Loading...
15070021CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO: 15070021 10320 MORETTI DR CUPERTINO CA 95014 (375 15 009) (CHEN'S CONSTRUCTION COMPANY) SAN JOSE, CA 95130 OWNER'S NAME: ( LAI LEE JEE-JEAN TRUSTEE) DATE ISSUED: OWNER'S PHONE: PHONE NO: LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: License Class Lia # Contractor (CHEN'S CONSTRUCTION COMPANY) Date —BLDG —ELECT —PLUMB I hereby affirm that I am licensed under the previsions of Chapter 9 (commencing MECH _ RESIDENTIAL _ COMMERCIAL with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. JOB DESCRIPTION: CONSTRUCT N 1 STORY SFD WITH 1,965 S.F. LIVING I hereby affirm under penalty of perjury one of the following two declarations: SPACE, 452 S.F. GARAGE & 40 S.F. PORCH/DECKS r. I have and wilt maintain a certificate of consent to self -insure for Worker's (2,457 COMBINED)**SUNNYVALE SANITARY** Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which Sq. Ft Floor Area: Valuation: $365000.00 this permit is issued. APPLICANT CERTIFICATION certify that I have read this application and state that the above information is correct. I agree to comply with all city and county APN Number: Occupancy Type: ordinances and state laws relating to building construction, and hereby 375 15 009 authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and PERMIT EXPIRES IF WORK IS NOT STARTED expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE 012 granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal 180 DAYS FROM LAST CALLED INSPECTION. Code, Section 9.18. Issued by: -1 Signature Date Date: OWNER -BUILDER DECLARATION RE -ROOFS: I hereby affirm that I am exempt from the Contractor's License Law for one of the All roofs shall be inspected prior to any roofing material being installed. If a roof is following two reasons: installed without first obtaining an inspection,. I agree to remove all new materials for 1. I, as owner of the properly, or my employees with wages as their sole inspection. compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044; Business & Professions Code) Signature of Applicant 2. I, as owner of the property, am exclusively contracting with licensed Date: contractors to construct the project (Sec. 7044, Business & Professions Code). ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: 1. I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the HAZARDOUS MATERIALS DISCLOSURE performance of the work for which this permit is issued. I have read the hazardous materials requirements under Chapter 6.95 of the 2. I have and will maintain Worker's Compensation Insurance, as provided for California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will by Section 3700 of the Labor Code, for the performance of the work for which maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(x) should I store or handle hazardous this permit is issued. material. Additionally, should I use equipment or devices which emit hazardous 3. I certify that in the performance of the work for which this permit is issued, I air contaminants as defined by the Bay Area Air Quality Management District I shall not employ any person in any manner so as to become subject to the will maintain compliance with the Cupertino Municipal Code, Chapter 9,12 and Worker's Compensation laws of California. If, after making this certificate of the Health & Safety Code, Sections 25505, 25533, and 25534. exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must forthwith comply with such provisions or this permit shall Owner or authorized agent: be deemed revoked. Date: APPLICANT CERTIFICATION CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance I certify that I have read this application and state that the above information is of work's for which this permit is issued (Sec. 3097, Civ C.) correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city Lender's Name to enter upon the above mentioned property for inspection purposes. (We) agree Lender's Address to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in ARCHITECT'S DECLARATION consequence of the granting of this permit. Additionally, the applicant I understand my plans shall be used as public records. understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Licensed Professional Signature Date CUPERTINO CONTRACTOR / SUBCONTRACTOR LIST Building Department City Of Cupertino 10300 Torre Avenue Cuertno, CA 95014-3255 I hone: 408-777-3228 Fax: 408-777-3333 JOB ADDRESS:PERMIT# SUBCONTRACTOR BUSINESS NAME OWNER'S NAM e: LAI LEFE aSC LICENSE GENERAL CONTRACTOR- CA /, Cno. Gcct�_av_� -PHONE# BUSINESS LICENSE # ADDRESS: lVoMaJ8v CITY/ZIPCODE: Cement Finishing --- --ill-wal ­­ —quiles an ijusinesse4iworiung in tne city to nave a Uity of Cupertino,b siness license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEIIULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBC ,NTRACTORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. I am not using any subcontractors:> 3 Signature hate Please check applicable subcontractors and complete the following information: V SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE Cabinets & Millwork Cement Finishing 1 Electrical Excavation, Fencing Flooring / Carpeting Linoleum / Wood Glass Glazing Heating Insulation Landscaping Lathing Masonry Painting Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal ,Sheet Rock Tile Owner / Contractor Signature Date CITY OF CUPERTINO BUILDING PERMIT I BUILDING ADDRESS: CONTRACTOR: PERMIT NO: 15070021 10320 MORETTI DR CUPERTINO CA 95014 (375 15 009) (CHEN'S CONSTRUCTION COMPANY) SAN JOSE, CA 95130 OWNER'S NAME: ( LAI LEE JEE-JEAN TRUSTEE) DATE ISSUED: OWNER'S PHONE: LICENSED CONTRACTOR'S DECLARATION License Class Lic. # �% 0 t' 1 i L G] I� i b Contractor (CHES CENSTRUCTI•N , WY Date I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. IMI: BUILDING PERMIT INFO: BLDG —ELECT -PLUMB MECH _ RESIDENTIAL _ COMMERCIAL JOB DESCRIPTION: CONSTRUCT (N) 1 STORY SFD WITH 1,965 S.F. LIVING I hereby affirm under penalty of perjury one of the following two declarations: SPACE, 452 S.F. GARAGE & 40 S.F. PORCHIDECKS i. I have and will maintain a certificate of consent to self -insure for Worker's (2,457 COMBINED)' 'SUNNYVALE SANITARY" Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for VI _ by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Sq. Ft Floor Area: Valuation: $365000.00 APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. n Signature {C 4tDate I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: 1. I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). hereby affirm under penalty of perjury one of the following three declarations: 1. I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. s. