Loading...
B-2016-2816CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO: B-2016-2816 19031 BARNHART AVE CUPERTINO, CA 95014-3501 (375 09 034) DIANLI CHEN CONSTRUCTION CUPERTINO, CA 95014 OWNER'S NAME: HUANG HONGMIN AND KONG MEI DATE ISSUED: 02/23/2017 OWNER'S PHONE: 408-9922-1536 JPHONE NO: (408) 888-2898 LICENSED ONT TOR' DECLARATION BUILDING PERMIT INFO: License Class B Lic. #856154 Contractor DIANLI CHEN CONSTRUCTION Date 03/31/2019 X BLDG _ELECT _PLUMB I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing MECH X RESIDENTIAL COMMERCIAL with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. JOB DESCRIPTION: CONSTRUCT 2 STORY HOME (1980 S.F.); ATTACHED 2 CAR I hereby affirm under penalty of perjury one of the following two declarations: GARAGE (426 S.F.); FRONT PORCH (152 S.F.); REAR PORCH (285 1. I have and will maintain a certificate of consent to self-insure for Worker's S.F.) Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. f/ z. I have and will maintain Worker's Compensation Insurance, as provided for by Dj, Section 3700 of the Labor Code, for the performance of the work for which this Sq. Ft Floor Area: 2406 Valuation: $450000.00 permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances APN Number: Occupancy Type: and state laws relating to building construction, and hereby authorize 375 09 034 R-3 (Custom),R-3 (Custom),U (Private Gar /Ag Bldg),U representatives of this city to enter upon the above mentioned property for (Private Gar /Ag Bldg) inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. PERMIT EXPIRES IF WORK IS NOT STARTED Additionally, the applicant u dersand will comply with all non-point WITHIN 180 DAYS OF PERMIT ISSUANCE OR source regulations per a upertintandsicipal Code, Section 9.18. 180 DAYS FROM LAST CALLED INSPECTION. Signature Date 2/2 2 17 Issued by: Abby Ayende b Date: 02/23/2017 I-hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: 1. I, as owner of the property, or my employees with wages as their sole RE-ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is compensation, will do the work, and the structure is not intended or offered for installed without first obtaining an inspection, I agree to remove all new materials for sale (Sec.7044, Business & Professions Code) inspection. 2. I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). Signature ofApplicant: Date: 2/23/2017 I hereby affirm under penalty of perjury one of the following three declarations: 1. I have and will maintain a Certificate of Consent to self-insure for Worker's ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2. I have and will maintain Worker's Compensation Insurance, as provided for by HAZARDOUS MATERIALS DISCLOSURE Section 3700 of the Labor Code, for the performance of the work for which this I have read the hazardous materials requirements under Chapter 6.95 of the permit is issued. California Health & Safety Code, Sections 25505, 25533, and 25534. I will 3. I certify that in the performance of the work for which this permit is issued, I maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should I store or handle hazardous shall not employ any person in any manner so as to become subject to the material. Additionally, should I use equipment or devices which emit hazardous Worker's Compensation laws of California. If, after making this certificate of air contaminants as defined by the Bay Area Air Quality Manag invent District I exemption, I become subject to the Worker's Compensation provisions of the will maintain compliance with the 04pertino Municipal Code, hapter 9.12 and Labor Code, I must forthwith comply with such provisions or this permit shall the Health &Safety Code, ction 25505, 25533 d 25534. be deemed revoked. Owner or authorized agent: APPLICANT CERTIFICATIONC certify that I have read this application and state that the above information is Date:/7 231201_7 correct. I agree to comply with all city and county ordinances and state laws N CV I hereby affirm that there is a construction lending agency for the performance relating to building construction, and hereby authorize representatives of this city of work's for which this permit is issued (Sec. 3097, Civ C.) to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, Lender's Name judgments, .costs, and expenses which may accrue against said City in Lender's Address consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal DECLARATION Code, Section 9.18. ARC'HITECT'S I understand my plans shall be used as public records. Signature Date 2/23/2017 Licensed Professional CONSTRUCTION PERMIT APPLICATION 12 COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 90300 TORRE AVENUE • CUPERTINO, CA 95014-3255 Cl.i PE l 1;313 (4C18�) {777-3228 • FAX (408) 777-3333 R'NTR.W r!fl'ATCTRTTVrffnW i ! ATIT%TrFTrTKT 1 1 AT TT]b ATIYII.T (T! 1 ] PROJECTADDRESS _n M W q h Ave. tf lLi1 fI"S1 APN# � DWNERNAME l G� ��' " PHONE -ay 40 j j✓ E-MAIL 11h O:� m " A (,Ian EW tJ i) STREET ADDRE ST ., yr od Dura CITY, STATE, ZIP FAX CONTACT NAME Q r� S 1 PHONE J [ p(% 4s1' � J yf� E-MA11� L.��} /_� r_�d aof�.AL � `S • l (� { , •� STREET ADDRESS 2 i'1 ter. PCiI%� �'i �i W •7 ` CITY, STATfi, ffL't p' W_ "[( SiIf7_ L r[ ��� (�% FAX ❑ OWNER ❑ OWNER -BUILDER 0 OWNER AGENT ❑ CONTRACTOR ❑ CONTRACTOR AGENT ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑ TENANT CONTRACTOANAME /' LICENSE NUMBHR `_ (i7 -717 -TYPE I BUS. LIC #7 .•^��'�� COMPANY NAME E-MAIL �cjlt/c'�n1I ��Y�,^ FAX STREET ADDRESS 1" 1 1 6N, rm ave rJ V`� CITY, STATE,ZIP`�jFe(% fP_Jq�/ PHONE ARCIIITECTJENGINEER NAME f LICENSE NUMBER BUS. LIC'#(`�O COMPANY NAME L�IV•(/ E-MAIL t�'(rf31��(��LsCQJY FAX STREET ADDRESS ji nj�`yf[� j%Tj } /�ft�'�� ly � �� YV• i! -,1 � •4 CITY, ST/Tf P,/py�f} Yrs I C.. f/t i/Kw i 1 �` i✓ a �P • �' / � � .d PgpjNyEt !/1 1i � 4? I � { �y� DESCRIPTFON OF WORK E}IISrINWUSE PROPOSED USE jCONSTR. TYPE 1 ' try ` 17 # STORIES 7/ USE TYPE OCC. SQ.ET. VALUATIQI4($) F=TG AREA ! l NEW FLOOR AREA (Ah. h. DVEMO TOTAL AREA i 1 V 2 NET AREA (,k a. b i u BATHROOM REMODELARFA / K=EN OTHER REMODELARF.A_..- REMODEL�F - PORCHAREA DECKAREA °^r �% TOTALDECK/PORCH AREA GA{RRAGE[�AREA: I❑y DETACff '"I LV tI [AATTAC€1 #DWELLING UNITS: IS ASECOND NIT DYES 6ECONDSIORY OYES BEINGAD .D? []NO ADDITION? `❑ND - PR& -APPLICATION IPYES,PROVIDE COPY OF _ PLANNINGAPPLS []NO 52wPLANNEQG APPROVAL LETTER 187119BLI)GAN OYES IUCHLERHOME? ❑NO RE IVEDT3Y:TOTAI. VALUATION: T 6-O' 000 By my signature below, I certify to each of the following: r am the property owner or autborizM agent tO et on th property owner's behalf. I bave read this application and the information I have •ovidcd is correct. I have read the Description of Work and verify it is accurate. I agree to comply T.vitii all applicable local ordinances and state laws relating to ding construction. I authorize representatives of Capertino to enter the above-identi£ed pta erty for inspection purposes. Signature of Applicant/Agent: Date: SUPPLEMENT IN flRMATIONREQUIRED PLAN CHECK Ti Pi ROUTING'6I.IP' ❑ ovffx IHR -co wTRR ❑ BUILDINGPLAN REVIEW New SFD'or Multifamily dwellings: Apply for demolition permit for eXisdug building(s). Demolition permit is required prior to issuance of building pernit for new building. © EXPRESS .❑ PLANNINU PLAri REVIt,w-, _ _ _ Commercial Bldgs: Provide a completed Hazardous Materials Disclosure ❑ STANDARD ❑ PUBLIC WORKS Form if any Hazardous Materials are being used as part Of this project. ❑ LARGE ❑ Fll c DEPT _ Copy ofPlanning Approval Letter orMeetingwith Planning prior to El nrnaDtz ❑ sn1aITARrs>wrRnlstxlrr submittal of Building Permit application. ❑ ENVIRONMENTALHEALTB. BidgApp 2411. doc revised 46121111 e'Ywellt IGf Building Department . City Of Cupertino _(& 1.0300 Torre Avenue s-t.,s Cupertino, CA 95014-3255 Telephone: 408-777-3228 CUPERTINO Fax: 408-777-3333 CONTRACTOR./.SUBCONTRACTOR LIST JOB ADDRESS: 1101 ' Pe(R6?rt U-t.' PERMIT# (gel/ - )- . OWNER'S NAME: HlktgC HO1 riI\ pin3 kON } .MEQ PHONE# cg).js3 GENERAL CONTRACT: ,vim (i dtp21-1 BUSINESS LICENSE# IUO-1qi U ADDRESS: (O($'i 2 t l(k I*Q CITY/ZIPCODE: tu.per b / W/9 :.