Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
15100146
I CITY OF CUPERTINO BUILDING PERMIT I BUILDING ADDRESS: 20143 SUISUN DR 1 CONTRACTOR: GLOBUS BUILDER INC 1 PERMIT NO: 15100146 1 OWNER'S NAME: BHARVANI VANDANA TRUSTEE & ET AL OWNER'S PHONE: 6502796824 ❑ LICENSED CONTRACTOR'S DECLARATION License ClassG _ Lic. # ,/ 1�/ �p Contractor Date /J 1 hereby affir I am licensed under the provisions of Chapter 9 (commenci with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: t. 1 have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the rformance of the work for which this permit is issued. �. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in uence of the granting of this permit. Additionally, the applican ands and will comply with all non -point source regu s per the unicipal Code, Section 9.18. Signature Datef ❑ OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: t. I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) 2. 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). I hereby affirm under penalty of perjury one of the following three declarations: t. I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption become subject to the Worker's Compensation provisions of the Labor Code must forthwith comply with such provisions or this permit shall be deemed revoked. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Signature. Date 6350 LAUREL CANYON BLVD STE 400 DATE ISSUED: 10/23/2015 N HOLLYWOOD, CA 91606 PHONE NO: (818) 760-7100 JOB DESCRIPTION: RESIDENTIAL ❑ COMMERCIAL ❑ CONSTRUCT (N) FRONT I STORY ADDITION (120 S.F.) TO FAMILY ROOM; (N) COVERED PORCH (66 S.F.); REMODEL (530 S.F.); INSTALL (I) TANKLESS WATER HEATER, A/C Sq. Ft Floor Area: I Valuation: $150000 APN Number: 36928010.00 1 Occupancy Type: PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROM LAST CALLED INSPECTION. Issued by: _ ��/�/' Date: RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. Signature of Applicant: Date: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health &Safety Code, Sectioys 23�V5, 25533, and 25534. Owner or ' f� �i � �' Date:( CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's Address ARCHITECT'S DECLARATION I understand my plans shall be used as public records. Licensed CUPER.TINO CONSTRUCTION PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • building a-)cuoertino.ong ❑ NEW CONSTRUCTION 5E ADDITION ❑ ALTERATICN / TI ❑ REVISION /DEFERRED ORIGINAL PERMIT ` M 61 r PROJECT ADDRESS �oi43 1C7— M / O APN # am -17— OWNER NAME ���N C(rVZZ W PHONE' VJ b �� /l1r 1 EMAIL STATE, ZIP FAX STREET ADDRESS �J k�j7 kCITY, �r G CONTACT NAMEa O PHONE O �,,/ r� E-MAIL �3 ) W I STRE-T DRE / CITY, STATE IP FAX O lfitVq OWNER ❑. OWNER-RUILDF-R ❑ OUTcRAGE7vT ❑ CONTRACTOR ❑ CONTRACTOR AGENT ❑ ARC= CT ❑ ENGNMR ❑ DEVELOPER ❑ TENANT �0 CTOR NAME ��r LIC 'S 4B LIC IS TYPE BUS. LIC # MAr C� 0 3180 0— 0— FAX bolaNAME bolai F y1 FO lOb'fI OP. STREET ADDRESS CITY, STATE, ZIP'S c PH r ARCHITECT/EIyCiN ERN✓E A96AS I I LICENSENLNBER q S— 1 BUS. LIC N COMPANY NAME-�- E-MAIL bz . tcp �� f-tt v,Qti our FAX STREET ADDRESS 1-: Vic. AT� CI7Y,STATE � ��� cA n5r/-2- --- PHi140 �� X 661 DESCRIPTION OF WORK . ,-qr�„ i* 0+ � V M k� Ui .�-i,1&4 � e&'\' �Q1 ' `� 1A 1 C�11 --k, --- Ge acy"oU -6u+;too W , bqyW,'kJ �� y- aft��� I1�PzJ lna� `u a i c. EJQSTINGUSE ` PR OSEDLSE CONSTR.TYPE tqs e4 V 6 #STORIES USE TYPE OCC. I SQ.FT. VALLA, )N!Sj r-5aSTG AREA I l� % V NEW FLOOR AREA O /I CJ DEMO AREA TOTAL NET AREA - BATIM OM KITCHEN OTHER REMODEL AREA R MODEL .AREA REMODEL AREA PORCH AREA DECK AREA TOTAL DECK/PORCH AREA GARAGE AREA: DETACH JQATTACH # DWELLINGUNTrS: IS A SECOND uNrrYES SECOND STORY ❑]'ES A HEINC DDED° �Tl0 ADDMON? '2�0 PRE•.APPLICATION ❑YES IF YES, PROVIDE COPY OF PL.ANNTNG MT1. NO PLANNLNG APPROVAL LETTER IS THE BLDG AN ❑ YES EICHLER HOME? NO IVSD gy ,+ �.�� - TOTAL VALUATION: ❑ ry I f� By my signature below, I certify to each of the following: I am the property o��ner or authorized agent to act on the property oHmer's behalf. I have read this application and the information I have provided is correct, I have read the Description of'Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating to building con I authorize representatives of Cupertino to enter the above -identified property for inspection purposes. Signature of Applicant/Agent: - Date: (p• SUPPLEMENTAL MTFORMATION REQUIRED 4 �•PLAh,CHE:CKT]�E � y �, ROLTIIvG SLIP �- New SFD or Multifamily d%Nellings: Apply for demolition permit for existing building(s). Demolition permit is required prior to issuance ofbuildingpermitfor 3 &L a�� `� r I�T 4 new building. 12ESS t rt ❑�PLAhhIhGPLA� RE]IEW_ _ Commercial Bldgs: Provide a completed Hazardous Materials Disclosur , ❑ srAntiA� n �- �IeLiBLi vt oRlcs� form if any Hazardous Materials are being used as part of this project. _ - i� Copy of Planning Approval Letter or Meeting with Planning prior to ) x -R _�FIREDEPT� submittal of Building Permit application. I�IA70R� ,ATTARYSE�i"ERDISrRICT _ — EA'YIitOIa'MENT-�lL IIEALTIi _ - BldgApp_201 1. doc revised 06/21/11 CITY OF CUPERTINO I51O 1 `tom l FEE ESTIMATOR - BUILDING DIVISION LMADDRESS: 20143 Suisun Dr. DATE: 10/19/2015 REVIEWED BY: PAUL jM APN: 369 28 010 BP#: `VALUATION: j$150,000 'PERMIT TYPE: Building Permit PLAN CHECK TYPE: Addition PRIMARY SFD or Duplex USE: 2nd Unit? Yes • No OTC? () Yes ©No PENTAMATION PERMIT TYPE: 1 R3SFDADD WORK Construct N Front 1 StoryAddition 120 S.f. to familyroom N Covered Porch 66 S.f. ; Remodel SCOPE (530 S.f.); Install (N) Tankless Water Heater, A/C Unit, 4 Windows, 1 Bay Window and 1 Sliding Door OCCUPANCY TYPE: TYPE OF CONSTR. FLR AREA s.f. PC FEES PC FEE ID BP FEES BP FEE ID R-3 (Custom) II-B,111-B,IV,V-B 186 $1,091.00 IADDPLCK $1,057.00 1ADDINSP PME Plan Check: $0.00 1 # $72.00 Mechanic IBREMAIR A/C Units (<--I OK cfm) Permit Fee: $1,057.00 Suppl. Insp. Fee:Q Reg. Q OT 0.0 1 hrs $0.00 0 # Plumbing / $29.00 IPRWHEATR Water Heater PME Unit Fee: $0.00 PME Permit Fee: $96.00 © # Window / Sliding Glass Door $431.00 1WINREP Replacement (_:onslruetion Tax:7_1 TOTALS: 186 $1,091.00 $1,057.00 MECH, HOURLY O Yes E) No PLUMB, HOURLY Q Yes Q No ELEC, HOURLY Q Yes Q No Mech. Plan Check 0.0 hrs $0.00 Plumb. Plan Check 0.0 1 hrs $0.00 : cc. Plan Check Mech. Permit Fee: IMPERMIT Plumb. Permit Fee: IPPERMIT Elec. Perniir Fee Other Mech. Insp. Fo.0 hrs $48.00 Other Plumb Insp. 0.0 hrs 1 $48.00 (1: her Nec. Insp, Ll hrs $0.00 PME Plan Check: NOTE: This estimate does not include fees due to other Departments (Le. Planning, Public Works, Fire, Sanitary Sewer District, School District, etc.). These lees are based on the preliminary information available and are only an estimate. Contact the Dept for addn'1 info. FEE ITEMS (Fee Resolution 11-053 a.77,1,113) FEE QTY/FEE MISC ITEMS Plan Check Fee: $1,091.00 F530 I s.f. $503.00 Remodel, Ot r IREMRESOTH Suppl. PC Fee: (2)Reg. Q OT F 0.0 hrs $0.00 PME Plan Check: $0.00 1 # $72.00 Mechanic IBREMAIR A/C Units (<--I OK cfm) Permit Fee: $1,057.00 Suppl. Insp. Fee:Q Reg. Q OT 0.0 1 hrs $0.00 0 # Plumbing / $29.00 IPRWHEATR Water Heater PME Unit Fee: $0.00 PME Permit Fee: $96.00 © # Window / Sliding Glass Door $431.00 1WINREP Replacement (_:onslruetion Tax:7_1 Administrative Fee: Q 0 Work Without Permit? 0 Yes Q) No $0.00 Advanced Planning Fee: 1PLLONGR $26.04 Select a Non -Residential Building or Structure E) 0 i Travel Documentation Fee: ITRAVDOC $48.00 Strong Motion Fee: IBSEISMICR $19.50 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $6.00 SUBTOTALS: $2,343.54 $1,035.00 TOTAL FEE: $3,378.54 Revised: 10/01/2015 JAN 15 2016 --� TESTING ENGINEERS, INC. FILE G 2811 Teagarden St. 510-835-3142 510-834 San Leandro, CA 94577 800-660-3142 San Leandro • San Jose - Martinez INSPECTION REPORT Week Ending. 