)13 Devices on System System 1 Whole house Unconditioned R-6 Unconditioned R-6 System is exempt 0 attic attic Notes: Registration Number: 316-A1018963A-M0113394A-0000 Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39 Schema Version: 2013.1.006 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 8 ) H. Installed Air Filter Device Information This section does not apply to this project. I. Air Filter Device Requirements 01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. The system shall be designed to accommodate the clean -filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean -filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be 02 labeled to disclose the applicable design airflow rate and the maximum allowable clean -filter pressure drop. The labels shall be permanently affixed to the air filter device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these determined or labeled maximum allowable clean -filter pressure drop values as rated using AHRI Standard 680. 03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50 percent in the 3.0 to10 micron range when tested in accordance with AHRI Standard 680. 05 The system shall be provided with air filtermedia that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the required efficiency and pressure drop requirements for the air filter device. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. U.S. Energy Raters Association Registration Number: 316-A1018963A-M0113394A-0000 Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39 Schema Version: 2013.1.006 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 8 ) J. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 MCH2O MCH21 MCH22 MCH23 MCH25 MCH28 Exemption from Minimum Exemption R -Value for AHU Fan AHU SC System SC System From Duct Duct Ducts In Ducts Located Efficacy Airflow Identification or Location or Area Leakage Leakage Conditioned In Cond Space (W per Rate (cfm Refrigerant Return Duct Design Name Served Requirements Test Space Verification cfm) per ton) Charge Table 150.0-C or D System 1 Whole house No Yes Not No No No No No exemptions applicable Notes: Registration Number: 316-A1018963A-M0113394A-0000 U.S. Energy Raters Association Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39 Schema Version: 2013.1.006 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 8 ) K. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(1), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced -air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet -to -outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan -type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. Refrigeran�#i4e Insulation: All refrigerant line kisulation in split system air conditioners and heat pumps must meet the R -value and protection requirements of Section 07 150.0(j)2 ar:d n 15Aciti =h 08 Condensing Unit Location: Condensing units shall nUb$laEe rl lyeRe4efSdik-e,,600*&t�Mction 150.0(h)3A. 09 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans 10 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. Registration Number: 316-A1018963A-M0113394A-0000 Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39 Schema Version: 2013.1.006 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 8 ) K. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Connections and Closures: All installed air -distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 11 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply -air and return -air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 12 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 13 The thermostat shall be installed in accordance with the manufacturers published installation specifications 14 First stage of heating shall be assigned to heat pump heating. 15 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met. Registration Number: 316-A1018963A-M0113394A-0000 U.S. Energy Raters Association Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39 Schema Version: 2013.1.006 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 8 of 8 ) Documentation Author's Declaration Statement 1.1 certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Mitul Patel Signature Date: Company: Saanya Construction Inc. 2016-01-28 Address: CEA/ HERS Certification Identification (if applicable): 10343 Mary Ave 968702 City/State/Zip: Phone: 1650-996-4083 Cupertino CA 95014 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Installation is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the responsible builder/installer. 3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by the enforcement agency. 4. I reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the construction or installation have been met. S. I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Responsible Builder/Installer Signature: Mitul Patel Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Position With Company (Title): i72r[ Q7e[ Saanya Construction Inc.Mitul Patel (Jan 28, 2016) Address: 13.9. Energy Ra ernAssociation 10343 Mary Ave 968702 City/State/Zip: Phone: 1650-996-4083 Date Signed: Cupertino CA 95014 12016-01-28 TM This digital signature is provided in order to secure the content of this registered document. and in no way implies Registration Provider responsibility for U.S. Energy RatDers Assoclatlon the accuracy of the information.' Registration Number: 316-A1018963A-M0113394A-0000 Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39 Schema Version: 2013.1.006 CUPERTINO PURPOSE: CALGREEN RESIDENTIAL CHECKLIST — MANDATORY ITEMS COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISI ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL X 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 - FAX (408) 777-3333 - building dcuoertino a The 2013 CalGreen Code applies to all newly constructed hotel 'h tels� dormitories, condominiums, shelters, congregate residences, em loye�4 other types of swellings with sleeping accommodations and new accesso uses. Existing site and landscaping improvements that are not otherwise requirements of CALGreen. Project Name: FICFam C. 0. 't-UPERTINO Bufloing Department ghpuses, dwellings, factory -built housing and i! Firigs associated with su h (�ed�rerr4dt<s��j�t �''!-�AN�"'FE Ktsv�cvJriu io�r. �/ew" '"/NTHf Project Address: III I S . S' �e Q (,t� ,ta,p ,,, (A L4 Project 1 Description: AeDDIT0 ' p _ N _ (N) MlkS . Ji NoTN t 1 A Instructions: f 'GK I-IVINA g-rvt4 --rawAr-pe-TNE Ff2.VNT. 1. The Owner or the Owner's agent shall employ a licensed professional experienced with the California Green Building Standards Codes to verify and assure that all required work described herein is properly planned and implemented in the project. 2. The licensed professional, in collaboration with the owner and the design professional shall initial Column 2 of this checklist, sign and date Section 1 - Design Verification at the end of this checklist and have the checklist printed on the approved plans for the project. 3. Prior to final inspection by the Building Department, the licensed professional shall complete Column 3 and sign and date Section 2 - Implementation Verification at the end of this checklist and submit the completed form to the Building Inspector. Column 2 MANDATORY FEATURE OR MEASURE Project Requirements Planning and Design - Site Development 4.106.2 Storm water drainage and retention during construction. A plan is 4 developed and implemented to manage storm water drainage during construction. 