14040181CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10411 BUBB RD
CONTRACTOR: SC BUILDERS INC
PERMIT NO: 14040181
OWNER'S NAME: M WEST PROPCO It LLC
910 THOMPSON PL
DATE ISSUED: 04/30/2014
OWNER'S PHONE: 4084503854
SUNNYVALE, CA 94085
PHONE NO: (408)328 -0688
❑ LICENSED CONTRACTOR'S DECLARATION
JOB DESCRIPTION: RESIDENTIAL COMMERCIAL
License Class_ Lic. # _7160
APPLE T.I. - VOLUNTARY SEISMIC UPGRADE
Contractor ��(�v(// S GNC. Date
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000) of Division 3 of the Business & Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self - insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
Sq. Ft Floor Area:
Valuation: $120000
erformance of the work for which this permit is issued.
ve and will maintain Worker's Compensation Insurance, as provided for by
ection 3700 of the Labor Code, for the performance of the work for which this
APN Number: 35720010.10411
Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
PERMIT EXPIRES IF WORK IS NOT STARTED
correct. I agree to comply with all city and county ordinances and state laws relating
WITHIN 180 DAYS �R1VI UANCE OR
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
180 DAYS F LAST C INSPECTION.
indemnify and keep harmless the City of Cupertino ag st liabilities, judgments,
costs, and expenses which may accrue against said in consequence of the
Y�
granting of this pe it. Additionally applica nderstands and will comply
Is y: Date:
with all non -p 'nt oorce regulatio r the C rtino Code, Section
9.18.
ROOFS:
Signature Date 30 14
All roofs shall be inspected prior to any roofing material being installed. If a roof is
any r
installed without first obtaining an inspection, I agree to remove all new materials for
inspection.
❑ OWNER- BUILDER DECLARATION
Signature of Applicant: Date:
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons:
ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER
I, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale (Sec.7044,
Business & Professions Code)
1, as owner of the property, am exclusively contracting with licensed contractors to
HAZARDOUS MATERIALS DISCLOSURE
construct the project (Sec.7044, Business & Professions Code).
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will
I hereby affirm carder penalty of perjury one of the following three
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
declarations:
Health & Safety Code, Section 25532(a) should I store or handle hazardous
I have and will maintain a Certificate of Consent to self- insure for Worker's
material. Additionally, should I use equipment or devices which emit hazardous
Compensation, as provided for by Section 3700 of the Labor Code, for the
air contaminants as defined by the B Area Air Quality nagement District I
performance of the work for which this permit is issued.
will maintain compliance with the C pertino at e, Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance, as provided for by
the Health & Safety Code, Sect' n 5505,25 , and 4.
Section 3700 of the Labor Code, for the performance of the work for which this
Owner or authorized agent: ate: 4/3a 1
permit is issued.
1 certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If, after making this certificate of exemption, I
CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code, 1 must
1 hereby affirm that there is a construction lending agency for the performance of
forthwith comply with Such provisions or this permit shall be deemed revoked.
work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
APPLICANT CERTIFICATION
Lender's Address
I certify that l have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
ARCHITECT'S DECLARATION
costs, and expenses which may accrue against said City in consequence of the
[understand my plans shall be used as public records.
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source regulations per the Cupertino Municipal Code, Section
Licensed Professional
9.18.
Signature _ Date
CUPIERTINO
CONSTRUCTION PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
10300 TORRE AVENUE - CUPERTINO, CA 95014 -3255
(408) 777 -3228 e FAX (408) 777 -3333 • buildingQcupertino.org
❑ NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION / TI ❑ REVISION / DEFERRED ORIGINAL PERMIT #
PROJECT ADDRESS
AIN # / Q q 1 )
OWNER NAME
sl� �1 e�S-P �cp - Z
t_c.c
PHONE
its 3$54
7&CQZ MAIL
v2 t' e1.1W_ F- ¢o
STREET ADDRESS
CITY, STATE, ZIP FAX
3351 OLLM C "IET
CA Go V
CONTACT NAME
PHONE E -MAIL
^
Qe-g uQ�
6TO.l069 S4$1b 11.SiFK$)IIG GOf1
STREET ADDRESS
CITY, STATE, ZIP
FAX
Cf1PS01A Lti
Sula -A V Le CA 9y
❑ OwiTR ❑ OWNER- BUILDER ❑ OWNER AGENT
❑ CONTRACTOR ❑ CONTRACTOR AGENT ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑ TENANT
CONTRACTOR NAME
LICENSE NUMBER
LICENSE TYPE
BUS. LIC #
-I Vi kal
S
0� 4 O
COMPANY NAME
EMAIL
(41EotZA ,
FAX
. Ou GIB
STREET ADDRESS
Tito n1oAf) k
CITY, STATE, ZIP
,AA ,J nLe- CA, qA0
PHONTEu65'
ARCHITECT/ENGINEER NAME
LICENSE NUMBER
BUS. LIC #
S�
sya,a
COMPANY NAME
E -MAIL
FAX
1=5MfE: Ld AVE
SuADE 7t °tiJSTQ�ICIV R!'IL . C4(1
STREET ADDRESS
CITY, STATE, ZIP
PHONE
x'15 %2 SA.� 4��'.� 4,
Mo — S[fL�11� r
3°t`i .W0 3
DESCRIPTION OF WORK
0♦i.>JPAIA a��S�l C U 9� Tc� 1�0 1LL� N G
I �
EXISTING USE
PROPOSED USE CONSTR
TYPE
# STORIES
USE
TYPE
OCC.
