Loading...
B-2017-0659CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 21408 KRZICH PL CUPERTINO, CA 95014-4943 (362 06 040) CONTRACTOR: PERMIT NO: B-2017-0659 CLEAN SOLAR INC SAN JOSE, CA 95112 DATE ISSUED: 04/26/2017 OWNER'S NAME: NOTT BABU R AND INDIRA TRUSTEE OWNER'S PHONE: 408-257-1708 PHONE NO: (408) 217-8876 LICENSED D ONT A TORR DECLARATION TION BUILDING PERMIT INFO_ : License Class CC -10/C-46-46 Lie. #910849 Contractor Q EAN SOLAR INC Date 02/28/2018 X BLDG X ELECT — PLUMB I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing — MECH X RESIDENTIAL — COMMERCIAL with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. JOB DESCRIPTION: I hereby affirm under penalty of perjury one of the following two declarations: (N) EV CHARGING OUTLET - GARAGE; (1) 100 AMP AC SUBPANEL m. I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Sq. Ft Floor Area: Valuation: $0.0.0 APPLICANT CERTIFICATION I certify that I have read this application and state that the above APN Number: Occupancy Type: information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize 362 06 040 representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue against said City in consequence of the granting this permit. Additionally, the applicant understands and willl comply with all ll non -point WITHIN 180 DAYS OF PERMIT ISSUANCE OR source regulations erthe Cupertino icipal Code, Section 9.18. 180 DAYS FROM LAST CALLED INSPECTION. Signature ` " Date , —�i1. Issued by: Phuong Devries J Date: 04/26/2017 OWNE - R N I hereby affirm that I am exempt from the Contractor's License Law for one of the RE -ROOFS: following two reasons: All roofs shall be inspected prior to any roofing material being installed. If a roof is m. I, as owner of the property, or my employees with wages as their sole installed without first obtaining an inspection, I agree to remove all new materials for compensation, will do the work, and the structure is not intended or offered for inspection. sale (Sec.7044, Business & Professions Code) z. I, as owner of the property, am exclusively contracting with licensed Signature ofApplicant: contractors to construct the project (See.7044, Business & Professions Code), Date: I hereby affirm under penalty of perjury one of the following three declarations: m. I have and will maintain a Certificate of Consent to self -insure for Worker's ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance, as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code, for the performance of the work for which this California Health & Safety Code, Sections 25505, 25533, and 25534. I will permit is issued. maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the s. I certify that in the performance of the work for which this permit is issued, I Health & Safety Code, Section 25532(a) should I store or handle hazardous shall not employ any person in any manner so as to become subject to the material. Additionally, should I use equipment or devices which emit hazardous Worker's Compensation laws of California. If, after making this certificate of air contaminants as defined by the Bay Area Air Quality Management District I exemption, I become subject to the Worker's Compensation provisions ofthe will maintain compliance with the Cup 'no Municipal Co, pter 9.12 and the Health & Safety Code, ec ons 25505, 255 , nd Z 534. Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked. Owner or authorized agent: APPLICANT CERTIFICATION Date: �7 24 I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws I hereby affirm that t ere is a onstruction lending agency for the performance, relating to building construction, and hereby authorize representatives of this city of work's for which th t is issued (Sec. 3097, Civ C.) to enter upon the above mentioned property for inspection purposes. (We) agree Lender's Name to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in Lender's Address consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal ARCHITECT'S DECLARATION Code, Section 9.18. 1 understand my plans shall be used as public records. Signature Date Licensed Professional )PERTINO NEWsTRII ,T ADDRESS &A . OWNER NAME STREET ADDRESS Jw, `V CONSTRUCTION PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION OtO65-4, 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • building(a�cuoertino orADDITION ����� ❑ ALTERATION / TI. ❑ REVISION / DEFERRED ORIGINAL PERMIT # APN # 4 -&, NE J /e tSTATE, CONTACT N ,t l? & STRrFTADT)" z % ❑ OWNER ❑ OWNER -BUILDER .❑ OWNERAGENT CONTRACTOR NAM/� COMPANY NAME STREET ADDRESS! f sJ �� ARCHITECT/ENGINEER NAME S f ET ADDRESS DESCRIPTION OF WORK EXISTG AREA BATHROOM REMODELAREA NEW FLOOR AREA R ❑ CONTRACTOR AGENT ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑ TENANT JBL �i LIC SE T�PE�� ° o� BUS. LIC # y a w 1 CITY, STATE, ZIP LICENSE NUMBER :FE-;MAILTATE, ZIP 04e REMODELAREA DEMO TOTAL AREA NET AREA OTHER REMODELAREA s' '121 I PHONE BUS. LIC # FAX PHONE USE I TYPE I DCC. I SQ.FT. VALUATION ($) B1dgApp 2011.doc revised 06/21/11 ❑ATTACH # DWELLING UNITS: IS A SECOND UNIT ❑ YES SECOND STORY ® YES BEINGADDED? ❑NO ADDITION? ❑NO PRE -APPLICATION ❑ YES IF YES, PROVIDE COPY OF is THE BLDG AN PLANNINGAPPL# []NO PLANNING APPROVAYE L LETTER EICHLERHOME? [3NpS -'- _ _' TOTAL VALUAT t act on a property owner's belialf. I have r/e`ad this By my signature below, I certify to each of the fo�ng: I am the property owner rlveqri�itjEjaecurate. application and the information I have provided i rrect. I have readtlre Desc ' t' ork I agree to comply with all applicable local ordinances and state laws relating to b struction. I authorize ep n tives of Ctlpe no to enter the above -identified property for inspection purposes. Signature of Applicant/Agent: Date: j J SUPPLEMENT IN 6RMATION REQUIRED Es �_„ p - iT Y+PNew v �T/ SFD or Multifamily a Bogs: Apply for demolition permit