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Sig Date APN Number: Occupancy Type: 375 15 009 PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FR^". �f' o i' CALLED INSPECTION. lnwtl-13y: -� �_� 1119116 Date: RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without fust obtaining an inspection, I agree to remove all new materials for inspection. Signature of Date: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Sections 25505, 251-33, and 25534. Owner or authorized agent: Date: < < M�CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's Address ARCHITECT'S DECLARATION understand my plans shall be used as public records. Licensed Professic CONSTRUCTION PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 •FAX (408) 777-3333 • building(-cupertino.org / S 0CU/PERTlN4 NEW CONSTRUCTION El ADDITION ❑ALTERATION / TI ❑ REVISION/ DEFERRED ORIGINAL PERMIT 4 PROJECT ADDRESS D ] ^ O p `/� r O D APN # 5-- 1,5-- OWNER NAME oM PHONE n E-MAIL wpb. STREET ADDRESS � � I,G CITY, STATE, ZIP d FAX V -� PHONED� E-MAIL�� CONTACT NAME-� � I STREET ADDRESS J_ /1 '��Vo'A ky �❑l CITY, STATE, ZIP- �r°� /l 71 FAX Om" 11 OWNER -BUDDER ❑ ONTcRAGENr CONTRACTOR ❑ CONTRACTOR AGENT ❑ ARCHrrFcT ❑ ENGINEER ❑ DEVELOPER ❑ TENANT CONTRACTOR NAME • LICENSE NUMBER LICENSE TYPE BUS. LIC # COMPANY NAME E-MAIL FAX STREET ADDRESS CITY, STATE, ZIP PHONE ARCHITECTIENGINEER NAME LICENSE NUMBER BUS. LIC # COMPANY NAME E-MAIL FAX STREET ADDRESS CITY, STATE, ZIP PHONE DESCRIPTION OF WORK� � e � _ c L) lbor 920 k5F ()�-ge TO4-ish -t /1/kbe— 1 % S (4 c - C'✓`� 7f EXISTING USE PROPOSED USECONSTR TYPE # STORIES USE TYPE I OCC. SQ.FT. VALUATION (S) AREA / AREA/ 1 L 7 NEWNEWFLOOR AREA 1 dKITCHEN DEMO / AREA BATHROOM OTHER REMODEL AREA REMODEL AREA REMODEL AREA PORCH AREA DECK AREA TOTAL DECK/PORCH ARE I GARAGE AREA: DETACH 'LOC W,45,4- REATTACH # DWELLA'G UNITS: IS A SECONDUNIT ❑ YES SECOND STORY []YES/ BErNGADDED? . �No ADDITION? ; NO PRE -APPLICATION ❑ YES IF YES, PROVIDE COPY OFt"SICTER PLANNGAPPL# RINO PLANNINGAPPROVALLETTERHOME? BLDG AN 11YES NOM '' QLD - OTAL VALUAT N: O0 By my signature below, I certify to each of the following: I am the property owror authorize aeent to ac a owner's behalf. I have read this application and the information I have provided is correct. I }lave read the Description of Work and verify urate. I agree to comply with all applicable local ordinances and state laws relating to buuilding constru n. I aukhorize representatives -of Cupertino to enter the above- tified op rt for in ection purposes. Signature of Applicant/Agent: Date:! 9 SUPPLEMENTAL IIRFORMATION REQUIRED New SFD or Multifamily dwellings: Apply for demolition permit for existing building(s). Demolition permit is required prior to issuance of buildir- permit for new building _ Commercial Bldgs: Provide a completed Hazardous Materials Disclosure <r,v, �,i;u, _ form if any Hazardous Materials are being used as part of this project. _ Copy of Planning Approval Letter or Meeting with Planning prior to submittal of Building Permit application. BldgApp_2011.doc revised 06/21/11 SF RPM��,M CITY OF CUPERTINO FEE ESTIMATOR - BUILDING DIVISION OCCUPANCY TYPE: ADDRESS: 10320 MORETTI DR DATE: 07/06/2015 REVIEWED BY: MELISSA PC FEE ID APN: 37515 009 BP#: 'VALUATION: 1$365,000 *PERMIT TYPE: Building Permit PLAN CHECK TYPE: New Construction PRIMARY USE: SFD or Duplex 2nd Unit? Yes No PENTAMATION PERMIT TYPE: 1 R3SFD WORK CONSTRUCT N 1 STORY SFD WITH 1,974 S.F. LIVING SPACE 452 S.F. GARAGE & 80 S.F. SCOPE I PORCH/DECKS (2,506 COMBINED) OCCUPANCY TYPE: TYPE OF CONSTR. FLR AREA s.f. PC FEES PC FEE ID BP FEES BP FEE ID R-3 (Custom) II-B,111-B,IV,V-B 2,506 $2,984.61 IR3PLNCK $2,821.63 1R31NSP Permit Fee: $2,821.63 Suppl. Insp. Fee -0 Reg. 0 OT 0.0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Construction Tax: IBCONSTAXR 1" # new units $684.98 Administrative 1,ee: 0 O Work Without Permit? 0 Yes No $0.00 TOTALS: 2,506 $2,984.61 i"ruvc�l L7vcutnc�nlalirtn 1 $2,821.63 Strong Motion Fee: IBSEISMICR NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School Lstrirt ot.- )_ neve feet aro hated an the nreliminary information available and are only an estimate. Contact the Dept for addn'1 info. FEE ITEMS (Fee Resolution 11-053 fff. 711113) Afech. Plan Check Plumb. flan Check ec. Plan Check ;bfecI, Permit Fee: Plug. Elec. Permit Fee Other Alcch. Ins) Other Plumb Ing?Ll Other lilec. Insp. E17-- 3dech. Insp. Pee: Plumb. Insp. Hee: Elec. Insp. Fee: NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School Lstrirt ot.- )_ neve feet aro hated an the nreliminary information available and are only an estimate. Contact the Dept for addn'1 info. FEE ITEMS (Fee Resolution 11-053 fff. 711113) FEE QTY/FEE MISC ITEMS Plan Check Fee: $2,984.61 Select a Misc Bldg/Structure or Element of a Building Supp/. PC Fee: Q Reg. ®OT 0.0 hrs $0.00 PME Plan Check: $0.00 Permit Fee: $2,821.63 Suppl. Insp. Fee -0 Reg. 0 OT 0.0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Construction Tax: IBCONSTAXR 1" # new units $684.98 Administrative 1,ee: 0 O Work Without Permit? 0 Yes No $0.00 Advanced Planning Fee: IPLLONGR $350.84 Select a Non -Residential Q Building or Structure 0 i i"ruvc�l L7vcutnc�nlalirtn 1 Strong Motion Fee: IBSEISMICR $47.45 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $15.00 SUBTOTALS: $6,904.51 $0.00 TOTAL FEE: $6,904.51 Revised: 07/02/2015 2013 Low -Rise Residential Mandatory Measures Summary NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measur : e ,s t e com liance a roach used Face tions ma a Iv. Review the res ective code section or more in orodtion. � Building Envelope Measures: § 110.6(a)1: Doors and windows between conditioned and unconditioned spaces are manufactured to limit air leakage. Fenestration products (except field -fabricated windows) have a label listing the certified U -Factor, certified Solar Heat Gain § 110.6(a)5: Coefficient SHGC , and infiltration that meets the requirements of § 10-111 (a). § 110.7: Exterior doors and windows are weatherstripped; all joints and penetrations are caulked and sealed. §I 10.8(a): Insulation specified or installed meets Standards for Insulating Material. Indicate type and include on the CF2R. The thermal emittance and aged solar reflectance values of the cool roofing material meets the