Loading...
B-2017-0047Mo CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR:; PERMIT NO: B-2017-0047 20388 CLAY ST CUPERTINO, CA 95014-4403 (369 38 026) POWFUL CONSTRUCTIOI 1 SAN JOSE, CA 95,116 OWNER'S NAME: Srinath Sudarsuanam DATE ISSUED: 02/01/2017 OWNER'S PHONE: 408-829-3043 PHONE NO: (408) 687-7607 LICENSED CONTRACTOR'S DECLARATION BUILDING PE$MIT INFO: License Class GENERAL BUILDING CONTRACTOR Lic. #853051 Contractor POWFUL CONSTRUCTION Date 01/31/2019 X BLDG X ELJZCT _ PLUMB MECH X REl3IDENTIAL COMMERCIAL I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. JOB DESCRIPTION: ADDITION (364 SF) LIVING AREA AND ENTRY PORCH (112 SF); I hereby affirm under penalty of perjury one of the following two declarations: REMODEL BATH (120 SF)' KITCHEN (120 SF); UPGRADE (E) 1. I have and will maintain a certificate of consent to self -insure for Worker's ELECTRICAL PP.NEL TO 200 AMP; REMODEL BEDROOM #4 (270 Compensation, as provided for by Section 3700 of the Labor Code, for the SF) erformance of the work for which this permit is issued. �z I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of th6 Labor Code, for the performance of the work for which this permit is issued. Sq. Ft Floor Areal 365 Valuation: $53850.00 APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances APN Number: I Occupancy Type: and state laws relating to building construction, and hereby authorize 369 38 026 i R-3 (Custom) representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue against said City in consequence of the granting of this permit. WITHIN X80 DAYS OF PERMIT ISSUANCE OR Additionally, the applicant understands and will comply with all non -point source r. gola`-tii h per the Cupertino Municipal Code, Section 9.18. 180 DAYS; FROM LAST CALLED INSPECTION. Signatire ' ��� -- Date 2/1/2017 Issued by: Abb�Ayende OWNER -BUILDER DECLARATION Date: 02/01/200 I hereby affirm that I am exempt from the Contractor's License Law for one of the ! RE -ROOFS: following two reasons: All roofs shall be inspected prior to any roofing material being installed. If a roof is 1. I, as owner of the property, or my employees with wages as their sole installed without f st obtaining an inspection, I agree to remove all new materials for compensation, will do the work, and the structure is not intended or offered for ! inspection. sale (Scc.7044, Business & Professions Code) j 2. I, as owner of the property, am exclusively contracting with licensed Signature of Applinant: contractors to construct the project (Sec.7044, Business & Professions Code). Date: 2/1/2017 I hereby affirm under penalty of perjury one of the following three declarations: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER 1. 1 have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. IHAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance, as provided for by I have read the !hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code, for the performance of the work for which this California Health maintain compliance & Safety Code, Sections 25505, 25533, and 25534. I will with the Cupertino Municipal Code, Chapter 9.12 and the permit is issued. 3. I certify that in the performance of the work for which this permit is issued, I Health & Safefy Code, Section 25532(a) should I store or handle hazardous material. Additidnally, should I use equipment or devices which emit hazardous shall not employ any person in any manner so as to become subject to the air contaminants) as defined by the Bay Area Air Quality Management District I 'fiance Worker's Compensation laws of California. If, after making this certificate of will maintain cowl with the Cupertino Municipal Code, Chapter 9.12 and exemption, I become subject to the Worker's Compensation provisions of the the Health & Safety Code, Sections 25505, 25533, and 25534. Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked. Own'er'or authorized agent: APPLICANT CERTIFICATION Date: 2/1/2017 \ I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws I hereby affirm that IAGENCY there is a construction lending agency for the performance relating to building construction, and hereby authorize representatives of this city of work's for whi h this permit is issued (Sec. 3097, Civ C.) to enter upon the above mentioned property for inspection purposes. (We) agree Lender's Name ! to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in Lender's Addie s consequence of the granting of this permit. Additionally, the applicant understands ARCHITECT'S DECLARATION and will comply with all non -point source regulations per the Cupertino Municipal I understand my plans shall be used as public records.. Code, Section 9.18. Licensed i Signature Date 21112917 Professional CUPERTINO CONSTRUCTION PERMIT APPLICA COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (+408) 777-3333 ❑ NEW CONSTRUCTION ® ADDITION ❑ ALTERATION /TI Q REVISION/ N 'ISION 0--Zoj- co:7- BRED ORIGINAL PERMIT 0 PROiECTADDRESS 20388 Clay Street 7=0 369- 8-026 OWNERNAME SRINATH SUDARSANAM & PALLAVI VITT boNB 408 829-3043 I E-MAIL snz328@gmaii.com STREETADDRESS 20388 ClayStreet CITY, STATE, ZIP Cupertino, A 95014 FAX CONTACT NAME Same as above mom � 11 -MAIL STREET ADDRESS CITY, STATE, ZIP PAX 0 OWNER ❑ OWNER -BUILDER ll OWNERAGENT 9coN-TYACTOR E3 CONTRACTOR AGENT © CH1TCiCT ❑ ENGINEER 13 DEVELOPER 13 TENANT CONTRACTOR NAME LICENSE NUMBER U ENSE TYPE BUS. LIC N l .-- - COMPANY NAMB. ( 0�94 C Jt f E AIAII. FAX STREET ADDRESS o CrrY, STATE, ZIP a qq PHONH (7 7/ ARCHITECT/ENGINEERNAME Archana Jain LICENSENUMBER C31760 BUS. LIC# COMPANY NAME F -MAIL ajsdesigns@hotmail.com FAX STRBETADDRESS 1631 Viilarita Dr CITY, STA -m zw Campbell, CA 95008 FHONE. 408-679-2333 DEscmPTIONOP wORK Addition of 364.50 sf of living areaYAdding 1.30 electrical outl s, 2 sun tunnels, remodel existing kitchen and bathroom, all fixtures in existing locations, adding entry porch i RMSUNGUSE Residential PROPOSED USE CONSUL Residential TYPE, VB{$) #STORMS 1 use TYPE ace. so.r r. VALUATION EXWrO AREA 2Q29 NEWFLOOR AREA 389.50 DEMO TOTAL AREA NET AREA 2393.5 0 Residential 35450 - 35,000 RE AREA120 KITCHENTEROOM �A 120 DELAREA RE Electrical 6,500 PORCHAREA I DECK AREA TOTALDECK/PORCHARRA I GARAGE AREA; EDETACH ATTACH Kitchen 5,850 112 397.84 #DWELLMo UNITs: ISASF.CONDUNrr []YES BEFNGADDED7 ®NO SECONDSTORY ©YES ADDITION? Wo Bathroom$ 6,500 1 PRE-APPLICATIONYES IF YES, PROVIDECOPY OF IS TIV, OLDG AN l3 YES TOTAL VALUATION: PLANNING APPLA �No PLANNING APPROVAL LETTER MCHLERHOME? INNO TIB 53,850 By my signature below, I certify to each of the following: I am the property owner or authorized agent to' ac on the properly owner's behalf. I have read this application and the infonnation I have provided is correct. I have read the Description of Work and verify it i accurate. I agree to comply with all applicable local ordinances and state laws relating to building con e�tion. 610 ' e representatives of Cupertino to enter t e above-identifi t pr perty for inspection purposes. f Jc Signature of Applicant/Agent: Date: { [ SUPPLEMENTAL INFORMATION REQUIRED PLANCH CKTYPE ROUTING SLIP ❑ OVER- TLW, oUNTER ❑ BUILDINGPLANREVIEW New SFD or Multifamily dwellings: Apply for demolition permit for existing building(s). Demolition permit is required prior to issuance of building permit for new building. ❑ EXPRESS ❑ PLAWrMG PLANREVIVW _ Commercial Bldgs: Provide a completed Hazardous Materials Disclosure © STANDARD ❑ PUBLIC WORKS form if any Hazardous Materials are being used as part of thus project. p LARGE ❑ FIRE DEPT _ Copy of Planning Approval Letter or Meeting with Planning prior to ❑ MAJOR � ❑ SANrI ARY SEWER DISTRICT submittal of Building Permit application. ❑ k"MONMENTALHEALTH BldgAN 201 Ldoo revised 06/21/11 CUPERTINO CONTRACTOR / SUBCO R LIST Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 Fax: 408-777-3333 JOB ADDRESS: SUBCONTRACTOR PERM # OWNER'S NAME: �j2i�r� '(a 'U� S%� PHOA _T # Mew ZVT '74c'( GENERAL CONTRACTOR c 1-0 cqv, ka-U l � BUS SS LICENSE # (� 3 ADDRESS: M-5FE vvxoke 5 4 LCITY/iIPCODE: 9,5'), *Our municipal coderequiresall businesses working in the city to have NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(! GENERAL CONTRACTOR AND AL SUBCONTRACTORS HAV BUSINESS LICENSE. m.. I am not using any su Signature Please check applicable subcontractors and complete the City of Cupertino business license. . WILL BE SCHEDULED UNTIL THE OBTAINED A CITY F CUPERTINO f-7 Date information: Owner / Contractor Signature Date SUBCONTRACTOR BUSINESS NAME ( BUSINESS LICENSE # Cabinets & Millwork i Cement Finishing Electrical Excavation Fencing Flooring / Carpeting Linoleum / Wood 1 Glass / Glazing Heating . Insulation Landscaping Lathing Masonry I Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner / Contractor Signature Date CUPERTINO SMOKE / CARBON MONOXIDE ALARMS OWNER. CERTIFICATE OF COMPLIANCE COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 (408) 777-3228 - FAX (408) 777-3333 - buildina(a)cupertino.cra PER IIT CANNOT BE FL`ALED UNTIL THIS CERTIFICATE HAS BEEN COMPLETED, SIGNET) ' NI) RE F(TR'SFD TO THE BLTILDING DIVISION PURPOSE This affidavit is a self -certification for the installation of all required Smoke and Carbon Monoxide Alarms for compliance with. 2016 CRC Section R314, R315, 2016 CBC Sections 420.6 and 907.2.11.2 where no interior access for inspections are required. GENERAL INFORMATION Existing single-family and multi -family dwellings shall be provided with Smoke Alarms and Carbon Monoxide alarms. When the valuation of additions, alterations, or repairs to existing dwelling units exceeds $1000.00, CRC Section R314, R315, and CBC Sections 907.2.11.5 and 420.6 require that Smoke Alarms and/or Carbon Monoxide Alarms be installed in the following locations: AREA SMOKE ALARM CO ALARM Outside of each separate sleeping area in the immediate vicinity of the bedroom(s) - (Smoke alarms shall not be located within 3 feet of bathroom door) X X On every level of a dwelling unit including basements and habitable attics X _ __X _ Within each sleeping room I X _ J Carbon Monoxide alarms are not required in dwellings which do not contain fuel -burning appliances and that do not have an attached garage. Carbon monoxide alarms combined with smoke alarms shall comply with CBC Section 420.6 and shall be approved by the Office of the State Fire Marshal. Power Supply: In dwelling units with no commercial power supply, alarm(s) may be solely battery operated. In existing dwelling units, alarms are permitted to be solely battery operated where repairs or alterations do not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl space. Refer to CRC Section R314 and CBC Sections 907.2.11.4 and 420.6.2. An electrical permit is required for alarms which must be connected to the building wiring. As owner of the above -referenced property, I hereby certify that the alarm(s) referenced above has/have been installed in accordance with the manufacturer's instructions and in compliance with the California Building and California Residential Codes. The alarms specified below have been tested and are operational, as of the date signed below. / Address: ckagr C/'y Permit No.900-097#7 Specify Number of Alarms: # Smoke Alarms: 7- __1 # Carbon Monoxide Detectors: Smoke and COform.doc revised 01/1 012 01 7 WATER -CONSERVING PLUMBING FIXTURES OWNER CERTIFICATE OF COMPLIANCE COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION CIJPERTIPtO 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 jj (408 77- 28 • FAX (408) 777-3333 • buildingCaDcupertino.om Owner Naive if l �l�C`r�'1 U V CAT��y'\CCVVL Permit Nok - coa*- Address 1. Is your real property a registered historical site? ❑ Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form. ,�Wf No Go to Question 2. 