SQ.FT.
VALUATION (S)
EXISTG
NEW FLOOR
DEMO
TOTAL
AREA
AREA
AREA
NET AREA
BATHROOM
KITCHEN
OTHER
REMODEL AREA
REMODEL AREA
RFN40DEL AREA
PORCH AREA
DECK AREA
TOTAL DECK /PORCH AREA
GARAGE AREA: DETACH
[]ATTACH
#DWELLING UNITS:
IS A SECOND UNIT [] YES
SECOND STORY []YES
BEING ADDED? []NO
ADDITION." []NO
PRE - APPLICATION YES IF YES, PROVIDE COPY OF
IS THE BLDG AN ❑ YES
E3G
TOTAL VALUATION:
PLANNTNGAPPL# ❑NO PLANNING APPROVAL LETTER
EICHLERHOME4 [3 NO
By my signature below, I certify to each of the following:
1 am the property owme orized a ct roperty owner's behalf. I have read
application and the information I have provided is correct.
I have read the Description of Work and ver it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to b ilding c
uthorize representatives of Cupertino to enter the above- identified property for inspection purposes.
Signature of Applicant/Agent:
Date: a99- L P& � �7d 14
SUPPLEMENTALINF ATI
QUIRED
M0ocx
cs
�,yUu.ROpTn
TrGw;, ,
New SFD or Multifamily dwellings: Apply for demolition ennit for
Y g PP Y p
I�'OVERTHECOUNTERr
° z '
L' �€' � �
BUII -DING
existing building(s). Demolition permit is required
prior to issuance of building
r
k
PLAN RED IEw
t, -
Penn it for new building.
'; ,EXPRESS, -,5+
Commercial Bldgs: Provide Hazardous
Materials Disclosure
cT '��
_ � w �
-:
*
a completed
Lv ST-XND Rn
Y°
eflI PUBLlc�voxrzs �
form if any Hazardous Materials are being used as part of this project.
? K
rt 3
mow -1 al
v
_ Copy of Planning Approval Letter or Meeting With Planning prior to'r4Aa
X�i
sn�rTR�S�xY sE i DisTiucr
submittal of Building Permit application. •
B1dgApp_2011.doc revised 06121111
CITY OF CUPERTINO
FEE ESTIMATOR — BUILDING ]DIVISION
..
ADDRESS: 10411 BUBB RD
DATE: 04128120/4
REVIEWED BY: MELISSA
� . r
APN: 357 20 010.10411
BP #: I Q VQl
''VALUATION: $120,000
*PERMIT TYPE: Building Permit
PLAN CHECK TYPE: Tenant Improvement
PRIMARY
USE: Commercial Building
PME Plan Check:
PENTAMATION
PERMIT TYPE: 1GENC0
WORK
APPLE T.I. - VOLUNTARY SEISMIC UPGRADES
SCOPE
Suppl. Insp. Fee:t) Reg. Q OT
NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School
District, etc. ). These fees are based on the nrelintinary information available and are onlv an estimate. Contact the Dent for addn'l info.
FEE ITEMS (Fee Resolution 11 -053 Eli 7,-1!13)
FEE
P1 Ib. PlrM Chrc A
Elec. Man Chcck
Plan Check Fee: Hourly Only? 0 Yes (D No
$0.00
i:lc( Permit Fee,
Suppl. PC Fee: E) Reg. Q OT
LLJ
Other• El. t. My.
$0.00
PME Plan Check:
Insp. Fec-
NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School
District, etc. ). These fees are based on the nrelintinary information available and are onlv an estimate. Contact the Dent for addn'l info.
FEE ITEMS (Fee Resolution 11 -053 Eli 7,-1!13)
FEE
QTY/FEE
1M[ISC ITI'E1M[S
Plan Check Fee: Hourly Only? 0 Yes (D No
$0.00
0 hours Plan Check, Hourly
$278.00 1STPLNCK
Suppl. PC Fee: E) Reg. Q OT
LLJ
hrs
$0.00
PME Plan Check:
$0.00
Permit Fee: Hourly Only? ® Yes (E) No
$0.00
Suppl. Insp. Fee:t) Reg. Q OT
LO ,Q
hrs
$0.00
PME Unit Fee:
$0.00
PME Permit Fee:
$0.00
Fec
Work Without Permit? C) Yes C) No
$0.00
Advanced Plannin& Fee:
$0.00
Select a Non - Residential
Building or Structure
Strong Motion Fee: 1BSEISMICO
$25.20
2.0 hrs Inspections
$278.00 1STINSP Inspection, Hourly
Bldg Stds Commission Fee: 1BCBSC
$5.00
SUBTOTALS:
$30.20
$556.00
TOTAL ]FEE:
1 $586.20
Revised: 04/01/2014
C�
�SS.1ys<
rjqK.f T INOO
CONTRACTOR / SUBCONTRACTOR OR ILIST
Building Department
City Of Cupertino
10300 Torre Avenue
Cupertino, CA 95014 -3255
Telephone: 408 - 777 -3228
Fax: 408-777-3333
•i /1' j
I 1
• 1' 1 :
of
GENERAL CONTRACTOR: c �� ���
' US1NESS LICENSE # -
V3 1101 IN
*Our municipal] code requires aIDl businesses working in the City to have a City of Cupertino business license.