4.106.3 Grading and paving. The site shall be planned and developed to I t-� keep surface water away from buildings. Construction plans shall indicate how site grading or a drainage system will manage all surface water flows. Column 3 Verification 7 rage I of 5 CalGreen 2014. doe revised 01/15/14 A4.2 General 4.201.1 Low-rise residential buildings shall meet or exceed the minimum ® ❑ standard design required by the California Energy Standards. .. .3 WATER EFFICIENCY AND CONSERVATION Indoor Water Use 4.303.1 Water conserving plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the following: ❑ 4.303.1.3.2 Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per flush. Tank -type water closets shall be certified to the performance criteria of the U.S. EPA WaterSense Specifications for Tank -type Toilets. ❑ 4.303.1.3.2 Urinals. The effective flush volume of urinals shall not exceed 0.5 gallons per flush. ❑ 4.303.1.3.1 Single Showerheads. Showerheads shall have a maximum flow rate of not more than 2.0 gallons per minute at 80 psi. Showerheads shall be certified to the performance criteria of the U.S, EPA WaterSense Specification for showerheads. ❑ 4.303.1.3.2 Multiple Showerheads serving one shower. When a shower is served by more than one showerhead, the combined flow rate of all showerheads and/or other shower outlets controlled by a single valve shall not exceed 2.0 gallons per minute at 80 psi, or the shower shall be IV designed to allow only one shower outlet to be in operation at a time. ❑ 4.303.1.4.1 Residential lavatory faucets. The maximum flow rate of residential lavatory faucets shall not exceed 1.5 gallons per minute at 60 psi. The minimum flow rate of residential lavatory faucets shall not be less than 0.8 gallons per minute at 20 psi. ❑ 4.303.1.3.2 Lavatory faucets in common and public use areas. The maximum flow rate of lavatory faucets installed in common and public use areas (outside of dwellings or sleeping units) in residential buildings shall not exceed 0.5 gallons per minute at 60 psi. ❑ 4.303.1.4.3 Metering faucets. Metering faucets when installed in residential buildings shall not deliver more than 0.25 gallons per cycle. ❑ 4.303.1.4.4 Kitchen Faucets. The maximum flow rate of kitchen faucets shall not exceed 1.8 gallons per minute at 60 psi. Kitchen faucets may temporarily increase the flow above the maximum rate, but not to exceed 2.2 gallons per minute at 60 psi, and must default to a maximum flow rate of 1.8 gallons per minute at 60 psi. 4.303.2 Standards for plumbing fixtures and fittings. Plumbing fixtures and fittings shall be installed in accordance with the California Plumbing Code, and shall meet the applicable standards referenced in Table 1401.1 of the California Plumbing Code. Page 2 of 5 Cul Green 2014.doc revised 01115114 Outdoor Water Use 4.304.1 Irrigation controllers. Automatic irrigation systems installed at the time of final inspection shall be weather-based. ❑ 4.304.1.1 Controllers shall be weather- or soil moisture-based controllers that automatically adjust irrigation in response to changes in plants' needs as weather conditions change. ® ❑ ❑ 4.304.1.2 Weather-based controllers without integral rain sensors or communication systems that account for local rainfall shall have a separate wired or wireless rain sensor which connects or communicated with the controller(s). Soil moisture-based controllers are not required to have rain sensor input. .. .4 MATERIAL CONSERVATION AND RESOURCE EFFICIENCY Enhanced Durability and Reduced Maintenance 4.406.1 Rodent proofing. Annular spaces around pipes, electric cables, r } conduits, or other openings in plates at exterior walls shall be protected against the ® ❑ passage of rodents by closing such openings with cement mortar, concrete masonry or similar method acceptable to the enforcing agency. Construction Waste Reduction, Disposal and Recycling 4.408.2 Construction waste management plan. Where a local jurisdiction does not have a construction and demolition waste management ordinance, a ® construction waste management plan shall be submitted for approval to the ❑ enforcing agency. Building Maintenance and Operation 4.410.1 Operation and maintenance manual. At the time of final inspection, ,,�r/�/ an operation and maintenance manual shall be provided to the building /u®, ❑ occupant or owner. A4.5 ENVIRONMENTAL QUALITY replaces 03.1 General. Install only a direct-vent sealed-combustion gas or sealedod-burning fireplace, L ® ❑ or a sealed woodstove. Pollutant Control 4.504.1 Covering of duct openings and protection of mechanical equipment during construction. Duct openings and other related air ❑ distribution component openings shall be covered during construction. 4.504.2.1 Adhesives, sealants and caulks. Adhesives, sealants and caulks shall be compliant VOC ❑ with and other toxic compound limits. 4.504.2.2 Paints and coatings. Paints, stains and other coatings shall be © compliant with VOC limits. ❑ 4.504.2.3 Aerosol paints and coatings. Aerosol paints and other coatings 1 N� shall be compliant with product weighted MIR Limits for ROC and other toxic ❑ compounds. Page 3 of 5 CalCreen_2014.doc revised 01/15/14 4.504.2.4 Verification. Documentation shall be provided to verify that compliant VOC limit finish ® ❑ materials have been used. 4.504.3 Carpet Systems. Carpet and carpet systems shall be compliant with VOC limits. ® ❑ 4.504.4 Resilient flooring systems. Eighty (80) percent of floor area receiving resilient flooring shall comply with the VOC-emission limits defined in the Collaborative for High Performance Schools (CHPS) Low -emitting Materials List or be certified under the Resilient Floor Covering Institute (RCFI) FloorScore program. 4.504.5 Composite wood products. Particleboard, medium density fiberboard (MDF), and hardwood plywood used in interior finish systems shall comply with low formaldehyde emission standards. Interior Moisture Control 4.505.2 Concrete slab foundation. Required vapor retarders and capillary breaks are also required to comply with CalGreen Section 4.505.2.1. 4.505.3 Moisture content of building materials. Moisture content of building materials in ® ❑ used wall and floor framing is checked before enclosure. Indoor Air Quality and Exhaust 4.506.1 Bathroom exhaust fans. Exhaust fans which terminate outside the building in ® ❑ are provided every bathroom. Environmental Comfort 4.507.2. Duct systems are sized and designed and equipment is selected using the following methods: 1. Establish heat loss and heat gain values according to ACCA Manual J or equivalent. 13 2. Size duct systems according to ACCA 29-D (Manual D) or equivalent. 3. Select heating and cooling equipment according to ACCA 36-S (Manual S) or equivalent. INSTALLER AND SPECIAL INSPECTOR QUALIFICATIONS Qualifications 702.1 Installer training. HVAC system installers are trained and certified in the installation HVAC ® ❑ proper of systems. 