requirements of §1 10.8(i) when the § 110.8(1): installation of a cool roof is specified on the CF 1 R. §110.80): A radiant barrier shall have an emittance of 0.05 or less when the installation of a radiant barrier is specified on the CF1R. Minimum R-30 insulation in wood -frame ceiling; or the weighted average U -factor shall not exceed 0.031. Minimum R-19 in a §150.0(a): rafter roof alteration. Attic access doors shall have permanently attached insulation using adhesive or mechanical fasteners. The attic access shall be gasketed to prevent air leakage. §150.0(b): Loose fill insulation shall conform with manufacturer's installed design labeled R -value. Minimum R-13 insulation in 2x4 inch wood framing wall or have a U -factor of 0.102 or less (R-19 in 2x6 or 0.074 maximum U - § 150.0(c): factor). §150.0(d): Minimum R-19 insulation in raised wood -frame floor or 0.037 maximum U -factor. In Climate Zones 14 and 16 a Class II vapor retarder shall be installed on the conditioned space side of all insulation in all exterior §150.0(g)l: walls, vented attics and unvented attics with air -permeable insulation. In Climate Zones 1-16 with unvented crawl spaces the earth floor of the crawl space shall be covered with a Class I or Class II § 150.0(g)2: vapor retarder. In a building having a controlled ventilation crawl space, a Class I or Class II vapor retarder shall be placed over the earth floor of § 150.0(g)3: the crawl space to reduce moisture entry and protect insulation from condensation, as specified in the exception to Section 150.0(d). Slab edge insulation shall: have a water absorption rate, for the insulation material alone without facings, no greater than 0.3%; §150.0(1): have water vapor permeance rate is no greater than 2.0 perm/inch, be protected from physical damage and UV light deterioration; and when installed as part of a heated slab floor meets the requirements of § 110.8 Fenestr including skylights, separating conditioned space from unconditioned space or outdoors shall have a maximum U - § 150.0(q): factor o var e U -factor of all fenestration shall not exceed 0.58. Fireplaces, Decorative Gas Appliances and &Mg Measures: §150.0(e)IA: Masonry oJf1pt2ff-k!$& e laces have a closable metal or glass door covering the entire opening of the firebox. Masonry or factofy-NAMWplaces have a combustion outside air intake, which is at least six square inches in area and is §150.0(e)1B: equipped with a re ily accessible, operable, and tight -fitting damper or a combustion -air control device. § 150.0(e)IC: MasontylWactory-built fireplaces have a flue damper with a readily accessible control. Continuous burning,'p-36-f1ights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside § 150.0(e)2:11 of the building, are prohibited. Space Conditioning, Water Heating and Plumbing System Measures: § 110.0-§ 110.3: HVAC equipment, water heaters, showerheads, faucets and all other regulated appliances are certified to the Energy Commission. Water heating recirculation loops serving multiple dwelling units meet the air release valve, backflow prevention, pump isolation § 110.3(c)5: valve, and recirculation loop connection requirements of §I 10.3(c)5. Continuously buming pilot lights are prohibited for natural gas: fan -type central f imaces, household cooking appliances (appli- §110.5: ances without an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt), and pool ands a heaters. Heating and/or cooling loads are calculated in accordance with ASHRAE, SMACNA or ACCA using design conditions specified §150.0(h)l: in § 150.0(h)2. Installed air conditioner and heat pump outdoor condensing units shall have a clearance of at least five feet from the outlet of any § 150.0(h)3A: dryer vent. § 150.0(i): Heating systems are equipped with thermostats that meet the setback requirements of § 110.2(c). Storage gas water heaters with an energy factor equal to or less than the federal minimum standards shall be externally wrapped § 150.00)1 A: with insulation having an installed thermal resistance of R-12 or greater. Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, have R-12 external §150.0(j)1B: insulation or R-16 internal insulation where the internal insulation R -value is indicated on the exterior of the tank. For domestic hot water system piping, whether buried or unburied: the first 5 feet of hot and cold water pipes from the storage tank, all piping with a nominal diameter of 3/4 inch or larger, all piping associated with a domestic hot water recirculation system § 150.00)2A: regardless of the pipe diameter, piping from the heating source to storage tank or between tanks, piping buried below grade, and all hot water pipes from the heating source to kitchen fixtures must be insulated according to the requirements of TABLE 120.3- A. All domestic hot water pipes that are buried below grade must be installed in a water proof and non -crushable casing or sleeve § 150.00)2B: that allows for installation, removal, and replacement of the enclosed pipe and i a 2013 Low -Rise Residential Mandatory Measures Summary § 150.00)2C: Pipe for cooling system lines shall be insulated as specified in § I50.00)2A. Piping insulation for steam and hydronic heating systems or hot waters stems with pressure > 15 psig shall meet the requirements in TABLE 120.3-A. §150.00)3: Insulation is protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation exposed to weather shall either be rated for outdoor use or installed with a cover suitable for outdoor service. For § 150.00)3A: example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation protected as specified or painted with coating that is water retardant and provides shielding from solar radiation that degrades the material. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space shall have a Class I § 150.00)3B: or Class II vapor retarding facing, or the insulation shall be installed at the thickness that qualifies as a Class I or Class II vapor retarder. Systems using gas or propane water heaters to serve individual dwelling units shall include: a 120V electrical receptacle within 3 feet of the water heater; a Category III or IV vent, or a Type B vent with straight pipe between the outside termination and the §150.0(n)l: space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the installed water heater, and allows natural draining without pump assistance; and a gas supply line with a capacity of at least 200,000 Btu/hr. §150.0(n)2: Recirculating loops serving multiple dwelling units shall meet the requirements of § 110.3(c)5. §150.0(n)3: Solar water -heating systems and collectors shall be certified and rated by the Solar Rating and Certification Corporation (SRCC) or by a testing agency approved by the Executive Director. Ducts and Fans Measures: All air -distribution system ducts and plenums installed are sealed and insulated to meet the requirements of CMC §601.0, §602.0. §603.0, §604.0, §605.0 and ANSUSMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-6.0 (or higher if required by CMC §605.0) or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing (RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts are mechanically fastened. Openings shall be sealed §150.0(m)l: with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than '/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. Factory -Fabricated Duct Systems shall comply with specified requirements for duct construction, connections, and closures; joints § 150.0(m)2: and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands. §150.0(m)3-6: Field -Fabricated Duct Systems shall comply with requirements for: pressure -sensitive tapes, mastics, sealants, and other requirements specified for duct construction; duct insulation R -value ratings; duct insulation thickness; and duct labeling. §150.0(m)7: All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or automatic dampers. § 150.0(m)8: Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers except combustion inlet and outlet air openings and elevator shaft vents. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not § 150.0(m)9: limited to the following: insulation exposed to weather shall be suitable for outdoor service. For example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation. §150.0(m)10: Flexible ducts cannot have porous inner cores. When space conditioning systems use forced air duct systems to supply conditioned air to an occupiable space, the ducts shall be § 150.0(m)11: sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 feet in length and through a thermal §150.0(m)12: conditioning component, except evaporative coolers, shall be provided with air filter devices that meet the requirements of §150.0(m)12. Space conditioning systems that utilize forced air ducts to supply cooling to an occupiable space shall have a hole for the placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the supply plenum. The § I50.0(m)13: space conditioning system must also demonstrate airflow > 350 CFM per ton of nominal cooling capacity through the return grilles, and an air -handling unit fan efficacy:5 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Zonally controlled central forced air cooling systems shall be capable of simultaneously delivering, in every zonal control mode, §150.0(m)15: an airflow from the dwelling, through the air handler fan and delivered to the dwelling, of >_ 350 CFM per ton of nominal cooling capacity, and operating at an air -handling unit fan efficacy of <_ 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. All dwelling units shall meet the requirements of ASHRAE Standard 62.2. Neither window operation nor continuous operation of §150.0(o): central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of providing the Whole Building Ventilation. §150.0(o)IA: Whole Building Ventilation airflow shall be confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Pool and Spa Heating Systems and Equipment Measures: Any pool or spa heating system shall be certified to have: a thermal efficiency that complies with the Appliance Efficiency § 110.4(a): Regulations; an on-off switch mounted outside of the heater that allows shutting off the heater without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and shall not use electric resistance heating. 2013 Low -Rise Residential Mandatory Measures Summary § 110.4(b)1: Any Pool or spa heating equipment shall be installed with at least 36 inches of pipe between filter and heater or dedicated suction and return lines, or built-up connections for future solar heating. § 110.4(b)2: Outdoor pools or spas that have a heat pump or gas heater shall have a cover. § 110.4(b)3: Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or pro- grammed to run only during off-peak electric demand periods. § 110.5: Natural gas pool and spa heaters shall not have a continuous burning pilot light. § 150.0(p): Residential pool systems or equipment shall meet specified pump sizing, flow rate, piping, filters, and valve requirements. Lighting Measures: § 110.9: All lighting control devices and systems, ballasts, and luminaires shall meet the applicable requirements of § 110.9. §150,0(k)IA: Installed luminaires shall be classified as high -efficacy or low -efficacy for compliance with §150.0(k) in accordance with TABLE. 150.0-A or TABLE 150.0-B, as applicable. §150.0(k)IB: When a high efficacy and low efficacy lighting system are combined in a single luminaire, each system shall separately comply with the applicable provisions of § 150.0(k). The wattage and classification of permanently installed luminaires in residential kitchens shall be determined in accordance with § 150.0(k)1C: § I30.0(c). In residential kitchens, the wattage of electrical boxes finished with a blank cover or where no electrical equipment has been installed, and where the electrical box can be used for a luminaire or a surface mounted ceiling fan, shall be calculated as 180 watts of low efficacy lighting r electrical box. § 150.0(k)iD: Ballasts for fluorescent lamps rated 13 watts or greater shall be electronic and shall have an output frequency no less than 20 kHz. Permanently installed night lights and night lights integral to installed luminaires or exhaust fans shall be rated to consume no § 150.0(k)IE: more than 5 watts of power per luminaire or exhaust fan as determined in accordance with § I30.0(c). Night lights do not need to be controlled by vacancy sensors. § 150.0(k)1F: Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods) shall meet the applicable requirements of § 150.0(k). § 150.0(k)2A: High efficacy luminaires must be switched separately from low efficacy luminaires. § 150.0(k)2B: Exhaust fans shall be switched separately from lighting systems. § I50.0(k)2C: Luminaires shall be switched with readily accessible controls that permit the luminaires to be manually switched ON and OFF. § 150.0(k)2D: Controls and equipment are installed in accordance with manufacturer's instructions. §150.0(k)2E: No control shall