12/25/15 PROJECT # 62293 PROJECT: 20143 Suisun Drive Suisun Cupertino, CA DATE HOURS Permit # 15100146 12/23/15 INSPECTOR M. Ardizzone TYPE OF INSPECTION: Epoxied Anchors PLACE OF INSPECTION: Jobsite Reported to Gai Baron of Globus Builders Inc. at the jobsite as requested. Inspected predrilled holes for proper diameter and depth. Observed the cleaning of holes and the injection of Simpson Set XP epoxy (exp. 7/17). Witnessed the proper insertion of one (1) 5/8" diameter Allthread anchor, for holddown, 24" in length, embedded 15" at rear of house and seventeen (17) 5/8" diameter Allthread anchors, 24" in length, embedded 10" at various locations. The preceding work was, to the best of my knowledge, in compliance with approved job plans and specifications, including revisions by engineer. Reviewed by: - — avid C ppero Special Inspection Division Manager 1cc: Globus Builder Inc./G. Baron City of Cupertino/Bldg. Inspection Dept The results presented in this report relate only to the item(s) tested/ inspected and may be reproduced only in its entirety unless written permission from TO is obtained. Page 1 of 1 CALGREEN RESIDENTIAL CHECKLIST - MANDATORY ITEMS RECEIVED COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION GUPERTINO ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL OCT 19 2015 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 ` (408) 777-3228 - FAX (408) 777-3333 • buildingacupertino.org ! RY PURPOSE: The 2013 CalGreen Code applies to additions or alterations of existing residential buildings where the addition or alteration increases the building's conditioned area, volume, or size and also applies to all new low-rise residential buildings, high-rise residential buildings, or both. Existing site and landscaping improvements that are not otherwise disturbed are not subject to the requirements of CALGreen. Project Name: Project Address Project Description: Instructions: @,0l k,�> _11�-411Au V o(r C-, krf; uo 1. The Owner or the Owner's agent shall employ a licensed professional experienced with the California Green Building Standards Codes to verify and assure that all required work described herein is properly planned and implemented in the project. 2. The licensed professional, in collaboration with the owner and the design professional shall initial Column 2 of this checklist, sign and date Section 1 - Design Verification at the end of this checklist and have the checklist printed on the Y proved plans for the proj'01F �fd:p� 3. Prior to final inspection b the BuildingDepartment, i nshQeri 13 and sign and date Section 2 - Implementation Verification at theen o ists d ubm the completed form to the Building Inspector. Column 2 Column 3 �AANDATORY FEATURE OR MEASURE Project Verification Requirements Planning and Design - Site Development 4.106.2 Storm water drainage and retention during construction. A plan is developed and implemented to manage storm water drainage during ❑ ❑ construction. 4.106.3 Grading and paving. The site shall be planned and developed to ❑ keep surface water away from buildings. Construction plans shall indicate how site grading or a drainage system will manage all surface water flows. Page 1 of 5 CalGreen_2014.doc revised 11/04114 N 4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design required by the California Energy Standards. Indoor Water Use 4.303.1 Water conserving plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the following: ❑ 4.303.1.3.2 Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per flush. Tank -type water closets shall be certified to the performance criteria of the U.S. EPA WaterSense Specifications for Tank -type Toilets. ❑ 4.303.1.3.2 Urinals. The effective flush volume of urinals shall not exceed 0.5 gallons per flush. ❑ 4.303.1.3.1 Single Showerheads. Showerheads shall have a maximum flow rate of not more than 2.0 gallons per minute at 80 psi. Showerheads shall be certified to the performance criteria of the U.S. EPA WaterSense Specification for showerheads. ❑ 4.303.1.3.2 Multiple Showerheads serving one shower. When a shower is served by more than one showerhead, the combined flow rate of all showerheads and/or other shower outlets controlled by a single valve shall not exceed 2.0 gallons per minute at 80 psi, or the shower shall be [� designed to allow only one shower outlet to be in operation at a time. ❑ 4.303.1.4.1 Residential lavatory faucets. The maximum flow rate of residential lavatory faucets shall not exceed 1.5 gallons per minute at 60 psi. The minimum flow rate of residential lavatory faucets shall not be less than 0.8 gallons per minute at 20 psi. ❑ 4.303.1.3.2 Lavatory faucets in common and public use areas. The maximum flow rate of lavatory faucets installed in common and public use areas (outside of dwellings or sleeping units) in residential buildings shall not exceed 0.5 gallons per minute at 60 psi. ❑ 4.303.1.4.3 Metering faucets. Metering faucets when installed in residential buildings shall not deliver more than 0.25 gallons per cycle. ❑ 4.303.1.4.4 Kitchen Faucets. The maximum flow rate of kitchen faucets shall not exceed 1.8 gallons per minute at 60 psi. Kitchen faucets may temporarily increase the flow above the maximum rate, but not to exceed 2.2 gallons per minute at 60 psi, and must default to a maximum flow rate of 1.8 gallons per minute at 60 psi. 4.303.2 Standards for plumbing fixtures and fittings. Plumbing fixtures and fittings shall be installed in accordance with the California Plumbing Code, and shall meet the applicable standards referenced in Table 1401.1 of the California Plumbing Code. Page 2 of 5 CalGreen_2014.doc revised 11104114 4.304.1 Irrigation controllers. Automatic irrigation systems installed at the time of final inspection shall be weather-based. ❑ 4.304.1.1 Controllers shall be weather- or soil moisture-based controllers that automatically adjust irrigation in response to changes in plants' needs as weather conditions change. ❑ ❑ ❑ 4.304.1.2 Weather-based controllers without integral rain sensors or communication systems that account for local rainfall shall have a separate wired or wireless rain sensor which connects or communicated with the controller(s). Soil moisture-based controllers are not required to have rain sensor input. A4.4 MATERIALCONSERVATION RESOURCE Enhance urability and Reduced Maintenance 4.406.1 Rodent proofing. Annular spaces around pipes, electric cables, conduits, or other openings in plates at exterior walls shall be protected a-�t NJ ❑ against the passage of rodents by closing such openings with cement mortar, concrete masonry or similar method acceptable to the enforcing agency. --------------- Construction Waste Reduction, Disposal and Recycling A& 4.408.2 Construction waste management plan. Where a local jurisdiction does not have a construction and demolition waste management ordinance, a ❑ construction waste management plan shall be submitted for approval to the enforcing agency. Building Maintenance and Operation 4.410.1 Operation and maintenance manual. At the time of final inspection, an operation and maintenance manual shall be provided to the building E ❑ occupant or owner. A4.5 ENVIRONMENTAL 4.503.1 General. Install only a direct-vent sealed-combustion gas or sealed ❑ ❑ wood-burning fireplace, or a sealed woodstove. Pollutant Control 4.504.1 Covering of duct openings and protection of mechanical equipment during construction. Duct openings and other related air ❑ distribution component openings shall be covered during construction. 4.504.2.1 Adhesives, sealants and caulks. Adhesives, sealants and caulks ❑ shall be compliant with VOC and other toxic compound limits. 