NO BUILDING ]FINAL OR FINAL OCCUPANCY INSPECT (S) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND AL S BCONT TO AVE OBTAINED A CITY OF CUPIERTI NO
BUSINESS LICENSE. II am not using any subcontractors.
Signature Date
Mease check appfficabRe subcontractors and complete the following information:
c�
Owner / Contractor Signature
Date
SUBCONTRACTOR
BUSJ NESS NAME
BUSINESS INESS LIICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring / Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner / Contractor Signature
Date
STATEMENT OF SPECIAL. INSPECTIONS, 20-13 CSC
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE • CUPERTINO, CA 550143255
CUPEFtTfhtfl (408) 777.3228 • FAX (408) 777 -3333 • building- 2cupertino.ora
\1014.) AJTAA-Y
S q5w1c uP
/0s¢" o
SITE 10411 Bubb Road
APN
33,15
ADDRESS
Signature .... ....................................
.......
Owner.....t�1...�!.�.5�.. P-4, °....�..,. LLB ................ ...............................
Contractor......G.. ? �tpi2.9..�.Z!k,................
Address ... 33.57.t D�Co ',S �¢ tE: ...................... ...............................
Address....C11o? a .PS41?... . ............................... ........................
Zip.. S f a �....... Phone
.1. .50: '1 ....
............... Zip! S ... Phone .
,,� �,
Applicant.... G.. �...... t? �.... ....�t...........................................................
SW Structural, Inc.
Engineer / Architect..............................................- ... ...... .....................
Address.....�ito. Mon pSo�.... C- ...................... ...............................
. ................
Addres07582 San Benito WaY... ...............................
City /St...` ....... Zivo,. `.0.55......... PhoneSs;04!4�er....
Monte Sereno, CA 95Q3Q 408.3°9.0623
City /St....., Zip...... Phone
�%�
"'
... .......................... . ....................
PROJECT DESCRIPTION: Tenant Improvement Of existing Single story tijt-up building.
This "STATEMENT OF SPECIAL INSPECTIONS" is submitted in fulfillment of the requirements of CBC Sections 1704 and 1705. This
form Is structured after and used by permission from the Structural Engineer Associalion of Northern Califcmia's (SEAONC) mode
statement of Special Ins included with this form is the following:
` ❑ "L I . TION AGENCIES (page 2). A list of testing agencies and other special in pe ors that will be
i re t t nd inspections for this project J
❑ "S _ SPECTIOtJ" (page 3 — 6). The Schedule of Specia{ Inspections sum �c the i I
l Inspe SlYrf
%d& wired. Special Inspectors will refer to the approved plans and specifications for de l d spe ))
inspecf Any additional tests and inspections required by the approved plans and specificatr� s st%at afse
be perfl U �j
Special Inspectionfl if ng will be performed in accordance with the approved plans and specifications, this statement and C G
Sections 1704, 171017 E t 704 -1708. Interim reports will be submitted to the Building Official and the Registered design
Professional in Responsible Charge in accordance with CBC Section 1704.1.2.
A Final Report of Special Inspections documenting r edd Special Inspectionstesti n t y discrepancies noted in
the inspections shall be submitted prior to issuance o� iii VW The Final Report will
document:
Required special inspections. J
Correction of discrepancies noted in inspecti -
The Owner recognizes his or her obligation to ensure that the constfuctioti'complies with the approved permit d . d
implement this program of special inspections. In partial fulfillment of these obligations, the Owner will reta' r the
Special Inspections as required in CBC Section 1704, 1. (t,�
This plan has been developed with the understanding that the Building Official will:
• Review and approve the qualifications of the Special Inspectors who will perform the inspectior4
• Monitor special inspection activities on the job site to assure that the Special Inspectors are quaTi ed and are
duties as called for in this Statement of Special Inspection.
• Review submitted inspection reports.
• Perform inspections as required by the local building code.
I have read and earee to cortwly with the terms and conditions of thi.a statement
eir
0�
Prepared By:
Architect
Project Id Engineer ❑ Architect
/...........
Registered Design professional in Charge
Signature .... ....................................
.......
, Exp 6130114
Lic.4 _._ ....... .. ..... ..... Cate :
............................
Owner Name-
�wner s Au hanzation
//
Signature ,....... ,. /
............
!
`
.............- '.......�........
t .
lJ r� L O Y G ��jj
Date:.'"1..........
�•
�. ..