bypass a dimmer or vacancy sensor function if the control is installed to comply with §I50.0(k). §150.0(k)2F: Lighting controls comply with applicable requirements of §110.9. An Energy Management Control System (EMCS) may be used to comply with dimmer requirements if. it functions as a dimmer § 150.0(k)2G: according to § 110.9; meets Installation Certificate requirements of § 130.4; the EMCS requirements of §130.5; and all other requirements in §150.0(k)2. An Energy Management Control System (EMCS) may be used to comply with vacancy sensor requirements of § I50.0(k) if. it § 150.0(k)2H: functions as a vacancy sensor according to § 110.9; meets Installation Certificate requirements of § 130.4; the EMCS requirements of 130.5; and all other requirements in §150.0(k)2. § I50.0(k)2I: A multiscene programmable controller may be used to comply with dimmer requirements of this section if it provides the functionality of a dimmer according to § 110.9, and complies with all other applicable requirements in §150.0(k)2. § 150.0(k)3A: A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. Kitchen lighting includes all permanently installed lighting in the kitchen except internal lighting in cabinets that illuminate only § 150.0(k)3B: the inside of the cabinets. Lighting in areas adjacent to the kitchen, including but not limited to dining and nook areas, are considered kitchen lighting if they are not separately switched from kitchen lighting. §I50.0(k)4: Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of illuminated cabinet. § I50.0(k)5: A minimum of one high efficacy luminaire shall be installed in each bathroom; and all other lighting installed in each bathroom shall be high efficacy or controlled by vacancy sensors. § 150.0(k)6: Lighting installed in attached and detached garages, laundry rooms, and utility rooms shall be high efficacy luminaires and controlled by vacancy sensors. § 150.0(k)7: Lighting installed in rooms or areas other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy, or shall be controlled by either dimmers or vacancy sensors. Luminaires recessed into ceilings shall: be listed for zero clearance insulation contact (IC) by Underwriters Laboratories or other nationally recognized testing/rating laboratory; have a label that certifies that the luminaire is airtight with air leakage less than 2.0 CFM at 75 Pascals when tested in accordance with ASTM E283; be sealed with a gasket or caulk between the luminaire housing § 150.0(k)8: and ceiling, and shall have all air leak paths between conditioned and unconditioned spaces sealed with a gasket or caulk; and allow ballast maintenance and replacement without requiring cutting holes in the ceiling. For recessed compact fluorescent luminaries with ballasts to qualify as high efficacy for compliance with §150.0(k), the ballasts shall be certified to the Energy Commission to comply with the applicable requirements in § 110.9. For single-family residential buildings, outdoor lighting permanently mounted to a residential building or other buildings on the same lot shall be high efficacy, or may be low efficacy if it meets all of the following requirements: i. Controlled by a manual ON and OFF switch that does not override to ON the automatic actions of Items ii or iii below; and § 150.0(k)9A: ii. Controlled by a motion sensor not having an override or bypass switch that disables the motion sensor, or controlled by a motion sensor having a temporary override switch which temporarily bypasses the motion sensing function and automatically reactivates the motion sensor within 6 hours; and iii. Controlled by one of the following methods: 2013 Low -Rise Residential Mandatory Measures Summary a. Photocontrol not having an override or bypass switch that disables the photocontrol; or b. Astronomical time clock not having an override or bypass switch that disables the astronomical time clock, and which is programmed to automatically turn the outdoor lighting OFF during daylight hours; or c. Energy management control system which meets all of the following requirements: At a minimum provides the functionality of an astronomical time clock in accordance with §110.9; meets the Installation Certification requirements in §130.4; meets the requirements for an EMCS in § 130.5; does not have an override or bypass switch that allows the luminaire to be always ON; and, is programmed to automatically turn the outdoor lighting OFF during daylight hours. For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies, and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site shall comply with one of the § 150.0(k)9B: following requirements: i. Shall comply with § 150.0(k)9A; or ii. Shall comply with the applicable requirements in 110.9, 130.0, §1 0.2, 130.4, 140.7 and 141.0. For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by § 150.0(k)9B or 150.0(k)9D § 150.0(k)9C: shall comply with the applicable requirements in § 110.9, § 130.0, § 130.2, § 130.4, § 140.7 and § 141.0. Outdoor lighting for residential parking lots and residential carports NN ith a total of eight or more vehicles per site shall comply § 150.0(k)9D: with the applicable requirements in ' 110.9, § 130.0, § 130.2, § 130.4, § 140.7 and § 141.0. Internally illuminated address signs shall comply with §140.8; or shall consume no more than 5 watts of power as determined §150.0(k)10: according to § 130.0(c). Lighting for residential parking garages for eight or more vehicles shall comply with the applicable requirements for § 150.0(k)11: nonresidential garages in § 110.9, § 130.0, § 130. 1, § 130.4, § 140.6, and § 141.0. In a low-rise multifamily residential building where the total interior common area in a single building equals 20 percent or less of § 150.0(k)I2A: the floor area, permanently installed lighting for the interior common areas in that building shall be high efficacy luminaires or controlled by an occupant sensor. In a low-rise multifamily residential building where the total interior common area in a single building equals more than 20 percent of the floor area, permanently installed lighting in that building shall: i. Comply with the applicable requirements in § 110.9, § 130.0, § 130. 