4.504.2.2 Paints and coatings. Paints, stains and other coatings shall be ❑ compliant with VOC limits. 4.504.2.3 Aerosol paints and coatings. Aerosol paints and other coatings be compliant with product weighted MIR Limits for ROC and other toxic El compounds. Page 3 of 5 CalGreen 2014.doc revised 11/04/14 4.504.2.4 Verification. Documentation shall be provided to verify that ❑ ❑ compliant VOC limit finish materials have been used. 4.504.3 Carpet Systems. Carpet and carpet systems shall be compliant with ❑ ❑ VOC limits. 4.504.4 Resilient flooring systems. Eighty (80) percent of floor area receiving resilient flooring shall comply with the VOC-emission limits defined in the Collaborative for High Performance Schools (CHPS) Low -emitting ❑ ❑ Materials List or be certified under the Resilient Floor Covering Institute (RCFI) FloorScore program. 4.504.5 Composite wood products. Particleboard, medium density fiberboard (MDF); and hardwood plywood used in interior finish systems shall ❑ ❑ comply with low formaldehyde emission standards. Interioroisture Control 4.505.2 Concrete slab foundation. Required vapor retarders and capillary ❑ breaks are also required to comply with CalGreen Section 4.505.2.1. 4.505.3 Moisture content of building materials. Moisture content of building ❑ materials used in wall and floor framing is checked before enclosure. Indoor Air Quality and Exhaust r • •:y 3 4.506.1 Bathroom exhaust fans. Exhaust fans which terminate outside the n/ ❑ uudd building are provided in every bathroom. Envir`o'nmental Comfo` 4.507.2. Duct systems are sized and designed and equipment is selected using the following methods: 1. Establish heat loss and heat gain values according to ACCA Manual J or equivalent. ❑ 2. Size duct systems according to ACCA 29-D (Manual D) or equivalent. 3. Select heating and cooling equipment according to ACCA 36-S (Manual S) or equivalent. INSPECTORINSTALLER AND SPECIAL QUALIFICATIONS 702.1 Installer training. HVAC system installers are trained and certified in ❑ the proper installation of HVAC systems. 702.2 Specialinspection. The Licensed Professional responsible to verify CALGreen'compliance is qualified and able to demonstrate competence in the ❑ ❑ discipline they inspect and verify. 703.1 Documentation. Verification of compliance with CALGreen may include construction documents, plans, specifications, builder or installer / certification, inspection reports, or other methods acceptable to the enforcing L�-,J( ❑ agency which show substantial conformance. Implementation verification shall be submitted to the Building Department after implementation of all required measures and prior to final inspection approval. Page 4 of 5 CalGreen_2014.doc revised 11/04/14 Project Name: Project Address: Project Description: CALGREEN SIGNATURE DECLARATIONS ck1y3 SSS" ti o4r- C(A SECTION 1 DESIGN VERIFICATION Complete all lines of Section 1 —"Design Verification" and submit the completed checklist (Columns 1 and 2) with the plans and. building permit application to the Building Department. The owner and design professional responsible for compliance with CalGreen Standards have revised the plans and certify that the items checked above are hereby incorporated into the project plans and will be implemented into the project in accordant with the requirements set forth in the 2013 California Green Building Standards Code as ado t d by the City f upertino. I I Owner's Signature W Owner's Name (Please Print Design Professional's Signature Signature of,License reen compliance ��a y LP v Name of License Professional responsible for CalGreen compliance (Please Print) Email Address for License Professional responsible for CalGreen compliance Date to., i . 1,5� Date Date Phone SECTION 2 — IMPLEMENTATION VERIFICATION Complete, sign and submit the competed checklist, including column 3, together with all original signatures on Section 2 to the Building Department prior to Building Department final inspection. I have inspected the work and have received sufficient documentation to verify and certify that the project identified above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of the 2013 California Green Building Standards Code as adopted by the City of Cupertino. Signature of License Professional responsible for CalGreen compliance Date Name of License Professional responsible for CalGreen compliance (Please Print) Phone Email Address for License Professional responsible for CalGreen compliance Page 5 of 5 CalGreen_2014.doc revised 11/04/14 BUILDING ENERGY ANALYSIS REPORT PROJECT: Dhrine Residence 20143 Suisun Drive Cupertino , CA 95014 Project Designer: -DECEIVED OCT 192015 BY Sokol Design I" 'o- COPY OF" . 408-735-7860 Report Prepared by: Deborah San Luis R08-12-2133 FRI Energy Consultants, LLC 21 N. Harrison Avenue, Suite 210 Campbell, CA 95008 408-866-1620 CUPS: TINO 19 20415 Job Number: REVIFWEU FOR i.o ,-.)E COMPLIANCE Reviewe() BY 0150828 Date: 10/13/2015 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.energysoft.com. EnergyPro 6.7 by EnergySoR User Number: 1315 ID 0150828 1 I TABLE OF CONTENTS I CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Residential Building Calculation Date/Time: 12:45, Tue, Oct 13, 2015 Calculation Description: Title 24 Analysis Input File Name: 0150828 Dhrine Residence.xml CF1 R -PRF -01 Page 1 of 8 GENERAL INFORMATION ENERGY USE SUMMARY 01 Project Name Residential Building 04 05 02 Calculation Description Title 24 Analysis 08 Energy Use (kTDV/ftZ-yr) 03 Project Location 20143 Suisun Drive Compliance Margin Percent Improvement 04 City Cupertino 05 Standards Version Compliance 2015 06 Zip Code 95014 07 Compliance Manager Version BEMCmpMgr 2013-4 (744) 08 Climate Zone CZ4 09 Software Version EnergyPro 6.6 10 Building Type Single Family 11 Front Orientation (deg/Cardinal) 180 12 Project Scope Addition and/or Alteration 13 Number of Dwelling Units 1 14 Total Cond. Floor Area (ft) 1975 15 Number of Zones 2 16 Slab Area (ft) 0 17 Number of Stories 1 18 Addition Cond. Floor Area 120 19 Natural Gas Available Yes 20 Addition Slab Area (ft) 0 21 Glazing Percentage (%) 23.9% COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below Registration Number: 215-A6356214A-000000000-0000 Registration Date/Time: 2015-10-13 13:13:09 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 Report Generated at: 2015-10-13 12:45:52 ENERGY USE SUMMARY 04 05 06 07 08 Energy Use (kTDV/ftZ-yr) Standard Design Proposed Design Compliance Margin Percent Improvement Space Heating 39.01 29.46 9.55 24.5% Space Cooling 20.15 26.48 -6.33 -31.4% IAQ Ventilation 0.00 0.00 0.00 0.0% Water Heating 14.04 9.27 4.77 34.0% Photovoltaic Offset ---- 0.00 0.00 ---- Compliance Energy Total 73.20 65.21 7.99 10.9% Registration Number: 215-A6356214A-000000000-0000 Registration Date/Time: 2015-10-13 13:13:09 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 Report Generated at: 2015-10-13 12:45:52 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Residential Building Calculation Description: Title 24 Analysis Calculation Date/Time: 12:45, Tue, Oct 13, 2015 Input File Name: 0150828 Dhrine Residence.xml REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. • Cathedral Ceiling • New ductwork added is less than 40 ft. in length HERS FEATURE SUMMARY CFI R -PRF -01 Page 2 of 8 The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building components tables below. Building -level Verifications: • --None -- Cooling System Verifications: • Minimum Airflow • Fan Efficacy Watts/CFM HVAC Distribution System Verifications: • --None -- Domestic Hot Water System Verifications: • --None -- ENERGY DESIGN RATING This is the sum of the annual TDV energy consumption for energy use components included in the