Inspection Agency/ Inspector Name:
Srr.rk�,- Cry -+C (Z JF
�%�
"'
(%
h.�
/l'/C. ✓rcAi «Gldl=
Si nature.....
Building Official or designee:/ ','
l� l
Signature ..............
11""3-
..........
........... ............................... Date:. ..�..
Spec-MInspectiunFa"rn_20l2.doc revised 09106-72
L S OF SF"ECIA�_ J"PFc T � 7N AGE JCIES
APPROVAL OF SPECIAL INSPECTORS:
Each special inspection agency, testing facility, and special inspector shall be recognized by the Building Official prior to performing any
duties. Special Inspection agency's listed on this form must be pre- approved and listed on Cupertino's approved Special Inspector's list.
Special inspectors shall carry approved identification when performing the functions of a special inspector. Identification cards shall
follow the criteria set by the California Council of Testing and Inspection Agencies. No personnel changes shall be made without first
obtaining the approval of the Building Official. Any unauthorized personnel changes may result in a "Stop Work Order" and possible
permit revocation. To be pre- approved by the City of Cupertino, refer to the SPECIAL INSPECTION CRITERIA handout. Please allow
two weeks to complete the application process.
The following are the testinq and special inspection agencies that will be retained to conduct tests and inspection on this project:
*All agencies specified on this form must be pre- approved and listed on the City of Cupertino's Approved Special Inspector's List.
SEISMIC REQUIREMENTS (Section 1705.3.6)
Descriptions of seismic-force-resisting system and designated s�+eismic systems subject to special inspections as per Section 1705.3:
— 'Pef I to k P W 411 -he's /
— C.-OA n w,'/y Hes
— M- e .1 e.'au-'na4.
The extent of the seismic - force - resisting system is defined in more detail in the construction documents.
WIND REQUIREMENTS Section 1705.4.1
Description of main wind- force - resisting system and designated wind resisting components subject to special inspections in accordance with Section
1705.4.2:
The extent of the main wind - force - resisting system and wind resisting components is defined in more detail in the construction documents.
SpecialnspectionForm_1011.doc remised 09106111
EXPERTISE
FIRM / INSPECTOR INFORMATION *
1. Special Inspection (except for
geotechnical)
Firm, 64...... q��, .......................
City..,. �� ?
Addr...RA. ....0.��A17-bJ4--
...............................
.....�E.�
State ..C-, .............Zip
,........................
.. ...0 .. .......................
Telephone.C1k9Y ...3� Fax ..................
..........................Email
b !�.0? .......
2.
Material Testing
Firm .....................................................................
Addr..........................................................
...............................
City...........................................................................
...............................
State .......................Zip
......................
Telephone........ ............................... Fax.............
...............................
Email. ...............................
3.
Geotechnical Inspections
Firm .....................................................................
Addr..........................................................
...............................
City...........................................................................
...............................
State .......................Zip
............... I......
Telephone ....... ............................... Fax.............
...............................
Email ............................
.............................
4.
Other:
Firm .....................................................................
Addr ..............................
.............................
...............................
City...........................................................................
...............................
State .......................Zip
...... I...............
Telephone....... ............................... Fax.............
...............................
Email...................
*All agencies specified on this form must be pre- approved and listed on the City of Cupertino's Approved Special Inspector's List.
SEISMIC REQUIREMENTS (Section 1705.3.6)
Descriptions of seismic-force-resisting system and designated s�+eismic systems subject to special inspections as per Section 1705.3:
— 'Pef I to k P W 411 -he's /
— C.-OA n w,'/y Hes
— M- e .1 e.'au-'na4.
The extent of the seismic - force - resisting system is defined in more detail in the construction documents.
WIND REQUIREMENTS Section 1705.4.1
Description of main wind- force - resisting system and designated wind resisting components subject to special inspections in accordance with Section
1705.4.2:
The extent of the main wind - force - resisting system and wind resisting components is defined in more detail in the construction documents.
SpecialnspectionForm_1011.doc remised 09106111
SCHEDULE OF SPECIAL INSPECTION
SITE
ADDRESS (��(l 5,66 �. APN BP #t�p�
PROJECT DESCRIPTION: J
Notation Used in Table:
Column headers:
C Indicates continuous inspection is required.
P Indicates periodic inspections are required. The notes and /or contract documents should clarify.
Box entries:
X Is placed in the appropriate column to denote either "C" continuous or "P" periodic inspections.
- -- Denotes an activity that is either a one -time activity or one whose frequency is defined in some other
manner.
Additional detail regarding inspections and tests are provided in the project specifications or notes on the drawings.
VERIFICATION AND INSPECTION C p REFERENCED IBC REFERENCE
STANDARD
INSPECTION OF FABRICATORS
1. )6 Inspect fabricator's fabrication and quality control - -- ___ 1704.3
procedures.
INSPECTION OF STEEL
1. Material verification of high- strength bolts, nuts and washers.
Identification marking to conform to ASTM stds
AISC 360,
specified in the approved construction documents.
- --
X
Section AU and
applicable ASTM
material standards
Inspect fabricator's fabrication and quality control
- -
X
--
procedures.
2. Inspection of high- strength bolting:
❑ Snug -tight joints.