forexisting buiiding(s). Demolition permit is required prior to issuance of buildingEx f 0 BifII,Dp�tG> LexEvI> permit for new building. ®: 3EitPREss , ®rli�rNING P> k13 _ Commercial Bldgs: Provide a completed Hazardous Materials Disclosure To—nn ®` saTA�rmARp ' ®,>sitc WORKs if any Hazardous Materials are being used as part of this project. _ Copy of Planning Approval Letter or Meeting with Planning prior to 0 LARGE ❑ 1" APT_ submittal of Building Permit application. ,� ®iKAaoit> ®saNtTnR,Y,s�ttRDtsT._ , =� :.:ill R4 '-.:. B1dgApp 2011.doc revised 06/21/11 ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALLCOVPLY WITH THE FOLLOWING APPLICABLE CODES: LICENSE HOLDER'S 2016 CBC / 2015 IBC . CEC ARTICLE 690 SIGNATURE • 2016 CRC / 2015 IRC . CFC ARTICLE 605.11 • 2016 CEC / 2014 NEC • IEEE STANDARD 929 • 2016 CMC / 2015 UMC • UL STANDARD 1741 CLEAN SOLAR INC • 2016 CPC / 2015 UPC • OSHA 29 CFR 1910.269 2016 CFC / 2015 IFC • THE AUTHORITY HAVING JURISDICTION KRZICH PL. t KOLL e, ire 1t0og SUITE San Jose, CA 95112 • 2016 BUILDING ENERGY EFFICIENCY STANDARDS • 2016 CALIFORNIA ENERGY CODE TITLE 24 Cont_ Llc# 910849 • 2016 CALIFORNIA HEALTH AND SAFETY CODE • WHERE APPLICABLE, RULES OF THE PUBLIC UTILITIES COMMISSION PROPERTY www_ ceanso ar com REGARDING SAFETY AND RELIABILITY Q LINE • THE AUTHORITY HAVING JURISDICTION • VAN UFACTURERS' LISTINGS AND INSTALLATION INSTRUCTIONS > FRONT OF o RESIDENCE CLEANSOLAR GOVERNING CODES 1. DC WIRING METHODS SHALL NOT BE INSTALLED WITHIN 10" OF THE ROOF DECKING OR SHEATHING EXCEPT WHERE COVERED BY 65'-0" THE PV MODULES AND EQUIPMENT (CEC 690.31 (E)(1)) 2. AN ACCESS POINT SHALL BE PROVIDED THAT DOES NOT PLACE THE GROUND LADDER OVER OPENINGS SUCH AS WINDOWS OR DOORS ARE LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION AND IN LOCATIONS WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS 100'-5" EXISTING TREE LIVES, WIRES, OR SIGNS (CRC P331.4.2) RESIDENCE N � 3. ALL EQUIPMENT AND ASSOCIATED CONNECTIONS OF INVERTERS, m � LEE 0 o MODULES, PV SOURCE CIRCUITS, BATTERY CONNECTIONS, ETC. JU m z In AND ALL ASSOCIATED WIRING AND INTERCONNECTIONS SHALL BE ce m N INSTALLED ONLY BY QUALIFIED PERSONNEL (CEC 690.4(E)) w � oz N 4. RAPID REQUIREMENTS: PV INSTALLED ON 14'-0" 11'- LL I I I I I I I w — SHUTDOWN SYSTEMS p o OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION. Z EL PV SYSTEM CONDUCTORS OF VORE THAN 5 FT INSIDE A BUILDING, OR VORE THAN 10 FT FROV A PV ARRAY, SHALL BE LIMITED TO NOT VORE THAN 30 VOLTS AND 240 VA WITHIN 10 SECONDS OF RAPID SHUTDOWN INITIATION, IN ACCORDANCE WITH CEC 690.12 24'-8" BACK OF RESIDENCE U w O 75'-0" d —N el JPH 4/20/17 421/17 ui ding Department SCALE: 1/16"= l'0" SHEETN11BER NOTES Rev7wed -y- DINunna D - PROPERTY PLAN 0-2 (18) (N) SOLAR MODULES LICENSE HOLDER'S SIGNATURE (N) AC SUB PANEL PITCH: 18° AZIMUTH: 180° (INSIDE GARAGE) CLEAN TOTAL AREA OF ARRAY: 298 FT2 (N) EV CHAGER SOLAR INC (I NSI D E GARAGE) 1445 KOLL CIRCLE, SUITE 109 O San Jose, CA 95112 Cont Uc# 910849 (E) #4 WATER PIPE BOND www- c eanso ar com FIRE ACCESS POINT M FLIT L91 FOR ACCESS LADDER �' PER CFC 605.1 1.3.2.1. SERVICE POINT 8 �_� �� (E) MAIN SERVICE PANEL+ CLEANSOLAR Me UTILITY METERING Q (E) #4 GROUND ROD AC SUBPANEL (N) AC SUBPANEL ® (N) PV LOAD CENTER (N) NM-B CABLE TO EvEV CHARGER RUN UNDER THE HOME ------------------------------------------------------------------------1 (N) CONDUIT TO BE RUN MIN. 1 " ABOVE ROOFTOP AND UNDER EAVES EXISTING AC LOAD CENTER 1 ST STORY=�3 RESIDENCE c COMPOSITION SHINGLEROOF at DEDICATED PV LOAD CENTER 16 36" " 24" 36" a o m = w LEE o R, Q Q —m NUI Je JUNCTION BOX 36' IN. 3' w � � �z `�`I H CC) CC) O p Z 0 w 0 O NCE_ O [>A]ROOF VENTS, OBSTRUCTIONS 0 ---- CONDUIT RUN ROOFTOP CONDUIT TO BE RUN ON CONDUIT BLOCKS MIN. 1"ABOVE ROOF SURFACE, CLOSE TO RIDGE LINES, AND w UNDER EAVES; DC CONDUIT TO BE LABELED AT MAX 10' INTERVALS, CONDUIT TO (N) SUBPANEL TO BE RUN AwNs JeR UNDER THE HOME CONDUIT RUNS ARE APPROXIMATE AND TE 4 zo n ARE TO BE DETERMINED IN THE FIELD BY THE INSTALLERS \ Liu � ding Department SCALE: 3/32" l'-0" U EQUIPMENT LEGEND e _ By D s ROOF PLAN 0-3 GROUNDING MODULE CLAMP IRONRIDGE XR10 RAIL CAPFOOT NEOPRENE BONDED SEALING WASHER — FLASHFOOT-2 ALUMINUM FLASHING WITH INTEGRATED RUBBER BUSHING (1) 5/16"x 4-3/4" SS LAG BOLT MIN. 2-1/2" EMBEDMENT NTS ATTACHMENT DETAIL 1 If OF MODULES IN ARRAY: 18 MODULE WEIGHT - EA 37.5 LBS MODULE WIDTH: 39.4 " MODULE HEIGHT: 64.6 " TOTAL ARRAY AREA: 317.8 FT2 RACKING WEIGHT: 51.5 LBS BOS WEIGHT: 88.4 LBS MODULE WEIGHT: 674.6 LBS TOTAL ARRAY :HEIGHT: 814.5 LBS # OF ROOF ATTACHMENTS: 28 DISTRIBUTED LOAD: 2.6 LBS/FT2 WEIGHT PER ATTACHMENT: 29.1 LBS VAULTED RAFTER`. 2" X 6" @ 24" OC DETAIL 3 RAFTERS 2" x 6" @ 24" OC DETAIL 2 FC @ VAX. RAFTERS x6"@24"OC DETAIL 2 jAULTED RAFTERS 2" X 6" @ 12" OC DETAIL 3 /AULTED RAFTERS 2"X6"@24"OC DETAIL 3 RONRIDGE XR10 RAIL SCALE: 1/16"=1'-0" LOAD BEARING WALL @ 11'-0" 24" EAVE OVERHANG COLLAR TIE 48" OC RIDGE BEAM 2" x 8" RAFTERS 2" x 6" @ 24" OC CROSS BEAM @ 10'-0" Buis ig Department EXTERIOR WALLS 11 hi ELEVATION DETAIL21 Phuona D -24"EAVEOVERHANG -RIDGE BEAM 2" x 8" -VAULTED RAFTERS 2"x6"@12"OCA 2" x 6" @ 24" OC -SUPPORT BEAM @ 10' -EXTERIOR WALLS NTS ELEVATION DETAIL 3 WEIGHT CALCULATIONS I PARTIAL FRAMING PLAN 3" - 6" SPAN @ 10' SPAN @ 10' 3" - 6" SPAN @ 10' SPAN @ 10' �COVPOSITION SHINGLE /-COVPOSITION SHINGLE LOAD BEARING WALL @ 11'-0" 24" EAVE OVERHANG COLLAR TIE 48" OC RIDGE BEAM 2" x 8" RAFTERS 2" x 6" @ 24" OC CROSS BEAM @ 10'-0" Buis ig Department EXTERIOR WALLS 11 hi ELEVATION DETAIL21 Phuona D -24"EAVEOVERHANG -RIDGE BEAM 2" x 8" -VAULTED RAFTERS 2"x6"@12"OCA 2" x 6" @ 24" OC -SUPPORT BEAM @ 10' -EXTERIOR WALLS NTS ELEVATION DETAIL 3 24" EAVE OVERHANG COLLAR TIE 48" OC RIDGE BEAM 2" x 8" RAFTERS 2" x 6" @ 24" OC CROSS BEAM @ 10'-0" Buis ig Department EXTERIOR WALLS 11 hi ELEVATION DETAIL21 Phuona D -24"EAVEOVERHANG -RIDGE BEAM 2" x 8" -VAULTED RAFTERS 2"x6"@12"OCA 2" x 6" @ 24" OC -SUPPORT BEAM @ 10' -EXTERIOR WALLS NTS ELEVATION DETAIL 3 (N) 100A 240V (N) NEMA 14-50 AC SUBPANEL LICENSE HOLDER'S EV CHARGING SQUARE D SIGNATURE OUTLET HOV612L100RB CLEAN O SOLAR INC T 1445 KOLL CIRCLE, (N) EV OCPD 3/4" EMT CONDUIT 2P 40A SUITE 109 San Jose, CA 95112 (3) #8 AWG THWN-2 WIRE Cont Lic# 910849 (1) #8 AWG THWN-2 EGG G - - - , UTILITY SERVICE www ceanso ar com - 120/240V Ip BRANCH CIRCUIT 1: (N) 60A 240V (10) LG ELECTRONICS LG320N 1 C-G4 MODULES PAIRED WITH PV LOAD CENTER (10) ENPHASE S280-60-LL-2-US (240V) MICROINVERTERS ENPHASE AC COMBINER C E SOLAR XAM1-120 WITH INTEGRATED (N) 125A 240V (E) MAIN METER MONITORING, NEMA 3R AC LOAD CENTER �O O� (E) SQUARE D HOMELINE - — — — SQUARED o 200A SERVICE PANEL ��__ HOV816L125RB (E) 200A VAIN BREAKER _____�______ ------ ENVOY-S MONITOR BRANCH CIRCUIT 2: (N) JBOX (8) LG ELECTRONICS LG320N1 C-G4 MODULES PAIRED WITH NEMA 3R oc D (N)0CPD oaos (8) ENPHASE S280-60-LL-2-US (240V) MICROINVERTERS 1 P 5A 2P 60A (N) PV OCPD CT L — — — (N) PV OCPD (N) OCPD `---2P 20A II 2P40A 2:)60A -- -- --- -- _ (N) PV OCPD F F v ti v I I IN i 2P 20A ----------GG c c m d O� O c' m I Cr E) #4 GROUND ROD + ce Q [A] WIRES IN FREE AIR [B] 3/4" EMT CONDUIT [C] 3/4" EMT CONDUIT [D] NM-B (ROVES) [E] 3/4" EMT CONDUIT E) #4 WATER PIPE BOND w � N H (3) #12 AWG WIRE + (1) #12 AWG EGG ** (6) #10 AWG THWN-2 WIRE (3) #8 AWG THWN-2 WIRE (3) #4 AWG PVC WIRE (3) #6 AWG THWN-2 WIRE Z 0-0 IN ENGAGE CABLE UV RATED SHEATHING (1) #8 AWG THWN-2 EGG (1) #8 AWG THWN-2 EGG (1) #8 AWG PVC EGG (1) #8 AWG THWN-2 EGG - - U NOTES: • MODULES ARE BONDED TO RAIL USING UL 2703 RATED BONDING SYSTEM - INTEGRATED BONDING MID-CLAMPS+ DIRECT-BURIAL LAY-IN-LUGS, SEE ATTACHED FOR SPECIFICATIONS • WHEN UTILIZING THE 120% RULE, BACKFED PV BREAKERS WILL BE INSTALLED AT OPPOSITE END OF THE BUS BAR FROM THE MAIN BREAKER. A PERMANENT WARNING LABEL TO BE INSTALLED PER SYSTEM SIGNAGE, SHEET F-1 • PV DC SYSTEM IS UNGROUNDED w • BACKFED PV BREAKER WILL BE INSTALLED AT OPPOSITE END OF THE BUS BAR FROM THE MAIN BREAKER. A PERMANENT WARNING LABEL TO BE INSTALLED PER SYSTEM SIGNAGE, SHEET F-1 • WHEN PRESENT, THE GEC TO BE CONTINUOUS AS PER CEC 250.64(C) AND TO TERMINATE AT A GROUNDING ELECTRODE WNe JPR • FOR ALL SYSTEMS OVER 25OV, CONCENTRIC AND ECCENTRIC KNOCKOUTS SHALL BE PROPERLY BONDED • THERE ARE NO BATTERY BACKUPS TIED TO THE INVERTER(S) 420/1 CUPPED PATH IS AS FOLLOWS: ONLY COMBINATION AC AND DC EGG IS REQUIRED FOR UNGROUNDED' TFC A SIN RACKING BONDS RACKING TO MODULE FRAMES, GROUNDING CLIPS BOND RACKING TO ENPHASE MICROINVERTERS, ENPHASE MICROINVERTERS HAVE TED BONDING TO CONNECT TO EGG IN THE ENPHASE TRUNK CABLE 4/21/17GROUND SUE-11B --ov d By- D -� ELECTRICAL LINE DIAGRAM " 1 SIGNAGE FORMAT: ALL LETTERS SHALL BE CAPITALIZED, 3/8" WHITE LETTERING ON RED BACKGROUND, ARIAL OR SIMILAR FONT, NON -BOLD; REFLECTIVE, ON WEATHER- RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT (USE UL -969 AS STANDARD FOR WEATHER RATING) WILL BE USED, DURABLE ADHESIVE MATERIALS MEET THIS REQUIREMENT. TO BE INSTALLED NEXT TO THE PV BREAKER AT THE MAIN ELECTRICAL SERVICE AND SUBPANEL TIE-IN LOCATIONS: TO BE INSTALLED AT THE DC DISCONNECT: OA WARNING - INVERTER OUTPUT CONNECTION. DO NOT PV SYSTEM DC DISCONNECT RELOCATE THIS OVERCURRENT DEVICE RATED MAX POWER -POINT CURRENT - 9.53 A © RATED POWER -POINT VOLTAGE - 33.6 V TO BE INSTALLED AT THE MAIN ELECTRICAL SERVICE MAXIMUM SYSTEM VOLTAGE 46 6 V AND SUBPANEL TIE-IN LOCATIONS: © WARNING DUAL POWER SOURCES SECOND SOURCE IS PHOTOVOLTAIC SYSTEM TO BE INSTALLED AT THE MAIN SERVICE PANEL, AC DISCONNECT, AND SUBPANEL TIE-IN LOCATIONS: © RATED AC OUTPUT CURRENT: 20.3 A NORMAL OPERATING AC VOLTAGE: 240 V SHORT CIRCUIT CURRENT - 12.56 A TO BE INSTALLED AT THE DC DISCONNECT: WARNING: ELECTRIC SHOCK HAZARD -DO NOT TOUCH O TERMINALS - TERMINALS ON BOTH THE LINE AND THE LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION TO BE INSTALLED AT THE JUNCTION BOXES, INVERTER, TO BE INSTALLED AT THE AC DISCONNECT: AND DC DISCONNECT (UNGROUNDED SYSTEMS): O CAUTION - PHOTOVOLTAIC AC DISCONNECT WARNING: ELECTRIC SHOCK HAZARD. THE DC O CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM TO BE INSTALLED AT THE JUNCTION BOXES: ARE UNGROUNDED AND MAY BE ENERGIZED ELECTRIC SHOCK HAZARD OE NO USER SERVICEABLE PARTS INSIDE CONTACT AUTHORIZED SERVICER FOR ASSISTANCE TO BE INSTALLED AT THE INVERTER (GROUNDED SYSTEMS, NEAR GROUND FAULT INDICATOR) WARNING: ELECTRIC SHOCK HAZARD O IF A GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED IN THE OPEN POSITION TO BE PLACED JUNCTION BOXES, DISCONNECTS, RACEWAYS, ENCLOSURES AND CABLE ASSEMBLIES: MARKING SHALL BE PLACED ON INTERIOR AND EXTERIOR DC CONDUIT, RACEWAYS, ENCLOSURES AND CABLE ASSEMBLIES EVERY 10 FEET, WITHIN 1 FOOT OF TURNS OR BENDS AND WITHIN 1 FOOT ABOVE AND BELOW PENETRATIONS OF ROOF/CEILING ASSEMBLIES, WALLS OR BARRIERS: Oj I WARNING: PHOTOVOLTAIC POWER SOURCE Dli�EO U O _ AC D RR �o �c0 PV ARRAY JUNCTION BOX PV LOAD CENTER (WHEN PRESENT) R.ew-evEd By- PINTiong Dew es TO BE INSTALLED AT THE ELECTRICAL SERVICE: A DIRECTORY PLACARD INDICATING LOCATION OF SERVICE AND PV SYSTEM DISCONNECTING MEANS IF NOT AT THE SAME LOCATION CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: PV SOLAR ARRAY PV LOAD CENTER SERVICE POINT & UTILITY METERING AC SUBPANEL 21408 KRZICH PL., CUPERTINO, CA 95014 TO BE PLACED AT THE SERVICE DISCONNECT: © PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN SIGNAGE 0— CB) O To 0 0 4) CK) PV METER SUBPANEL MAIN SERVICE (WHEN PRESENT) (WHEN PRESENT) PANEL SIGNAGE LOCATIONS - MICROINVERTER SYSTEM LICENSE HOLDER'S SIGNATURE CLEAN SOLAR INC 1445 KOLL CIRCLE, SUITE 109 San Jose, CA 95112 Cont Lic# 910849 www_ ceanso ar com CLEANSOLAR N m 00 d O� O r - o Q U Q m N U Ir � po� Ln 00 w 00 N cl- Z w U N � U U w O —N el JeR 1e 420/1] REV 4m/n CLEAN SOLAR INC 1445 KOLL CIRCLE, SUITE 109 San Jose, CA 95112 Cont Lic# 910849 www_ ceanso ar com CLEANSOLAR at N N m = r o Q U Q m N U Y N po� Lf7 w~�O c0 O O O Z w d U N � U t- U w O w d Nm JeR ie. 4/20/17 4/21/17 HE-11 Z_ 1 Enphase S280 Microinverter /! DATA INPUT DATA (DC). 