performance compliance approach for the Standard Design Building (Energy Budget) and the annual TDV energy consumption for lighting and components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics) and accounting for the annual TDV energy offset by an on-site renewable energy system. Reference Energy Use Energy Design Rating Margin =Percent Improvement Total Energy (kTDV/f2-yr)* 123.14 115.15 7.99 6.5% * includes calculated Appliances and Miscellaneous Energy Use (AMEU) BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft2) Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Residential Building 1975 1 5 2 0 1 Registration Number: 215-A6356214A-000000000-0000 Registration Date/Time: 2015-10-13 13:13:09 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CFIR-08252015-744 Report Generated at: 2015-10-13 12:45:52 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Residential Building Calculation Date/Time: 12:45, Tue, Oct 13, 2015 Calculation Description: Title 24 Analysis Input File Name: 0150828 Dhrine Residence.xml CF1R-PRF-01 Page 3of8 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft2) Avg. Ceiling Height Water Heating System 1 Water Heating System 2 1ST Floor Conditioned HVAC System1 1855 8 DHW Sys 1 Roof Rise (x in 12) 1 ST Floor Addition Conditioned HVAC System1 120 9 DHW Sys 1 Verified Existing Condifion OPAQUE SURFACES 01 02 03 04 05 06 07 08 09 10 Name Zone Construction Azimuth Orientation Gross Area (ft2) Window & Door Area (ft2) Tilt (deg) Status Verified Existing Condition Front Wall 1ST Floor R-0 Wall 180 Front 212.6 61.2 90 Existing No Left Wall 1ST Floor R-0 Wall 270 Left 392 48.7 90 Existing No Rear Wall 1ST Floor R-0 Wall 0 Back 440 202.2 90 Existing No Right Wall 1ST Floor R-0 Wall 90 Right 304 43.4 90 Existing No Roof 3 1ST Floor R-19 Roof Attic 1818 Existing No Raised Floor 1ST Floor R-0 Floor Crawlspace 1855 Existing No Front Wall 2 1 ST Floor Addition R-13 Wall 180 Front 85.5 59.3 90 New N/A Roof 4 1ST Floor Addition R-30 Roof Attic 40 New N/A Roof 5 1ST Floor Addition R-30 Roof Attic 60 New N/A Raised Floor 2 1ST Floor Addition R-19 Floor Crawlspace 60 New N/A Raised Floor 3 1 ST Floor Addition R-19 Floor Crawlspace 60 New N/A OPAQUE SURFACES — Cathedral Ceilings 01 02 03 04 05 06 07 08 09 10 11 1 12 13 Name Zone Type Orientatio n Area (ft2) Skylight Area (ft2) Roof Rise (x in 12) Roof Pitch Roof Tilt(deg) Roof Reflectan ce Roof Emittance Framin g Factor Status Verified Existing Condifion Roof 1ST Floor R-19 Roof Attic 1 Front 37.1 37 4 0.33 18.43 0.1 0.85 0.07 Existing No Roof 2 1ST Floor Addition R-30 Roof Attic Front 20.1 20 4 0.33 1 18.43 0.1 0.85 0.07 New NlA Registration Number: 215-A6356214A-000000000-0000 Registration Date/Time: 2015-10-13 13:13:09 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 Report Generated at: 2015-10-13 12:45:52 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Residential Building Calculation Date/Time: 12:45, Tue, Oct 13, 2015 Calculation Description: Title 24 Analysis Input File Name: 0150828 Dhrine Residence.xml CF1 R -PRF -01 Page 4 of 8 ATTIC 01 02 03 04 05 06 07 08 09 10 Name Construction Type Roof Rise Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Statu s Verified Existing Condition Attic 1ST Floor Attic Roof1ST Floor Ventilated 4 0.1 0.85 No No Enigsti No Attic 1 ST Floor Addition Attic Roof1 ST Floor Addition Ventilated 4 0.1 0.85 No No New No WINDOWS 01 02 03 04 05 06 07 08 09 10 11 Name Surface (Orientation -Azimuth) Width(ft) Multiplie Height (ft) r Area (ftz) U -factor SHGC Exterior Shading Status Verified Existing Condition Window New Front Wall (Front -180) ---- 1 30.6 0.32 0.25 Insect Screen (default) New N/A Window New 2 Front Wall (Front -180) ---- ---- 1 30.6 0.32 0.25 Insect Screen (default) New N/A Window Left Wall (Left -270) ---- ---- 1 4.0 0.55 0.67 Insect Screen (default) Existing No Window 2 Left Wall (Left -270) ---- ---- 1 13.7 0.55 0.67 Insect Screen (default) Existing No Window 3 Left Wall (Left -270) ---- - 1 11.3 055 0.67 Insect Screen (default) Existing No Window New 3 Left Wall (Left -270) - 1 19.7 0.32 0.25 Insect Screen (default) New N/A Sliding Glass Door Rear Wall (Back -0) - 1 50.6 0.53 0.67 Insect Screen (default) Existing No Sliding Glass Door 2 Rear Wall (Back -0) ---- ---- 1 50.6 0.53 0.67 Insect Screen (default) Existing No Sliding Glass Door New Rear Wall (Back -0) ---- ---- 1 101.0 0.32 0.29 Insect Screen (default) New N/A Window 4 Right Wall (Right -90) ---- ---- 1 21.4 0.55 0.67 Insect Screen (default) Existing No Window New 4 Right Wall (Right -90) ---- ---- 1 22.0 0.32 0.25 Insect Screen (default) New N/A Skylight New Roof (Front -180) ---- 1 37.0 0.42 0.32 None New N/A French Door Front Wall 2 (Front -180) ---- ---- 1 26.7 0.32 0.29 Insect Screen (default) New N/A Window 5 Front Wall 2 (Front -180) ---- 1 16.3 0.32 0.25 Insect Screen (default) New N/A Window 6 Front Wall 2 (Front -180) ---- ---- 1 16.3 0.32 0.25 Insect Screen (default) New N/A Skylight Roof 2 (Front -180) ---- ---- 1 20.0 0.42 0.32 None New N/A Registration Number: 215-A6356214A-000000000-0000 Registration Date/Time: 2015-10-13 13:13:09 HERS Provider: CaICERTS Inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 Report Generated at: 2015-10-13 12AS:S2 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Residential Building Calculation Date/Time: 12:45, Tue, Oct 13, 2015 Calculation Description: Title 24 Analysis Input File Name: 0150828 Dhrine Residence.xml CF1 R -PRF -01 Page 5 of 8 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 Total Cavity Winter Design Construction Name Surface Type Construction Type Framing R -value U -value Assembly Layers • Cavity/ Frame: no insul. / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Attic Roof ST Floor Attic Roofs Wood Framed Ceiling in. O.C. none 0.644 Roofing: Light Roof (Asphalt Shingle) • Floor Surface: Carpeted Floors Over Floor Deck: Wood Siding/sheathing/decking R-0 Floor Crawlspace Crawlspace Wood Framed Floor 2x12 @ 16 in. O.C. none 0.216 Cavity/ Frame: no insul. /2x12 • Inside Finish: Gypsum Board • Cavity / Frame: no insul. / 2x4 • Exterior Finish: Wood R-0 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O.C. none 0.302 Siding/sheathing/decking • Inside Finish: Gypsum Board Ceilings (below Cavity/Frame: R-9.1 /2x4 R-19 Roof Attic attic) Wood Framed Ceiling 2x4 @ 24 in. O.C. R 19 0.049 Over Floor Joists: R-9.9 insul. • Inside Finish: Gypsum Board • Cavity / Frame: R-19 / 2x4 • Roof Deck: Wood Siding/sheathing/decking R-19 Roof Atticl Cathedral Ceilings Wood Framed Ceiling 2x4 @ 24 in. O,C. R 19 0.057 Roofing: Light Roof (Asphalt Shingle) • Cavity / Frame: no insul. / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Attic Roof ST Floor Addition Attic Roofs Wood Framed Ceiling in. O.C. none 0.644 Roofing: Light Roof (Asphalt Shingle) • Floor Surface: Carpeted Floors Over Floor Deck: Wood Siding/sheathing/decking R-19 Floor Crawlspace Crawlspace Wood Framed Floor 2x6 @ 16 in. O.C. R 19 0.049 Cavity /Frame: R -19/2x6 • Inside Finish: Gypsum Board • Cavity/ Frame: R-13 / 2x4 • Exterior Finish: Wood R-13 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O.C. R 13 0.095 Siding/sheathing/decking • Inside Finish: Gypsum Board Ceilings (below Cavity / Frame: R-9.1 / 2x4 R-30 Roof Attic attic) Wood Framed Ceiling 2x4 @ 24 in. O.C. R 30 0.032 Over Floor Joists: R-20.9 insul. • Inside Finish: Gypsum Board • Cavity / Frame: R-30 / 2x4 • Roof Deck: Wood Siding/sheathing/decking R-30 Roof Atticl Cathedral Ceilings Wood Framed Ceiling 2x4 @ 24 in. O.C. R 30 0.042 Roofing: Light Roof (Asphalt Shingle) Registration Number: 215-A6356214A-000000000-0000 Registration Date/Time: 2015-10-13 13:13:09 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 