1, § 140.6 and § 141.0; and § 150.0(k) 1213: ii. Lighting installed in corridors and stairwells shall be controlled by occupant sensors that reduce the lighting power in each space by at least 50 percent. The occupant sensors shall be capable of turning the light fully On and Off from all designed paths of ingress and egress. Solar Ready Buildings: Single family residences located in subdivisions with ten or more single family residences and where the application for a §1 10.10(a)l: tentative subdivision map for the residences has been deemed complete, by the enforcement agency, on or after January 1, 2014, shall comply with the requirements of § 110.10 through § 110.10 e . § 110.10(a)2: Low-rise multi -family buildings shall comply with the requirements of § 110.10(b) through § 110.10(d). The solar zone shall have a minimum total area as described below. The solar zone shall comply with access, pathway, smoke ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local jurisdiction. The solar zone total area shall be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for § 110.10(b)1: buildings with roof areas greater than 10,000 square feet. For single family residences the solar zone shall be located on the roof or overhang of the building and have a total area no less than 250 square feet. For low-rise multi -family buildings the solar zone shall be located on the roof or overhang of the building or on the roof or overhang of another structure located within 250 feet of the building or on covered parking installed with the building project and have a total area no less than 15 percent of the total roof area of the building excluding any skylight area. § 110.10(b)2: All sections of the solar zone located on steep -sloped roofs shall be oriented between 110 degrees and 270 degrees of true north. No obstructions, including but not limited to, vents, chimneys, architectural features, and roof mounted equipment, shall be § 110.10(b)3A: located in the solar zone. Any obstruction, located on the roof or any other part of the building that projects above a solar zone shall be located at least twice § 110.10(b)3B: the distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of the nearest point of the solar zone, measured in the vertical plane. For areas of the roof designated as solar zone, the structural design loads for roof dead load and roof live load shall be clearly § 110.10(b)4: indicated on the construction documents. The construction documents shall indicate: a location for inverters and metering equipment and a pathway for routing of conduit from the solar zone to the point of interconnection with the electrical service (for single family residences the point of § 110.10(c): interconnection will be the main service panel); a pathway for routing of plumbing from the solar zone to the water -heating system. A copy of the construction documents or a comparable document indicating the information from § 110.10(b) through § 110.10(c) § I it0.10(d): shall be provided to the occupant. § 110.10(e)I: The main electrical service panel shall have a minimum busbar rating of 200 amps. The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a § 110.10(e)2: future solar electric installation. The reserved space shall be: positioned at the opposite (load) end from the input feeder location or main circuit location, and permanently marked as "For Future Solar Electric'. HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Mrs. Lai Residence Date 6/29/2015 System Name HVAC Floor Area 1,974 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,016 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 38,000 24,114 879 517 24,394 Total Output (Btuh) 38,000 0 Output Btuh/s ft) 19.3 1,094 1,355 Cooling System 0 0 Output per System 33,600 0 0 0 0 Total Output (Btuh) 33,600 0 879 0 Total Output (Tons) 2.8 1,094 1,355 Total Output (Btuh/s ft) 17.0 Total Output (s ft/Ton) 705.0 26,301 27,104 Air System CFM per System 1,050 HVAC EQUIPMENT SELECTION Airflow cfm 1,050 Carrier 58MVB40-14 CNP 38HD 3 T 31,985 387 38,000 Airflow (cfm/s ft) 0.53 Airflow (cfm/Ton) 375.0 Outside Air (%) 0,0% Total Adjusted System Output 31,985 387 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Aug 3 PM 38,000 Jan 1 AM Outside Air (cfm/s ft) 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 28 OF Outside Air 0 cfm 69 OF 69 OF 115 OF 115 OF Heating Coil Supply Fan 1,050 cfm 114 OF ROOM 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 88/68°F Outside Air —4r 10 0 cfmCooling 79 / 63 OF 4 ;01 79/62°F 55/53°F 55/53°F ®- Coil Supply Fan 1,050 cfm 41.2% 4 UA 4 56 / 54 OF ROOM 78/ 62 OF EnergyPro 6.5 by EnergySoft User Number: 20692 Run Code: 2015-08-29708:08:32 ID: WHY15-0505 Page 5 of 5 A CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Mrs Lai Residence Calculation Description: Title 24 Analysis Calculation Date/Time: 08:10, Mon, Jun 29, 2015 Input File Name: 10320 Moretti rev 2T 1.7.xml CF1 R -PRF -01 Page 1 of 9 GENERAL INFORMATION 01 Project Name Mrs Lai Residence Building Complies with Computer Performance 02 Calculation Description Title 24 Analysis 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 Project Location 10320 Moretti Dr. 04 City Cupertino 05 Standards Version Compliance 2015 06 Zip Code 95014 07 Compliance Manager Version BEMCmpMgr 2013-3c (710) 08 Climate Zone CZ4 09 Software Version EnergyPro 6.5 10 Building Type Single Family 11 Front Orientation (deg/Cardinal) 270 12 Project Scope Newly Constructed 13 Number of Dwelling Units 1 14 Total Cond. Floor Area (FTZ) 1974 15 Number of Zones 1 16 Slab Area (FTZ) 0 17 Number of Stories 1 18 Addition Cond. Floor Area N/A 19 Natural Gas Available Yes 20 Addition Slab Area (FTZ) N/A 21 Glazing Percentage (%) 16.5% COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below ENERGY USE SUMMARY 04 05 06 07 08 Energy Use (kTDV/ft2-yr) Standard Design Proposed Design Compliances Margin ` \ Percent Improvement Space Heating 18.95 23.37 -4.42 -23.3% Space Cooling 10.41 10.01 0.40 3.8% IAQ Ventilation 1.17 1.17 0.0 0.0% Water Heating 14.05 9.28 7 34.0% Photovoltaic Offset ---- 0.00 0.00 Compliance Energy Total 44.58 43.83 0.75 1.7% Registration Number: 215-No175546A-000000000-0000 Registration Date/Time: 2015-06-29 08:30:17 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF111-02272015-710 Report Generated at: 2015-06-29 08:10:54 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1 R -PRF -01 Project Name: Mrs Lai Residence Calculation Date/Time: 08:10, Mon, Jun 29, 2015 Page 2 of 9 Calculation Description: Title 24 Analysis Input File Name: 10320 Moretti rev 2T 1.7.xml REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. • Cathedral Ceiling • Window overhangs and/or fins HERS FEATURE SUMMARY The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building components