702.2 Special inspection. The Licensed Professional responsible to verify CALGreen compliance is qualified and able to demonstrate competence in the discipline they inspect and verify. Verifications 703.1 Documentation. Verification of compliance with CALGreen may include construction documents, plans, specifications, builder or installer certification, inspection reports, or other methods acceptable to the enforcing agency which ® ❑ show substantial conformance. Implementation verification shall be submitted to the Building Department after implementation of all required measures and prior to final inspection approval. Page 4 of 5 CalGreen 2014. doe revised 01/15/14 CALGREEN SIGNATURE DECLARATIONS Project Name:QV0.{� Project Address: Project Description: /A Daiyey4 e A (N) j1,95Ti;� �E c7D1,( fklJprHi�>n 2�%d� 01�_0 t,A, tI PP—Y Ale8A SZ-_ A-wALe:-1H GG©, IoW,—, .D,5 TKe- 94ij�-AA e)r- kdu6r_ SECTION 1 - DESIGN VERIFICATION Complete all lines of Section 1 -"Design Verification" and submit the completed checklist (Columns 1 and 2) with the plans and building permit application to the Building Department. The owner and design professional responsible for compliance with CalGreen Standards have revised the plans and certify that the items checked above are hereby incorporated into the project plans and will be implemented into the project in accordance with the requirements set forth in the 2013 California Green Building Standards Code as adopted by the City of Cupprtjhq; Owner's Signature Date Owners Name (Please Print) DeWgn Pmfessionei's Sionahue Date S ,A4 G4 A L I VA 0 TAVA Design Professional's Name (Please Print) Signature of License Pro ssional responsible for CalGreen compliance Date =996 - 4 0� Name of License Professlonal responsible for CalGreen compliance (Please Print) Phone .. Email Address for License Professional responsible for CalGreen compliance SECTION 2 - IMPLEMENTATION VERIFICATION Complete, sign and submit the competed checklist, including column 3, together with all original signatures on Section 2 to the Building Department prior to Building Department final inspection. I have inspected the work and have received sufficient documentation to verify and certify that the project identified above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of the 2013 California Green Building Standards Code as adopted by the City of Cupertino. Signature of License Professional responsible for CalGreen compliance Date Name of License Professional responsible for CalGreen compliance (Please Print) Phone for Page 5 of 5 responsible for CalGreen 2014 doc revised 0111 i/14 Mf -,-FAL f�COFiNG t3P��,. CUPERTINO GUIDE 8uiltling DepDepartmentme APR 14 2014 SPECIFICATION Manufacturer: REVIEWED FOR CODE COMPLIANCE 40 DECRA Roofing Systemsrteviewea ray. A Fletcher Building CompanyOFFICE 1230 Railroad Street (Xi Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07313 [07 31 131 STONE COATED METAL ROOF SHINGLE This guide specification has been prepared by DECRA Roofing Systems, in printed and electronic media, as an aid to specifiers in preparing written construction documents for stone coated metal Shingle.. Edit entire master to suit project requirements. Modify or add items as necessary. Delete items which are not applicable. Words and sentences within brackets r reflect a choice to be made regarding inclusion or exclusion of a particular item or statement. This section may include performance, proprietary and descriptive type specifications. Edit to avoid conflicting requirements. Editor notes to guide the specifier are included between lines of asterisks to assist in choices to be made. Remove these notes before final printing of specification. This guide specification is written around the Construction Specifications Institute (CSI), Section Format standards references to section names and numbers are based on MasterFormat 95 [2011 update]. For specification assistance on specific product applications, please contact our local product representa- tives throughout North America at 800-795-0776. SUBMIT -IAL #2 aRECEjvED APR 042014 i3y DECRA Roofing Systems reserves the right to modify these guide specifications at any time. Updates to this guide specification will be posted to the manufacturer's web site and/or in printed matter as they oc- cur. DECRA Roofing Systems makes no expressed or implied warranties regarding content, errors, or omissions in the information presented. DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle Master Guide Specifications 07313-1 04-30-2013 PART 1 - GENERAL 1.1 SUMMARY A. Related Documents: Provisions established within General and Supplementary Conditions of the Contract, Division 1 — General Requirements, and the Drawings are collectively applicable to this Section. B. Section Includes: Formed metal roofing panels with colored stone chip finish. C. Associated metal flashings. Edit the Related Sections paragraph below to suit project requirements; delete sections that will not be used, or add sections as required. D. Related Sections: 1. Division 6 Section "Rough Carpentry" for framing and sheathing. 2. Division 7 Section "Sheet Metal Flashing and Trim" for metal flashing, gutters, and downspouts. 3. Division 7 Section "Roof Accessories" for roof ventilators. 4. Division 7 Section "Joint Sealants" for field -applied sealants. 5. Division 9 Section "Painting" for painting of roof accessories. E. Alternates. #*###*#*##*#+r •. .. ,. .**iii##*#########*k*k##k**##*4**#****i***t****!f#fi4f#t*ff!#ifff#4f#f#4!*#**t*##}#k**#*ffk*4*44ti4fNlf#ff#f If work of this section will affect alternate bids, retain the following subparagraph. 1. Refer to Section 01230 [01 23 00] for alternatives involving work of this Section. 1.2 SUBMITTALS Include submittal requirements below, which are consistent with the scope of the project and extent of work of this section - only request submittals, which are necessary for review of design intent. Do not request submittals if drawings sufficiently describe the products of this section or if proprietary specifying techniques are used. The review of submittals increases the possibility of unintended variations to drawings. Insert the appropriate reference to the Division 1 section A. Submit under provisions of Section 01300 L 1 [01 30 001. B. Product Data: Include construction details, material descriptions, dimensions of individual components and profiles, finishes, fasteners, accessories, and manufacturers written installation instructions. C. Shop Drawings: Include roof plans and elevations; sections at hips, ridges, gables, valleys, and eaves; and details of components, accessories, and attachments to other work. D. Samples for Initial Selection: Manufacturer's color charts and samples consisting of units or sections of units showing the full range of colors, textures, and patterns available for each type DECRA Shingle indicated. 1.3 QUALITY ASSURANCE A. Regulatory Requirements: 1. Conform to applicable building code for roof assembly fire hazard requirements. 2. Conform to building code for minimum wind uplift resistance. DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle Master Guide Specifications 07313-2 04-30-2013 1.4 REFERENCES A. Fire -Test -Response Characteristics: Provide DECRA Shingle with fire -test -response characteristics indicated, as determined per test method ASTM E108 — Test for Fire Resistance of Roof Covering Materials, for application and slopes indicated. 