2. Does your real property have a licensed plumber certifying that, due to the age or configuration of the property or its plumbing, installation of water -conserving plumbing fixtures is not technically feasible? Yes Civil Code Sections 110 1. 1 through 1101.8 do not apply. ❑ The licensed plumber's certification has been provided to the Building Division. Skip the rest of the form and sign bottom of form. ❑ No Go to Question 3. 3. Is water sei vice permanently disconnected for your building? ❑ Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form. kNo Go to Question 4. 4. Is your real property built and available for use or occupancy on or before January 1, 1994? ❑ No My real property is built and available for use or occupancy after January 1, 1994. Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form. Yes My real property is built and available for use or occupancy on or before January 1, 1994. Civil Code Sections 1101.1 through 1101.8 apply. Check one of the three following statements and sign bottom of form.. 5. Please check ONE of the following: My property is a single-family residential real property. See Civil Code Section 1101.4. On and after January 1, 2014, building alterations or improvements shall require all non-compliant plumbing fixtures to be replaced with water -conserving plurnbing fixtures throughout the building. On or before January 1, 2017, all non- compliant plumbing fixtures shall be replaced with water -conserving plumbing fixtures (regardless of whether property undergoes alterations or improvements). ❑ My property is a multifamily residential real property. See Civil Code Section 1101.5. On and after January 1, 2014, specified building alterations or improvements shall require non- compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures. On or before January 1, 2019, all non-compliant plumbing fixtures shall be replaced with water - conserving plumbing fixtures throughout the building (regardless of whether property undergoes alterations or improvements). ❑ My property is a commercial real property. See Civil Code Section 1101.5. On and after January 1, 2014, specified building alterations or improvements shall require non- compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures. On or before January 1, 2019, all non-compliant plumbing fixtures shall be replaced with water- conserving plumbing fixtures throughout the building (regardless of whether property undergoes alterations or improvements). I, as the owner or owner's agent of this property, certify under penalty of perjury that non-compliant plumbing fixtures will be replaced prior to date specified above with water -conserving plumbing fixtures in accordance with Civil Code Sections 1101.1 through 1101.8, the current California Plumbing Code and California Green Building Standards Code, and manufacturer's installation requirements, and that the water -conserving plumbing fixtures comply with the requirements as indicated in the table on the following page. I Owner or Owner Agent's Signature:' Date: l/Z // 7Z I Upon completing and signing this Noftificate, please return it to the Building Division in order to final your building permit. SB4072015.doc revised 08126/15 BUILDING PERMIT CANNOT BE FINALED AND COMPLETED UNTIL THIS CERTIFICATE HAS BEEN SIGNED AND RETURNED TO THE BUILDING DIVISION 1. If the existing plumbing fixture water usage/flow rate is equal to or lower than the figure shown, it is not required to be upgraded. SB407 2015. doc revised 08/26/15 Non -Compliant Water -Conserving Plumbing Fixture PlumbingFixture (Fixture Complying with Current Code Applicable to New Construction) Maximum Water Usage/Flow Rate Fixture Type Water Usage 2013 CPC Ch. 4 2013 CPC Ch. 4 _ 2013 CPC Ch. 4 /Flow Rate 2013 CALGreen Div. 4.3 2013 CALGreen Div. 4.3 2013 CALGreen Div. 5.3 Single -Family Multi -Family Commercial Residential Residential Water Closets Exceed 1.6 Single flush toilets: 1.28 gallons/flush (Toilets) Gallons/flush Dual flush toilets: 1.28 gallons/flush effective flush volume (the composite, average flush volume of two reduced flushes and one full flush Urinals Exceed 1.0 0.5 gallons/flush Gallons/flush Showerheads Exceed 2.5 2.0 gallons per minute @ 80 psi. Also certified to the performance criteria of gallons per minute U.S. EPA WaterSense Specification for Showerheads (A hand-held shower is considered a showerhead.) For multiple showerheads serving one shower, the combined flow rate of all showerheads and/or other shower outlets controlled by a single valve shall not exceed 2.0 gallons per minute @ 80 psi, or the shower shall be designed to allow only one shower outlet to be in operation at a time. Faucets — Exceed 2.2 gallons Maximum 1.5 gallons per Within units: _ 0.5 gallons per minute ((.&_V 60 Lavatory per minute minute @ 60 psi; minimum Maximum 1.5 gallons psi Faucets 0.8 gallons per minute @ per minute @ 60 psi; 20 psi minimum 0.8 gallons per minute @ 20 psi In common and public I use areas: 0.5 gallons per minute @ 60 psi 1.8 gallons per minute _ Faucets — Exceed 2.2 gallons 1.8 gallons per minute @ 60 psi 1.8 gallons per minute _ 1.8 gallons per minute C 60 Kitchen per minute 60 psi @ 60 psi psi Faucets May temporarily increase May temporarily up to 2.2 gallons per increase up to 2.2 minute @ 60 psi, and must gallons per minute @ default to maximum 60 psi, and must 1.8 gallons per minute @ default to maximum 60 psi 1.8 gallons per minute Where faucets meeting @ 60 psi the above are unavailable, I Where faucets meeting aerators or other means the above are may be used to achieve unavailable, aerators or i reduction. other means may be used to achieve reduction. , 1. If the existing plumbing fixture water usage/flow rate is equal to or lower than the figure shown, it is not required to be upgraded. SB407 2015. doc revised 08/26/15 CERTIFICATE OF COMPLIANCE Alterations to Space Conditioning Systems (formerly CF -IR -ALT -HVAC) Project Name: Ve f N,) �- � �- 0 1-1 - D O "-/ `7 CF1R-ALT-02-E (Page 1 of 3) Clay St I Date Prepared: 2017-07-16 A. General Information CF1R-ALT-02 is applicable to multiple space conditioning systems contained within a single dwelling unit. When multiple dwelling units must be documented, use one CF1R-ALT-02 document for each dwelling unit. 01 Project Name Clay St 02 Date Prepared 2017-07-16 03 Project Location 20374 Clay St 04 Building Type Single family 05 CA City Cupertino 06 Dwelling Unit Name Clay St SC System SC System CFA served system a Dwelling Unit Conditioned Installing new SC 07 Zip Code 95014 08 Floor Area (ft) 2393 by this SC ducted containing system Number of Space entirely new 09 Climate Zone 4 10 Conditioning (SC) Systems in 1 component? components? feet of ducts? duct system? this Dwelling Unit: Alteration Type B. Space Conditioning (SC) System Information 01 02 03 04 05 06 07 08 09 10 Is the SC Installing a SC System SC System CFA served system a refrigerant Installing new SC Installing Installing Installing Identification or Location or Area by this SC ducted containing system more than 40 entirely new entirely new Name Served System (ft) system? component? components? feet of ducts? duct system? SC system? Alteration Type Entirely new or System 1 Whole house 2393 Yes No Yes Yes Yes Yes complete replacement space conditioning system C. Extension of Existing Duct System, Greater Than 40 Feet (Section 150.2(b)1Diib) This section does not apply to this project. Registration Number: 217-A020241492A-000-000-0000000-0000 CA Building Energy Efficiency Standards - 2016 Residential Compliance Registration Date/Time: 2017-07-16 09:25:58 Report Version: 2016.1.005 Schema Version: rev 10/16 HERS Provider: CaICERTS Report Generated: 2017-07-16 21:53:45 CERTIFICATE OF COMPLIANCE CF111-ALT-02-E Alterations to Space Conditioning Systems (formerly CF -IR -ALT -HVAC) (Page 2 of 3) D. Altered Space Conditioning System (Sections 150.2(b)lE and F) This section does not apply to this project. E. Entirely New or Complete Replacement Duct System, with or without Equipment Changeout (Sections 150.2(b)1Diia and 150.2(b)1E, F) This section does not apply to this project. F. Entirely New or Complete Replacement Space Conditioning System (Section 150.2(b)lC) 01 02 03 04 05 06 07 08 09 10 11 Heating Cooling System Heating Minimum Cooling Minimum Required Identification or Heating System Altered Heating Efficiency Efficiency Cooling Altered Cooling Efficiency Efficiency Thermostat New Duct Name Type Component Type Value System Type Component Type Value Type R -Value Annual Fuel This field or This field or System 1 Central gas All new heating Utilization 95 No cooling No cooling section is section is SetbackTher R 6 furnace components Efficiency component altered not not mostat (AFUE) applicable applicable Required Documentation: CF2R-MCH-01-E - Space Conditioning Systems - Duct insulation requirement for the new portions of supply -air and return -air ducts or plenums: R6 (CZ 1-10, 12 and 13) and R8 (CZ 11 and 