*Our municipal code requires all businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBC NT CTORS AVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. I am not using any subcontractors: i nature Date Please check applicable subcontractors an omplete the following information: V SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing' V Electrical • Excavation Fencing Flooring/Carpeting Linoleum/Wood Glass/Glazing Heating Insulation . Landscaping Lathing - V - Masonry Painting/Wallpaper Paving Plastering Plumbing • Roofing Septic Tank Sheet Metal Sheet Rock . Tile 1 73-b ( /0" n / ntractor ignature Date F1 WEC and Associates,, Inc. POW# March 20, 2017 B9016�%16 City of Cupertino Community Development Building Division 10300 Torre Avenue Cupertino, CA 95014-3202 Subject: Survey Report 19031 Barnhart Avenue Cupertino, CA To Whom It May Concern: This letter is to confirm in writing that WEC and Associates, Inc provided a staking survey for the foundation line on the subject property. The stakes have been placed in accordance with the plans approved by the City of Cupertino both horizontally and vertically. The horizontal control is established by the county recorded tract map(s) and/or Record- of Survey(s) and the monument line established along Barnhart Avenue. We subsequently paid a site visit on 3/20/2017. From our professional point of view, the contractor formed the foundation walls in accordance with the horizontal setback requirement as shown on the city's approved plan. The finish floor elevation, based on the top of form measurement, is 102.3'. We make no warranty, expressed or implied, as to the services rendered except that our services are performed in a manner consistent with that degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances at the same time and in the same or similar locality. If you have any further questions regarding this matter, please contact me at your convenience. Sincerely, WEC and Associates, Inc. Yi-Ran Wu, PE., LLS 2625 Middlefield Road #658 * Palo Alto, CA 94306 e Tel: 650-823-6466 * Fax: 650-887-1294 N.8r3V53V. 51.00' f i t 0 13 it i I ➢ k i➢ i{ 6 ! I t t f! ii ! ! f $ f➢ ➢ O it t � I N ➢ (➢ NEW RE51DENCE FF—' 102.3 4", �10 11� t t __ __ ____ -- -- N.8i39'53'W. 51.00' TB EL=100.00 'z1 sTAMG DIAGM E�'I W E C 2625 MIDDLELD RD #658 TEL: (650) 823-6466 19031U PERK CA AVE& ASSOCIATES PALO ALTO, GA 943 FAX: (650) 887-1294 CAPEX ENGINEERING IATC. PO BOX 14198, FREMONT, CA 94539 Tel: (510) 668-1815 Fax-- (5 10) 41116-8690 Project No. 10815 March 2 1 . 2017 Building Department City of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3)232 sukiect: Proposed New Residence at 19031 Barnhart Ave. Cupertino, CA BUILDING PAD GRADING OBSERVATION REPORT Dear Sir: CAPE�X EAIGINEERING 17VC., has provided observation service for primary and final grading of building pad. On the basis of our observation and testing-, we conclude building pad, compaction operation was performed in general accordance with I recommendations of soil report and compacted to a minimum of 90% relative compaction. If you have any questions, please contact our office at your convenience. Sincerely, PEX L GINEEPJNG INC., Gary Y _1�a P.0 Principal 13 F-1 CAPEXENGINEERING INC PO BOX 14198, FRFMONT, CA 94539 Tel: (510) 668-1815 Fax: (5 I0) 490-8690 Project No. 10815 March 21, 2017 Building Department City of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3232 Subject: Proposed New Residence at 19031 Barnhart Ave. Cupertino, CA FOOTING EXCAVATION (GRADE BEANS & SPREAD FOOTINGS) AND PREPARATION OBSERVATION REPORT Dear Sir: CAPEX ENGINEERING INTC., has provided inspection service for footing excavation and preparation. Footing depth and width were excavated adequate in accordance with approved foundation plan and specifications. The exposed soil conditions of excavated foundation are beyond design bearing capacity and acceptable. Any questions, please call our office at your convenience. Sincerely, CAPER E14GINEE-RING INC., 7 i��arymat,P-.E--- PrinZipal r • G.S. ENGINEERING CONSULTING ENGINEERS June 28, 2017 Building Inspection Department 10300 Torre Ave. Cupertino, California 95014 Attn: City Inspector RE: RESIDENCE -19031 Barnhart Ave zDlb This is to certify that in accordance with Section 1704, 1707 of the 2016 California Building Code, we have provided structural observations/Inspections for the following construction: 1. Roof and shear wall nailings The structural observations/inspections were performed by a Registered Civil Engineer in the State of California. Base upon inspections performed and our substantiating reports, it is our professional judgment that, to the best of our knowledge, the observed structural work was performed in accordance with the approved plans, specifications, and applicable workmanship provisions of the California Building Code. Very truly yours, Guangsheng Wang, P.E. Principal CC. Mei Kong G.S. Engineering !'