1. Fire -Test Exposure: Class A. B. ASTM A792/A792M: Sheet Steel, Aluminum -Zinc Alloy Coated by the Hot Dip Process, Structural (physical) Quality. C. UL 1897 and UL 580: Wind Uplift Resistance of Roof Assemblies. D. ASTM C920: Specification for Elastomeric Joint Sealants. E. Impact Resistance: UL 2218, Class 4. F. Appraisal Certificates: 1. International Code Council (ICC), Whittier California, Report No. ESR 1483. 2. Underwriters Laboratories, Inc., Northbrook, Illinois, USA File No. R14710. 3. Canadian Construction Materials Center, Ottawa, Ontario, CCMC#13085-R. G. [Texas Department of Insurance Report RC -280 — Wind Resistance]. 1.5 DELIVERY, STORAGE, AND HANDLING A. Store and handle roofing materials to ensure dryness. Store in a dry, well -ventilated, weather tight place. Protect from corrosion, staining and traffic and wind damage. Store rolls of felt and other sheet materials on end on pallets or another raised surface. 1.6 WARRANTY A. Manufacturing Warranty: Written, transferable, limited warranty provided by DECRA Roofing Systems, covering manufacturing defects/excessive granule loss. Refer to warranty for specifics. 1. Warranty Period: 50 years from date of Substantial Completion. 2. Wind Warranty: 120 mph winds, full warranty period. 3. Hail Penetration: full warranty period. PART2-PRODUCTS 2.1 MANUFACTURER A. DECRA Roofing Systems, Inc., 1230 Railroad Street, Corona, CA 92882 (951-272-8180), (951- 272-4476 FAX); www.decra.com. 2.2 MATERIALS A. Metal Shingle: DECRA Shingle three course formed interlocking panels resembling dimensional roofing shingles. 1. Material: Rolled and pressure formed, Aluminum -Zinc Alloy Coated Steel with three vertical ribs forming three flat steps, each of which shall have raised and lowered pan sections. 2. Finish: Ceramic coated colored stone chip finish. 3. Thickness: 26 Gauge, .0179 inches (.455 mm). 4. Steel: Grade 37 (Grade 255). 5. Size: 21" wide by 52" long (533 by 1321 mm). 6. Exposure: 19-3/4" wide by 49" long (368 by 1270 mm). 7. Weight: 125 pounds per square. DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle Master Guide Specifications 07313-3 04-30-2013 Make color selection from the choices below and delete the colors not required for the project. 8. Color: [Canyon Brown] [Fawn Grey] [Midnight Eclipse] [Vintage Slate] [Woodland Green]. #xi***+x*xx4xf4xxxxxx**4#ixfx4ifx*x#*##*#i#**##*k*###*###***xi*#xxixxx*#ix**4fixl4x#4fi#i4x##44i##*##f#i##fS#fi#4*#+i*xx*#xxfxxxxxx#i Do NOT use LEAD or COPPER with this aluminum -zinc alloy coated steel roofing system. Do NOT use any treated wood products that may contain COPPER — i.e. pressure treated or fire retardant. DECRA Shingle Valley must be used. Include [ ] if desired or needed. B. Flashing: 1. [Valley: DECRA Roofing Systems, Inc., Shingle Valley and Cap, Aluminum -Zinc Alloy coated Steel sheet � i es (.455 mm). Pressure formed into a valley with a stone coated valley cap. Finish: Match upper exposed stone coated surface of the valley cap to the shingle material/color.] 2. Fascia Metal: DECRA Roofing Systems, Inc., Shingle Starter Clip w/ Drip Edge, Aluminum -Zinc Alloy Coated Steel sheet, 26 Gaugr_ '� 17s inches (455 mm). Pressure formed to fit along the leading edge of roof panels at eave/fascia. 3. Rake / Gable Channel: DECRA Roofing Systems, Inc., Shingle Rake/Gable Channel, Aluminum -Zinc Alloy Coated Steel sheet, 26 Gauge, c; s (.455 mm). Pressure formed to match roofing material to be applied along rakes and gables. Pre -paint to match as needed prior to installing panels. 4. Short Course Clip: DECRA Roofing Systems, Inc., Shingle Short Course Clip, Aluminum - Zinc Alloy Coated Steel sheet, 26 Gauge, .0179 inches (.455 mm). Pressure formed for use with starting a short course or when Shingle Starter Clip w/ Drip Edge will not conform to existing eave/fascia. 5. Pipe Jack Flashing: ; . ! ; .g; .0179 inches (.455 mm) galvanized or Aluminum -Zinc Alloy Coated Steel, clean, prime and paint to match roof material. 6. Underpan: DECRA Roofing Systems, Inc., DECRA Shingle/XD® Underpan: Aluminum - Zinc Alloy Coated Steel sheet, 26 Gauge, .0179 inches (.455 mm), pressure formed to counter flash roof penetrations matching Shingle material profile. C. Hip & Ridge: Shingle Hip & Ridge covers hips and ridges matching shingle material, color, and finish. 1. Hips / Ridges: DECRA Roofing Systems, Inc., DECRA Shingle Hip & Ridge, Aluminum - Zinc Alloy Coated Steel sheet, 2.6 Gauge, .0179 inches (.455 mm). Pressure formed to match roofing material, color, and finish to be applied along hips and ridges. 2. Screws: Minimum No. 9 hex (1/4" diameter) by 1-1/2" long (38.1 mm) minimum, corrosion resistant, color coordinated to match the panels. 2.3 ACCESSORIES Do NOT use LEAD or COPPER with this aluminum -zinc alloy coated steel roofing system. Do NOT use any treated wood products that may contain COPPER — i.e. pressure treated or fire retardant. A. Sheet Metal Materials: Aluminum -Zinc Alloy Coated Steel sheet: ASTM A 792/A 792M, Class AZ50 (AZ150) coating designation; minimum Grade 37 (Grade 255). Verify requirements for ice dam protection with local building code and include [ ] if required/desired. B. Felt Underlayment: ASTM D 226, Type I, No. 15 or ASTM D 226, Type II, No.30, non -perforated, asphalt -saturated organic felt. C. [Perimeter Underlayment: ASTM D 1970; self -adhering, polymer -modified, bituminous sheet underlayment; 40 mils (1 mm) thick. Provide primer when recommended by underlayment manufacturer.] DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle Master Guide Specifications 07313-4 04-30-2013 D. Sealant: One -part elastomeric polyurethane, sealant as recommended in writing by panel manufacturer. Where sealant will be exposed, provide in color to match panels. 1. Standard: ASTM C920-86. E. Fasteners: Screws: Minimum No. 9 hex (1/4" diameter) by 1-1/2" long (38.1 mm) minimum, corrosion resistant, black or color coordinated to match the panels where visible. PART 3 - EXECUTION Include the information in parenthesis [ ] for re -roofing applications, and as required by code, delete if not required. ###+xxx++####xx**x+#+##*##xx++#++##+##++#+##*######*x#*+#+####***+x+#+#+x**x**#+++###xxx+xx#+####*r#+x*#######*++++#+*xxx*#++######xt 3.1 EXAMINATION A. Examine substrate and conditions for compliance with requirements for maximum moisture content, soundness of roof deck and other conditions affecting performance of DECRA metal roofing. [Damaged, rotted or loose roofing materials shall be removed and the substrate corrected for re -roofing applications]. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Clean substrate of any projections and substances detrimental to metal panel roofing. Cover knotholes or other minor voids in substrate with sheet metal flashing secured with roofing nails. B. Coordinate installation of metal shingles with roof deck, flashing and other adjoining work to ensure proper sequencing. Do not install roofing until vent stacks and other penetrations through roofing have been installed, are securely fastened and flashing is in place. C. Inspect and verify exterior stucco and EIFS wall enclosures are completed. 