5280 -60 -LL -2 -US. S280 -60 -LL 5 -US... Enphase Microinverters CLEAN Commonly used mod pairings' 235 W - 365 W SOLAR INC. R Maximum input DC voltage 48 V 1445 KOLL CIRCLE `/`�� Enphase tri 2 Y ® Peak power cracking voltage 27 V - 37 V SUITE 1r, San Jose, CA 95112 Operating range 16 V - 48 V Min/Max start voltage 22 V / 48 V Cont. Licit 910849 — Max INC short circuit current 15 A OUTPUT DATA (AC) 208 VAC 240 VAC www- ceanso at com tot Peak 280 VA 280 VA output power - Maximum continuous power 270 VA 270 VA _ Nominal voltage!range2 208 V! 183-229 V 240 V ! 211-264 V - Nominal output current 1.30A 1 A 3 A � � Nominal frequency/.nge Extended frequency range 00,'57-61 Hz 57 - 63 Hz 60l 57 -fit Hz 57 63 Hz \md Power factor at rated power 1.0 10 \\: Maximum nets per 20 A branch croup 21 (three phase, balanced) 14 (single phase) w Maximumoutput fault current 663 mA rms, 100 m5 663 mA, 100 ms Power factor (adjustable) 1 / QZ leading... 0-7 legging 7 /0_7leading _. 0.7lagging EFFICIENCY 208 Vac 240 Vac \\ CEC weighted efficiency 86,51 97.0% .... ..�._� _� Peak inverter efficiency gas 56 97.3 MECHANICAL DATA Designed for high-powered, 60 -cell modules, the advanced grid -ready Enphase S280 T cro inve er ' is built Ambient temperature range + -40-C to 65-C on the fifth -generation platform and achieves the highest efficiency for module -level power electronics along with cost per watt reduction. With its all -AC approach, the S280 simplifies design and installation for 280 VA Connecter type 5280-60-L 2 -US: MC4 s280-60-Lu5-us: Amphenol H4m N z- o installations, and delivers optimal energy harvest. The S280 is compatible with storage systems, includingDimensions (WxHxD) 72 mm x 175 mm x 35 mm (without bracket) = cc m = r Q U Q battery management systems. Weight 8 A Al Ins) m N U fl� O Ln w N Cooling Natural convection - No fans H Z The Enphase S280 integrates seamlessly the Enphase Envoy -S"" communications gateway, and Enphase Enclosure environmental rating vro Outdoor -NEMA 6 o C o ~ no CC Enlighten'"" 0 � Z � FEATURES monitoring and analysis software. N v U U Compatibility 60 -cell PV modules r RO IVE SIMPE Af,_ E, -[ABLE VA C -ED i READY Communication Power line Integrated ground The DC circuit meets the requirements for ungrounded PV arrays in - Optimized for higher -power, - No GEC needed for microinverter - Complies with fixed power factor, NEC 690.35. Equipment ground is provided in the Engage Cable. No additional 6C -cell modules - No DG design or string calculation voltage and frequency ride -through GEC or ground is required. Ground fault protection (OFF) is Integrated into the - Maximizes energy required requirements microinverter. production - More than 1 million hours of testing - Remote updating to respond to Monitorin g Emi hten Manager d M E,Ii hten mmmu ger r g g op rin tions - Mirtmizes Impact of shading. - Industry-leading warranty, changing grid requirements Compliance 7 C UL1741lIEEE1547, FCC Part 15 Class B. CAN/CSA-C22.2 NO. 0-1091, 0.4-04, and 107.1-01 U dust, and debris up to 25 years - Configurable for variable grid profiles o like Hawaiian Electric Company -se,sr- vit v tai ,,ra it, oc r m (HECO) Rule 14H, California Rule 21 N - .vats an _e d d Ir—, al =-w d h, .^e r city w a SPH _ enphcarse �� . 't Enphase Microinverter technology, F enpha e- �� rE. 4/zo/l7 E N E P G v G US VI t=E - -- `-t: B I spa r •- N E R D. " v. 4/2l/n _0.5tF =e _. ---d AI.,ad... :k_o beros.n this ..— Yare r_�a ee by=he=r _p.,,. o+r.�r- METW101Rev 20 �nr�Za-2.1 yrt- 5- INVERTER SPECIFICATIONS Enphase®Energy // Rapid Shutdown Enphasea Engage Cable System // DATA CLEAN _ - Rap d $�� in i€� `- s in ( g,� € SOLAR INC 1445 KOLL CIRCLE, SUITE 10 9 San Jose, CA 95112 CABLE TYPES! ORDERING OPTIONSCJ Voltage Connector Spacing PV Module Orientation Model Number #Connectors` Weight" 240 VAC, 4 conductors 1.025 meter (40") Portrait ET10-240-40 40 40 he 240 VAC, 4 conductors 1.7 meter (67") Landscape ET17-240-40 40 45 lbs The 2014 edition of 'he National Electrical Code 112014' added W'ri ne„ sn NEC 20547 Cont. Lic # 910849 nem rapid `ghvt Wn reci -r 208 VAC, 5 conductors 1.025 meter duy) Portrait ET10-208-30 30 30 lbs Dase Micl 2erb8 s fully meet rapid shutdown reap renhePts Enpwil� to he , , _ - www_ ceanso ar com 208 VAC, 5 conductors 1.7 meter (67") Landscape ET17 208 30 30 35 lbsne.r code without the need to Instal an additional electrical ecluiPanent, '- 'addi2n�ll -„ saaai.,blet ough E�pharsaric edd'.strbutora. weghts a2 appro,nate - tr;inverters trequire or ? €-, unds lO spa i I ufdow _ CLEANSOLAR CABLE SPECIFICATIONS Description Rating Cable temperature rating 90`C (194`F)wetldry Cable insulator rating THWN-2 UV exposure ratingUU46 C. F7 Conductor size 12AWG ork around _ bio ed. — Compliance IEC 60529 IP67, CAN/GSA 22.2 No. 21, 182.3, UL486A/B, 514C, 6703, and 9703 Cable rating TC-ER Cable Diameter 125 cm (0.49") Minimum bend radius 12 cm (4-75") Work a �, _ ENGAGE ACCESSORIES Work second Resident=a. ting Inverter Commercial Sail N � Branch Terminator Disconnect Tool One terminator needed per branch Plan to use at least one per m O W Or circuit installation c m = 6r ET-TERM-10 (sold in packs of 10) ET-DISC-05 (sold in packs of 5i Q U Q gm NUI aandard ~ O CC) O O O F Watertight Sealing Cap One needed to cover each unused Cable Clip _ Many needed to fasten cabling �_ U connector on the cabling -'`�^ to `he racking or to secure looped F _ ET-SEAL-10 (sold to packs of 10) cabling a ET-CLIP-100 (sold in packs of 100) _ _ e ..._ ai. - Engage Coupler - - Used for splicing two power cables - - X_ within an array , i _ w ET-SPLK-05 (sold in packs of 5)- d To learn more about Enphase Microinverter technology,t ! t _= _�� wma JeR rE. 420/17 visit .aems= - F u , -' olearn more, wslt _w �.