- --
X
❑ Pretensioned and slip - critical joints using turn -of -nut
with matchmarking, twist -off bolt or direct tension
---
X
AISC 360,
indicator methods of installation.
1704.3.3
Section M2.5
❑ Pretensioned and slip - critical joints using turn -of -nut
without matchmarking or calibrated wrench methods
X
- --
of installation.
3. Material verification of structural steel and cold- formed steel deck.
For structural steel, identification markings to conform
X
AISC 360,
to AISC 360.
_ _
Section M2.5
❑ For other steel, identification markings to conform to
Applicable ASTM
ASTM standards specified in the approved
---
X
material standards
construction documents.
❑ Manufacturer's certified test reports.
- --
X
SpecialnspectionForm_20)2.doc remised 09106112
VERIFICATION ARID INSPECTION
C
P
REFERENCED
STANDARD
IBC
REFERENCE
4. Material verification of weld filler materials:
W Identification marking to conform to AWS specification
in the approved construction documents.
- --
X
AISC 360,
Section A3.5 and
applicable AWS A5
documents
_ _
❑ Manufacturer's certificate of compliance required.
- --
X
- --
- --
5. Inspection of welding:
a. Structural steel and cold- formed steel deck:
D. Complete and partial joint penetration groove welds.
X
---
AWS D1.1
1704.3.1
❑ Multipass fillet welds.
X
---
❑ Single -pass fillet welds > 5/16"
X
- --
• Plug and slot welds.
X
- --
IA Single -pass fillet welds <= 5/16"
- --
X
❑ Floor and roof deck welds.
- --
X
AWS D1.3
b. Reinforcing steel:
• Verification of weldability of reinforcing steel other than
ASTM A 706.
- -
X
AWS D1.4 ACI 318:
Section 3.5.2
• Reinforcing steel resisting flexural and axial forces in
intermediate and special moment frames, and
boundary elements of special structural walls of
concrete and shear reinforcement.
X
___
• Shear reinforcement.
X
---
❑ Other reinforcing steel.
- --
X
6. Inspection of steel frame joints details for compliance:
• Details such as bracing and stiffening.
- --
X
- --
1704.3.2
• Member locations.
- --
X
• Application of joint details at each connection.
- --
X
VERIFICATION AND INSPECTION
C
P
REFERENCED
STANDARD
IBC
REFERENCE
INSPECTION OF WELDING
1. ❑ Welded studs when used for structural diaphragms.
- --
X
- --
1704.3
2. ❑ Welding of cold- formed steel framing members.
- --
X
�3, ❑ Welding of stairs and railing systems.
- --
X
SpecinlnspectionForm_2012.doe revised 09106112
VERIFICATION AND INSPECTION
C
P
REFERENCED
STANDARD
IBC
REFERENCE
INSPECTION OF CONCRETE
1. ❑ Inspection of reinforcing steel, including prestressing
- --
X
ACI 318: 3.5, 7.1 -7.7
1913.4
tendons and placement.
2. ❑ Inspection of reinforcing steel welding in accordance
AWS D1.4 ACI 318:
with Table 1704.3 Item 5b.
3.5.2
3. ❑ Inspection of bolts to be installed in concrete prior to
and during placement of concrete where allowable
X
--
ACI 318: 8.1.3,
1911.5, 1912.1
loads have been increased or where strength design
21.2.8
is used.
4. ❑ Inspection of anchors installed in hardened concrete.
- --
X
ACI 318:
1912.1
5. ❑ Verifying use of required design mix.
1904.2.2,1913.2,
- --
X
ACI 318:
1913.3
6. ❑ At time fresh concrete is sampled to fabricate
ASTM C 172
specimens for strength tests, perform slump and air
X
- --
ASTM C 31
1913.10
content tests and determine the temperature of the
concrete.
ACI 318: 5.6, 5.8
7. ❑ Inspection of concrete and shotcrete placement for
X
- --
ACI 318: 5 510
.9, .
1913.6, 1913.7,
proper application techniques.
1913.8
8. ❑ Inspection for maintenance of specified curing
- -_
X
ACI 318: 5.11 -5.13
1913.9
temperature and techniques.
9. Inspection of prestressed concrete:
❑ Application of prestressing forces.
X
- --
ACI 318: 18.20
❑ Grouting of bonded prestressing tendons in the
X
- --
ACI 318: 18.18.4
---
seismic force - resisting system.
10. ❑ Erection of precast concrete members.
- --
X
ACI 318: Ch. 16
---
11. ❑ Verification of in -situ concrete strength, prior to
stressing of tendons in posttensioned concrete and
- --
X
ACI 318: 6.2
- --
prior to removal of shores and forms From beams and
structural slabs.
12. ❑ Inspect formwork for shape, location, and dimensions
- --
X
ACI 318: 6.6.1
- --
of the concrete member being formed.
13. 9f Bolts Installed in Existing Masonry or Concrete
• Direct tension testing of existing anchors.
- --
X
See ICC ES Reports form special
inspection requirements for proprietary
• Direct tension testing of new bolts.
- --
X
Torque testing of new bolts.