3.3 INSTALLATION A. General: Comply with manufacturer's written instructions for products and applications indicated, unless more stringent requirements apply. B. Underlayment: Apply number of plies required by governing code, but at least one ply, with each ply overlapping the ply below at least 6 inches (152 mm) and ends lapped at least s (457 mm). 1. [Omit felt underlayment at areas of perimeter underlayment. Lap felt underlayment over perimeter underlayment as recommended by manufacturer, but not less than (51 mm).] C. [Perimeter Underlayment: Apply minimum 2A inches (609 mm) wide layer of perimeter underlayment along entire perimeter of surface to receive metal shingles, including at eaves, ridges, edges, hips, valley, skylights, dormers, and around projections through roof. Exten perimeter underlayment a minimum of c inches (914 mm) inside exterior wall line at edges.] D. Valleys: Install in accordance with manufacturer's instructions with a minimum 6 inch (152 mm) overlap in direction of flow. E. Flashing: Install as indicated on approved submittals and in accordance with manufacturer's written instructions. F. Shingle Panels: Install DECRA Shingle, accessories, flashing, and hip & ridge level and plumb. Use fasteners per above specifications. 1. Using the recommended offset, the first course of panels lock into the Shingle Starter Clip w/ Drip Edge. 2. The second course of panels start at the rake edge, valley or hip with a panel that is inches (711 mm) in length, panel exposure is 25 inches (635 mm), measured from the left side of the panel. 3. Position the panel into the top clip of the panels on the course below. The center of each field panel will be placed directly above the overlap of the panels on the previous course. 4. Make sure the top clips of each panel are flush. The maximum allowable gap should be i s src, ,e Z, (76 mm). 5. Once the panel is in position, firmly push (by hand or foot) on the panel in the area that overlaps the joint of the two panels below. This will help position the panel for fastener placement. DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle Master Guide Specifications 07313-5 04-30-2013 6. After positioning the panel, firmly push (by hand or foot) on the left side of the panel until it is locked firmly into the clip -lock of the panel on the course below. Install a fastener in the upper left corner straight down through the panel. 7. Firmly push (by hand or foot) on the right side of the panel and make sure it is locked into the previously installed panel. Install a fastener in the upper right portion of the panel. Placing this fastener at a slight upward angle (45°) will help draw the shingle panel into the proper locking position. Complete the installation with 2 additional fasteners straight down into the panel. Specify the appropriate number of fasteners per code requirements; 4 is standard installation. 8. Fasten each panel with minimum [4] fasteners along top edge of panel. 9. Cut and slot DECRA panels that will terminate at the Shingle Rake/Gable Channel or at the Valley in accordance with the manufacturer's instructions. G. Hip & Ridge: Install Shingle Hip & Ridge along hips, ridges and rakes as indicated on approved submittals and in accordance with manufacturers written instructions. Bend and fold exposed ends of hips ridges and neatly, cap with an end cap or a piece of similar material. 3.4 CLEANING AND PROTECTION A. Damaged Units: Replace panels and other components of the work that have been dented, damaged or have deteriorated beyond successful repair by finish touchup with acrylic coating and stone chip granules. B. Cleaning: After completing installation, remove any debris from the roof. C. Foot Traffic: Avoid walking on side laps. END OF SECTION 07313 [07 31 13] DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle Master Guide Specifications 07313-6 04-30-2013 r BUILDING ENERGY ANALYSIS REPORT I SUBMIT PROJECT:'ICE .�� 1 Savale Residence (Ex + Add) 7i 1111 S. Stelling Rd. .� Cupertino, Ca. Project Designer: San Interior Design 6937 Azalea Dr. San Jose, Ca. 95120 (408) 705-0448 it. I �A 0 oli,� " I i> y CUPERTINO Building Dapirtment Report Prepared by: �' ^r*4� Chuck Clemons ;SPR � � *2,s'-4 Energy Calc Co. 45 Mitchell Blvd. #16 kev,eweii r3y. San Rafael, Ca. 94903 (415) 457-0990 c+ .ter-�� MgR�,O Job Number:41� 0307SAV Date: 3/6/2014 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.energysoft.com. EnergyPro 5.1 by EnergySoft User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV I TABLE OF CONTENTS I Cover Page Table of Contents Form CF -1 R Certificate of Compliance Form MF -1 R Mandatory Measures Summary HVAC System Heating and Cooling Loads Summary EnergyPro 5.1 by EnergySoft Job Number. ID: 0307SAV User Number: 1005 1 2 3 9 12 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF -1 R Project Name Savale Residence (Ex + Add) Building Type ® Single Family ❑ Addition Alone ❑ Multi Family ® Existing+ Addition/Alteration Date 3/6/2014 Project Address 1111 S. Stelling Rd. Cupertino California Energy Climate Zone CA Climate Zone 04 Total Cond. Floor Area 1, 939 Addition 743 # of Stories 1 FIELD INSPECTION ENERGY CHECKLIST ❑ Yes IZI No HERS Measures -- If Yes, A CF -4R must be provided per Part 2 of 5 of this form. ❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details. INSULATION Construction Type Area Special Cavity f r Features see Part 2 of 5 Status Roof Wood Framed Attic R-11 1,189 Existing Wall Wood Framed None 681 Existing Floor Wood Framed w/Crawl Space None 1,196 Existing Roof Wood Framed Attic R-30 731 New Wall Wood Framed R-13 495 New Floor Wood Framed w/Crawl Space R-19 292 New Slab Unheated Slab -on -Grade None 451 Perim = 31' New FENESTRATION U- Orientation Area Factor Exterior SHGC Overhang Sidefins Shades Status Skylight 3.0 1.300 0.73 none none None Existing Skylight 4.0 1.300 0.73 none none None New Front (E) 36.0 0.550 0.67 none none Bug Screen Existing Left (S) 18.0 0.550 0.67 none none Bug Screen Existing Rear (W) 80.0 0.550 0.67 none none Bug Screen Existing Right (N) 33.5 0.550 0.67 none none Bug Screen New Right (N) 7.0 0.550 0.67 none none Bug Screen Removed Skylight 12.0 1.300 0.73 none none None New Front (E) 13.0 0.370 0.33 none none Bug Screen New Left (S) 30.0 0.370 0.33 none none Bug Screen New Rear (W) 36.0 0.370 0.33 none none Bug Screen New HVAC SYSTEMS Ot . Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Central Furnace 78% AFUE No Cooling 13.0 SEER Setback Existing HVAC DISTRIBUTION Location Heating Duct Cooling Duct Location R -Value Status HVAC Ducted Ducted Attic, Ceiling Ins, vented 2.1 Existing WATER HEATING Ot . Type Gallons Min. Eff Distribution Status 1 Instant Gas 0 0.82 No Pipe Insulation Altered Ener Pro 5.1 by Ener Soft User Number: 1005 Run Code: 2014-03-06T13:53:23 ID: 0307SAV Page 3 of 12 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF -1 R Project Name Savale Residence (Ex + Add) Building Type m Single Family ❑ Addition Alone ❑ Multi Family ® Existing+ Addition/Alteration Date 3/6/2014 Project Address 1111 S. Stelling Rd. Cupertino California Energy Climate Zone CA Climate Zone 04 Total Cond. Floor Area 1,939 Addition 743 # of Stories 1 FIELD INSPECTION ENERGY CHECKLIST ❑ Yes ❑ No HERS Measures -- If Yes, A CF -4R must be provided per Part 2 of 5 of this form. ❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details. INSULATION Area Special Construction Type Cavity (ft) Features see Part 2 of 5 Status FENESTRATION U- Exterior Orientation Area(fo Factor SHGC Overhang Sidefins Shades Status Right (N) 36.0 0.370 0.33 none none Bug Screen New HVAC SYSTEMS Ot . Heating Min. Eff Cooling Min. Eff Thermostat Status HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R -Value Status WATER HEATING Ot . Type Gallons Min. Eff Distribution Status Ener Pro 5.1 by Ener Soft User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV Page 4 of 12 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF -1 R Project Name Savale Residence (Ex + Add) Building Type ® Single Family ❑ Addition Alone ❑ Multi Family ® Existing+ Addition/Alteration Date 3/6/2014 SPECIAL FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System Existing FAU does not include a cooling system, field verification is not necessary. HERS REQUIRED VERIFICATION Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a completed CF -4R form for each of the measures listed below for final to be given. Ene Pro 5.1 by Ener Soft User Number: 1005 RunCode: 201403-06T13:53:23 ID: 0307SAV Page 5 of 12 PERFORMANCE CERTIFICATE: Residential (Part 3 of 5) CF-1 R Project Name Building Type m Single Family ❑ Addition Alone Date Savale Residence (Ex + Add) ❑ Multi Family 10 Existing+ Addition/Alteration 3/6/2014 ANNUAL ENERGY USE SUMMARY Standard Proposed Margin TDV kBtu/ft2- r Space Heating 57.73 47.98 9.74 Space Cooling 26.28 30.07 -3.79 Fans 13.18 13.22 -0.04 Domestic Hot Water 19.56 14.53 5.03 Pumps 0.00 0.00 0.00 Totals 116.75 105.80 10.95 Percent Better Than Standard: 9.4% BUILDING COMPLIES - NO HERS VERIFICATION REQUIRED Fenestration Building Front Orientation: (E) 90 deg Ext. Walls/Roof Wall Area Area Number of Dwelling Units: 1.00 (E) 254 49 Fuel Available at Site: Natural Gas (S) 472 48 Raised Floor Area: 1,488 (169 420 116 Slab on Grade Area: 451 (N) 312 70 Average Ceiling Height: 8.0 Roof 1,939 19 Fenestration Average U-Factor: 0.48 TOTAL: 302 Average SHGC: 0.53 Fenestration/CFA Ratio: 15.5% REMARKS STATEMENT OF COMPLIANCE CABEC This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 the Administrative Regulations and Part 6 the �'WO ^"Asses aeon of 6uiklm Ene yCensukann SM Efficiency Standards of the California Code of Regulations. CMck Ck.non. an-W211. Eno.-W-M The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author �� / / Co.Calc Energy ac Company E:'"r"� 3/6/2014 Address 45 Mitchell Blvd. #16 Name Chuck Clemons City/state/ZipCity/state/Zip San Rafael, Ca. 94903 Phone (415) 457-0990 Signed Date The individual with overall design responsibility hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application, and recognizes that compliance using duct design, duct sealing, verification of refrigerant charge, insulation installation quality, and building envelope sealing require installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Company San Interior Design `t)MC AI-1 `✓%kl\%AS-O* a Address 6937 Azalea Dr. Name City/State/Zip San Jose, Ca. 95120 Phone (408) 705-0448 Signed License # Date Ener Pro 5.1 bV Ener Soft User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV Page 6 of 12 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF -1 R Project Name Savale Residence (Ex + Add) Building Type m Single Family ❑ Addition Alone ❑ Multi Family m Existing+ Addition/Alteration Date 3/6/2014 OPAQUE SURFACE DETAILS Surface Type Area U- Insulation Joint Appendix Factor Cavitv Exterior Frame Interior Frame Azm Tilt I Status 4 Location/Comments Roof 1,189 0.079 R-11 180 22 Existing 4.2.1-A2 Existing Area Wall 188 0.356 None 90 90 Existing 4.3.1-A1 Existing Area Wall 334 0.356 None 180 90 Existina 4.3.1-A1 Existing Area Wall 144 0.356 None 270 90 Existing 4.3.1-A1 Existing Area Wall 15 0.356 None 0 90 Existing 4.3.1-A1 Existing Area Wall 297 0.356 None 0 90 Removec 4.3.1-A1 Existing Area Floor 1,196 0.097 None 0 180 Existing 4.4.1-A1 Existing Area Roof 731 0.031 R-30 90 0 New 4.2.1-A20 Addition Zone Wall 17 0.102 R-13 90 90 New 4.3.1-A3 Addition Zone Wall 90 0.102 R-13 180 90 New 4.3.1-A3 Addition Zone Wall 160 0.102 R-13 270 90 New 4.3.1-A3 Addition Zone Wall 228 0.102 R-13 0 90 New 4.3.1-A3 Addition Zone Floor 292 0.037 R-19 0 180 New 4.4.1-A4 Addition Zone Slab 451 0.730 None 0 180 New 4.4.7-A1 Addition Zone FENESTRATION SURFACE DETAILS ID Type Area U -Factor SHGC2 Azm Status Glazing Type Location/Comments 1 Skylight 3.0 1.300 Default 0.73 Default 180 Existing Double Metal Skylight Existing Area 2 Skylight 4.0 1.300 Default 0.73 Default 180 New Double Metal Skylight Existing Area 3 Window 36.0 0.550 Default 0.67 Default 90 Existing Double Non Metal Clear Existing Area 4 Window 18.0 0.550 Default 0.67 Default 180 Existing Double Non Metal Clear Existing Area 5 Window 80.0 0.550 Default 0.67 Default 270 Existing Double Non Metal Clear Existing Area 6 Window 33.5 0.550 Default 0.67 Default 0 New Double Non Metal Clear Existing Area 7 Window 7.0 0.550 Default 0.67 Default 0 Removed Double Non Metal Clear Existing Area 8 Skylight 12.0 1.300 Default 0.73 Default 90 New Double Metal Skylight Addition Zone 9 Window 13.0 0.370 NFRC 0.33 NFRC 90 New LowE Vinyl Addition Zone 10 Window 30.0 0.370 NFRC 0.33 NFRC 180 New LowE Vinyl Addition Zone 11 Window 36.0 0.370 NFRC 0.33 NFRC 270 New LowE Vinyl Addition Zone 12 Window 36.0 0.370 NFRC 0.33 NFRC 0 New LowE Vinyl Addition Zone (1) U -Factor Type: 116-A =Default Table from Standards, NFRC =Labeled Value 2 SHGC Type: 116-B = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Window Exterior Shade Type SHGC H t Wd Ove hang Left Fin Right Fin Len H t LExt RExt Dist Len H t Dist Len H t 1 None 1.00 2 None 1.00 3 Bug Screen 0.76 4 Bug Screen 0.76 5 Bug Screen 0.76 6 Bug Screen 0.76 7 Bug Screen 0.76 8 None 1.00 9 Bug Screen 0.76 10 Bug Screen 0.76 11 Bug Screen 0.76 12 Buq Screen 0.76 EnergyPro 5.1 by Ener Soft User Number: 1005 Run Code: 2014-03-06T13:53:23 ID. 0307SAV Pa e 7 of 12 CERTIFICATE OF COMPLIANCE: Residential (Part 5 of 5) CF -1 R Project Name Savale Residence (Ex + Add) Building Type m Single Family ❑ Addition AloneDate ❑ Multi Family 10Existing+ Addition/Alteration 3/6/2014 BUILDING ZONE INFORMATION Floor Area ft System Name Zone Name New Existing Altered Removed Volume Year Built HVAC Existing Area 1,196 9,568 1960 Addition 743 5,944 Totals 7431 1,1961 01 0i i HVAC SYSTEMS System Name Qty. Heating Type Min. Eff. Cooling Type Min. Eff. Thermostat Type Status HVAC 1 Central Furnace 78% AFUE No Cooling 13.0 SEER Setback Existing HVAC DISTRIBUTION Duct System Name Heating Cooling Duct Location R -Value Ducts Tested? Status HVAC Ducted Ducted Attic, Ceiling Ins, vented 2.1 ❑ Existing WATER HEATING SYSTEMS S stem Name Qty Type Distribution Rated Input Btuh Tank Cap. al Energy Factor or RE Standby Loss or Pilot Ext. Tank Insul. R- Value Status Tankless Gas 1 Instant Gas No Pipe Insulation 199,000 0 0.82 n/a n/a Altered Standard Gas 50 gal or Le 1 Small Gas pre -altered for Above 40,000 50 0.58 n/a n/a MULTI -FAMILY WATER HEATING DETAILS HYDRONIC HEATING SYSTEM PIPING Control Hot Water Piping Length ft 0 0 iz a N Pipe Q c System Name Length