%K' '—N.Eh'�' fC 77916 r ry r CITY OF CUPERTINO 10300 Torre Avenue Telephone 777-3228 INSPECTION NOTICE BUILDING DIVISION -1-7 JOB DATE ADDRESS 1101 TIME DAILY REPORT C) CORRECTION NOTICE �/ VIOLATION El TYPEINSR: BLDGI ELEC. 0 PLBG. 0 MECH. C3 Ll STOP WORK Ll FREWSPECTRION, FEE > WEATHER 5- U1"' - INSR CARD TO RAK ON. JOB -SITE G.S. ENGINEERING CONSULTING ENGINEERS June 28, 2017 Building Inspection Department 10300 Torre Ave. Cupertino, California 95b14 Attn: City Inst 'RE: RESIDE This is to certify have provided st -19031 Barnhart Ave accordance with Section 04,1707 of the 2016 California Building Code, we bservations/Ins ons for the following construction: 1. Roof and floor rough framing The structural observations/inspections were performed by a Registered Civil Engineer in the State of California. Base upon inspections performed and our substantiating reports, it is our professional judgment that, to the best of our knowledge, the observed structural work was performed in accordance with the approved plans, specifications, and applicable workmanship provisions ofthe California Building Code. Very truly yours, Guangsheng Wang, P.E. Principal CC. Mei Kong L 7' f�N" l No. c 7'916 �. Exp. p 14 `s�•q��, C ! V OF CA G.S. Engineering/:11(376 DLivii i Ct..' l?rcinotrt, C,k)=1a9S!'PH: (510)304-9812 13 C-6 - )-11-4 FE G . ENGINEERING CONSULTING ENGINEERS June 28, 2017 Building Inspection Department 10300 Torre Ave. Cupertino;California 95014 • Attn: City Inspector RE: RESIDENCE-19031 Barnhart Ave This is to certify that in accordance with Section 1704, 1707 of the 2016 California Building Code, we have prowtded structural observations/Inspections for the following construction: • :1. Roof and shear wall nailings The structural observations/inspections were performed by a Registered Civil Engineer in the State of California'.Base upon inspections perfogied and our substantiating reports,it is our professional judgment'that,to the best of our knowledge, the observed structural work was performed in accordance with the approved plans, specifications,and applicable workmanship provisions of the California Building,Code. Very truly yours, I ':10.C 77916 ; GuangshengWang, RE. s CIV1�- s Principal �'1F CP CC. Mei Kona • 71/1),'Z hie? • G.S. Engineering•41' 76 € :p,i!;„ _ t. I 5 x. .s',I 2 APEX ENGINEERING INC PO BOX 14119B,FREMONT,CA 94539 Tet:(510)ese.94015 Far;(510)490-earn Etuilding Department August 04.2017 City of Cupertino 10300 tore Ave, Ctipertino.CA 9501. r $ubjeet: New Residence at cf--- 7 UV' l'031 Bernhart Avenue. Cupertino,CA (Permit No. B2016-2816) SPECIAL INSPECTION SO 'ICES FINAL AFFIDAVIT FOR STEEL WELDINC: Mar Sir: CAPEX ENGINEERING INC, has provided testing and special inspection services at the suhject site in oceardance with section I 704A of the California Building Code(2016 Edition) as listed below. (1) Revievt. mill certification(test reports)&Check weldee&certification. (2) inspection (.V welding procedure (FCAW process) specifications qualification and equipment. (3) check structural members for thickness adjacent to welds. ' (4) Inspect joints for proper preparation. (5) Check the type and sin of electrodes (NR 232) to be used for the various joints and positions. (6) Observe the technique of each welder periodically with the use of a welding inspection shield. (7) Obserce fillet weds on (2) Wi (W1.0x39)beams to bottom end plates and wall plate at garage. Personnel under the general supervision of a :registered Civil Engineer periintried these inspections. Bas on the inspections performed and upon our substantiating reports that the inspected work was performed, to the best or our knowledge. in =romance with the approved plans and specifications and the applicable workinanshipNovisions of the California Building Code. -;14' 4V14" Sincerely. 17.t 9APEX ENGINEERING INC `,37 - .t' t;syfte t kir!: su, tl Principal —-