17-026 Envirocom, Limited Asbestos and Lead-in-Paint Inspection at City Hall'CITY OF a
CUPERTINO
AGREEMENT
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino , CA 95014
408-777-3200
THIS AGREEMENT, made and entered into this 16th day of February is by and between the CITY
OF CUPERTINO (hereinafter "CITY") and ENVIROCOM, P.O. Box 28310, San Jose, CA 95159,
Phone: (408) 894-9062, Email: mitch@enviro-com.net. (hereinafter "CONTRACTOR"), in
consideration of their mutual covenants, the parties agree as follows:
CONTRACTOR shall provide or furnish the following specified services and/or materials: Limited
Asbestos and Lead-in-Paint Inspection in connection with the City Hall I.T. Tenant Improvement
Project. ~
Check box if services are further described in an Exhibit. ~
EXHIBITS: The following attached exhibits hereby are made part of this Agreement: Exhibit A.
TERM: The services and/or materials furnished under this Agreement shall commence on
February 21, 2017 and shall be completed no later than March 31, 2017.
COMPENSATION : For the full performance of this Agreement , CITY shall pay CONTRACTOR:
$2,459.
California Labor Code, Section 1771 requires the payment of prevailing wages to all workers
employed on a Public Works contract in excess of $1,000.00 .
GENERAL TERMS AND CONDITIONS
Hold Harmless. Contractor shall , to the fullest extent allowed by law, indemnify, defend, and hold
harmless the City and its officers, officials, agents , employees and volunteers against any and all
liability, claims, stop notices, actions , causes of action or demands whatsoever from and against any
of them , including any injury to or death of any person or damage to property or other liability of any
nature , arising out of, pertaining to, or related to the performance of this Agreement by Contractor or
Contractor's employees, officers , officials, agents or independent contractors. Contractor shall not
be obligated under this Agreement to indemnify City to the extent that the damage is caused by the
sole or active negligence or willful misconduct of City, its agents or employees. Such costs and
expenses shall include reasonable attorneys ' fees of counsel of City's choice , expert fees and all
other costs and fees of litigation .
Subcontracting. Contractor has been retained due to their unique skills and Contractor may not
substitute another, assign or transfer any rights or obligations under this Agreement. Unless prior
written consent from City is obtained, only those people whose names are listed this Agreement
shall be used in the performance of this Agreement.
Assignment. Contractor may not assign or transfer this Agreement, without prior written consent
of CITY.
P age 1 o f 3
Short Form Agreem ent
Insurance. Contractor shall file with City a Certificate of Insurance consistent with the following
requirements
Coverage:
Contractor shall maintain the following insurance coverage:
(1) Workers' Compensation :
Statutory coverage as required by the State of California.
(2) Liability:
Commercial general liability coverage in the following minimum limits:
Bodily Injury: $500,000
each occurrence
$1,000,000
aggregate -all other
Property Damage: $100,000 each occurrence
$250,000 aggregate
If submitted, combined single limit policy with aggregate limits in the amounts of
$1,000 ,000 will be considered equivalent to the required minimum limits shown
above.
(3) Automotive:
(4)
Comprehensive automotive liability coverage in the following minimum limits:
Bodily Injury: $500,000 each occurrence
Property Damage: $100,000 each occurrence
or
Combined Single Limit: $500,000 each occurrence
Professional Liability:
Professional liability insurance which includes coverage for the professional acts,
errors and omissions of Consultant in the amount of at least $1 ,000,000.
Subrogation Waiver. Contractor agrees that in the event of loss due to any of the perils for which it
has agreed to provide comprehensive general and automotive liability insurance, Contractor shall
look solely to its insurance for recovery. Contractor hereby grants to City, on behalf of any insurer
providing comprehensive general and automotive liability insurance to either Contractor or City with
respect to the services of Contractor herein, a waiver of any right to subrogation which any such
insurer of said Contractor may acquire against City by virtue of the payment of any loss under such
insurance.
Termination of Agreement. The City reserves the right to terminate this Agreement with or
without cause with a seven (7)-day notice. The Contractor may terminate this Agreement with or
without cause with a seven (7)-day written notice.
Non-Discrimination. No discrimination shall be made in the employment of persons under this
Agreement because of the race, color, national origin, ancestry, religion, gender or sexual orientation
of such person
Interest of Contractor. It is understood and agreed that this Agreement is not a contract of
employment in the sense that the relationship of master and servant exists between City and
undersigned. At all times, Contractor shall be deemed to be an independent contractor and
Contractor is not authorized to bind the City to any contracts or other obligations in executing this
Agreement. Contractor certifies that no one who has or will have any financial interest under this
Page2of3
Short Form Agreement
Agreement is an officer or employee of City. City shall have no right of control as to the manner
Contractor performs the services to be performed. Nevertheless , City may, at any time , observe the
manner in which such services are being performed by the contractor.