Report Generated at: 2015-10-13 12:45:52 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Residential Building Calculation Description: Title 24 Analysis Calculation Date/Time: 12:45, Tue, Oct 13, 2015 Input File Name: 0150828 Dhrine Residence.xml CF1R-PRF-01 Page 6 of 8 WATER HEATING SYSTEMS 01 02 03 04 05 06 07 08 Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction M Status Verified Existing Condition DHW Sys 1 DHW Pipe Insulation, All Lines DHW Heater 1 1 Annual Altered No WATER HEATERS 01 02 03 04 05 06 07 08 Name Heater Element Type Tank Type Tank Volume (gal) Energy Factor or Efficiency Input Rating Tank Exterior Insulation R -value Standby Loss (Fraction) DHW Heater 1 Natural Gas Small Instantaneous 0 0.84 EF 185000-Btu/hr 0 0 WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 Name Pipe Insulation Parallel Piping Compact Distribution Point -of Use Recirculation with Manual Control Recirculation with Sensor Control DHW Sys 1 n/a n/a n/a n/a n/a n/a SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 07 08 09 Heating System Cooling System Distribution Fan Floor Area Verified Existing Name System Type Name Ducted Name Ducted System System Served Status Condition HVAC Systeml Other Heating and Heating Yes Cooling Yes Air Distribution HVAC Fan 1975 Altered No Cooling System Component 1 Component 1 System 1 1 HVAC - HEATING SYSTEMS 01 02 03 Name Type Efficiency Heating Component 1 CntrlFurnace - Fuel -fired central furnace 90 AFUE Registration Number: 215-A6356214A-000000000-0000 Registration Date/Time: 2015-10-13 13:13:09 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 Report Generated at: 2015-10-13 12:45:52 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Residential Building Calculation Description: Title 24 Analysis Calculation Date/Time: 12:45, Tue, Oct 13, 2015 Input File Name: 0150828 Dhrine Residence.xml CF1 R -PRF -01 Page 7 of 8 HVAC - COOLING SYSTEMS 01 02 03 04 05 06 07 Name Verified Airflow Efficiency Verified EER Multi -speed Verified Refrigerant Charge Name System Type EER SEER Zonally Controlled Compressor HERS Verification Cooling Component 1 SplitAirCond - Split air conditioning 11 14 No No Cooling Component Location system Status Condition Verification Air Distribution 1 -hers -cool HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component 1 -hers -cool Required 350 Not Required Not Required Not Required HVAC - DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 08 09 10 Insulation Supply Duct Return Duct Verified Existing HERS Name Type Duct Leakage R -value Location Location Bypass Duct Status Condition Verification Air Distribution Ducts located in attic Existing (not 6,0 » Attic Attic None Existing +New No N/A System 1 specified) HVAC - FAN SYSTEMS & HERS VERIFICATION 01 02 03 04 Name Type Fan Power (Watts/CFM) HERS Verification HVAC Fan 1 Single Speed PSC Furnace Fan 0.58 Required IAQ (Indoor Air Quality) FANS 01 02 03 04 05 Name IAQ CFM IAQ Fan Type IAQ Recovery Effectiveness(%) HERS Verification SFam IAQVentRpt 0 Default 0 Not Required Registration Number: 215-A6356214A-000000000-0000 Registration Date/Time: 2015-10-13 13:13:09 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 Report Generated at: 2015-10-13 12:45:52 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Residential Building Calculation Date/Time: 12:45, Tue, Oct 13, 2015 Calculation Description: Title 24 Analysis Input File Name: 0150828 Dhrine Residence.xml CF1 R -PRF -01 Page 8 of 8 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Nicholas Bignardi Company: Signature Date: FRI Energy Consultants, LLC. 2015-10-13 12:49:43 Address: CEA/HERS Certification Identification (If applicable): 21 N. Harrison Ave, City/State/Zip: Phone: Campbell, CA 95008 408-866-1620 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name: Responsible Designer Signature: ,qnat So�oi Anat Sokol Company: Date Signed: Sokol design 2015-10-13 13:13:09 Address: License: 1430 hawk ct N/A City/State/Zip: Phone: sunnyvale, CA 94087 408-506-1229 Digitally signed by CaICERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 215-A6356214A-000000000-0000 Registration Date/Time: 2015-10-13 13:13:09 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-08252015-744 Report Generated at: 2015-10-13 12:45:52 RESIDENTIAL MEASURES SUMMARY RMS -1 Project Name Dhrine Residence Building Type m Single Family ❑ Addition Alone ❑ Multi Family m Existing+ Addition/Alteration 11011312015 Date Project Address 20143 Suisun Drive Cupertino California Energy Climate Zonotal CA Climate Zone 04e Cond. Floor Area T 1,975 Addition 120 # of Units 1 INSULATION Construction Type Area Cavity (ft) Special Features Status Floor Wood Framed w/Crawl Space - no insulation 1,855 Existing Wall Wood Framed - no insulation 993 Existing Roof Wood Framed Attic R 19 1,818 Existing Floor Wood Framed w/Crawl Space R 19 120 New Wall Wood Framed R 13 58 New Roof Wood Framed Attic R 30 100 New FENESTRATION I Total Area: 472 Glazing Percentage: 23.9%1 Orientation Area(ft) U -Fac SHGC Overhang Sidefins New/Altered Average U -Factor: 0.34 Exterior Shades Status Front (S) 93.8 0.320 0.25 none none Bug Screen New Left (W) 29.0 0.550 0.67 none none Bug Screen Existing Left (W) 19.7 0.320 0.25 none none Bug Screen New Rear (N) 101.2 0.530 0.67 none none Bug Screen Existing Rear (N) 101.0 0.320 0.29 none none Bug Screen New Right (E) 21.4 0.550 0.67 none none Bug Screen Existing Right (E) 22.0 0.320 0.25 none none Bug Screen New Skylight 37.0 0.420 0.32 none none None New Front (S) 26.7 0.320 0.29 none none Bug Screen New Skylight 20.0 0.420 0.32 none none None New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Central Furnace 90% AFUE Split Air Conditioner 14.0 SEER Setback Altered HVAC DISTRIBUTION Location Heating Cooling Duct Location Duct R -Value Status HVAC System Ducted Ducted Attic 6.0 Altered WATER HEATING Qty. Type Gallons Min. Eff Distribution Status 1 Small Instantaneous Gas 0 0.84 All Pipes Ins Altered Ener Pro 6.7 bV Ener Soft User Number. 1315 RunCode: 2015-10-13T12:47:59 ID. 0150828 Page 3 of 8 2013 Low -Rise Residential Mandatory Measures Summary NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measures listed, regardless of the .,,.e ..,I- -d 1 Rovio thv rvvnartive rnde .vertinn fnr mnre ininrmatinn_ Building Envelope Measures: § 110.6(a)1: Doors and windows between conditioned and unconditioned spaces are manufactured to limit air leakage. Fenestration products (except field -fabricated windows) have a label listing the certified U -Factor, certified Solar Heat Gain § 110.6(a)5: Coefficient SHGC , and infiltration that meets therequirements of § 10-111 a). §110.7: Exterior doors and windows are weatherstripped; all joints and penetrations are caulked and sealed. § 110.8(a): Insulation specified or installed meets Standards for Insulating Material. Indicate type and include on the CF2R. The thermal emittance and aged solar reflectance values of the cool roofing material meets the requirements of § 110.8(i) when the § 110.8(i): installation of a cool roof is specified on the CFIR. § 110.80): A radiant barrier shall have an emittance of 0.05 or less when the installation of a radiant barrier is specified on the CF I R. Minimum R-30 insulation in wood -frame ceiling; or the weighted average U -factor shall not exceed 0.031. Minimum R-19 in a §150.0(a): rafter roof alteration. Attic access doors shall have permanently attached insulation using adhesive or mechanical fasteners. The attic access shall be gasketed to prevent air leakage. § 150.0(b): Loose fill insulation shall conform with manufacturer's installed design labeled R -value. Minimum R-13 insulation in 2x4 inch wood