- --
X
products
❑ Prequalification test for bolts and other types of
anchors.
_ -_
X
14. ❑ Other:
Spec ialnspectionForm_2012.doc revised 09106112
0
2012.doc revised 09106112
REFERENCE FOR CRITERIA
VERIFICATION AND INSPECTION
C
F
IBC
TMS 402 1ACI
TMS 402 /ACI
SECTION
530 /ASCE 5
530 /ASCE 6
INSPECTION OF LEVEL 1 MASONRY
❑ Compliance with required inspection provisions of
the construction documents and the approved
- --
X
- --
- --
Art. 1.5
submittals shall be verified.
2. ❑ Nifica-ti on of f m and fAAc prior to construction
X
_ --
___
Art. 1.48
where specifically exempted by this code.
3. ❑ Verificat n of slump flow and VSI as delivered to
X
- --
___
___
Art. 1.513.11.b.3
the site for elf consolidating grout.
4. As masonry constr tion begins, the following shall be verified to ensure compliance:
• Proportions of site- repared mortar.
- --
X
- --
- --
Art. 2.6A
• Construction of mortar' ints.
- --
X
- --
- --
Art.3.313
• Location of reinforcemenNahorages. nectors,
__-
X
- --
- --
Art. 3.4, 3.6A
prestressing tendons, an
• Prestressing technique.
- --
X
- --
- --
Art. 3.613
• Grade and size of prestressing ten ns and
- --
X
- --
- --
Art. 2.413, 2.4H
anchorages.
5. During construction the inspection programs all verify:
❑ Size and location of structural elements.
- --
X
- --
- --
Art. 3.3F
• Type, size, and location of anchors, including
other details of anchorage of masonry to
- --
X
1.16.1
structural members, frames or other construction.
• Specified size, grade, and type of reinforcement,
anchor bolts, prestressing tendons and
- --
X
- --
Sec. 1.15
Art. 2.4, 3.4
anchorages.
• Welding of reinforcing bars.
X
- --
- --
---
❑ Preparation, construction and protection of
masonry during cold weather (temperature below
___
X
Se .2104.3,
- -_
Art. 1.8C, 1.8131
40 degrees F) or hot weather (temperature above
2 04.4
90 degrees F).
❑ Application and measurement of prestressing
X
�
\
I
force.
- --
�
- --
- --
Art. 3.6B
6. Prior to grouting the following shall be verified to ensure compliance:
❑ Grout space is clean.
- --
X
- --
- --
Art. 3.21D
❑ Placement of reinforcement and connectors and
- --
X
---
-9x. 1.3
Art. 3.4
prestressing tendons and anchorages.
❑ Proportions of site - prepared grout and
- --
X
- --
- --
Art. 2.6B
prestressing grout for bonded tendons.
❑ Construction of mortar joints.
- --
X
- --
- --
Art. 3.313
7. Grout placement:
• Grout placement shall be verified ensure
X
- --
___
___
rt. 3.5
compliance.
• Observe grouting of prestressing bonded
X
- --
- --
- --
Art 6C
tendons.
0
2012.doc revised 09106112
03
Specia117specfi017Form_2012.doc revised 09 106112
REFERENCE FOR CRITERIA
VERIFICATION AND INSPECTION
C
P
IBC
TMS 4021AC1
TMS 4021AC1
SECTION
530 /ASCE 5
530 /ASCE 6
8. ❑ Preparation of any required grout specimens,
Sec.
mortar specimens, and /or prisms shall be
- --
X
2105.2.2,
- --
Art. 1.4
observed.
2105.3
INSPECTION OF LEVEL 2 MASONRY
1. ❑ Co Hance with required inspection provisions
of the onstruction documents and the approved
- --
X
--
- --
Art. 1.5
submitt
2. ❑ Verification f fm and fAAc prior to construction
and for every ,000 square feet during
- --
X
- --
- --
Art. 1.413
construction.
3. ❑ Verification of pro rtions of materials in
premixed or preblen ed mortar and grout as
- --
X
- --
- --
Art. 1.51 .
delivered to the site.
4. ❑ Verification of slump flo and VSI as delivered to
X
- --
- --
- --
Art. 1.513.1.b.3
the site for self consolidate grout.
5. The following shall be verified to sure compliance:
r, grout, and
• Proportions of site - prepared m!nrns.
__-
X
- --
- --
Art. 2.6A
prestressing grout for bonded
• Placement of masonry units and cons uction of
X
- --
- --
Art. 3.36
mortar joints.
• Placement of reinforcement, connectors a
- --
X
- --
Sec. 1.15
Art. 3.4, 3.6A
prestressing tendons and anchorages.
• Grout space prior to grouting.
X
- --
- --
- --
Art. 3.21D
• Placement of grout.
X
- --
- --
- --
Art. 3.5
• Placement of prestressing grout.
- --
- --
- --
Art. 3.6C
• Size and location of structural elements.
- --
- --
- --
Art. 3.31'
• Type, size, and location of anchors, including
other details of anchorage of masonry to
X
- --
- --
Sec.1.2.2(e)
structural members, frames and other
construction.