___� B - .E]g G and` ent _ _ _ _ 4/21/17- \ Q 0.3 E,pirs—_A—go,Ali r ;ih. ....... A.mderh, e, bra:-rd,'. t rea. r�d by,h _ , sP -.htv ,sa. sER �a��Z-2.2 TRUNK CABLE SPECIFICATIOINi ed By De � RAPID SHUTDOWN COMPLIANCE _ " IRONRIDGE FIashFoot 2 installation Tools Required: tape measure, chalk line, stud finder, roofing bar, caulking gun, driver with 1/4" bit and 7/16" hex socket. CLEAN SOLAR INC t _ _ '- �._ 1445 KOLL CIRCLE, 3rd course SUITE 109 San Jose, CA 95112 '.'S6 = t Rafter - - 1.O1.. '.2nd course Cont Lic # 910849 j - h www -ceansoarcom 3.67 ') �) -. ---- c-. - ,. _. - tstcourse '- 3 Locate rafters and snap vertical and horizontal lines Slide flashing, between 1st and 2nd course, so the CLEANSOLAR to mark flashing locations. Drill 1/4" pilot holes, then top is at least 3/4" above the edge of the 3rd course 4 fill with roofing manufacturer's approved sealant. and the bottom is above the edge of the 1 st course. THIS EDGE TOWARDS ROOF RIDGE 1 � I i 12:00) at N O Line up pilot hole with flashing hole and insert lag Place Cap onto flashing in desired orientation for m = 0 pp = a bolt with bonded washer through flashing. Tighten E,'W or N/S rails and rotate 180 degrees. FlashFoot d Q v a m lag bolt until fully seated. 2 is now installed and ready for IronRidge XR Rails. 0 LEE 3.00.' 0 CO Oar. 0 0 i Structural certification d Z at w at El -v 5 ��„ 4,50) Designed and Certified for Compliance with the International U N -> Building Code & ASCE/SEI-7. U Y -0`u , _ Water Seal Ratings "`- Water Sealing Tested to UL 441 Section 27 "Rain Test` and - TAS 100-95 "Wind Driven Rain Test" by Intertek. -._ Ratings applicable for composition shingle roofs having slopes between 2:12 and 12:12. NO. PART NUMBER DESCRIPTION QTY. UL 2703 1 IFM-100-006 ASSY, FLASHING, MILL 1 Conforms to UL 2703 Mechanical and Bonding Requirements. See Iron Ridge Flush Mount Installation Manual for full ratings. w 2 FM -100-008 ASSY, CAP, MILL 1 .SCREW, LAG, HEX, 5/16. Wf KIT, FLASHFOOT 2 3 23-31 18-475LGF CUSTOM HEAD, 7/16 HEX W/ FLANGE 4.75L 1 Attach rails to either side of the open slot using bonding hardware. Level rail at desired height, then A K 4 125-3102-0O0S WASHER, EPDM BACKED 1 Ftorque to 260 in -lbs (21 ft -lbs). JPH sin m male,.�i� crow" s m, a iasn. om z as e v CUP � —' O rE. 4/20/1 7 sLV 4/21/17 020161—Flitlge,Inc. Allrights resond. Visit www.imnridge.com orca111-800-227-9523 for more infornation. FM-FF2-MAN REV 1.0 \ F P� ,£> ervetl. Vila www.ironritlge.comor call 1-800-227-9523for more information. FM-FF2-MAN REV 1.0 Reviewed 3,, ""INTiona Dew e= FOOTING SPECIFICATIONSZ"3 I R 0 N R I D G E XR Rail Family XR Rail Family The XR Rail Family offers the strength of a curved rail in three targeted sizes. Each size supports specific design loads, while minimizing material costs. Depending on your location, there is an XR Rail to match. Over their lifetime, solar panels experience countless a extreme weather events. Not just the worst storms in years _ but the worst storms in 40 years. High winds capable of ripping panels from a roof, and snowfalls weighing s\®®OR enough to buckle a panel frame. _ -- XR Rails are the structural backbone preventing They p XR10 XR100 XR1000 these results. The resist uplift, protect against buckling and safely and efficiently�.:� XRio •s a sleek, low profile mounting XR100 is the Wtimate residential XR1000 is a heavyweight among �vA �_\ transfer loads Into the building StrOCtUre. �," `� ... ra perfectly matched to reg ons mounting rail. It supports a range of solar mounting pals, Its built to handle Their spanning superior Sin lit �� � _ A, without snow. It achieves 6 foot spans w d wind and snow conditions, while also extreme and spans 12 feet or p p g Ca pabiy �-- while also staying light and economical, maximizing spans, more for commercial applications, requires fewer roof attachments.�,,v� ` reducingthe number of roof vA ' v\ ti spanning capability a sparn g capability z span ng capability \\ �� �\ �� Moderate load capability Heavy load capability Extreme load capability penetrations and the amount _ \ Clear anodized finish Clear & black anodized finish Clear anodized finish Of Installation time. _ `� `� �'� nternal splices available Internal splices available Infernal splices available Rail Selection s w The following table was prepared in compliance with applicable engineering codes and standards. Values are based on the following criteria: ASCE 7-10, Roof Zone 1, Exposure B, Roof Slope of 7 to 27 degrees and Mean s 9 Building Height of 30 ft. Visit IronRidge.com for detailed span tables and certifications. ' Force -Stabilizing Curve 100 \\\ ��� s:o d roofs 9 120 \\ \ \ P 9 t both vertical and lateral Es forces on mounting rails which can cause them None S \\\ \ is star while designed to c ease s \\ \ \ \ \ to bend and [win. The curved shape of XR Rails Is s eciail desi netl to strength in both 140 XRtU XR1iX! iYt34i$i g the twisting, This uniquefeatur160 weather and a longer s secunry fince. extreme weather and a longer system BteSma 100 IF 10-20 120 \, 140 , \�- '160 100 30 160 Compatible with Flat & Pitched Roots = = Corrosion -Resistant Materials 100 XR Rails are to nRage offers - All XR Rails are made of marine -grade f40 compatible with _ a range of tilt le aluminum II then r t t d w th an 160 RashFootand options} flat g anodized finish, Anodizing o — suHaoe f - - -� -- — — �t other pitched roof O roof mounting and structural corrosion, while also providing 50-70 160 attachments._ applicaticns a amore attractive appearance. - - -------------------------------- 80-90 80 SO 160 .... But dn Department Re-iewed 3y PINTIong De es RACKING SPECIFICATIONS CLEAN