framing wall or have a U -factor of 0.102 or less (R-19 in 2x6 or 0.074 maximum U - [E§150.0(c): factor). §150.0(d): Minimum R-19 insulation in raised wood -frame floor or 0.037 maximum U -factor. In Climate Zones 14 and 16 a Class 11 vapor retarder shall be installed on the conditioned space side of all insulation in all exterior §150.0(g)1: walls, vented attics and unvented attics with air -permeable insulation. In Climate Zones 1-16 with unvented crawl spaces the earth floor of the crawl space shall be covered with a Class I or Class II §150.0(g)2: vapor retarder. In a building having a controlled ventilation crawl space, a Class I or Class II vapor retarder shall be placed over the earth floor of § 150.0(g)3: the crawl space to reduce moisture entry and protect insulation from condensation, as specified in the exception to Section 150.0(d). Slab edge insulation shall: have a water absorption rate, for the insulation material alone without facings, no greater than 0.3%; § 150.0(1): have water vapor permeance rate is no greater than 2.0 penY/inch, be protected from physical damage and UV light deterioration; and when installed as part of a heated slab floor meets therequirements of § 110.8 . Fenestration, including skylights, separating conditioned space from unconditioned space or outdoors shall have a maximum U- 150.0 § (q)' factor of 0.58; or the weighted averse U -factor of all fenestration shall not exceed 0.58. Fireplaces, Decorative Gas Appliances and Gas Log Measures: §150.0(e)IA: Masonry or factory -built fireplaces have a closable metal or glass door covering the entire opening of the firebox. Masonry or factory -built fireplaces have a combustion outside air intake, which is at least six square inches in area and is §150.0(e)1B: equipped with a readily accessible, operable, and tight -fitting damper or a combustion -air control device. § 150.0(e)1C: Masonry or factory -built fireplaces have a flue damper with a readily accessible control. Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside § 150.0(e)2: of the building, are prohibited. Space Conditioning, Water Heating and Plumbing System Measures: §110.0-§110.3: HVAC equipment, water heaters, showerheads, faucets and all other regulated appliances are certified to the Energy Commission. Fater heating recirculation loops serving multiple dwelling units meet the air release valve, backflow prevention, pump isolation § 110.3(e)5: valve, and recirculation loop connection requirements of §I 10.3(c)5. Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces, household cooking appliances (appli- §110.5: ances without an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt), and pool ands a heaters. Heating and/or cooling loads are calculated in accordance with ASHRAE, SMACNA or ACCA using design conditions specified §150.0(h)1: in § 150.0 2. Installed air conditioner and heat pump outdoor condensing units shall have a clearance of at least five feet from the outlet of any § 150.0(h)3A: dryer vent. § 150.0(i): Heating systems are equipped with thermostats that meet the setback requirements of § 110.2(c). Storage gas water heaters with an energy factor equal to or less than the federal minimum standards shall be externally wrapped §150.0(j)lA: with insulation having an installed thermal resistance of R-12 or greater. Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, have R-12 external § 150.0(j)1 B: insulation or R-16 internal insulation where the internal insulation R -value is indicated on the exterior of the tank. For domestic hot water system piping, whether buried or unburied: the first 5 feet of hot and cold water pipes from the storage tank, all piping with a nominal diameter of 3/4 inch or larger, all piping associated with a domestic hot water recirculation system § 150.00)2A: regardless of the pipe diameter, piping from the heating source to storage tank or between tanks, piping buried below grade, and all hot water pipes from the heating source to kitchen fixtures must be insulated according to the requirements of TABLE 120.3- A. All domestic hot water pipes that are buried below grade must be installed in a water proof and non -crushable casing or sleeve §150.00)2B: that allows for installation, removal, and replacement of the enclosed pipe and insulation. 2013 Low -Rise Residential Mandatory Measures Summary § 150.00)2C: Pipe for cooling system lines shall be insulated as specified in § I50.06)2A. Piping insulation for steam and hydronic heating systems or hot waters stems with pressure > 15 psig shall meet therequirements in TABLE 120.3-A. § 150.06)3: Insulation is protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation exposed to weather shall either be rated for outdoor use or installed with a cover suitable for outdoor service. For §150.00)3A: example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation protected as specified or painted with coating that is water retardant and provides shielding from solar radiation that degrades the material. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space shall have a Class I § 150.00)3B: or Class II vapor retarding facing, or the insulation shall be installed at the thickness that qualifies as a Class I or Class II vapor retarder. Systems using gas or propane water heaters to serve individual dwelling units shall include: a 120V electrical receptacle within 3 feet of the water heater; a Category III or IV vent, or a Type B vent with straight pipe between the outside termination and the § 150.0(n)1: space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the installed water heater, and allows natural draining without pump assistance; and a gas supply line with a capacity of at least 200,000 Btu/hr. § 150.0(n)2: Recirculating loops serving multiple dwelling units shall meet the requirements of §l 10.3(c)5. Solar water -heating systems and collectors shall be certified and rated by the Solar Rating and Certification Corporation (SRCC) § 150.0(n)3: or by a testing enc roved by the Executive Director. Ducts and Fans Measures: All air -distribution system ducts and plenums installed are sealed and insulated to meet the requirements of CMC §601.0, §602.0, §603.0, §604.0, §605.0 and ANSI/SMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-6.0 (or higher if required by CMC §605.0) or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing (RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts are mechanically fastened. Openings shall be sealed § 150.0(m)l: with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181A, or UL 18113 or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than '/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. Factory -Fabricated Duct Systems shall comply with specified requirements for duct construction, connections, and closures; joints § 150.0(m)2: and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands. §150.0(m)3-6: Field -Fabricated Duct Systems shall comply with requirements for: pressure -sensitive tapes, mastics, sealants, and other requirements specified for duct construction; duct insulation R -value ratings; duct insulation thickness; and duct labeling. All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or automatic §150.0(m)7: dampers. § 150.0(m)8: Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers except combustion inlet and outlet air openings and elevator shaft vents. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not limited to the following: insulation exposed to weather shall be suitable for outdoor service. For example, protected by aluminum, § 150.0(m)9: sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation. §150.0(m)10: Flexible ducts cannot have porous inner cores. When space conditioning systems use forced air duct systems to supply conditioned air to an occupiable space, the ducts shall be §150.0(m)11: sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 feet in length and through a thermal §150.0(m)12: conditioning component, except evaporative coolers, shall be provided with air filter devices that meet the requirements of §150.0(m)12. Space conditioning systems that utilize forced air ducts to supply cooling to an occupiable space shall have a hole for the placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the supply plenum. The §150.0(m)13: space conditioning system must also demonstrate airflow >_ 350 CFM per ton of nominal cooling capacity through the return grilles, and an air -handling unit fan efficacy 5 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Zonally controlled central forced air cooling systems shall be capable of simultaneously delivering, in every zonal control mode, § 150.0(m)15: an airflow from the dwelling, through the air handler fan and delivered to the dwelling, of >_ 350 CFM per ton of nominal cooling capacity, and operating at an air -handling unit fan efficacy of <_ 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. All dwelling units shall meet the requirements of ASHRAE Standard 62.2. Neither window operation nor continuous operation of §150.0(0): central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of providing the Whole Building Ventilation. §150.0(o)IA: Whole Building Ventilation airflow shall be confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Pool and Spa Heating Systems and Equipment Measures: Any pool or spa heating system shall be certified to have: a thermal efficiency that complies with the Appliance Efficiency § 110.4(a): Regulations; an on-off switch mounted outside of the heater that allows shutting off the heater without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and shall not use electric resistance heating. 2013 Low -Rise Residential Mandatory Measures Summary Any pool or spa heating equipment shall be installed with at least 36 inches of pipe between filter and heater or dedicated suction § 110.4(b)1: and return lines, or built-up connections for future solar heating. § 110.4(b)2: Outdoor pools or spas that have a heat pump or gas heater shall have a cover. § 110.4(b)3: Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or pro - ed to run only during off-peak electric demand periods. § 110.5: Natural gas pool and spa heaters shall not have a continuous burning pilot light. §150.0(p): Residential pool systems or equipment shall meet specified pump sizing, flow rate, piping, filters, and valve requirements. Lighting Measures: § 110.9: All lighting control devices and systems, ballasts, and luminaires shall meet the applicable requirements of § 110.9. Installed luminaires shall be classified as high -efficacy or low -efficacy for compliance with §150.0(k) in accordance with TABLE §150.0(k)IA: 150.0-A or TABLE 150.0-B, as applicable. When a high efficacy and low efficacy lighting system are combined in a single luminaire, each system shall separately comply § 150.0(k)IB: with the applicable provisions of § 150.0 . The wattage and classification of permanently installed luminaires in residential kitchens shall be determined in accordance with § I30.0(c). In residential kitchens, the wattage of electrical boxes finished with a blank cover or where no electrical equipment has §150.0(k)IC: been installed, and where the electrical box can be used for a luminaire or a surface mounted ceiling fan, shall be calculated as 180 watts of low efficacy lighting er electrical box. § 150.0(k) I D: Ballasts for fluorescent lamps rated 13 watts or greater shall be electronic and shall have an output frequency no less than 20 kHz. Permanently installed night lights and night lights integral to installed luminaires or exhaust fans shall be rated to consume no §150.0(k)IE: more than 5 watts of power per luminaire or exhaust fan as determined in accordance with §130.0(c). Night lights do not need to be controlled by vacancy sensors. §150.0(k)IF: Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods) shall meet the applicable requirements of § 150.0(k). § 150.0(k)2A: High efficacy luminaires must be switched separately from low efficacy luminaires. § 150.0(k)2B: Exhaust fans shall be switched separately from lighting systems. § I50.0(k)2C: Luminaires shall be switched with readily accessible controls that permit the luminaires to be manually switched ON and OFF. § 150.0(k)2D: Controls and equipment are installed in accordance with manufacturer's instructions. § 150.0(k)2E: No control shall bypass a dimmer or vacancy sensor function if the control is installed to comply with § 150.0(k). §150.0(k)2F: Lighting controls comply with applicable requirements of §110.9. An Energy Management Control System (EMCS) may be used to comply with dimmer requirements if. it functions as a dimmer § 150.0(k)2G: according to § 110.9; meets Installation Certificate requirements of § 130.4; the EMCS requirements of § 130.5; and all other requirements in150.0(k)2. An Energy Management Control System (EMCS) may be used to comply with vacancy sensor requirements of §150.0(k) if: it § 150.0(k)2H: functions as a vacancy sensor according to § 110.9; meets Installation Certificate requirements of § 130.4; the EMCS requirements of § 130.5; and all other requirements in § 150.0(k)2. A multiscene programmable controller may be used to comply with dimmer requirements of this section if it provides the § 150.0(k)2I: functionality of a dimmer according to § 110.9, and complies with all other applicable requirements in § I50.0(k)2. § 150.0(k)3A: A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. Kitchen lighting includes all permanently installed lighting in the kitchen except internal lighting in cabinets that illuminate only § 150.0(k)3B: the inside of the cabinets. Lighting in areas adjacent to the kitchen, including but not limited to dining and nook areas, are considered kitchen lighting if they are not separately switched from kitchen lighting. § 150.0(k)4: Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of illuminated Permanently § 150.0(k)5: A minimum of one high efficacy luminaire shall be installed in each bathroom; and all other lighting installed in each bathroom shall be high efficacy or controlled by vacancy sensors. Lighting installed in attached and detached garages, laundry rooms, and utility rooms shall be high efficacy luminaires and §150.0(k)6: controlled by vacancy sensors. Lighting installed in rooms or areas other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high § I50.0(k)7: efficacy, or shall be controlled by either dimmers or vacancy sensors. Luminaires recessed into ceilings shall: be listed for zero clearance insulation contact (IC) by Underwriters Laboratories or other nationally recognized testing/rating laboratory; have a label that certifies that the luminaire is airtight with air leakage less than 2.0 CFM at 75 Pascals when tested in accordance with ASTM E283; be sealed with a gasket or caulk between the luminaire housing §150.0(k)8: and ceiling, and shall have all air leak paths between conditioned and unconditioned spaces sealed with a gasket or caulk; and allow ballast maintenance and replacement without requiring cutting holes in the ceiling. For recessed compact fluorescent luminaries with ballasts to qualify as high efficacy for compliance with § 150.0(k), the ballasts shall be certified to the Energy Commission to comply with the applicable requirements in § 110.9. For single-family residential buildings, outdoor lighting permanently mounted to a residential