• Specified size, grade, and type of reinforcement,
anchor bolts, prestressing tendons and
- --
X
- --
Sec. 1.15
Art. 2.4, 3.4
anchorages.
• Welding of reinforcing bars.
X
-
_-
Sec. 2.1.9.7.2,
- --
3.3.3.4 (b)
• Preparation, construction, and protection of
masonry during cold weather (temperature below
___
X
Sec. 2104.3,
___
Art. 1.8C, 1.81D
40 degrees F) or hot weather (temperature above
2104.4
90 degrees F).
• Application and measurement of prestressing
X
- --
- --
- --
Art. 3.613
force.
6. ❑ Preparation of any required grout specimens,
Sec.
mortar specimens, and /or prisms shall be
X
- --
2105.2.2,
- --
Art. 1.4
observed.
2105.3
03
Specia117specfi017Form_2012.doc revised 09 106112
VERIFICATION AND INSPECTION
C
p
REFERENCED
STANDARD
IBC
REFERENCE
INSPECTION OF WOOD
1. NO Inspect prefabricated wood structural elements and
assemblies in accordance with Section 1704.2.
- --
1704.6
2. ❑ spect site built assemblies.
- --
- --
3. Inspec igh -load diaphragms:
❑ Verify de and thickness of sheathing.
- --
---
❑ Verify nom al size of framing members at adjoining
panel edges.
_
___
- --
1704.6.1
❑ Verify nail or stap diameter and length,
- --
- --
❑ Verify number of fast er lines,
- --
- --
❑ Verify spacing between f teners in each line and at
edge margins.
4. ❑ Metal- plate- connected wood tru es spanning 60 feet
or greater: Verify temporary install ion
restraint/bracing and the permanent dividual truss
---
X
---
1704.6.2
member bracing are installed in accor nce with the
approved truss submittal package.
REQUIRED VERIFI TION AND INSPECTION OF SOIL
1. ❑ Verify materials below footings are adequate to
achieve the desired bearing capacity.
- -
X
2, ❑ Verify excavations are extended to proper depth and
have reached proper material.
_
X
3. ❑ Perform classification and testing of compacted fill
X
materials.
- --
Table 1704.7
4. ❑ Verify use of proper materials, densities and lift
thicknesses during placement and compaction of
X
-
compacted fill.
5. ❑ Prior to placement of compacted fill, observe subgrade
_
X
and verify that site has been prepared properly.
REQUIRED VERIFICATION AND INSPECTION OF DEEP DRIVEN F UNDATION ELEMENTS
1. ❑ Verify element materials, sizes and lengths comply
X
with the requirements.
2. ❑ Determine capacities of test elements and conduct
X
additional load tests, as required.
3. ❑ Observe driving operations and maintain complete
X
_ --
and accurate records for each element.
4. ❑ Verify locations of piles and their plumbness, confirm
type and size of hammer, record number of blows per
- --
Table 1704.8
foot of penetration, determine required penetrations to
X
- --
achieve design capacity, record tip and butt elevations
and document any damage to foundation element.
5. ❑ For steel elements, perform additional inspections in
accordance with Section 1704.3.
6. ❑ For concrete elements and concrete filled elements,
perform additional inspections in accordance with
- --
- --
Section 1704.4.
012.doc revised 09106112
VERIFICATION ARID INSPECTION
C
P
REFERENCED
STANDARD
IBC
REFERENCE
7. ❑ For specialty piles, perform additional inspections as
determined by the registered design professional in
- --
- --
- --
Table 1704.8
responsible charge.
RE4YIRED VERIFICATION AND INSPECTION OF CAST -IN -PLACE DEEP FOUNDATION ELEMENTS
1 ❑ Obse rve drilling operations and maintain complete and
X
accurate ecords for each element.
2. ❑ Verify place ent locations and plumbness, confirm
element diam ters, bell diameters (if applicable),
lengths, embe ent into bedrock (if applicable), and
X
- -- - --
Table 1704.9
adequate end -be ing strata capacity. Record
concrete or grout v umes.
3. ❑ For concrete elements, perform additional inspections
in accordance with Sect n 1704.4.
___
___
HELICAL PILE FOUNDATIONS
1. ❑ Record installation equipmen sed, pile dimensions,
X
- -_
1704.10
tip elevations, final depth, final 1 stallation torque.
SP YED FIRE - RESISTANT MATERIALS
Physical and visual tests
1. Condition of substrates.
❑ Inspect surface for accordance with the a roved fire -
resistance design and the approved man uf turer's
- --
- --
written instructions.
❑ Verify minimum ambient temperature before an after
- --
X
application.
❑ Verify ventilation of area during and after applicatio
- --
X
2. ❑ Measure average thickness per ASTM E605 and
Section 1704.12.4.
S
' --
- -'
- --
1704.12.1
3. ❑ Verify density of material for conformance with the
approved fire- resistant design and ASTM E605. (Ref.
--
- --
Section 1704.12.5)
4. ❑ Test cohesive /adhesive bond strength per Section
1704.12.6.
5. ❑ Condition of finished application.