Pipe Diameter Insul. Thick. Qty. HP Plenum Outside Buried ❑ Ener Pro 5.1 by Ener Soft User Number: 1005 RunCode: 201403-06713:53:23 ID: 0307SAV Page 8 of 12 MANDATORY MEASURES SUMMARY: Residential Pae 1 of 3 MF -1 R Project Name Savale Residence (Ex + Add) Date 3/6/2014 NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measures listed, regardless of the compliance approach used. More stringent energy measures listed on the Certificate of Compliance (CF -1 R, CF -1 R -ADD, or CF - 1 R -ALT Form) shall supersede the items marked with an asterisk (*) below. This Mandatory Measures Summary shall be incorporated into the permit documents, and the applicable features shall be considered by all parties as minimum component performance specifications whether they are shown elsewhere in the documents or in this summary. Submit all applicable sections of the MF -1 R Form with plans. Building Envelope Measures: 116(a)l: Doors and windows between conditioned and unconditioned spaces are manufactured to limit air leakage. §116(a)4: Fenestration products (except field -fabricated windows) have a label listing the certified U -Factor, certified Solar Heat Gain Coefficient SHGC and infiltration that meets the requirements of 10-111 (a). 117: Exterior doors and windows are weather-stripped; all joints and penetrations are caulked and sealed. 118(a): Insulation specified or installed meets Standards for Insulating Material. Indicate type and include on CF -6R Form. §118(i): The thermal emittance and solar reflectance values of the cool roofing material meets the requirements of §118(i) when the installation of a Cool Roof is specified on the CF -1 R Form. *§1 50 a : Minimum R-19 insulation in wood -frame ceiling orequivalent U -factor. 150(b): Loose fill insulation shall conform with manufacturer's installed design labeled R -Value. *§1 50 c : Minimum R-13 insulation in wood -frame wall orequivalent U -factor. *§1 50 d : Minimum R-13 insulation in raised wood -frame floor orequivalent U -factor. 150(f): Air retarding wrap is tested, labeled, and installed according to ASTM E1677-95 2000 when specified on the CF -1 R Form. 150 : Mandatory Vapor barrier installed in Climate Zones 14 or 16. §150(1): Water absorption rate for slab edge insulation material alone without facings is no greater than 0.3%; water vapor permeance rate is no greater than 2.0perm/inch and shall be protected from physical damage and UV light deterioration. Fireplaces, Decorative Gas Appliances and Gas Log Measures: 150 e 1 A: Masonry or factory -built fireplaces have a closable metal or glass door covering the entire opening of the firebox. §150(e)1 B: Masonry or factory -built fireplaces have a combustion outside air intake, which is at least six square inches in area and is equipped with a with a readily accessible, operable, and tight -fitting damper and or a combustion -air control device. §150(e)2: Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of the building,are prohibited. Space Conditioning, Water Heating and Plumbing System Measures: §110-§113: HVAC equipment, water heaters, showerheads, faucets and all other regulated appliances are certified by the Energy Commission. §113(c)5: Water heating recirculation loops serving multiple dwelling units and High -Rise residential occupancies meet the air release valve backflow prevention, pump isolation valve and recirculation loop connection requirements of §113(c)5. §115: Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces, household cooking appliances (appliances with an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt), and pool and spa heaters. 150(h): Heating and/or cooling loads are calculated in accordance with ASHRAE, SMACNA or ACCA. §1500): Heating systems are equipped with thermostats that meet the setback requirements of Section 112(c). §1500)1 A: Storage gas water heaters rated with an Energy Factor no greater than the federal minimal standard are externally wrapped with insulation having an installed thermal resistance of R-12 or greater. §1500)1 B: Unfired storage tanks, such as storage tanks or backup tanks for solar water -heating system, or other indirect hot water tanks have R-12 external insulation or R-16 internal insulation where the internal insulation R -value is indicated on the exterior of the tank. §1500)2: First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes are insulated per Standards Table 150-B. §1500)2: Cooling system piping (suction, chilled water, or brine lines),and piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A. §1500)2: Pipe insulation for steam hydronic heating systems or hot water systems >15 psi, meets the requirements of Standards Table 123-A. 150(j)3A: Insulation is protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. §1500)3A: Insulation for chilled water piping and refrigerant suction lines includes a vapor retardant or is enclosed entirely in conditioned space. 150(j)4: Solar water -heating systems and/or collectors are certified by the Solar Rating and Certification Corporation. EnergyPro 5.1 by EnergySoft User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV Page 9 of 12 MANDATORY MEASURES SUMMARY: Residential (Page 2 of 3 MF -1 R Project Name Date 1 Savale Residence (Ex + Add) 3/6/2014 §150(m)1: All air -distribution system ducts and plenums installed, are sealed and insulated to meet the requirements of CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R- 4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape or other duct -closure system that meets the applicable requirements of UL 181, UL 181 A, or UL 181 B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings reater than 1/4 inch, the combination of mastic and either mesh or tape shall be used §150(m)1: Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. §150(m)2D: Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands. 150(m)7: Exhaust fans stems have back draft or automatic dampers. §150(m)8: Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers. §150(m)9: Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material. 150 m 10: Flexible ducts cannot have porous inner cores. §150(o): All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2-2007 Ventilation and Acceptable Indoor Air Quality in Low -Rise Residential Buildings. Window operation is not a permissible method of providing the Whole Building Ventilation required in Section 4 of that Standard. Pool and Spa Heating Systems and Equipment Measures: §114(a): Any pool or spa heating system shall be certified to have: a thermal efficiency that complies with the Appliance Efficiency Regulations; an on-off switch mounted outside of the heater; a permanent weatherproof plate or card with operating instructions; and shall not use electric resistance heating ora pilot light. §114(b)1: Any pool or spa heating equipment shall be installed with at least 36" of pipe between filter and heater, or dedicated suction and return lines, or built-up connections for future solar heating. 114(b)2: Outdoor pools ors as that have a heat pump or gas heater shall have a cover. §114(b)3: Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or programmed to run only during off-peak electric demand periods. 