14-16) CF2R and CF3R-MCH-20-H Duct Leakage Test required - Leakage rate compliance: <= 5%. CF2R and CF3R-MCH-22 Fan Efficacy CF211 and CF3R-MCH-23 Airflow Rate Verification Compliance: Fan Efficacy <= 0.58 W per cfm and System Airflow >= 350 cfm per ton. Alternative Compliance: CF211 and CF3R-MCH-28 Return Duct Design verification is an alternative to MCH -22 and MCH -23 verification. CF211 and CF3R-MCH-25-H Refrigerant Charge verification required when refrigerant containing components are installed or altered (applicable in CZ 2, 8-15). Exceptions: Heating -only systems are exempt from the 0.58 W per cfm and 350 cfm per ton requirements. Note: An "entirely new or replacement duct system" means at least 75% of the duct system is new duct material, and up to 25% may consist of reused parts from the dwelling unit's existing duct system (e.g., registers, grilles, boots, air handler, coil, plenums, duct material) if the reused parts are accessible and can be sealed to prevent leakage Registration Number: 217-A020241492A-000-000-0000000-0000 Registration Date/Time 2017-07-16 09:25:58 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2016.1.005 Report Generated: 2017-07-16 21:53:45 Schema Version: rev 10/16 CERTIFICATE OF COMPLIANCE CF111-ALT-02-E Alterations to Space Conditioning Systems (formerly CF -IR -ALT -HVAC) (Page 3 of 3) Documentation Author's Declaration Statement 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: /J��� /� Novelo, Jose l - Company: Signature Date: California Air Duct Testers 2017-07-16 12:25:58 Address: CEA/ HERS Certification Identification (if applicable): 5279 Eggers Dr City/State/Zip: Phone: Fremont CA 94536 408-824-0740 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a registered copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Responsible Designer Signature: camacho, pedro�� Company: Date Signed: POWFUL CONSTRUCTION 2017-07-16 09:25:58 Address: License: 1658 E FERNANDO STREET 853051 City/State/Zip: Phone: SAN JOSE CA 95116 408-687-7607 X123 Easy to Verify at CaICERTS.com Digitally signed by CaICERTS. This digital signature is provided in order to secure the content of this registered document, and in noway implies Registration Provider responsibility fc r the accuracy of the info r1i Registration Number: 217-A020241492A-000-000-0000000-0000 Registration Date/Time 2017-07-16 09:25:58 HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2016.1.005 Report Generated: 2017-07-16 21:53:45 Schema Version: rev 10/16 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 8) Project Name: Clay St Enforcement Agency: City of Cupertino Permit Number: 2017-0047 Dwelling Address: 20374 Clay St City: Cupertino Zip Code: 95014 A. General Information 01 Dwelling Unit Name Clay St 02 Climate Zone 4 03 Dwelling Unit Total Conditioned Floor 2393 04 Number of Space Conditioning 1 CFA served Area (ft2) Installing a Systems in this Dwelling Unit. Installing 05 Certificate of Compliance Type Prescriptive alterations (CF111-ALT) 06 Method Used to Calculate HVAC Loads NotApplicableEquipmentChangeout 07 Calculated Dwelling Unit Sensible Cooling Load (Btu/h) This field or section is not applicable 08 Calculated Dwelling Unit Heating Load (Btu/h) This field or section is not applicable 09 1 Dwelling Unit Number of Bedrooms 3 ducted containing system MCH -01b - Space Conditioning Systems Ducts and Fans - Prescriptive Alterations B. Space Conditioning (SC) System Information 01 02 03 04 05 06 07 08 09 10 CFA served Is the SC Installing a Installing SC System SC System by this SC system a refrigerant Installing new SC Installing more entirely Installing Identification or Location or Area System ducted containing system than 40 feet of new duct entirely new Name Served (ftZ) system? component? components? ducts? system? SC system? Alteration Type Entirely new or complete System 1 Whole house 2393 Yes No Yes Yes Yes Yes replacement space conditioning syste m Registration Number: 217-A020241492A-000-001-M01001A-0000 Registration Date/Time: 2017-07-17 22:25:10 HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2016.1.006 Report Generated: 2017-07-17 20:24:14 Schema Version: rev 4/7/2017 CERTIFICATE OF INSTALLATION CF2R-MCH-0I-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 8) C. Space Conditioning (SC) System Alterations Compliance Information O1 02 03 04 05 06 07 08 09 10 11 12 13 Rated Heating Capacity, Output (Btu/h) System 1 AFUE 95 Lennox ml950fOO9�Oxp60c- 5911j3699 86000 Notes: Central Fan Integrated Heating Cooling New or (CFI) SC Altered Heating Minimum Altered Cooling Minimum Required Replaced New Ventilation Identification Heating Heating Efficiency Efficiency Cooling Cooling Efficiency Efficiency Thermostat Duct Duct System or Name System Type Component Type Value System Type Component Type Value Type Length R -Value Status This field This field All new No cooling or or System 1 Central gas heating AFUE 95 No cooling component section section is Setback GT40Ft R6 Not a CFI furnace componen altered is not not system is applicabl applicabl e e D. Installed Heating Equipment Information 01 02 03 04 05 06 07 SC Identification or Name Heating Efficiency Type Heating Efficiency Value Heating Unit Manufacturer Heating Unit Model Number Heating Unit Serial Number Rated Heating Capacity, Output (Btu/h) System 1 AFUE 95 Lennox ml950fOO9�Oxp60c- 5911j3699 86000 Notes: E. Installed Cooling Equipment Information This section does not apply to this project. F. Extension of Existing Duct System, Greater Than 40 Feet This section does not apply to this project. Registration Number: 217-A020241492A-000-001-M01001A-0000 Registration Date/Time: 2017-07-17 22:25:10 HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2016.1.006 Report Generated: 2017-07-17 20:24:14 Schema Version: rev 4/7/2017 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 8) G. Installed Duct System Information 01 02 03 04 05 06 07 08 09 Air Filter Device Identification or Name Air Filter Device Type Air Filter Device Location Determined Design Airflow Rate for Air Filter Device (cfm) Determined Design Allowable Pressure Drop for Air Filter Device (inch W.C.) System 1 Method of Filter 1 Can RA3.3 Hallway 1200 0.02 Notes: compliance with Airflow SC System SC System duct and filter Number of Air Protocols be Identification or Location or Area Supply Duct Supply Duct Return Duct Return Duct grille sizing Req's Filter Devices on used to test Name Served Location R -Value Location R -Value in 150.0(m)13 System this System? System 1 Whole house Unconditioned R-6 Unconditione R-6 Exempt - No 1 No crawl space d crawl space Cooling Notes: H. Installed Air Filter Device Information 01 02 03 04 05 06 07 SC System Identification or Name SC System Location or Area Served Air Filter Device Identification or Name Air Filter Device Type Air Filter Device Location Determined Design Airflow Rate for Air Filter Device (cfm) Determined Design Allowable Pressure Drop for Air Filter Device (inch W.C.) System 1 Whole house Filter 1 Filter Grille Hallway 1200 0.02 Notes: I. Air Filter Device Requirements 01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. Registration Number: 217-A020241492A-000-001-M01001A-0000 Registration Date/Time: 2017-07-17 22:25:10 HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2016.1.006 Report Generated: 2017-07-17 20:24:14 Schema Version: rev 4/7/2017 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 8) I. Air Filter Device Requirements The system shall be designed to accommodate the clean -filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean -filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be 02 labeled to disclose the applicable design airflow rate and the maximum allowable clean -filter pressure drop. The labels shall be permanently affixed to the air filter device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these determined or labeled maximum allowable clean -filter pressure drop values as rated using AHRI Standard 680. 03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 m range when tested in accordance with AHRI Standard 680. 05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the required efficiency and pressure drop requirements for the air filter device. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. Registration Number: 217-A020241492A-000-001-M01001A-0000 Registration Date/Time: 2017-07-17 22:25:10 HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2016.1.006 Report Generated: 2017-07-17 20:24:14 Schema Version: rev 4/7/2017 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 8) J. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 Exemption MCH -20 from MCH -23 Minimum MCH -22 MCH -25 Exemption R -Value for MCH -21 AHU MCH -28 SC System SC System From Duct Duct Ducts In AHU Fan Airflow Identification or Location or Area Leakage Leakage Conditioned Duct Location Efficacy Rate Refrigerant Return Duct Design Name Served Requirements Test Space Verification (W/cfm) (cfm/ton) Charge - Table 150.0-13 or C System 1 Whole house No Yes Not No No No No No exemptions applicable Notes: Registration Number: 217-A020241492A-000-001-MO1001A-0000 ....alLttm 1 Z11 11,1t4wow r- s► • ,, Registration Date/Time: 2017-07-17 22:25:10 HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2016.1.006 Report Generated: 2017-07-17 20:24:14 Schema Version: rev 4/7/2017 CERTIFICATE OF INSTALLATION CF2R-MCH-03-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 8) K. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced -air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet -to -outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan -type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R -value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B 10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section and 2. LA150.0(h)1 ir Distribution System Ducts, Plenums and Fans Registration Number: 217-A020241492A-000-001-MO1001A-0000 Registration Date/Time: 2017-07-17 22:25:10 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2016.1.006 Report Generated: 2017-07-17 20:24:14 Schema Version: rev 4/7/2017 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 8) K. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. 