tables below. Building -level Verifications: • IAQ mechanical ventilation Cooling System Verifications: • Minimum Airflow • Fan Efficacy Watts/CFM HVAC Distribution System Verifications: • Duct Sealing Domestic Hot Water System Verifications: • -- None -- ENERGY DESIGN RATING This is the sum of the annual TDV energy consumption for energy use components included in the performance compliance approach for the Standard Design Building (Energy Budget) and the annual TDV energy consumption for lighting and components not regulated by Title 24; Part 6 (such as domestic appliances and consumer electronics)and accounting for the annual TDV energy offset by an on-site renewable energy system. Reference Energy Use Energy Design Rating Margin Percent Improvement Total Energy (kTDV/f2-yr)' 90.02 89.27 0.75 0.8% ` includes calculated Appliances and Miscellaneous Energy Use (AMEU) BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (112) Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Mrs Lai Residence 1974 1 3 1 0 1 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft2) Avg. Ceiling Height Water Heating System 1 Water Heating System 2 New First Floor Conditioned HVAC1 1974 10 DHW Sys 1 Registration Number: 215-N0175546A-000000000-0000 Registration Date/Time: 2015-06-29 08:30:17 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CFiR-02272015-710 Report Generated at: 2015-06-29 08:10:54 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Mrs Lai Residence Calculation Date/Time: 08:10, Mon, Jun 29, 2015 Calculation Description: Title 24 Analysis Input File Name: 10320 Moretti rev 2T 1.7.xml CF1R-PRF-01 Page 3 of 9 OPAQUE SURFACES 01 02 03 04 05 06 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ft2) Window & Door Area (ft) Tilt (deg) New Rear Wall New First Floor R-13 Wall 90 Back 441.7 104 90 New Left Wall New First Floor R-13 Wall 0 Left 580 93.6 90 New ront Wall New First Floor R-13 Wall 90 Back 441.7 128 90 New Right Wall New First Floor R-13 Wall 0 Left 580 120 90 New Roof 2 New First Floor R-30 Roof Attic 1961.7 New First Floor 2 New First Floor R-19 Floor Crawlspace 1974 OPAQUE SURFACES — Cathedral Ceilings 01 02 03 04 05 06 07 08 09 10 11 Name Zone Type Orientatio n Area (ft) Skylight Area (ft2) Roof Rise (x in 12) Roof Pitch Roof Tilt (deg) Roof Reflectance Roof Emittance Framing Factor New Roof New First Floor R-30 Roof Attic1 Left 12.4 12.3 4 0.33 18.43 0.1 0.85 0.07 ATTIC 01 02 03 04 05 06 07 08 Name Construction Type Roof Rise Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Attic New First Floor Attic RoofNew First Floor Ventilated 4 0.1 0.85 Yes No Registration Number: 215-No175546A-000000000-0000 Registration Date/Time: 2015-06-29 08:30:17 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-29 08:10:54 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Mrs Lai Residence Calculation Date/Time: 08:10, Mon, Jun 29, 2015 Calculation Description: Title 24 Analysis Input File Name: 10320 Moretti rev 2T 1.7.xml CF1 R -PRF -01 Page 4 of 9 WINDOWS 01 02 03 04 Name Side of Building 01 02 03 04 05 06 07 08 09 10 Name Type Surface (Orientation -Azimuth) Width (ft) Height (ft) Multipli er Area (ft) U -factor SHGC Exterior Shading Windows Window New Rear Wall (Back -90) 5.0 5.0 1.2 30.0 0.39 0.37 Insect Screen (default) Window2 Window New Rear Wall (Back -90) 5.0 5.0 0.4 10.0 0.39 0.37 Insect Screen (default) Windowl 2 Window New Left Wall (Left -0) 5.0 5.0 0.552 13.8 0.39 0.37 Insect Screen (default) Window2 2 Window New Left Wall (Left -0) 5.0 5.0 0.552 13.8 0.39 0.37 Insect Screen (default) Window3 Window New Left Wall (Left -0) 5.0 5.0 1.32 33.0 0.39 0.37 Insect Screen (default) Window4 Window New Left Wall (Left -0) 5.0 5.0 1.32 33.0 0.39 0.37 Insect Screen (default) Windows 3 Window New ront Wall (Back -90) 5.0 5.0 0.48 12.0 0.39 0.37 1 Insect Screen (default) Window2 3 Window New ront Wall (Back -90) 5.0 5.0 1.44 36.0 0.39 0.37 Insect Screen (default) Window3 2 Window New ront Wall (Back -90) 5.0 5.0 0.48 12.0 0.39 0.37 Insect Screen (default) Windowl 4 Window New Right Wall (Left -0) 5.0 5.0 0.48 12.0 0.39 0.37 Insect Screen (default) Window2 4 Window New Right Wall (Left -0) 5.0 5.0 0.48 12.0 0.39 0.37 Insect Screen (default) Window3 3 Window New Right Wall (Left -0) 5.0 5.0 0.6 15.0 0.39 0.37 Insect Screen (default) Window4 2 Window New Right Wall (Left -0) 5.0 5.0 0.6; 15.0 0.39 0.37 Insect Screen (default) Window5 Window New Right Wall (Left -0) 5.0 5.0 0.6 15.0 0.39 0.37 Insect Screen (default) Window6 Window New Right Wall (Left -0) 5.0 5.0 r 0.6 15.0 0.39 0.37 Insect Screen (default) Windowl Window New Right Wall (Left -0) 5.0 5.0 0.24 6.0 0.39 0.37 Insect Screen (default) Window8 Window New Right Wall (Left -0) 5.0 5.0 0.24 6.0 0.39 0.37 Insect Screen (default) Window9 Window New Right Wall (Left -0) 5.0 5.0 0.48 12.0 0.39 0.37 Insect Screen (default) Window10 Window New Right Wall (Left -0) 5.0 5.0 0.48 12.0 0.39 0.37 Insect Screen (default) Skylight Skylight New Roof (Left -0) 1 8.0 0.37 0.29 4 Suntunnels Skylight New Roof (Left -0) 1 4.3 0.37 0.29 DOORS 01 02 03 04 Name Side of Building Area (ft) U -factor Doorl New Rear Wall 64.0 0.50 Door1 2 New ront Wall 20.0 0.50 Door2 New ront Wall 48.0 0.50 Registration Number: 215-N0175546A-000000000-0000 Registration Date/Time: 2015-06-29 08:30:17 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-29 08:10:54 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Mrs Lai Residence Calculation Date/Time: 08:10, Mon, Jun 29, 2015 Calculation Description: Title 24 Analysis Input File Name: 10320 Moretti rev 2T 1.7.xml CF1 R -PRF -01 Page 5of9 OVERHANGS AND FINS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Overhang Left Fin Right Fin Window Depth Dist Up Left Extent Right Extent Flap Ht. Depth Top Up DistL Bot Up Depth Top Up Dist R Bot Up Windows 0 0 0 0 0 0 0 0 0 0 0 0 0 Window2 0 0 0 0 0 0 0 0 0 0 0 0 0 Windowl2 0 0 0 0 0 0 0 0 0 0 0 0 0 Window2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Window3 0 0 0 0 0 0 0 0 0 0 0 0 0 Window4 0 0 0 0 0 0 0 0 0 0 0 0 0 Windowl3 0 0 0 0 0 0 0 0 0 0 0 0 0 Window2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Window3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Windowl4 0 0 0 0 0 0 0 0 0 0 0 0 0 Window2 4 0 0 0 0 0 0 0 0 0 0 0 0 0 Window3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Window4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Window5 0 0 0 0 0 0 0 -- 0 0 0 0 0 0 Window6 0 0 0 0 0 0 0... 0 0 0 0 0 0 Window? 