The Contractor shall comply with all applicable Federal, State, and local laws and ordinances
including, but not limited to, unemployment insurance benefits, FICA laws, and the City business
license ordinance.
Changes. No changes or variations of any kind are authorized without the written consent of the
City.
CONTRACT CO-ORDINATOR and representative for CITY shall be:
NAME : Alex Acenas, Project Manager DEPARTMENT: Public Works
This Agreement shall become effective upon its execution by CITY, in witness thereof, the parties
have executed this Agre,_rn ent the da and year first written above .
CONSU '// ,/ <
By~l:-7"----+---r"-----,.,,....,_----7"~-;r-----,,,,_ __
T itle -+-'"---'"'~:..--.-=-:,,.-;z:--'---------
APPROVALS
Page 3 o f3
Short Form A greement
EXPENDITURE DISTRIBUTION
tn-3 3 ~ !lo 7 -9 (IJ) -9~o ..
February 16, 2017
Proposal 17-007.03
Mr. Alex Acenas
Project Manager
Public Works Dept.
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
EXHIBIT A
ENJ/JRQCOM
Subject: Proposal for Limited Asbestos and Lead-In-Paint Inspection, City Hall
10300 Torre Avenue, Cupertino, California
Dear Mr. Acenas:
Envirocom is pleased to present this proposal for limited asbestos and lead-in-paint
inspection/survey at the subject locations, hereafter, referred to as Site. Envirocom
understands that two offices will be renovated at the Site in the near future.
The survey/inspection will include the following tasks:
Task 1 -Prefield Activities
Envirocom's inspector will coordinate Site inspections with the client to get access to all
areas of concern. Envirocom will obtain floor plans from the client for the Site or
prepare one at the Site, and prepare all necessary field equipment and material.
Task 2-Facility Inspection & Environmental Sampling
The inspection will be performed by a California-certified asbestos consultant (CAC) and
California Department of Public Health (CDPH) certified lead inspector/assessor.
Envirocom will perform a walk through to identify homogeneous materials, collect
samples of suspect asbestos-containing material (ACM), and paint on major surfaces
or/and deteriorated paint.
P .O. Box 28310
San Jose, CA 95159
Phone(408)894-9062
Fax (408) 894-9063
Mr . Alex Acenas Envirocom .
Proposal for Limited Asbestos and Lead-In-Paint Inspection
10300 Torre Avenue, Cupertino , California
Page2
Envirocom will take the samples to State/National-certified laboratories for chemical
analysis and laboratory testing.
Envirocom anticipates collecting up to 20 bulk samples at the Site to be tested for
asbestos, and 6 paint samples will be collected to be analyzed for lead.
Task 3 -Laboratory Analysis/Testing
The samples will be submitted to EM Lab of South San Francisco, California an
independent laboratory that participates in the bulk sample proficiency analysis program
conducted by EPA and is accredited by the National Voluntary Laboratory Accreditation
Program (NVLAP), and State of California. The bulk samples will be tested using EPA's
Polarized Light Microscopy (PLM) method. The paint samples will be analyzed using
Atomic Absorption Spectrometry (AAS).
Task 4 -Report preparation and Submittal
Envirocom will prepare a report summarizing the field observations , laboratory test
results, and quantity of the ACM as well as condition of painted surfaces at the Site .
Additionally, Envirocom will present recommendations for properly abating the identified
ACMs as well as lead-related hazards.
Envirocom will submit one copy of the report to the client.
COST ESTIMATE
Envirocom's cost estimate for the work described in Task 1-4 is $2,459.00.
Detail cost is presented in Table I. If additional sampling is warranted during the
inspection, Envirocom will only charge the client per unit cost for the additional samples
only ($25/sample for asbestos & $35/sample for lead). If fewer samples will be
collected during the inspection, the client will be charged only for the number of samples
collected at the Site.
SCHEDULE
Envirocom is ready to start this project on February 21, 2017, and have the report
prepared by February 24, 2017.
To authorize starting the work please complete and sign the enclosed Acceptance of
Proposal Form and email, or fax a copy to our office at 408-894-9063.
Mr. Alex Acenas
Proposal for Limited Asbestos and Lead-In-Paint Inspection
10300 Torre Avenue, Cupertino , California
Envirocom .