11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. Connections and Closures: All installed air -distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 12 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply -air and return -air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 14 The thermostat shall be installed in accordance with the manufacturers published installation specifications 15 First stage of heating shall be assigned to heat pump heating. 16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. Registration Number: 217-A020241492A-000-001-MO1001A-0000 Registration Date/Time: 2017-07-17 22:25:10 HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2016.1.006 Report Generated: 2017-07-17 20:24:14 Schema Version: rev 4/7/2017 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 8 of 8) Documentation Author's Declaration Statement 1. 1 certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Jose Novelo ���j�� Company: Signature Date: California Air Duct Testers 2017-07-17 20:27:39 Address: CEA/ HERS Certification Identification (if applicable): 5279 Eggers Dr City/State/Zip: Phone: Fremont CA 94536 1408-824-0740 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Installation is true and correct. 2. 1 am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person's behalf. 3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4. 1 will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Responsible Builder/Installer Signature: pedro camacho n Position With Company (Title): Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) POWFUL CONSTRUCTION owr Address: CSLB License: 1658 E FERNANDO STREET 853051 City/State/Zip: Phone: Date Signed: SAN JOSE CA 95116 1408-687-7607 X123 12017-07-17 22:25:10 Digitally signed by CaICERTS. This digital signature is provided in order to secure the content of this registered document, and in noway implies Registration Provider responsibility for the accuracy of the information. Registration Number: 217-A020241492A-000-001-M01001A-0000 Registration Date/Time: 2017-07-17 22:25:10 HERS Provider: CaICERTS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2016.1.006 Report Generated: 2017-07-17 20:24:14 Schema Version: rev 4/7/2017 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Clay St Enforcement Agency: City of Cupertino Permit Number: 2017-0047 Dwelling Address: 20374 Clay St City: Cupertino Zip Code: 95014 A. System Information 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Location or Area Served Whole house 03 Building Type from CF -1R Single family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 j Duct System Compliance Category Replacement MCH -20d - Complete Replacement or Altered Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton) 0 02 Heating Capacity (kBtu/h) 86 03 Conditioned Floor Area served by this HVAC system (ftz) 2393 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.05 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Heating system method 08 Measured AHUAirflow This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm) 93 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 25 11 Compliance Statement: System passes leakage test Registration Number: 217-A020241492A-000-001-M20001A-0000 CA Building Energy Efficiency Standards 2016 Residential Compliance Registration Date/Time: 2017-07-17 22:25:10 HERS Provider: CaICERTS Report Version: 2016.1.006 Report Generated: 2017-07-17 20:27:20 Schema Version: rev 03/16 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation 02 Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 If a complete replacement, all supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. OS If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. If the system complies using the Smoke Test method, the smoke test was conducted in accordance with the requirements 07 of Reference Residential Appendix RA3.1.4.3.6. Systems that comply using smoke test shall not be included in sample groups for HERS verification compliance. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. Registration Number: Registration Date/Time: 2017-07-17 22:25:10 HERS Provider: CaICERTS 217-A020241492A-000-001- M 20001A-0000 CA Building Energy Efficiency Standards Report Version: 2016.1.006 Report Generated: 2017-07-17 20:27:20 2016 Residential Compliance Schema Version: rev 03/16 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Documentation Author's Declaration Statement 1. 1 certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Documentation Author Signature����� Jose Novelo Company: Signature Date: 2017-07-17 20:27:39 California Air Duct Testers Address: CEA/ HERS Certification Identification (if applicable): 5279 Eggers Dr City/State/Zip: Phone: Fremont CA 94536 1408-824-0740 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Installation is true and correct. 2. 1 am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person's behalf. 3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4. 1 understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, l am required to offer any necessary corrective action at no charge to the building owner. 5. 1 will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Responsible Builder/Installer Signature: pedro camacho Position With Company (Title): Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) oyyr POWFUL CONSTRUCTION Address: CSLB License: 1658 E FERNANDO STREET 853051 City/State/Zip: Phone: Date Signed: SAN JOSE CA 95116 1408-687-7607 X123 2017-07-17 2225:10 Third Party Quality Control Program (TPQCP) Status: Name of TPQCP (if applicable): Digitally signed by Ca10ERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: Registration Date/Time: 2017-07-17 22:25:10 HERS Provider: CaICERTS 217-A020241492A-000-001-M 20001A-0000 CA Building Energy Efficiency Standards Report Version: 2016.1.006 Report Generated: 2017-07-17 20:27:20 2016 Residential Compliance Schema Version: rev 03/16 Revuewed Byd:��)I'ILIG'lg DevIes DatE�� nl/3n/l 7 I TABLE OF CONTENTS I Cover Page 1 Table of Contents 2 Form CF -1 R -PRF -01-E Certificate of Compliance 3 Form RMS -1 Residential Measures Summary 12 Form MF -1 R Mandatory Measures Summary 13 Room Load Summary 17 CUI�IEI�I 11140 1I°°I3Uii III Iihn I1'° III rfi n nt EnergyPro 7.1 by EnergySoft FiEWEMI � � ` L.� �� .w.� User Number: 6249 evuewe Il a ydIC:)II'ILIG'I Devles rn o 4 - LL O CL d LL a U D cn T N c 0 Q S a N '5 N 00 70- 0 O CL cn 'L N E O C Z ° v � d � v f CL U 0 d C 0 s N N i 7 C N O d LL N jp V V w � d p' d W O 2 £ d O L_ O' p E O O Z '0 pO O Z Q S O C C m C J m H H N W W U z Q o O Cl) J IL m O U C d rn E 17 N O � O £ 0 O N C. C. C N 0 U L O N � CL d IL n U 2 C o E c N W c Lo U m W N E 0 U C cn .y d O t0 'p 0� N M O NL 3 � 3 N Lo N O O O a D m O L c c g o z z W U) D m m c c Z m d E 0 W O- z z O O C C U O .y d LL D (O 00 LO •p V r` O O M O O O 0 00 N N N N O 01 O w N � a) c w N Q) T O N COCO N T Q N O 76 c -- 2 U C 2 :° c O 75 0W c Q U (C6(06 LL c fl fl c N O C N T � -OO W V a) 2 a a) C) ai o a rn o ON U Of H U U (n Q N O M O C d d N N W N d w O C O U oT o M fl U 1:41 v m Q Z .� m m J E t;Q N Q O Q d 'O y .� V E 'd C LL o ._ .� O IL o v m a v� o �° c a o a L) O C =' 7 Q U N Q U :° Z Q O Q O LL Z_ QJ W Z _ N M le O W O N O W O W O O O O O O N O 0 d C 0 s N N i 7 C N O d LL N jp V V w � d p' d W O 2 £ d O L_ O' p E O O Z '0 pO O Z Q S O C C m C J m H H N W W U z Q o O Cl) J IL m O U N W D Q W LL J Q U W IL N 0 W W L E Z 0 C d E £ 0 C. C. C V N IL C N E 0 U C .y d t0 'p 0� N M O N Q N Lo N O O O a D O L U) a W U) D W z W C .y d D (O 00 LO •p V r` O O M LQ O 0 00 N , N N O 01 C w N w N Q) 'o N N N O c -- 2 U C 2 :° 75 0W D fl fl c N O C T � a w o U N W D Q W LL J Q U W IL N 0 W W L E Z 0 rn o 4 - LL O W N CL d LL a U D cn T N O Q C a N '5 N m N � O CL Ncn L LL N E O 0 Z 0 fC V d V CL U L N d r, o cn O L � C E Z = c O N m E — d O N O O C L � O £U 7 Z N d C N N O N O L N m E 7 Z N O O v d m � O C d m E Z rn c d o0 O p C L D d 7 Z N Q O N O rn O LL M N d O Z C O O H U Q O LL Z c WO N m o D _ Z Q O t1 70 W d LL OL a (L Z_ J m � � w L m w a O rd, >, £ a Q o vi O � (6 c m m d 'g Q E m r0 O U Mn C N 0) t1 L O U m d O `t v y •� Q � L T 2) M C C7 O C;y d N C G a w O L �! O W t 0 O v m x O 0 C w Q p. N O `0 a 0 � c _o N 2 a L U a) co 0 O U (6 E N m � Q N M M co Q Q � L w O 2 y a � V c W a `O � U (6 N Q L „ a a O c � d E a d E O E 3 c � c N > > N Q Q m 2 2 c � d N Q d O w O C > N O. � N C d Q co O O d y V � d v w >, N L y L C N w W Q prj N L > i w �� > E 00 y Qw i W C £ N y yr LL OC C 0p Z O OQ Qd o OC O ;5 Z ZZdZ WO >> O Z O 1 H M Ux. o. . . L N d r, o cn O L � C E Z = c O N m E — d O N O O C L � O £U 7 Z N d C N N O N O L N m E 7 Z N O O v d m � O C d m E Z rn c d o0 O p C L D d 7 Z N Q O N O rn O LL M N d O Z C O O H U Q O LL Z c WO N m o D _ Z Q O t1 70 W d LL OL a (L Z_ J m � � w L m w j rd, >, £ N o O � c m d 'g c m r0 C N 0) t1 d O v y •� � L O M C C7 C C;y d N C G O w O L �! W t v m x o 0 w Q p. N `0 a � c N 2 rp L U a) co co N 2 E N r O � Q N M M Q Q � L � O V y � V c W a `O � d C d � N L „ a c � d E � N d d E E c � c N > > N Q Q m 2 2 c � d N Q d � E L T N O. � w' p1 V � d C N w W Q prj N U U 00 y Qw i C £ N w m 0 Z O £ w T Q Q Z >_ c)) c p N d N r- J c)) > J C N OLL fl. C N Z_ w d Z W L w Z N � N N p L d � w c 00 i N w+�+ C y £ > O O >, Q N H V N � Z N N N N N C T Z O i C N E W W N O O +� o d co 7 Z L C C W H m m L N d r, o cn O L � C E Z = c O N m E — d O N O O C L � O £U 7 Z N d C N N O N O L N m E 7 Z N O O v d m � O C d m E Z rn c d o0 O p C L D d 7 Z N Q O N O rn O LL M N d O Z C O O H U Q O LL Z c WO N m o D _ Z Q O t1 70 W d LL OL a (L Z_ J m mil 04�) Boz ow E N.....II co ORS. CDu w6 U w w LL w �m caw >oI w om Lu IL.IL.M UO: Q O U m O :O 0 N co a C N U) U c 0 �U W T 2) Z w c O 2 a m C� U N rd, >, N O � m d 2 rd, N O W x o 0 w C Lo L U a) co co N 2 � Q N i Q O � co lL N d C N d E Z E E c N > > N Q Q 2 2 x N O. � � O O C � a a N U U m (6 Z O £ Q Q Z >_ c)) c O N r- J c)) > J O N OLL 3 Z_ X Z W w Z N mil 04�) Boz ow E N.....II co ORS. CDu w6 U w w LL w �m caw >oI w om Lu IL.IL.M UO: Q O U m O :O 0 N co a C N U) U c 0 �U W T 2) Z w c O 2 a m C� U rn CD 4 - LL O W M CL d O LL a U D En T N 0 Q C a N '5 2 m r- 0 CL En 'L � U N E O 0 Z U � d U O CL U LC) mil O.. F L.Lw w U� ) Uoc:0 ' )o >11 T oM r._ 11 �WLL Il.