0 0 0 0 0 0 0 0 0 0 0 0 0 Window8 0 0 0 0 0 0 0 0 0 0 0 0 0 Window9 0 0 0 0 0 0 0 0 0 0 0 0 0 Windowl0 0 0 0 0 0 0 0 0 0 0 0 0 0 Registration Number: 215-N0175546A-000000000-0000 Registration Date/Time: 2015-06-29 08:30:17 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-29 08:10:54 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Mrs Lai Residence Calculation Date/Time: 08:10, Mon, Jun 29, 2015 Calculation Description: Title 24 Analysis Input File Name: 10320 Moretti rev 2T 1.7.xml CF1 R -PRF -01 Page 6 of 9 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 Total Cavity Winter Design Construction Name Surface Type Construction Type Framing R -value U -value Assembly Layers • Cavity/ Frame: no insul. /2x4 Top Chrd • Roof Deck: Wood Siding/sheathing/decking 2x4 Top Chord of Roof Truss @ 24 • Tile Gap: present Attic RoofNew First Floor Attic Roofs Wood Framed Ceiling in. O.C. none 0.400 • Roofing: 10 PSF (ROOMle) • Floor Surface: Carpeted Floors Over • Floor Deck: Wood Siding/sheathing/decking R-19 Floor Crawlspace Crawlspace Wood Framed Floor 2x6 @ 16 in. O.C. R 19 0.049 • Cavity/ Frame: R -19/2x6 • Inside Finish: Gypsum Board Ceilings (below • Cavity/ Frame: R-9.1 /2x4 R-30 Roof Attic attic) Wood Framed Ceiling 2x4 @ 24 in. O.C. R 30 0.032 • Over Floor Joists: R-20.9 insul. • Inside Finish: Gypsum Board • Cavity / Frame: R-30 /2x4 • Roof Deck: Wood Siding/sheathing/decking • Tile Gap: present R-30 Roof Attica Cathedral Ceilings Wood Framed Ceiling 2x4 @ 24 in. O.C. R 30 0.039 • Roofing: 10 PSF (RoofTile) • Inside Finish: Gypsum Board • Cavity/ Frame: R -13/2x4 • Exterior Finish: Wood R-13 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O.C. R 13 0=095 Siding/sheathing/decking BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (QII) Quality Installation of Spray Foam Insulation Building Envelope Air Leakage ACH @ 50 Pa Not Required Not Required Not Required WATER HEATING SYSTEMS 01 02 03 04 05 06 Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction (%) DHW Sys 1 - 1/1 DHW Pipe Insulation, All Lines DHW Heater 1 1 .0% Registration Number: 215-N0175546A-000000000-0000 Registration Date/Time: 2015-06-29 08:30:17 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-29 08:10:54 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Mrs Lai Residence Calculation Date/Time: 08:10, Mon, Jun 29, 2015 Calculation Description: Title 24 Analysis Input File Name: 10320 Moretti rev 2T 1.7.xml CF1 R -PRF -01 Page 7 of 9 WATER HEATERS 01 02 03 04 05 06 07 08 Name Heater Element Type Tank Type Tank Volume (gal) Energy Factor or Efficiency Input Rating Tank Exterior Insulation R -value Standby Loss (Fraction) DHW Heater 1 Natural Gas Small Instantaneous 0.2 0.84 199000-Btu/hr 0 0 WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 Name Pipe Insulation Parallel Piping Compact Distribution Point -of Use Recirculation Control Central DHW Distribution DHW Sys 1 - 1/1 --- --- --- --- --- SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 SC Sys Name System Type Heating Unit Name Cooling Unit Name Fan Name Distribution Name Cooling Component 1:Heating Component 1:Air Distribution System 1:HVAC Fan 1:1 Other Heating and Cooling System HeatingComponent 1 Cooling Component 1 HVAC Fan 1 Air Distribution System 1 HVAC - HEATING UNIT TYPES 01 02 03 Name Type Efficiency Heating Component 1 CntrlFurnace - Fuel -fired central furnace 96.6 AFUE HVAC - COOLING UNIT TYPES 01 02 03 04 05 06 07 Name System Type Efficiency EER SEER Zonally Controlled Multi -speed Compressor HERS Verification Cooling Component 1 SplitAirCond 11.3 13 Not Zonal Single Speed Cooling Component 1 -hers -cool Registration Number: 215-N0175546A-000000000-0000 Registration Date/Time: 2015-06-29 08:30:17 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-29 08:10:54 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Mrs Lai Residence Calculation Description: Title 24 Analysis Calculation Date/Time: 08:10, Mon, Jun 29, 2015 Input File Name: 10320 Moretti rev 2T 1.7.xml CF1 R -PRF -01 Page 8of9 HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component 1 -hers -cool Required 350 Not Required Not Required Not Required HVAC - DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 Name Type Duct Leakage Insulation R -value Duct Location Bypass Duct HERS Verification Air Distribution System 1 DuctsAttic Sealed and tested 6 Attic None Air Distribution System 1 -hers -dist HVAC DISTRIBUTION - HERS VERIFICATION 01 02 03 04 05 06 07 08 Name Duct Leakage Verification Duct Leakage Target (%) Verified Duct Location Verified Duct Design Buried Ducts Deeply Buried Ducts Low -leakage Air Handler Air Distribution System 1 -hers -dist Required 6.0 Not Required Not Required Not Required Not Required --- HVAC-FAN SYSTEMS 01 02 03 04 Name Type Fan Power (Watts/CFM) HERS Verification HVAC Fan 1 Single Speed PSC Furnace Fan 0.58 HVAC Fan 1 -hers -fan HVAC FAN SYSTEMS - HERS VERIFICATION 01 02 03 Name Verified Fan Watt Draw Required Fan Efficiency (Watts/CFM) HVAC Fan 1 -hers -fan Required 0.58 IAQ (Indoor Air Quality) FANS 01 02 03 04 05 06 Dwelling Unit IAQ CFM IAQ Watts/CFM IAQ Fan Type IAQ Recovery Effectiveness(%) HERS Verification SFam IAQVentRpt 49.74 0.25 Default 0 Required Registration Number: 215-N0175546A-000000000-0000 Registration Date/Time: 2015-06-29 08:30:17 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-29 08:10:54 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Mrs Lai Residence Calculation DatefTime: 08:10, Mon, Jun 29, 2015 Calculation Description: Title 24 Analysis Input File Name: 10320 Moretti rev 2T 1.7.xml CF1 R -PRF -01 Page 9 of 9 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Aalele� Jack Lin Company: Signature Date: W H Y CONSTRUCTION 2015-06-29 08:30:17 Address: CEA/HERS Certification Identification (If applicable): 6805 WESTMOOR WAY City/State/Zip: Phone: SAN JOSE, CA 95129 (408) 218-0587 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name: Responsible Designer Signature:' Jack Lin Company: Date Signed: W H Y CONSTRUCTION 2015-06-29 08:30:17 Address: License: 6805 WESTMOOR WAY CSLB #964820 City/State/Zip: Phone: SAN JOSE, CA 95129 (408) 218-0587 Digitally signed by Ca10ERTS. This digital signature is provided in order to secure the content of this registered document, and in noway implies Registration Provider responsibility for the accuracy of the information. Registration Number: 215-N0175546A-000000000-0000 Registration Date/Time: 2015-06-29 08:30:17 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-06-29 08:10:54