SOLAR INC 1445 KOLL CIRCLE, SUITE 109 San Jose, CA 95112 Cont Lic# 910849 www ceanso or com Slis C LEANSOLAI[ at N O o Q U Q m poI U I� Y N w~ O c0 O 00 O N� Z at ITT at cT N U UcT w O rL d —N ol JeR rs 420/17 rLV 421/17 Z-4.1 a IronRidge December 18, 2014 Starling Madison Lofquistr Inc. Mr. David F. Taggart Page 5of20 I V IronRidge XR10 Rail, Roof Flush Mounting System - Structural Analysis 5224 South 39" Street, Phoenix, Arizona 85040 tel: (602) 438-2500 fax: (602) 438-2505 ROC#291316 w—onleng.com IronRidge December 18, 2014 1495 Zephyr Ave Page 1 of 20 Hayward, CA 94544 Attn: Mr. David F. Taggart, Vice President Products Subject: IronRidge XR10 Rail, Roof Flush Mounting System- Structural Analysis Dear Sir: We have analyzed the IronRidge XR10 Rail for the subject solar module support system and determined that, for the configurations and criteria described below, it is in compliance with the applicable sections of the following Reference Documents: Codes: ASCE/SEI 7-10 Min. Design Loads for Buildings & Other Structures California Building Code 2012 Edition Other: AC428, Acceptance Criteria for Modular Framing Systems Used to Support PV Modules, dated Effective November 1_ 2012 by ICC -ES Aluminum Design Manual, 2010 Edition The IronRidge XR10 Rail is an extruded aluminum section with an overall depth of 1.75 in. and a net area of 0.363 sq.in. The rails are used to support solar modules, typically, on the roof of a building. See Exhibit A - attached. The rails are clamped to aluminum angle brackets that are either attached directly to the roof framing or attached to a stand that is screwed to the roof framing. The rails are mounted across the slope with a small clearance (flush mounting) to the underlying roof structure. The installed solar modules are at the same slope as the underlying roof structure. All loads are transferred to the roof framing through the an - le brackets bY P sim le bi-axial flexure of Fable 4A - MAX-MUN SPANS (1'i -Roof Slope €` to 27` - Wind Zone 1(67,51' Max Module tengeh) 5810 8a! Wind Speed Ground Snow Load Exposure mph 0 psf 10 psf 20 psf 30 psf 40 50 60 psf psf psf 70 psf 80 psf 90 psf 100 75 ''.. 65 55 49 43 39 35 33 31 29 105 75 ''.. 65 55 49 43 39 35 33 31 29 110 75 I., 65 55 49 43 39 35 33 31 29 120 75 65 55 49 43 39 35 33 31 29 Category 8 1 30 75 65 55 49 43 39 35 33 31 29 140 71 65 55 49 43 39 35 33 31 29 150 66 65 55 49 43 39 35 33 31 29 160 62 62 54 48 43 39 35 33 31 29 170 59 '.. 59 53 47 43 39 35 33 31 29 100 75 ''.. 65 55 49 43 39 35 33 31 29 105 75 65 55 49 43 39 35 33 31 29 110 75 65 55 49 43 39 35 33 31 29 120 70 65 55 49 43 39 35 33 31 29 Category C 130 65 64 54 48 43 39 35 33 31 29 140 60 ''.. 60 53 48 43 39 35 33 31 29 150 56 56 52 47 43 39 35 33 31 29 160 53 53 51 46 42 39 35 33 31 29 170 1 50 50 50 45 41 1 38 35 1 33 1 31 29 100 75 65 55 49 43 39 35 33 31 29 105 73 65 55 49 43 39 35 33 31 29 110 70 65 55 49 43 39 35 33 31 29 120 64 64 54 48 43 39 35 33 31 29 Category D 130 60 60 53 47 43 39 35 33 31 29 140 55 55 52 46 42 39 35 33 31 29 150 52 52 50 46 42 39 35 33 31 29 160 49 49 49 45 41 38 35 33 31 29 170 1 46 46 1 46 44 1 40 37 35 33 31 29 the rails. The maximum span of the rails is governed by either the mid -span flexural stresses or the Notes - see page 20 deflection requirement that the rail not come into contact with the roof. The effect of seismic loads (for all design categories A -F) have been determined to be less than the effect due to wind loads in all load conditions and combinations. Therefore, the maximum allowable spans for common load cases are shown in the tables below. Tables IA -9A are for modules with a maximum long dimension of 67.5 inches and Tables 1B -9B are for modules with a maximum long dimension of 78.5 inches. Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers Starling Madison Lofgiust, Inc. Consulting Structural and Forensic Engineers CUPSR-`140 4__; I Q, �4p__ G'9101YANGZ But ding Department 3y "In - a Dew es RACKING ENGINEERING CLEAN SOLAR INC_ 1445 KOLL CIRCLE, SUITE 109 San Jose, CA 95112 Cont Licit 910849 www_ ceanso ar com CLEANSQLAR N - cc _ O N m = r o Q U Q m NUII- � N w Ln w~�O c0 O O O Z 'et TJ w U N U U w O w d —N rl JeR e 420/17 421/17 E Z-4.2 25800 Commercentre Drive IronRidge December 18, 2014 Lake Forest. CA 92630 USA Mr. David F. Taggart Page 20 of 20 Telephone: 949 448.41C-0 hrmRidge XRI O Rail, Roof Flush Mounting System— Structural .Analysis Facsimile: 949,448,4111 www.interiekcom CLEAN SOLAR INC . :. -: �- -���- uoLLaR F, Notes— Tabulated values are based on the following criteria: SuirF 109 SUITE 1. Building mean roof height = 30 ft San Jose, CA 95112 2. Risk Category I In the basis of the tests undertaken, the sample(s) of the below product have been found to comply with the requirements of 3. Solar maximum module long dimension is 67.5 inches for Tables IA-9A and 73.5 inches for the referenced specifications at the time the tests were carried out. Cont Lic rt 910849 Tables I B-9B. www- c eanso ar com 4. Provide 2 in, clear between roof and rail 5. End cantilever span (max) = 0.40 x maximum span from above tables Applicant Name &Address: IronRidge, Inc. 6. No rail splices in end spans 1495 Zephyr Ave. Hayward, CA 94544 7. No rail splices in middle 1,13 of interior spans 8. Single simple span(s). Spans listed in the tables above may be multiplied by 1.08 for Product Description: XR Rails with Integrated Grounding. continuous rails of 3 or more spans. C LEANSQLAR Ratings & Principle Fire Class Resistance Rating: Characteristics: - Class A for Steep Slope Flush-Mount(symmetrical) Applications when using Type 1 and Our analysis assumes that the rails, including the connections and associated hardware, are installed Type 2, Listed Photovoltaic Module. in a worl�manlike manner in accordance with the "IronRidge Roof Mount Installation Manual" by - Class A for