DRC Reso 00613 -ASA -00
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 6
OF THE DESIGN REVIEW COMMITTEE OF THE CITY OF CUPERTINO
APPROVING BUILDING AND ARCHITECTURAL MODIFICATIONS TO AN APPROVED
APARTMENT DEVELOPMENT
SECTION I: PROJECT DESCRIPTION
Application No.: 13 -ASA -00
Applicant: Pegasus Development Company
Location: Northwest Corner of Blaney & Rodrigues Avenues
SECTION II: FINDINGS
WHEREAS, the Design Review Committee of the City of Cupertino received an application for an
Architectural and Site Approval, as described in this Resolution; and
WHEREAS, the Design Review Committee finds that the changes are beneficial and compatible with
the surrounding area;
1. The proposal, at the proposed location, will not be detrimental or injurious to property or
improvements in the vicinity, and will not be detrimental to the public health, safety, general
welfare, or convenience;
2. The proposal is consistent with the purposes of the zoning ordinance, and the General Plan.
3. The proposal will use materials that are compatible with neighboring properties.
4. The change of building material is considered an upgrade.
5. The horizontal siding is attractive and enhances the design.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this
matter, the application no. 13 -ASA -00, is hereby approved; and
That the subconclusions upon which the findings and conditions specified in this Resolution are based
and contained in the public hearing record concerning Application 13 -ASA -00 as set forth in the
Minutes of the Design Review Committee Meeting of June 28, 2000, and are incorporated by reference
herein.
Resolution No. 6
Page 2
June 28, 2000
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT.
1. DESIGN CHANCRES
All existing buildings and the 24 recently approved buildings are approved for horizontal siding.
The buildings and trims shall be painted according to the approved material board under Use
Permit Application No. 14-U-98. Additionally, the existing building decks may have their railings
match the decision of the 24 approved units.
2. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government Code
Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of
such fees, and a description of the dedications, reservations, and other exactions. You are hereby
further notified that the 90 -day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If
you fail to file a protest within this 90 -day period complying with all of the requirements of Section
66020; you will be legally barred from later challenging such exactions.
3. CONSTRUCTION PHASING
Work with staff to develop a construction management program prior to beginning the work which
involves; construction phasing, construction timing, separating residents from construction activity,
construction staging area, and parking.
PASSED AND ADOPTED this 28th day of June, 2000, at a Regular Meeting of the Design Review
Committee of the City of Cupertino, State of California, by the following roll call vote:
AYES:
COMMISSIONERS: David Doyle, Jerry Stevens
NOES:
COMMISSIONERS:
ABSTAIN:
COMMISSIONERS:
ABSENT:
COMMISSIONERS:
ATTEST:
Ciddy Wordell
City Planner
G: Planning,/Drc/Biltmorereso
APPROVED:
;rry Stevens, Chairperson
esign Review Committee