�lh mr�r: U C Q O U m c a 5) O 0 N a a3 a N U) U a) �U 0= w � T J 2) 7 a) Z w C O 2 a K 00 a) Q C� U M o M d Q N Z Z i W O p wc w = O O O O O O O Q Q Q Q Q O O O O O L EO c%iO 5 Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z UJ O O O w C w O U p M O 00 0) O 0 Ct) V CO V O w 00 � 00 N O O O O O O O � a o 0 O O O O O c c c c c c c 3 3 3 3 3 c c c c c O N'x 'x 'x 'x 'x 'x 'x z z z z z .X 'x 'x 'x 'x Q .. w w w w w w w w w w w w 00 =' 0) O O O O O O O O U O O O O Q Cl)Q O O O 0 HT O a3 a3 Q � � c)) Q dO 0) c)) U O J o > L d x Z w w N U N I N w od M LaL 0) N O N Z O O w C 3 CO N OMco O W In Q a O O O O O O L � Q C N O i co O V co O O V N N N co O co W N LO O N N_ N N_ co aft O �aft N V N V O O O N N Cf1 CO M N N M O L c O N C CU O O co O O U co O C O O U O O N LL J m 0-1 J m C� LL J m 0-1 O t E V) M N M N LO M N O N M N M N M a) co U a3 U LL LL LL C Q 3 w w w Cl) ? U 3 3 3 o U o O N O O O O O o � O O O � LO O O O O � LL a3 a3 a3 co l a3 co co co co co co N N C C C C O C > C > O C O C O C O C O C O O O O O O �O J J J J J J > > > > > CO CO CO CO CO A v7 XXX v7 v7 n X L j O i) v7 'X v7 'X O Z O Z O Z O Z a) Z w w w w Q w w cn w — — — O p N N N N N M co CO > > m > U LL j �j �j 0 LL j L,L C N C a3 L O a) > O a > O � Z LL J � O .� , 6 a) a) O_) Mn O a) a) 0 LL LU � Z) Q a O LC) mil O.. F L.Lw w U� ) Uoc:0 ' )o >11 T oM r._ 11 �WLL Il.�lh mr�r: U C Q O U m c a 5) O 0 N a a3 a N U) U a) �U 0= w � T J 2) 7 a) Z w C O 2 a K 00 a) Q C� U O M d Q N Z Z i W O U N 0) c 3 x z N w L EO c%iO 5 O L LL LL O O V CC w LO 00 LOO 00 � •£ O O w C w O 02Q p M O 00 0) O 0 Ct) V CO V O w 00 � 00 H O O w co co co M � a o 0 d N_ 01- O x 0 LL. .. t N N N N i � Q LO i 7 M Q .. a0 N 0 le O C C Q Q O U U Q Q Cl)Q O O O 0 HT a3 a3 Q � � c)) Q dO 0) c)) U O N J o > L d x Z w w N U I N w LaL 0) N O N Z O O w Q a O LC) mil O.. F L.Lw w U� ) Uoc:0 ' )o >11 T oM r._ 11 �WLL Il.�lh mr�r: U C Q O U m c a 5) O 0 N a a3 a N U) U a) �U 0= w � T J 2) 7 a) Z w C O 2 a K 00 a) Q C� U rn o 4 - LL o W q CL d LL a U D cn T N 0 Q C a N '5 N m N r- 0 G Q. cn 'L N E M C z 0 fC V d V O CL U U') mil �Rz O Oaf U LL w m -0 °o 04.E ELY: >11 r w ` Of IL.IL.M UO: C Q O U :o O O N a (6 a N U) U O �U W W O T 2) O Z w C O 2 � .o m C� U a� O C v NC 'i N O Z O Z p O Z O Z O Z O Z O W Q Z Q Z Q Z dC Z Z Z c O O Z V y Cl) C Cl) C Cl) C Cl) C Cl) C Cl) C Cl) C Cl) C 3 3 3 3 N O O Z O Z Z z W y w w W W W W c pp o O O V � O z O z N w } L O 20 Z Z } w O N � m N rn O s N L c o c 0 c 0 U c 0 c 0 c 0 o 0 O c o C LO W LO W LO W C w •£ O O O (JJ (JJ W Z (JJ (JJ Z Z V SC W aUi c aUi c aUi c W aUi c aUi c aUi c O p w 5 p p co 0 C V0 W 0 W 0 W 0 W 0 W 0 W 0 W 0 W N N N d = N O O O N_ O O O O O O O O y C W N W N W N W N W N W N W N N M N M N M N M O w in 0 cn O O O O O O O HT 0 O O O O O O O m O O O O co p N y L VV N � Q co co V N O M O O Q U c O O O J > V C2 O J CN w o 3 X O O W 00 U C7 0 � U 7 Q U Q Q (6 (6 v O w s 4n Q O O O Q 0 co C _ O J >_ O N UI O J iy z x O O U X Z Q U U _ Q U Q H Q s U') mil �Rz O Oaf U LL w m -0 °o 04.E ELY: >11 r w ` Of IL.IL.M UO: C Q O U :o O O N a (6 a N U) U O �U W W O T 2) O Z w C O 2 � .o m C� U M o O v 'i N O Z O Z O Z O Z O Z O Z O Z O Z Q Z Q Z Q Z Q Z W O U c O Z Z y Cl) C Cl) C Cl) C Cl) C Cl) C Cl) C Cl) C Cl) C 3 3 3 3 N N Z Z Z Z W W W W W W W W c c LO N w w O 5 O O O w O O rn O s N L c o c 0 c 0 c 0 c 0 c 0 c 0 o 0 O c o c o o c O 0 c O OL (JJ (JJ (JJ (JJ (JJ (JJ (JJ Z (JJ (JJ Z Z SC W aUi c aUi c aUi c aUi c aUi c aUi c aUi c aUi c aUi c C V0 W 0 W 0 W 0 W 0 W 0 W 0 W 0 W N N N N = N O O O O O O O O O O O O y W N W N W N W N W N W N W N W N N M N M N M N M O w in 0 cn O O O O O O 0 O N O O O O O O O O O O p N y L VV N N N co co V N O M W O co Q d a 7 v O w s 4n o co 0 co iy s O O s QIn LO LO L-0 N M O O M r N ' Y N LL LL LL m 'W—i m O O Q Q C C C O> O `m > O O o o LL 0 LL 0 LL 0 J o J . .�—� t O o o 7 N N M V LO co � 00 co N M N p -O O O O O O O— 0 t 3: O t O t O cn O z_ U') mil �Rz O Oaf U LL w m -0 °o 04.E ELY: >11 r w ` Of IL.IL.M UO: C Q O U :o O O N a (6 a N U) U O �U W W O T 2) O Z w C O 2 � .o m C� U C O v C O U rn c O Z Z W N d y O O c c LO N w w O 5 O O O w O O W co 0 O M W N Q � C O U O N m > (n O 0 0 p O d LL v � N y N O p NO 0 z in 0 cn O O 0 U') mil �Rz O Oaf U LL w m -0 °o 04.E ELY: >11 r w ` Of IL.IL.M UO: C Q O U :o O O N a (6 a N U) U O �U W W O T 2) O Z w C O 2 � .o m C� U rn o 4 - LL O W LO CL d LL a U D cn _T N C 0 Q C a N '5 N m N c p , CL cn 'L N E r M 0 Z 0 V d V O CL U Mil o " N...".wu ry wwww i M--- ORS. Owl U mw w i= Vo. Vlwud'��w N C:0 °who 04.E !!!����J CO ELY: N -r11 r Ow mow? Lu IL.IL.M 00: U C Q O U m 0 a 5) 0 O O N a (6 a N U) U O �U W O T 2) � O Z w C O 2 a 0) m � U v a 0 0 0 m M y O O c � LL a � N a H O O t w O O O a O O O m J O O N O O C LL a d C J a O O H t c 0 d O O m O = a m o 0 LL t � C 0) K W N N O N N y J X W O a M O N O O t C a d N N z 3 0 CO D O C U 0 Q N LL Z Q m W O Mil o " N...".wu ry wwww i M--- ORS. Owl U mw w i= Vo. Vlwud'��w N C:0 °who 04.E !!!����J CO ELY: N -r11 r Ow mow? Lu IL.IL.M 00: U C Q O U m 0 a 5) 0 O O N a (6 a N U) U O �U W O T 2) � O Z w C O 2 a 0) m � U rn o 4 - LL O W CL d LL a U D cn T N C O Q c a N '5 N 00 70- 0 0 L w Q' � L N E M 0 Z v � d � •o v CL U -o m a co U) U O �U w � T 4 O 7 O Z W c O 2 a m O Q C� U a V i a V i U N U a V i U N 0 0 N 0 ��'a� C, a Q— c i° s P- s Z s m i° _ ) h ya k OU a k k N C k C/)m k a m C t �. O m� N t N p a >+ N m N U p�Z� O N N -t; (6 N -t; (6 -C U) N CF = N N -z m OA �p AV -C h A� N U O«o Z� m m O x �co Z Z�Z�N Z>+Z3=o�_a 00 0- N c) :l mhch = = ¢Qa c =aw ar-bNm : m � D� h LO o o � 0- 0 = M _ z p z p O 0= O � h _�ap _ O zo -zOO (U O_ mU ], M Q h Q UO N O 0 � 4 N N Q � = Q N 7 t r h t rz r t r t U r -� r' o, t -� E � -� E Li t E � U E h -� E - •_ -� E o, �7 N =_ O LL LL �7 N = LL N •1 � LL U J N Y � LL U J m Y N `� U LL �7 N= = LL = �7 N •1 _ LL U J h N N = LL a N y .� LL U J m Y N `� U LL �7 N= O LL ALL h N= = LL LL \ t m ,g LL V m A O� app V O� S O V � O LL V O LL V O 0) LL V (%) mp A O 0) a'S� a'S Soo Soo 00'S a'Sm aN 'mSo 00'mS a'm �x 'so; . . . . . U�� . . . U�o . . . m U . . . m AU . . . oo AUo� . . . . m AU . . . mSoo Uoo . . . U . . . :US(cqm . . . . U'Sm Om . . . c rn N y N 7 V V O co V O O N O O L Cl? V N O O N O O O O O O O O O O O O O O O W •M O L) N O O O O O O O O O O O O O O O Ln O Cl) i 0 0 0 0 0 0 0 H N N N U U2 2 U U U U 2U U U: O O O O O O O O O i C C o 0 U o 0C) C C C o 0 C)le C C C O N O N 0 o co N N (O O co co N p p O O O N O X x N x N L U L U N x N x N x N L U N x N N Q H Q H Q H X X X N N N 0) 0) 0) LO 0) 0 0) 11 >m m O O LL m > U U U U U U 0 O O O O O O O O 0 O v E E E E E L E L E i LL(L (L (L LL LL LL LL N -O LL LL LL LL LL -O LL -O LL 0 O O O O O U O O O O O O O a� v_ 3 3 0) v_ 3 ~ O p p m > co O O - U 0 m > j O O U O O O n U o O n N U N g 0) CO �_ �_ i 0 3 0) CO �_ i p 3 0) CO O x '� Q Q LL U '� C Q LL U x N w U U U - w U U mco N Z O d E n O Q O U Q m U (o U U m 0 U s (o n 0 n LL 0 V m Q 0)Q Q co m QO O 0 O O O O �L U N � O ( x w O O O Z O W LL LO O V _ C� Q .2 Q a O 101 Q -o m a co U) U O �U w � T 4 O 7 O Z W c O 2 a m O Q C� U rn (D 4 - LL o c rn c rn M � U c rn N p CL d a W O O a Z rn LP U W LL U t �C/) Y c H w04 N 7 O) c N O C N O N _ x O k �0)g N a O LL U C N O ^ co EoaQ a � O a m c h M C/) O a O N i Q N � LL 0 � $� 7 Q Q o O W N O N d W ALL cYiJ W w E d Z N 72 Z N k M L W � C o d a) x (6 C U) w � N N 0 E E co LL d a C m y O N X -o � Y 6 (O N 00 m d � O C L_ Y � CO 7 d c Q d .0 H M O O � 0 HT _ a y 1 C� N Q 0.0) O O T w Z N Cl) �. O 0 N Lug E O ai L w U oLL W H E N r m H U N d O U d >, U Y _ o m z f� E LU x in x C z Q G d O d w o O (C jy U O Z Q W O. C Z O C O c U N d M O Q o a W @ O �T y C d Z a_ N (6 E c T = w d a m L CL L �T C7 N N Q O Z N O y y p O U 2 £ c o z W U � W aO Q U UEn O aQ w W c m Z =� O O U w w LL w LL x x 7 O Z W CL a O £ x 0 Q a N N U O O z W 0) p An U O O W ( w m 2 Q H C W S U _0 N _r_LL m U - N — d Z m °' O U cn N W J ~ CO � LU O U Q Q a G x � = Cn O a) U CL w IL m o z O y Q O c W ci o > I<-- Eo o Z W O U �? O li .. C' Z V J O m U a U rn c rn M N0 c rn N p 00 W O O O Z rn LP U W O Y c H w04 N 7 O) c M C N O w _ x Lu N X W C N O ^ co a � O a m c L N i Q N � LL 7 Q Q o O W N O N d W N W w E d Z N 72 Z N k M L W � C o d a) x (6 C U) w � N N 0 E E co LL d a C m y HT -o C O 6 p��III � Usk O 00 m 6 � U C N_ Y � 7 d c N H d a O � 0 HT _ a N O £ N 0 0.0) O O T o' O v N �. O 0 N Lug E t5 ai L w U oLL W H r O N d O U d >, U Y _ o m z c LU x in x d O d w U � O W Z Q C 0 rn M c rn N C O N 0 0 co O £ r- c rn J 0 Q U W O Y c H w04 Z d a M C N LL HT Lu a L a � O a m c L w m d N � 2 7 Q Q o W W 2 � W N W w Z N L N k M O C W C N O T O (6 C U) a 2 Q N LL d W N E E co LL uuu O'u„E ��uuuuuuuu 0.6.0 C m y U O LL W p��III � Usk 00 y 6 O > C C O o �o Qu Y � 7 d c N H O � 0 a co Q O 0.0) O O o' O v d �. O 0 Lug E t5 ai L w U oLL �� W O li W d O U o Y _ c a �> rn d O d w U � O � C � � Z UCL E C Z O O U O c d a � d M O Q o a o O �T y _O d � C (6 E c y = w d a L �T C7 d N Z N O y y co O o 2 £ c d W N UEn O aQ W c m Z =� Lm— O U N w o x x T Z m2 � W £ x 0 Q rn M c rn N N 0 0 % O O rn W O O w04 Z M C N LL (6 Lu �U L a � L N � LL 7 � x Q o m W 2 � N W w N L Q d M O C N mil Ou U) a 2 �Rz U o N.....II N LL E E co LL uuu O'u„E ��uuuuuuuu 0.6.0 c m y U r 0 LL U p��III � Usk (n 2 O O = r O o �o Qu 7 d u o SLY: N N in 0 Q ----------------------cm Of d � Lug E t5 } U 7 � N Q O U o p� c a O d O U o Co Z UCL E C O U O c -O d M O Q o a o Z U U d � c)) cLU c y = w � N C7 M N Z O o � c wc = O _ UEn O aQ c m Z =� Lm— O U N a O O T E m2 N75 £ 6� N N U O O K z O H z d O U W Z U Q Q a � = Cn M rn N 0 O r w04 o M C N LL (6 Lu 0 L a � L LL Q W 2 � O U L U mil Ou y a 2 �Rz U o N.....II N a E LL L uuu O'u„E ��uuuuuuuu 0.6.0 r 0 U p��III � Usk O o �o Qu u o SLY: ----------------------cm Of Lug U Q O U a C O c -O d M O Q o a o Z U U N c)) cLU c y = U y w C7 � T 2) Z O Q Z w wc = O 2 a UEn c m Lm— � U rn o 4 - LL O W co CL d LL a U D cn T N 0 Q C a N '5 N 00 70- 0 OCL w+ c N� L LL � N E r O C Z v � d O U CL U C O_ C O M O V) � V W Q N V O N ;� M � N w � Q z rn cn C W x C N W o z � o p d y d y Q d rn O N fl Z O 7 E d p O U co U a O d O o C U Z 7 T O N N C N N W � V j 2 of 7 O LU W Ct) O p y N a v T d C d m O U V 7 C W U Cl) O W � v Q W O J Gf Q 7 C M o O c O N T li O O D a 0.0 Q Q fl. c O — HT t6 � N= O N £ O Q T O d N U � O O O U N � �m C Q d a N W O SLY, >- V O C cn W Q M O Z U O (6 a U N Q o O U O LL U co U x HT O W y C O_ M O V) � V W Q O N ;� M z N � > rn L C NC N W o z � o p rn W O O Z d p co U a O d > N O a O 7 C O N N X W W � V j 2 of 7 V d D O O p y O a Z T d m O U V 7 C � U O � v Q O J Gf Q 7 C M o O mil (Ou N T li O O D o 0.0 Q Q OJ — 7 zM--- N C"2 �muuuuuuu Oaf O d U � O O N � �m C w caw d a Oo O SLY, V O N 'I W r N xF U (6 a (6 N Q O CO cn O LL U co 00: HT O W y c 7 U c _ n E Z O D :O m o cn O E Z O N D T 'O � Q Q x M C O O N N � O � L N W o z � o x co a O a O o i O � d � O W � j 2 of V d O W O 4 d O U O Q Gf Q p M o C mil (Ou li O O D U �R o Q E N.....II — zM--- C"2 �muuuuuuu Oaf U �m w caw Oo SLY, N 'I r N xF o LL U 00: Q _ n E O U :O O O N 'O (6 a N U) Z Q O � U LL w £ T) .0 C N < W 7 Z — O Q T Q co LL = O L (n Z w O O c 2 a Q m nCY � U rn o 4 - LL O W OM CL d LL a U D cn T N c 0 Q c a N '5 N 00 N r- 0 O Q. Ncn L LL � N E M 0 Z ° 0 V d V CL U Mil U hoz o M C:)...II m � K.