Page3
Envirocom appreciates the opportunity submitting this proposal for your review, and look
forward serving you on this project. Please feel welcome to call me if you have
questions .
Very Truly Yours,
Envirocom
/ /
f;!:/;'l v~
Mitch Hajiaghai, REA II, CPESC, QSD
Certified Asbestos and Lead Consultant
Enclosures: Table I, Cost Estimate
Fee Schedule 2017
Terms and Conditions
Acceptance of Proposal
Task N°
TABLE I
COST ESTIMATE
Asbestos and Lead-In-Paint Inspection
10300 Torre Avenue, Cupertino, California
Description Unit Cost Quantity Cost
1-4 -Asbestos and Lead-In-Paint Inspection and Reporting
-Certified Asbestos
Consultant/Lead Inspector $110/hr 5 hr $550.00
-Field Technician $80/hr 6 hr $480.00
-Bulk Sample Testing $25/sample 20 sample $500.00
Using PLM Method
-Paint Sample Analysis $35/sample 6 sample $210.00
-Truck/Mileage
To Site and Laboratory $.59/mile 100 mile $59.00
• Prepare and Submit Report
-Certified Asbestos
Consultant $110/hr 6 hr $660.00
Cost For Task 1-4 $2,459.00
STANDARD FEE SCHEDULE
PHASE I, II, Ill ENVIRONMENTAL SITE ASSESSMENT
PROFESSIONAL PERSONNEL
PROFESSIONAL PERSONNEL
2017
1. Principal Technical Staff (Engineer/Geologist/Scientist)
2. Project Manager
3. Senior Technical Staff (Engineer/Geologist/Scientist)
4. Project Associate
4. (Certified Asbestos & Lead Consultant)
5. Technical Staff (Field Engineer/Scientist/ Geologist)
6. Expert Witness and Litigation (4 Hours Minimum Charge)
TECHNICAL PERSONNEL
1. Field Technicians (4 hours Minimum Charge)
2. Technic~J Editor
3 . Drafting , CAD, Database Programmers
MISCELLANEOUS SERVICES
1. Travel Time
2. Direct Expenses
Auto Mileage
Per Diem
3. Administrative Staff
4 . Additional Report Reproduction
and submittal
$175.00/hr
$150.00/hr
$140.00/hr
$125.00/hr
$110 .00/hr
$99.00/hr
$250.00/hr
$80.00/hr
$70.00/hr
$75.00/hr
Same as Above
$0.59/mile or $70/day
$200.00/day
$59.00/hr
$80/each
NOTES: (1) Unless otherwise paid directly by client , agency fees will be charged cost + 15%, (2) Rented
equipments will be charged cost + 15%
ASBESTOS AND LEAD CONSUL TING
AND INDUSTRIAL HYGIEN SERVICES
2017
PERSONNEL RATES
1 . Certified Industrial Hygienist
2. Certified Asbestos Consultant
3. Certified Lead Inspector/Assessor & Monitor
4. Certified Radon Measurement Specialist
5. Site Surveillance Technician/Field Technician
6. Drafting
7. Administrative Staff
$150.00/hr
$110.00/hr
$110.00/hr
$110.00/hr
$80.00/hr
$75.00/hr
$59.00/hr
ANALYTICAL RATES FOR ASBESTOS (48 HOURS TURNAROUND)
1. Sample Analysis by Polarized Light Microscopy (PLM)
2. Sample Analysis by 1000 Point Count
3. Sample Analysis by Gravimetric Point Count
4. Air Sample Analysis by Phase Contrast Micoscopy (PCM)
$25.00/sample
$100.00/sample
$165.00/sample
$25.00/sample
$200.00/sample 5. Air Sample Analysis by Transmission Electron Microscopy
(TEM) AHERA
ANALYTICAL RATES FOR LEAD-IN-PAINT (48 HOURS TURNAROUND)
1. Paint Sample Analysis by FAA
2. Air Sample Analysis by FAA
FIELD EQUIPMENT
1. Travel Time
2. Auto Mileage
3. Per Diem
4. Air Sampling Pump
5. Miscellaneous Items (Cassettes , PPE, etc.)
$35.00/sample
$35.00/sample
Same as Above
$0.59/mile or $70/day
$200 .00/day
$20.00/day
$50.00/day
NOTES: (1) The above personnel rates are for normal weekday working hours . Please add additional 30 %
surcharge to the personnel rates for emergency calls , weekend and holiday work . (2) Bulk samples
containing greater than 3 layers will be charged $15/additional layer for PLM analysis .