Loading...
Exhibit CC 02-07-2017 Item No. 17 2016 Bicycle Transportation Plan Implementation2016 Bicycle Transportation Plan Implementation – Class IV Bike Lanes 1February 7, 2017 City of Cupertino Background •2016 Bike Plan approved by Council May, 2016 •$2 million in funding approved •Stevens Creek Blvd Class IV Bike Lanes #1 Priority •Staff directed to implement McClellan Road concurrently 2 Goals and Objectives 3 •Class IV Separated Bike Lanes –Enhance Safety and Level of Comfort for Bicyclists Types of Barriers 4 Types of Barriers 5 Raised Median $900k-$1.1M Precast Curb $600-$800k Flexible Posts $30-$50k Concrete Barrier $700-$900k Raised Bikeway $1.3M-$2.0M Driveway Treatments 6 Bus Stop Treatments 7 Protection at Intersections 8 •Right lane for right-turn vehicles only, controlled by dedicated signal phasing •Bikes have protected signal phase •At high right-turn volume intersections only Protection at Intersections 9 McClellan Road •More challenging than SCB –Multiple residential driveways –School traffic –Limited Right-of-way 10 Next Steps 11 •Public Workshop held January; overall support •VTA supportive of bus stop alternatives •Discussions with residents along McClellan upcoming •Initial draft engineering plans and cost estimates by summer •Construction of first segments before end of 2017