� Oaf U LL w Ulm caw " m ou co SLY: >11 r :. ` �W LuU EzQ O U m a O N 'O `o a N U) U 0 �U W .. w o >, 2) � a) Z w O 0 a Mll .o Co C� U 0 0 O U co E 'E 0 0 m U a) a3 A O E t E O t U o Q co U co Q O co O_ - 6 a3 O co a) Od MF U o O O N O a) U (6 H a O a3 O i c C) Q O O c (6 c � � 2 U_ O � O :300a "It C7 O a) co ) Q co .2) Lo c Qe — a) a) -0o a o L o 00 o m U CD a)00 c: O o 70 cCO O w 0 Z O 0 E c m x c a) c a3 m o f co O o_ in o c a) c O w L () U a) a3 U L D uJ U d o COn� 0 D d a3 T o ° o T U c a) c 0 n U a) ( m a3 t c ai a3 n c -C o a) O i U O a) O U 'O C% U _ M � (n O 0 U o a) c a) O o a a o 0 co oU a�F o co c o c ooa3 �o (6 Z(n - a) U N O 0 a) LU o Z LU co o a) � c ~w f� H � F.2 c Q O a c U z � Z O Z m o m o Q U '*c, c c ( a o (n CO i V .Q E C7 L) qH ¢ Q O a) o c oMc mm 00 LU O x (� Jc0 2o na N U �' �? W co 2 a)c : LO o np L � o m o U o F=co '� Z o o a) ai m '°' f 7 Z m 0 O -0-0 o U z m U L �jy a) .. V1 O) p C� x d cwt c c- c)) C: x Z6 0_ o_� o o C c U U Q Z w m m > C3 m N o a) � O a3 o l No c o 3 a) o n m U O 0o `c° m in V O — o o a t N w o U�N " a) 070 o o U Q U � C� U Q U Mil U hoz o M C:)...II m � K.� Oaf U LL w Ulm caw " m ou co SLY: >11 r :. ` �W LuU EzQ O U m a O N 'O `o a N U) U 0 �U W .. w o >, 2) � a) Z w O 0 a Mll .o Co C� U RESIDENTIAL MEASURES SUMMARY RMS -1 Project Name Clay Street Addition Building Type ® Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 1/11/2017 Project Address 20388 Clay Street Cupertino California Energy Climate Zone CA Climate Zone 04 Total Cond. Floor Area 2,394 Addition 365 # of Units 1 INSULATION Construction Type Area Cavity (ft) Special Features Status Floor Wood Framed w/Crawl Space no insulation 2,029 Existing Wall Wood Framed no insulation 1,335 Existing Door Opaque Door no insulation 33 Existing Roof Wood Framed Attic R11 2,021 Existing Floor Wood Framed w/Crawl Space R 19 365 New Wall Wood Framed R 15 337 Add=R-5.0 New Roof Wood Framed Attic R 30 363 Cool Roof New Demising Wood Framed - no insulation 240 New FENESTRATION Total Area: 255 Glazing Percentage: 10.7%1New/Altered Orientation Area(ft2) U -Fac SHGC Overhang Sidefins Average U -Factor: 0.32 Exterior Shades Status Front (NE) 60.0 1.280 0.80 none none Bug Screen Existing Left (SE) 36.0 1.280 0.80 none none Bug Screen Existing Rear (SW) 24.0 1.280 0.80 none none Bug Screen Existing Right (NM 30.0 1.280 0.80 none none Bug Screen Existing Skylight 8.0 1.280 0.80 none none None Existing Rear (SW) 80.0 0.320 0.25 2.0 none Bug Screen New Right (NM 15.0 0.320 0.25 2.0 none Bug Screen New Skylight 1.1 0.320 0.25 none none None New Skylight 1.1 0.320 0.25 none none None New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Central Furnace 78% AFUE Split Air Conditioner 13.0 SEER Setback Existing HVAC DISTRIBUTION Location Heating Cooling Duct Location Duct R -Value Status HVAC System Ducted Ducted Attic 6.0 Existing WATER HEATING Qty. Type Gallons Min. Eff Distribution Status �I viii III -Rt Ener Pro 7.1 by Ener Soft User Number. 6249 ID: 16-12309 Pae 12 of 17 DatEg: y'l/K/'I 2016 Low -Rise Residential Mandatory Measures Summary NOTE. Low-rise residential buildings subject to the Energy Standards must comply with all applicable mandatory measures, regardless of the compliance approach used. Review the respective section for more information. *Exceptions may apply. (Original 08/2016) Building Envelope Measures: § 110.6(a)l : Air Leakage. Manufactured fenestration, exterior doors, and exterior pet doors must limit air leakage to 0.3 cfm/ft2 or less when tested per NFRC-400 or ASTM E283 orAAMA/WDMA/CSA 10l/I.S.2/A440-2011.' § 110.6(a)5: Labeling. Fenestration products must have a label meeting the requirements of § 10-111(a). § 110.6(b): Field fabricated exterior doors and fenestration products must use LI -factors and solar heat gain coefficient (SHGC) values from TABLES * 110.6-A and 110.6-B for compliance and must be caulked and/or weatherstri etl. § 110.7: Air Leakage. All joints, penetrations, and other openings in the building envelope that are potential sources of air leakage must be caulked, asketed, or weather stripped. § 110.8(a): Insulation Certification by Manufacturers. Insulation specified or installed must meet Standards for Insulating Material. § 110.8(g): Insulation Requirements for Heated Slab Floors. Heated slab floors must be insulated per the requirements of § 110.8(g). § 110.8(i): Roofing Products Solar Reflectance and Thermal Emittance. The thermal emittance and aged solar reflectance values of the roofing material must meet the requirements of § 11 0.8 i when the installation of a cool roof is specified on the CF1 R. § 110.80): Radiant Barrier. A radiant barrier must have an emittance of 0.05 or less and be certified to the Department of Consumer Affairs. Ceiling and Rafter Roof Insulation. Minimum R-22 insulation in wood -frame ceiling; or the weighted average LI -factor must not exceed 0.043. Minimum R-19 or weighted average LI -factor of 0.054 or less in a rafter roof alteration. Attic access doors must have permanently attached § 150.0(a): insulation using adhesive or mechanical fasteners. The attic access must be gasketed to prevent air leakage. Insulation must be installed in direct contact with a continuous roof or ceiling which is sealed to limit infiltration and exfiltration as specified in § 110.7, including but not limited to placing insulation either above or below the roof deck or on top of a drywall ceiling.* § 150.0(b): Loose -fill Insulation. Loose fill insulation must meet the manufacturer's required density for the labeled R -value. Wall Insulation. Minimum R-13 insulation in 2x4 inch wood framing wall or have a LI -factor of 0.102 or less (R-19 in 2x6 or LI -factor of 0.074 or § 150.0(c): less). Opaque non -framed assemblies must have an overall assembly LI -factor not exceeding 0.102, equivalent to an installed value of R-13 in a wood framed assembly.* § 150.0(d): Raised -floor Insulation. Minimum R-19 insulation in raised wood framed floor or 0.037 maximum U -factor.' § 150.0(f): Slab Edge Insulation. Slab edge insulation must meet all of the following: have a water absorption rate, for the insulation material alone without facings, no greater than 0.3%; have a water vapor permeance no greater than 2.0 perm/inch; be protected from physical damage and UV light deterioration; and, when installed as part of a heated slab floor, meet the requirements of § 11 0.8 . Vapor Retarder. In Climate Zones 1-16, the earth floor of unventetl crawl space must be covered with a Class I or Class II vapor retarder. This § 150.0(g)l : requirement also applies to controlled ventilation crawl space for buildings complying with the exception to § 150.0(d). Vapor Retarder. In Climate Zones 14 and 16, a Class I or Class II vapor retarder must be installed on the conditioned space side of all § 150.0(g)2: insulation in all exterior walls, vented attics, and unventetl attics with air -permeable insulation. 150.0 § (q)' Fenestration Products. Fenestration, including skylights, separating conditioned space from unconditioned space or outdoors must have a maximum LI -factor of 0.58; or the weighted average LI -factor of all fenestration must not exceed 0.58.' Fireplaces, Decorative Gas Appliances, and Gas Log Measures: § 150.0(e)lA: Closable Doors. Masonry or factory -built fireplaces must have a closable metal or glass door covering the entire opening of the firebox. § 150.0(e)l B: Combustion Intake. Masonry or factory -built fireplaces must have a combustion outside air intake, which is at least six square inches in area and is equipped with a readily accessible, operable, and tight -fitting damper or combustion -air control device.' § 150.0(e)l C: Flue Damper. Masonry or factory -built fireplaces must have a flue damper with a readily accessible control.' § 150.0(e)2: Pilot Light. Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of the building, are prohibited. Space Conditioning, Water Heating, and Plumbing System Measures: § 110.0-§ 110.3: Certification. Heating, ventilation and air conditioning (HVAC) equipment, water heaters, showerheads, faucets, and all other regulated appliances must be certified by the manufacturer to the Energy Commission.' § 110.2(a): HVAC Efficiency. Equipment must meet the applicable efficiency requirements in TABLE 110.2-A through TABLE 110.2-K.* Controls for Heat Pumps with Supplementary Electric Resistance Heaters. Heat pumps with supplementary electric resistance heaters § 110.2(b): must have controls that prevent supplementary heater operation when the heating load can be met by the heat pump alone; and in which the cut -on temperature for compression heating is higher than the cut -on temperature for supplementary heating, and the cut-off temperature for compression heating is higher than the cut-off temperature for supplementary heating.* § 110.2(c): Thermostats. All unitary heating or cooling systems not controlled by a central energy management control system (EMCS) must have a setback thermostat.' Water Heating Recirculation Loops Serving Multiple Dwelling Units. Water heating recirculation loops serving multiple dwelling units must § 110.3(c)5: meet the air release valve, backflow prevention, pump priming, pump isolation valve, and recirculation loop connection requirements of § 11 0.3 c 5. § 110.3(c)7: Isolation Valves. Instantaneous wat th ani � 6.8 rhe ������ ����� �� kBTU/hr (2 kW) must have isolation valves with hose bibbs or other fittings on both cold water an t. I Pilot Lights. Continuously burning n . of,,, teru s st ms to Ilow for water tank flushingwhen the valves are closed. t furnaces; household § 110.5: pil prI� central cooking appliances (appli- ances without an electrical suppl vol ion with pilot lights that consume less than 150 Btu/hr are exempt); and pool and spa heaters.' .