150 : Residential pool systems orequipment meet the pump sizing, flow rate, piping, filters, and valve requirements of §150 Residential Lighting Measures: §150(k)1: High efficacy luminaires or LED Light Engine with Integral Heat Sink has an efficacy that is no lower than the efficacies contained in Table 150-C and is not a low efficacy luminaire asspecified by §150(k)2. 150(k)3: The wattage of permanently installed luminaires shall be determined asspecified by §130(d). §150(k)4: Ballasts for fluorescent lamps rated 13 Watts or greater shall be electronic and shall have an output frequency no less than 20 kHz. §150(k)5: Permanently installed night lights and night lights integral to a permanently installed luminaire or exhaust fan shall contain only high efficacy lamps meeting the minimum efficacies contained in Table 150-C and shall not contain a line -voltage socket or line - voltage lamp holder; OR shall be rated to consume no more than five watts of power as determined by §130(d), and shall not contain a medium screw -base socket. 150(k)6: Lighting integral to exhaust fans, in rooms other than kitchens, shall meet the applicable requirements of §150(k). 150(k)7: All switching devices and controls shall meet the requirements of §150(k)7. §150(k)8: A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. EXCEPTION: Up to 50 watts for dwelling units less than or equal to 2,500 ft2 or 100 watts for dwelling units larger than 2,500 ft2 may be exempt from the 50% high efficacy requirement when: all low efficacy luminaires in the kitchen are controlled by a manual on occupant sensor, dimmer, energy management system (EMCS), or a multi -scene programmable control system; and all permanently installed luminaries in garages, laundry rooms, closets greater than 70 square feet, and utility rooms are high efficacy and controlled by a manual -on occupant sensor. §150(k)9: Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of illuminated cabinet. EnergyPro 5.1 by EnergySoff User Number: 1005 RunCode: 2 014-03-0 6 713:53:23 ID: 0307SAV Page 10 of 12 MANDATORY MEASURES SUMMARY: Residential (Page 3 of 3 MF -1 R Project Name Date Savale Residence (Ex + Add) 3/6/2014 §150(k)10: Permanently installed luminaires in bathrooms, attached and detached garages, laundry rooms, closets and utility rooms shall be high efficacy. EXCEPTION 1: Permanently installed low efficacy luminaires shall be allowed provided that they are controlled by a manual -on occupant sensor certified to comply with the applicable requirements of §119. EXCEPTION 2: Permanently installed low efficacy luminaires in closets less than 70 square feet are not required to be controlled by a manual -on occupancy sensor. §150(k)11: Permanently installed luminaires located in rooms or areas other than in kitchens, bathrooms, garages, laundry rooms, closets, and utility rooms shall be high efficacy luimnaires. EXCEPTION 1: Permanently installed low efficacy luminaires shall be allowed provided they are controlled by either a dimmer switch that complies with the applicable requirements of §119, or by a manual - on occupant sensor that complies with the applicable requirements of §119. EXCEPTION 2: Lighting in detached storage building less than 1000 square feet located on a residential site is not required to comply with §150 k 11. §150(k)12: Luminaires recessed into insulated ceilings shall be listed for zero clearance insulation contact (IC) by Underwriters Laboratories or other nationally recognized testing/rating laboratory; and have a label that certifies the lumiunaire is airtight with air leakage less then 2.0 CFM at 75 Pascals when tested in accordance with ASTM E283; and be sealed with a gasket or caulk between the luminaire housing and ceiling. §150(k)13: Luminaires providing outdoor lighting, including lighting for private patios in low-rise residential buildings with four or more dwelling units, entrances, balconies, and porches, which are permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy. EXCEPTION 1: Permanently installed outdoor low efficacy luminaires shall be allowed provided that they are controlled by a manual on/off switch, a motion sensor not having an override or bypass switch that disables the motion sensor, and one of the following controls: a photocontrol not having an override or bypass switch that disables the photocontrol; OR an astronomical time clock not having an override or bypass switch that disables the astronomical time clock; OR an energy management control system (EMCS) not having an override or bypass switch that allows the luminaire to be always on EXCEPTION 2: Outdoor luminaires used to comply with Exceptions to §150(k)13 may be controlled by a temporary override switch which bypasses the motion sensing function provided that the motion sensor is automatically reactivated within six hours. EXCEPTION 3: Permanently installed luminaires in or around swimming pool, water features, or other location subject to Article 680 of the California Electric Code need not be high efficacy luminaires. §150(k)14: Internally illuminated address signs shall comply with Section 148; OR not contain a screw -base socket, and consume no more than five watts of power as determined according to §130(d). §150(k)15: Lighting for parking lots and carports with a total of for 8 or more vehicles per site shall comply with the applicable requirements in Sections 130, 132, 134, and 147. Lighting for parking garages for 8 or more vehicles shall comply with the applicable requirements of Sections 130, 131, 134, and 146. §150(k)16: Permanently installed lighting in the enclosed, non -dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires. EXCEPTION: Permanently installed low efficacy luminaires shall be allowed provided that they are controlled by an occupant sensors certified to comply with the applicable requirements of 119. EnergyPro 5.1 by EnergySoff User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV Page 11 of 12 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Savale Residence (Ex + Add) Date 3/6/2014 System Name HVAC Floor Area 1,939 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,322 Return Vented Lighting Return Air Ducts Return Fan Ventilation 54 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 75,000 27,293 1,117 972 35,243 Total Output Btuh 75,000 0 Output Btuh/ ft 38.7 2,233 3,607 Cooling System 0 0 Output per System 0 706 377 54 2,357 Total Output Btuh 0 0 11493 0 Total Output ons 0.0 2,233 3,607 Total Output Btuh/s ft) 0.0 Total Output s ftfron 0.0 1 32,464 44,814 Air System CFM per System 2,500 HVAC EQUIPMENT SELECTION Airflow cfm 2,500 Existing FAU 0 0 75,000 Airflow cfm/s ft 1.29 Airflow cfm/Ton 0.0 Outside Air %/0 2.2% Total Adjusted System Output 0 0 (Adjusted for Peak Design conditions) 1 TIME OF SYSTEM PEAK Aug 3 PM 75,000 Jan 1 AM Outside Air cfm/S ft) 0.03 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak 28 IF 68 IF 68 OF 105 'F Outside Air 54 cfm Supply Fan Heating Coil 2,500 cfm 69 IF fl 104 °F ROOM 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 88/68°F 76/62°F 76/62°F 55/54°F Outside Air 54 cfm Supply Fan Cooling Coil 2,500 cfm 45.7% 76 / 62 IF 56 / 54 OF ROOM 75 / 61 IF EnergyPro 5.1 by EnergySoff User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV Page 12 of12