building or other buildings on the same lot shall be high efficacy, or may be low efficacy if it meets all of the following requirements: i. Controlled by a manual ON and OFF switch that does not override to ON the automatic actions of Items ii or iii below; and § 150.0(k)9A: ii. Controlled by a motion sensor not having an override or bypass switch that disables the motion sensor, or controlled by a motion sensor having a temporary override switch which temporarily bypasses the motion sensing function and automatically reactivates the motion sensor within 6 hours; and iii. Controlled by one of the following methods: 2013 Low -Rise Residential Mandatory Measures Summary a. Photocontrol not having an override or bypass switch that disables the photocontrol; or b. Astronomical time clock not having an override or bypass switch that disables the astronomical time clock, and which is programmed to automatically turn the outdoor lighting OFF during daylight hours; or c. Energy management control system which meets all of the following requirements: At a minimum provides the functionality of an astronomical time clock in accordance with §110.9; meets the Installation Certification requirements in §130.4; meets the requirements for an EMCS in § 130.5; does not have an override or bypass switch that allows the luminaire to be always ON; and, is programmed to automatically turn the outdoor lighting OFF during daylight hours. For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies, and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site shall comply with one of the § 150.0(k)9B: following requirements: i. Shall comply with § 150.0(k)9A; or ii. Shall comply with the applicable requirements in 110.9, §130.0, §130.2, 130.4, §140.7 and 141.0. For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by §150.0(k)9B or 150.0(k)9D §150.0(k)9C: shall comply with the applicable requirements in 110.91 130.0, 130.2 130.4, 140.7 and 141.0. Outdoor lighting for residential parking lots and residential carports with a total of eight or more vehicles per site shall comply § 150.0(k)9D: with the applicable requirements in § 110.9, § 130.0, § 130.2, § 130.4, § 140.7 and § 141.0. Internally illuminated address signs shall comply with § 140.8; or shall consume no more than 5 watts of power as determined §150.0(k)10: according to § 130.0(c). Lighting for residential parking garages for eight or more vehicles shall comply with the applicable requirements for § I50.0(k)11: nonresidential garages in § 110.9, § 130.0, § 130. 1, § 130.4 § 140.6, and § 141.0. In a low-rise multifamily residential building where the total interior common area in a single building equals 20 percent or less of § 150.0(k)12A: the floor area, permanently installed lighting for the interior common areas in that building shall be high efficacy luminaires or controlled by an occupant sensor. In a low-rise multifamily residential building where the total interior common area in a single building equals more than 20 percent of the floor area, permanently installed lighting in that building shall: i. Comply with the applicable requirements in § 110.9, § 130.0, § 130. 1, § 140.6 and § 141.0; and § 150.0(k)12B: ii. Lighting installed in corridors and stairwells shall be controlled by occupant sensors that reduce the lighting power in each space by at least 50 percent. The occupant sensors shall be capable of turning the light fully On and Off from all designed paths of ingress and egress. Solar Ready Buildings: Single family residences located in subdivisions with ten or more single family residences and where the application for a § 110.10(a)l: tentative subdivision map for the residences has been deemed complete, by the enforcement agency, on or after January 1, 2014, shall comply with the requirements of § 110.10(b) throw 110.10 e . §I10.10(a)2: Low-rise multi -family buildings shall comply with therequirements of §I 10.10(b) through §I 10.10(d). The solar zone shall have a minimum total area as described below. The solar zone shall comply with access, pathway, smoke ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local jurisdiction. The solar zone total area shall be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for §110.10(b)l: buildings with roof areas greater than 10,000 square feet. For single family residences the solar zone shall be located on the roof or overhang of the building and have a total area no less than 250 square feet. For low-rise multi -family buildings the solar zone shall be located on the roof or overhang of the building or on the roof or overhang of another structure located within 250 feet of the building or on covered parking installed with the building project and have a total area no less than 15 percent of the total roof area of the building excluding any skylight area. § 110.10(b)2: All sections of the solar zone located on steep -sloped roofs shall be oriented between 110 degrees and 270 degrees of true north. No obstructions, including but not limited to, vents, chimneys, architectural features, and roof mounted equipment, shall be § 110.10(b)3A: located in the solar zone. Any obstruction, located on the roof or any other part of the building that projects above a solar zone shall be located at least twice § 110.10(b)3B: the distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of the nearest point of the solar zone, measured in the vertical lane. For areas of the roof designated as solar zone, the structural design loads for roof dead load and roof live load shall be clearly § 110.10(b)4: indicated on the construction documents. The construction documents shall indicate: a location for inverters and metering equipment and a pathway for routing of conduit from the solar zone to the point of interconnection with the electrical service (for single family residences the point of § 110.10(c): interconnection will be the main service panel); a pathway for routing of plumbing from the solar zone to the water -heating system. A copy of the construction documents or a comparable document indicating the information from § 110.10(b) through § 110.10(c) § 110.10(d): shall be provided to the occupant. § 110.10(e)1: The main electrical service panel shall have a minimum busbar rating of 200 amps. The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a § 110.10(e)2: future solar electric installation. The reserved space shall be: positioned at the opposite (load) end from the input feeder location or main circuit location, and permanently marked as "For Future Solar Electric'. HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Dhrine Residence Date 10/13/2015 System Name HVAC System Floor Area 1,975 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,298 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 39,672 26,392 1,111 943 35,706 Total Output (Btuh) 39.672 0 Output Btuh/s ft 20.1 1,197 1,983 Cooling System 0 0 Output per System 36,000 0 0 0 0 Total Output Btuh 36,000 0 1.111 0 Total Output Tons 3.0 1,197 1,983 Total Output Btuh/s ft 18.2 Total Output s ft/Ton 658.3 28,786 39,672 Air System CFM per System 0 HVAC EQUIPMENT SELECTION Airflow cfm 0 90% AFUE (14 SEER) 34,317 0 39,672 Airflow cfm/s ft 0.00 Airflow cfm/Ton 0.0 Outside Air (%) 0-0% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 34,317 0 39,672 Aug 3 PM Jan 1 AM Outside Air (cfm/sgft) 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak 28 Outside Air 0 cfm 66 IF Heating Coil i 103 OF "-Z ROO'm 68 IF COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 88/68°F Outside Air Ar 0 cfm 76/62°F 55/54°F Cooling Coil 46.5% ROOM EnergyPro 6.7 by EnergySoff User Number: 1315 RunCode: 201 5-10-13 712:47:59 ID 0150828 Page 8 of 8