� Building Cooling and Heating Loadtiil, �,I N�cI accordance with ASHRAE Handbook, Equipment -ACNA 150.0 h 1: § O pp' ameiitals Voes dentia Comfort System Installation Standards Manual; or ACCA d Fend � I Manual J using design conditions off, fume t i 11"t es I/ atEg: 01/K/1 2016 Low -Rise Residential Mandatory Measures Summary § 150.0(h)3A: Clearances. Installed air conditioner and heat pump outdoor condensing units must have a clearance of at least 5 feet from the outlet of any dryer vent. § 150.0(h)3B: Liquid Line Drier. Installed air conditioner and heat pump systems must be equipped with liquid line filter driers if required, as specified by manufacturer's instructions. § 150.00)1: Storage Tank Insulation. Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, must have R-12 external insulation or R-16 internal insulation where the internal insulation R -value is indicated on the exterior of the tank. Water piping and cooling system line insulation. For domestic hot water system piping, whether buried or unburied, all of the following must be insulated according to the requirements of TABLE 120.3-A: the first 5 feet of hot and cold water pipes from the storage tank; all piping with a § 150.00)2A: nominal diameter of 3/4 inch or larger; all piping associated with a domestic hot water recirculation system regardless of the pipe diameter; piping from the heating source to storage tank or between tanks; piping buried below grade; and all hot water pipes from the heating source to kitchen fixtures.' § 150.00)2B: Water piping and cooling system line insulation. All domestic hot water pipes that are buried below grade must be installed in a water proof and non -crushable casing or sleeve.' § 150.00)2C: Water piping and cooling system line insulation. Pipe for cooling system lines must be insulated as specified in § 150.00)2A. Distribution piping for steam and h dronic heating systems or hot waters stems must meet the requirements in TABLE 120.3-A.' § 150.00)3: Insulation Protection. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation Protection. Insulation exposed to weather must be installed with a cover suitable for outdoor service. For example, protected by § 150.00)3A: aluminum, sheet metal, painted canvas, or plastic cover. The cover must be water retardant and provide shielding from solar radiation that can cause degradation of the material. § 150.00)3B: Insulation Protection. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space must have a Class I or Class II vapor retarder. Gas or Propane Systems. Systems using gas or propane water heaters to serve individual dwelling units must include all of the following: a § 150.0(n)1: 120V electrical receptacle within 3 feet of the water heater; a Category III or IV vent, or a Type B vent with straight pipe between the outside termination and the space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the water heater, and allows natural draining without pump assistance; and a gas supply line with a capacity of at least 200,000 Btu/hr. § 150.0(n)2: Recirculating Loops. Recirculating loops serving multiple dwelling units must meet the requirements of § 110.3(c)5. § 150.0(n)3: Solar Water -heating Systems. Solar water -heating systems and collectors must be certified and rated by the Solar Rating and Certification Corporation SRCC or by a listing agency that is approved by the Executive Director. Ducts and Fans Measures: § 110.8(d)3: Ducts. Insulation installed on an existing space -conditioning duct must comply with § 604.0 of the California Mechanical Code (CMC). If a contractor installs the insulation, the contractor must certify to the customer, in writing, that the insulation meets this requirement. CMC Compliance. All air -distribution system ducts and plenums must be installed, sealed, and insulated to meet the requirements of CMC §§ 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Portions of supply -air and return -air ducts and plenums must be insulated to a minimum installed level of R-6.0 (or higher if required by CMC § 605.0) or a minimum installed level of R-4.2 when entirely in conditioned space as confirmed through field verification and diagnostic testing § 150.0(m)1: (RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts must be mechanically fastened. Openings must be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181 A, or UL 181 B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than'/ inch, the combination of mastic and either mesh or tape must be used. Building cavities, support platforms for air handlers, and plenums designed or constructed with materials other than sealed sheet metal, duct board or flexible duct must not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms must not be compressed to cause reductions in the cross-sectional area of the ducts.' Factory -Fabricated Duct Systems. Factory -fabricated duct systems must comply with applicable requirements for duct construction, § 150.0(m)2: connections, and closures; joints and seams of duct systems and their components must not be sealed with cloth back rubber adhesive duct tapes unless such tae is used in combination with mastic and draw bands. § 150.0(m)3: Field -Fabricated Duct Systems. Field -fabricated duct systems must comply with applicable requirements for: pressure -sensitive tapes, mastics, sealants, and other requirements specified for duct construction. § 150.0(m)7: Backdraft Dampers. All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or automatic dampers. § 150.0(m)8: Gravity Ventilation Dampers. Gravity ventilating systems serving conditioned space must have either automatic or readily accessible, manually operated dampers in all openings to the outside, except combustion inlet and outlet air openings and elevator shaft vents. Protection of Insulation. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and § 150.0(m)9: wind. Insulation exposed to weather must be suitable for outdoor service. For example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation must be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation. § 150.0(m)10: Porous Inner Core Flex Duct. Porous inner core flex duct must have a non -porous layer between the inner core and outer vapor barrier. Duct System Sealing and Leakage Test. When space conditioning systems use forced air duct systems to supply conditioned air to an § 150.0(m)11: occupiable space, the ducts must be sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in accordance with § 150.0 m 11 and Reference Residential Appendix RA3. Air Filtration. Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 feet in length and through a thermal m § 150.0(m)12: conditioning tonin component, ,exce eva � rs, must e Prov g p p p ided with air filter devices that meet the design, installation, efficiency, g I pressure drop, and labeling requirem I .0 m III°°�7 �;;', �' 11140 1°113Uii III Iiiin I1'° III rti n nt V°tEVH l;C FOR DU'.-: C0NA['[JAN0I Revv ew d l y: IC:.)II,.IUU'.l IC: AAII lAA g: 01/K/17 2016 Low -Rise Residential Mandatory Measures Summary u ew ew : d b . Ih...,M II,.1 LO,.�l Il...)ay 1na DatE,b y'If;' /1 Duct System Sizing and Air Filter Grille Sizing. Space conditioning systems that use forced air ducts to supply cooling to an occupiable space must have a hole for the placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the § 150.0(m)13: supply plenum. The space conditioning system must also demonstrate airflow >_ 350 CFM per ton of nominal cooling capacity through the return grilles, and an air -handling unit fan efficacy < 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3.3. This applies to both single zone central forced air systems and every zone for zonally controlled central forced airs stems.' Ventilation for Indoor Air Quality. All dwelling units must meet the requirements of ASHRAE Standard 62.2. Neither window operation nor §150.0(0): continuous operation of central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of providing whole -building ventilation. § 150.0(o)lA: Field Verification and Diagnostic Testing. Whole -building ventilation airflow must be confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3.7. Pool and Spa Systems and Equipment Measures: Certification by Manufacturers. Any pool or spa heating system or equipment must be certified to have all of the following: a thermal efficiency § 110.4(a): that complies with the Appliance Efficiency Regulations; an on-off switch mounted outside of the heater that allows shutting off the heater without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and must not use electric resistance heating.* § 110.4(b)1: Piping. Any pool or spa heating equipment must be installed with at least 36 inches of pipe between the filter and the heater, or dedicated suction and return lines, or built-in or built-up connections to allow for future solar heating. § 110.4(b)2: Covers. Outdoor pools or spas that have a heat pump or gas heater must have a cover. § 110.4(b)3: Directional inlets and time switches for pools. Pools must have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or programmed to run only during off-peak electric demand periods. § 110.5: Pilot Light. Natural gas pool and spa heaters must not have a continuously burning pilot light. 150.0 § (p)' Pool Systems and Equipment Installation. Residential pool systems or equipment must meet the specified requirements for pump sizing, flow rate, piping, filters, and valves.' Lighting Measures: § 110.9: Lighting Controls and Components. All lighting control devices and systems, ballasts, and luminaires must meet the applicable requirements of § 110.9.' § 110.9(e): JA8 High Efficacy Light Sources. To qualify as a JA8 high efficacy light source for compliance with § 150.0(k), a residential light source must be certified to the Energy Commission according to Reference Joint Appendix JA8. § 150.0(k)lA: Luminaire Efficacy. All installed luminaires must be high efficacy in accordance with TABLE 150.0-A. Blank Electrical Boxes. The number of electrical boxes that are more than 5 feet above the finished floor and do not contain a luminaire or § 150.0(k)l B: other device must be no greater than the number of bedrooms. These electrical boxes must be served by a dimmer, vacancy sensor control, or fan speed control. Recessed Downlight Luminaires in Ceilings. Luminaires recessed into ceilings must meet all of the requirements for: insulation contact (IC) § 150.0(k)l C: labeling; air leakage; sealing; maintenance; and socket and Tight source as described in § 150.0(k)l C. A JA8-2016-E Tight source rated for elevated temperature must be installed by final inspection in all recessed downli ht luminaires in ceilings. § 150.0(k)l D: Electronic Ballasts. Ballasts for fluorescent lamps rated 13 watts or greater must be electronic and must have an output frequency no less than 20 kHz. Night Lights. Permanently installed night lights and night lights integral to installed luminaires or exhaust fans must be rated to consume no § 150.0(k)l E: more than 5 watts of power per luminaire or exhaust fan as determined in accordance with § 130.0(c). Night lights do not need to be controlled by vacancy sensors. § 150.0(k)l F: Lighting Integral to Exhaust Fans. Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods) must meet the applicable requirements of § 150.0(k).* Screw based luminaires. Screw based luminaires must not be recessed downlight luminaires in ceilings and must contain lamps that comply § 150.0(k)l G: with Reference Joint Appendix JA8. Installed lamps must be marked with "JA8-2016" or "JA8-2016-E" as specified in Reference Joint Appendix JA8.' § 150.0(k)l H: Enclosed Luminaires. Light sources installed in enclosed luminaires must be JA8 compliant and must be marked with "JA8-2016-E." § 150.0(k)2A: Interior Switches and Controls. All forward phase cut dimmers used with LED light sources must comply with NEMA SSL 7A. § 150.0(k)2B: Interior Switches and Controls. Exhaust fans must be switched separately from lighting systems.' § 150.0(k)2C: Interior Switches and Controls. Luminaires must be switched with readily accessible controls that permit the luminaires to be manually switched ON and OFF. § 150.0(k)2D: Interior Switches and Controls. Controls and equipment must be installed in accordance with manufacturer's instructions. § 150.0(k)2E: Interior Switches and Controls. No control must bypass a dimmer or vacancy sensor function if the control is installed to comply with 150.0(k). § 150.0(k)2F: Interior Switches and Controls. Lighting controls must comply with the applicable requirements of § 110.9. Interior Switches and Controls. An energy management control system (EMCS) may be used to comply with dimmer requirements if it: § 150.0(k)2G: to § the Installation Certificate requirements of § 130.4; meets the EMCS requirements of § functions as a dimmer accordingia 130.5(f); and meets all othe.0 k . �17 ��� I�i' ""' "� Interior Switches and Conbe used to comp) with vacancy sensor requirements in § 150.0(k) if it meets all of the II I W 9 "ificate § 150.0(k)2H: following: it functions as a vmy F� IIS" requirements of § 130.4; the EMCS requirements of § 130.5(f); and all other re uir 150.0(k)21: §cording Interior Switches and Controls. A m�law r r al °b Mj t I „� to comply with dimmer requirements in § 150.0(k) if it provides the functionality of a dimmer ac an h a o er applicable requirements in 150.0(k)2. u ew ew : d b . Ih...,M II,.1 LO,.�l Il...)ay 1na DatE,b y'If;' /1 2016 Low -Rise Residential Mandatory Measures Summary § 150.0(k)2J: Interior Switches and Controls. In bathrooms, garages, laundry rooms, and utility rooms, at least one luminaire in each of these spaces must be controlled by a vacancy sensor. § 150.0(k)2K: Interior Switches and Controls. Dimmers or vacancy sensors must control all luminaires required to have light sources compliant with Reference Joint Appendix JAB, except luminaires in closets less than 70 square feet and luminaires in hallways.* § 150.0(k)2L: Interior Switches and Controls. Undercabinet lighting must be switched separately from other lighting systems. Residential Outdoor Lighting. For single-family residential buildings, outdoor lighting permanently mounted to a residential building, or to other § 150.0(k)3A: buildings on the same lot, must meet the requirement in item § 150.0(k)3Ai (ON and OFF switch) and the requirements in either item § 150.0(k)3Aii (photocell and motion sensor) or item § 150.0(k)3Aiii (photo control and automatic time switch control, astronomical time clock, or EMCS. Residential Outdoor Lighting. For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies, § 150.0(k)3B: and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site must comply with either § 150.0(k)3A or with the applicable requirements in §§ 110.9, 130.0, 130.2, 130.4, 140.7 and 141.0. § 150.0(k)3C: Residential Outdoor Lighting. For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by 150.0(k)3B or § 150.0(k)3D must comply with the applicable requirements in §§ 110.9, 130.0, 130.2, 130.4, 140.7 and 141.0. § 150.0(k)3D: Residential Outdoor Lighting. Outdoor lighting for residential parking lots and residential carports with a total of eight or more vehicles per site must comply with the applicable requirements in §§ 110.9, 130.0, 130.2, 130.4, 140.7, and 141.0. § 150.0(k)4: Internally illuminated address signs. Internally illuminated address signs must comply with § 140.8; or must consume no more than 5 watts of power as determined according to § 130.0(c). § 150.0(k)5: Residential Garages for Eight or More Vehicles. Lighting for residential parking garages for eight or more vehicles must comply with the applicable requirements for nonresidential garages in §§ 110.9, 130.0, 130.1, 130.4, 140.6, and 141.0. Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior § 150.0(k)6A: common area in a single building equals 20 percent or less of the floor area, permanently installed lighting for the interior common areas in that building must be high efficacy luminaires and controlled by an occupant sensor. Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior common area in a single building equals more than 20 percent of the floor area, permanently installed lighting in that building must: § 150.0(k)6B: i. Comply with the applicable requirements in §§ 110.9, 130.0, 130.1, 140.6 and 141.0; and ii. Lighting installed in corridors and stairwells must be controlled by occupant sensors that reduce the lighting power in each space by at least 50 percent. The occupant sensors must be capable of turning the light fully on and off from all designed paths of ingress and egress. Solar Ready Buildings: Single Family Residences. Single family residences located in subdivisions with ten or more single family residences and where the § 110.10(a)1: application for a tentative subdivision map for the residences has been deemed complete by the enforcement agency must comply with the requirements of § 110.10 b through § 110.10 e . § 110.10(a)2: Low-rise Multi -family Buildings. Low-rise multi -family buildings must comply with the requirements of § 110.10(b) through § 110.10(d). Minimum Area. The solar zone must have a minimum total area as described below. The solar zone must comply with access, pathway, smoke ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local jurisdiction. The solar zone total area must be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for buildings with roof areas § 110.10(b)1: greater than 10,000 square feet. For single family residences the solar zone must be located on the roof or overhang of the building and have a total area no less than 250 square feet. For low-rise multi -family buildings the solar zone must be located on the roof or overhang of the building, or on the roof or overhang of another structure located within 250 feet of the building, or on covered parking installed with the building project, and have a total area no less than 15 percent of the total roof area of the building excluding any skylight area.' § 110.10(b)2: Orientation. All sections of the solar zone located on steep -sloped roofs must be oriented between 110 degrees and 270 degrees of true north. § 110.10(b)3A: Shading. The solar zone must not contain any obstructions, including but not limited to: vents, chimneys, architectural features, and roof mounted equipment.' Shading. Any obstruction located on the roof or any other part of the building that projects above a solar zone must be located at least twice the § 110.10(b)3B: distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of the nearest point of the solar zone, measured in the vertical lane.' § 110.10(b)4: Structural Design Loads on Construction Documents. For areas of the roof designated as solar zone, the structural design loads for roof dead load and roof live load must be clearly indicated on the construction documents. Interconnection Pathways. The construction documents must indicate: a location for inverters and metering equipment and a pathway for § 110.10(c): routing of conduit from the solar zone to the point of interconnection with the electrical service (for single family residences the point of interconnection will be the main service panel); and a pathway for routing of plumbing from the solar zone to the water -heating system. § 110.10(d): Documentation. A copy of the construction documents or a comparable document indicating the information from § 110.10(b) through 110.1 0 c must be provided to the occupant. § 110.10(e)1: Main Electrical Service Panel. The main electrical service panel must have a minimum busbar rating of 200 amps. Main Electrical Service Panel. The main electrical service panel must have a reserved space to allow for the installation of a double pole circuit § 110.10(e)2: breaker for a future solar electric installation. The reserved space must be: positioned at the opposite (load) end from the input feeder location or main circuit location; and permanent) "For Future Solar Electric". IIIII' El'III 11140 1I°°I° Iii III Iihn I1'° III m ui nt REVHV Wl..D FOR CODE C0AV['[JAN0 Revv ew d l y:IC:.)II,.IUU'l IC:: AAIIlAA ROOM LOAD SUMMARY Project Name Date Clay Street Addition 1/11/2017 System Name Floor Area HVAC System 2,394 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult. CFM Sensible I Latent CFM I Sensible Latent CFM Sensible Existing Living Area Existing 1st Floor 1 1,304 26,609 969 1,304 26,609 969 1,136 42,814 New Living Area 1st Floor Addition 1 169 3,4491 174 169 3,449 174 96 3,632 I , Total includes ventilation load for zonal w 1,473 30,057 1,144 1,232 46,446 1,473 30,057 1,144 1,232 46,446