Low Slope Flush-Mount and Tilt-Mount (symmetrical and asymmetrical) IronRidge and generally accepted standards of construction practice. Additional information is Applications when using Type 1, listed Photevull.de MUdule. available at the IronRidge web site, IronRidge.com, Verification of PST Module capacity to support Models: 51-61GD-005, 51-61GD-0056, 51-5000-001, and 51-65-001 the loads associated with the given array shall be the responsibility of the Contractor or Owner and Brand Name: N/A not IronRidge or Siarling Madison Lofquist. Relevant Standards: UL Subject 2703 (Section 15.2 and 15.3) Outline of Investigation for Rack Mounting Systems and Clamping Devices for Flat-Plate Photovoltaic Modules and Panels, Issue Number: 2, Nov 13, 2012 Referencing UL1703 (Section 31.2) Standard for Safety for Flat-Plate Photovoltaic Modules and The adequacy of the supporting roof framing is to be determined by others. Panels, May 20, 2014 Intertek Testing Services NA, Inc. Please feel free to contact me at Foul' convenience if you have any questions. Verification Issuing Office: 25800 Commercentre Dr. Lake Forest, CA 92630 N ' ro On O _ Date of Tests: 08/27/2014 to 01/07/2015 cc < m = r U on �.-- Test Report Number(s): 101541132LAX-002 m � U r-- LES Respectfully }'ours, ems` '�d � � 3 sL$ This verification is part of the full test report(s) and should be read in conjunction with them. This report does not automatically imply product certification. w N o O o w frs s? r7 d Z ' w o i 07;973 Tres Warner, P.E. E - � e, � t Design Division Manager \ J f Completed by: Amar Kacel Reviewed by: Andrew Koretoff U lit.\R CiL b Title: PV Engineer Title: Reviewer Signature: - ,. Signature: iL*-#d--_ Date: 01/26/2015 Date: 01/26/2015 t- U w O sVer;tu �. k _ 1 o,.ided pu.��rz;.,_he c,. �e._ r�ei.,, d:sC_t r. r,ek's w � r_ hid .. "C _ On, f.c�ag_e,^i ,.,, _ -,nl F-arm,-r.t.,r.c h ., -ad — toawNa on r JPH Starling Madison Lofquist, Inc. Consulting Structural and Forensic Engineers - _.- z c z r j p rE. 4/zo/» �� ee ,c .-�y.,.:, ,._ ze. , .� t. of , .e, o.,mp,,...t,� ,_ c.._r,�,e re_ r�, ere ..e_ v 4/21/17 -20- Eton GFT-OP-11a (24-MAR-2014) SUE— RACKING ENGINEERING- c: 3y DINunna De � RACKING FIRE RATING Z"4.3 1VQ10'!V 1\11661406 21111 Lkh I R 0 N R I D G E UFO Family of Components System Diagram ZA,, � n, pff -U- 1, d ET �_,u L�i Y A,-,-, -------- -------- ---------------- - - - FT -1 - - - -------- ------- - - - - 417- - - - - - - - - - - - - - - - - - - - - - - EAN S CLLAP N The UFO family of components eliminates the need for 1445 KOLL CIRCLE, separate grounding hardware by bonding solar modules SUITE 10 San Jose, CA 95112 directly to IronRidge XR Rails. All system types that feature the UFO family—Flush Mount, Tilt Mount and Ground Mount—are fully listed to the 12703 standard. - cont Lic# 910849 - - - - - --------- - - - - - -- - - - - - - - - - - UFO hardware forms secure electrical bonds with both the www c eanso ar coin module and the rail, resulting in many parallel grounding paths throughout the system. This leads to safer and more reliable installations. ---------------- -- -- ----- CLEANSOLAR x 'B Stopper Sleeve P` Universal Fastening Object (UFO) The Stopper Sleeve snaps Th. UFO —moly ends solar mcb.1s. to XR s 1 into Rails. It comes assembled and lubricated, and onto the UFO, converting it a bonded end clamp, can fit a wide range of module heights. - - - -------- 0 UFO Q Stopper Sleeve 9 Grounding Lug m Bonded Splice Ground Wire Nit V Approved Enphase microinverters can provide equipment grounding of IronRidge systems, eliminating the need for N Ekk, grounding lugs and field installed equipment ground conductors (EGC). A minimum of two microinverters mounted to the JA I same rail and connected to the same Engage cable is required. Refer to installation manuals for additional details. < r -,J U r-- MM001" P, RS� �5 TEE wH CO z 'k, UL Certification CS 0 cc A, _11PA, A� C, ...... . . The IronRidge Flush Mount, Tilt Mount, and Ground Mount ims I, \�NIKEZB 11[ XR Rails XR1000 Only 0 L Bonded Splice Each Bonded splice uses Systems have been listed to UL 2703 by Inlertelk Group UFO/Stopper V V V screws to for IN 111 1 C a -1 self -drilling a see a connec: I u. No plc_ Bonded Splice N/A V "IN a S01 bonding strap needed. eo 12703 is the standard for evaluating solar mounting Grounding Lugs 1 per Row 1 per Row 1 per Array Grounding Lug Bonded Attachments systems. It ensures these devices will maintain strong electrical and mechanical connections over Microinverters Enphase - M250,72, M250-60, M215,60, C250-72 & Power Darton - MIG240, MIG300, G320, G640 Optimizers, SolarEdge - P300, P320, P400, P405, P600, P700, P730 A single Grounding Lug connects an entire row The bonding bolt attaches of PV modules to the and bonds the L -foot to the an extended period of time in extreme outdoor environments. Fire Rating Class A Class A N/A �1 JPH ti grounding conductor. rail. It is installed with the Tested or Evaluated with over 400 Framed Modulesr—N same socket as the past of the Modules FO Refer to installation manuals for a detailed list. 4/20/17 4/21/17 Bui ding Department o g\ De-iewed By PiNunna Devres ff!! GROUNDING 5 BONDING SPECIFICATIONS —' -is\\\\" hk GROUNDING STRAP EXPANSION JOINT - Use IronFlidge's Microinverter Kit to bond compatible _ microinverters and power optimizers to the racking system.CLEAN Grounding Strap Expansion Joints are required for thermal F,nm en - - '- Insert Microinverter Kit T-bolt into top Place SOLAR INC expansion of rows exceeding 100 feet of rail. c eo-naus n rail slot. \� into 1445 KOLL CIRCLE, Imi compatible microinverter or power optimizer position i tighten hex to 80 in-lbs. = suire 109 Insert Internal Splice into first rail and secure with screw. Assemble and secure Grounding Strap 3/8" from railst` and nut San pose, ca 95112 i Slidesecond l over Internal Splice leaving 1"gap COMPATIBLE PRODUCTS �� Attachother end of Grounding Strap with between rails ' `.,, ___ ...