MISCELLANEOUS
1. Mastic and Intumescent Fire - Resistant Coating.
- --
- --
- --
1704.13
2. Exterior Insulation and Finish Systems (EIFS). Water -
resistive barrier coating when installed over a sheathing
- --
- --
- --
1704.14
substrate.
3. Special Cases
- --
- --
- --
1704.15
4. Smoke Control System
- --
- --
- --
1704.16
5. Seismic Resistance
❑ Suspended ceiling systems and their anchorage.
- --
- --
- --
1705.3 [4.3]
SpecinlnspectionForm_2012.doc revised 09106112
VERIFICATION AND INSPECTION
C
P
REFERENCED
STANDARD
IBC
REFERENCE
6. Wind Resistance
• of cladding and roof framing connections.
- --
- --
- --
❑ Wall co�tfions roof and floor diaphragms and
_ -_
- --
framing
___
• Roof and floor diaphrag stems, including
___
collectors, drag struts and bou elements.
___
___
• Vertical wind - force - resisting systems, inc 'ng braced
- --
frames, moment frames, and shear walls.
__-
- --
❑ Wind- force - resisting system connections to the
foundation.
❑ Fabrication and installation of systems or components
required to meet the impact resistance requirements
- --
- --
- --
of Section 1609.1.2.
SPECIAL INSPECTION FOR WIND REQUIREMENTS
1. tructural Wood
❑ ect field gluing operations of elements of the main
X
win rce- resisting system.
- --
1706.2
❑ Inspect nai ' bolting, anchoring, and other fastening
of components ' in the main windforce- resisting
_
X
system, including wo shear walls, wood
diaphragms, drag struts, es and hold- downs.
2. Cold- Formed Steel Framing
❑ Welding of elements of the main wind - force- 'sting
-
X
system.
❑ Inspection of screw attachments, bolting, anchoring,
and other fastening of components within the main
---
1706.3
wind - force- resisting system including shear walls,
- --
X
braces, diaphragms, collectors (drag struts) and hold -
downs.
3. Wind- resisting components
• Roof cladding.
- --
X
- --
1706.4
• Wall cladding.
- --
X
SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE
1. ❑ Special inspection for welding in accordance with the
X
- --
1707.2
quality assurance plan requirements ofAISC 341.
2. Structural Wood
❑ Inspect field gluing operations of elements of the
X
- -
seismic- force - resisting system.
Inspect nailing, bolting, anchoring, and other fastening
of components within the seismic - force- resisting
1707.3
system, including wood shear walls, wood
- --
X
diaphragms, drag struts, braces, shear panels and
hold- downs.
3. Cold- Formed steel light -frame construction
❑ Welding of elements of the seismic - force- resisting
X
1707.4
system.
SpeciabrspectianFor•m_2012.doc remised 09 106112
❑ Inspection of screw attachments, bolting, anchoring,
and other fastening of components within the seismic-
_ -
X
force- resisting system including shear walls, braces,
dia ragms, collectors (drag struts) and hold- downs.
4. Storage ra s and access floors
❑ Anchorag of storage racks 8 feet or greater in height
X
1707.5
and access ors.
5. Architectural compo ents
❑ Inspect erection an fastening of exterior cladding
weighing more than sf and higher than 30 feet
- --
X
above grade or walking urface.
❑ Inspect erection and faste\gof veneer we ighing
more than 5 psf.and highe30 feet above grade
- --
X
or walking surface.
- --
1707.6
❑ Inspect erection and fastening of a exterior non-
bearing walls higher than 30 feet ab ve grade or
- --
X
walking surface.
❑ Inspect erection and fastening of all inten r non-
bearing walls weighing more than 15 psf a higher
- --
X
than 30 feet above grade or walking surface.
6. Mechanical and Electrical Components
❑ Inspect anchorage of electrical equipment for
emergency or stand -by power systems.
--
X
❑ . Inspect anchorage of non - emergency electrical
X
equipment.
- --
❑ Inspect installation of piping systems and associated
mechanical units carrying flammable, combustible, or
- --
X
- --
1707.7
highly toxic contents.
❑ Inspect installation of HVAC ductwork that contains
hazardous materials.
❑ Inspect installation of vibration isolation systems
where required by Section 1707.7.
- --
X
7. ❑ Verify that the equipment label and anchorage or
mounting conforms to the certificate of compliance
1707.8
when mechanical and electrical equipment must be
- --
seismically qualified.
8. ❑ Seismic isolation system: Inspection of isolation
___
X
1707.9
system per ASCE 7 — Section 17.2.4.8
9. ❑ Obtain mill certificates for reinforcing steel, verify
compliance with approved construction documents,
- --
- --
- --
1708.2
and verify steel supplied corresponds to certificate.
10. ❑ Structural Steel: Invoke the QAP Quality Assurance
___
___
___
1708.3
requirements in AISC 341.
11. ❑ Obtain certificate that equipment has been seismically
- -_
1708.4
qualified.
12. ❑ Obtain system tests as required by ASCE 7 Section
- --
- --
- --
1 08.5
17.8.
SpecialiispectiaiForm_2012.doc revised 09106112