-- _ Cont Lic # 910849 for hardware, and torque hex nuts to 80 in-lbs. q� - T - Enphase - M250-72, M250-60, M215-60, and C250-72 - 4 second Bonded splice screw is not used with Expansion Joints. Darfon - MIG240, MIG300, G320, G640 www ceanso ar com 1 Solar Edge - P300, P320, P400, P405, I'l P700, P730 ------- - 4 Do not install module over top of expansion joint location. ? / M K' % .. rn 0 in i Fully s- ems as ea vti `' � s<,- r bap _ G LEANSQLAR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Iron Ridge systems using approved Enphase products eliminate the need for lay-in lugs and field installed equipment _ E_ _ - f __ _ _= T_ _ _ _ __ -_ - - - - _ - grounding conductor (EGC). This solution meets the requirements of 12703 for bonding and grounding and is included in this listing. The following Enphase products are included in this listing: Microinverters M250-72, M250-60, M215-60, C250-72, and Engage cables ETXX-240, ETXX-208, ETXX-277. s - -- - - - - - - - __ _ _ _ _ = = - - - - - - 3 V A minimum of two inverters mounted to the same rail and connected to the same Engage cable are required. � The microinverters must be used with a maximum 20 A branch rated overcurrent protection device (DCPO). at N � O 6n I� _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ o Q U Q v _ 3 m � _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Insert Frameless Kit T-bolt in top rail slot. Place starv TEE` washer over T-bolt, allowing it to rest on top of rail. Secure s,P„,asne, ' w module clamps with a hex nut and torque to 80 in-lbs. O o at P Tested or evaluated third-party module clamps: Z w at " � s _FS UTMC 2 ) and SFS • Sunforson Silver or black $ - 00(8 mid = = = UTEC-200(6) end clamps. - - — _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Sunprems silver or black clamps with art p _ — numbers 7500105X where X can be 1 5 6 or 7 P Follow module manufacturer's installation instructions to install ---- ---- ---- -� the module clamps. = Q UFO • Grounding Lug" — Fault Current Minimum 10 AWG � 4 Frameless modules require using a Grounding Lug on every rail. \ Ground Path — Copper Wire' tt, F­­a U r (80 robs) Grounding Lugs W m Bonded Splice (Rail Connection) F,­­ -y -e 0 'Grounding Lugs and wire are not required in systems using Enphase micminverters. wms JeN a 911��[ PEKI----. -- -. ogre 4/20/17 3y ForTuongg D vs GROUNDING 5 BONDING SPECIFICATIONS Z"5.2 Product Data Sheet HOM612L100RB Load Center, 200A, Main Type: Fixed - Factory main lugs, 1-Phase 1=nphese AC Combiner Boxinstalled n CLEAN MODEL NUMBER SOLAR INC. -,c C—Misn,_ox ,,<-,vt -a: AC ronr6mer 3th Eupre-_ o.y-S Ni.a,,d g,aee.. re,e c E. pins! _.,c[on _._. '. 1445 KOLL CIRCLE, m ter:. ( S! C12,2 - 0,%n. a - s ru . { - . - list Price $86.00 USD ITE 109 ACCESSORIES (order sea-<ratetyl Ava.lablirly Stock Item: This item is normally stocked in our distribution facility- San Jose, CA 95112 .,Fz__ Mc, .,,­:.-.____. aC -� �,ih . ev CE I=pODENI-DI of-vert_'.(Av_:aro :. _ LM _ a M�..,,-?��t_. P'cc vs-�.�q.i .s. a.. ---=gcmcreIU,or . s�ll .a. _ - - - Cont Llc # 910849 NI _g CT pftoa,o '.. :,;.a,:er,_,ersena..e �.e..o-�,, co u ..,t�r, e _. 2-5ryi. --'_ - 3 T www- c eanso ar cpm ELECTRICAL SPECIFICATIONS .,1 x, oms—em cSo ........ ......... '15k1. at UFVAC.... ......... ......... ......... ......... ................ --. - 'r rc .14—mum ci`out,-_ 240 vA - Technical Characteristics 8 utput c m. '8' Voltage Rating 1201240VAG ..aced input ­r en t, Bac:.:-put :�h Width 8.88 Inches CLEANSQLAR .,.a..lmum ftt­rrimjlt n;e r_;.a_ -uru,, h SOA Wire Size #8 to #1 AWG(AII S_ ar br_=- 7 ...o. breaks shree-- po Z _-1?, Z4 >,--" [l s -c.�.. anted b1Eak- a Wiring Configuration 3-Wire ;io Me'e -nc CT Depth 4.27 Inches MECHANICAL DATA ----. ----. Height 12.65 Inches D,nnee—its ......... ......... ......... ............... s'53"x8.0` Ojerght kg'1 - Approvals UL Listed b -ance r 4 Application Designed to meet res'dertlal commercial and industrial requirements to protect electrical nt lemp—t e - - - - 0c �V ,0 115- El systems, equipment and people. Cooling - Cover Type Combination FIusFJSuHace .,.o:,.o en :rating 0,..3c,\. ­rtinfiad. NEMA .._ypa 3R,pelyc:berat .. t.eu_ e s.�e 1. to 6 S 'C plo, ao,,d,clar_"nanch ilp,l,s Marketing Trade Name Heres,Ie Ampere Rating 200A FcV.,'oca. moo.,_ , .T - _...e. 1. M.r _,_ , Bus Material No Plated Aluminum Ai_l;vde -M 2000.R:se 16,560 feet) Enclosure Type Outdoor/Rainproof INTERNET CONNECTION OPTILa#25........ Box Number 2R � Mragratedv,_I-F. ......... ......... ......... ......... ......... ................ 80211loo Spaces 6 N a O CO h S Cal - - . _ u.c ae - Enclosure Rating NEMA 3R m m = n O Cellular, ER^cr L BOE 1 { :cl:. cl Grounding Bar Order separately � Q U Q — COMPLIANCE ......... ......... ......... ......... ......... ......... ............._, Short Circuit Current Rating 10kA m d' U LCE C, c a ce. m.__ Ctx. J11 4i Main Type Fixed - Factory installed main lugs W Z N C Omn-.Ec roy-S UL X15 H CO O O O iANlCSA 022.2 No-e1C1 =I Maximum Single Pole Circuits 12 Z W 17 CFR.Aa^ =5, Clzs B. ICES C 3 Maximum Tandem Circuit Breakers 6 1n " ,- _EN o C:20" EN5 - EN`61 - --. ENS'000-h-1, ENb;O_06-_ Phase 1-Phase U N U Metering-ANSI C_Qac.,- , .Oso.,-n Notes: 70A (max) branch circuit breaker and 100A (max) back fed main circuit breaker. Shipping and Ordering Category 00149 - Load Centers, NIEMAt & 3R, 2 - 8 Circuits, Type HOM Discount Schedule DE3C Article Number 785901061205 U Package Quantity 1 w Weight 9.92 lbs. 0 Availability Code Stock Item: This item s normally stocked in our distribution facility. d eexon sr. JPH To- ar mcae f abut Erpha e of i ttr ICG . visit sit n eiir^,hase.corn s E PHASE, = 4/20/17 B W&MpAaawnwrngnis--carn NR w \ E T } NUMBER.PV LOAD CENTER SPECIFICATIO Se =_ By De 'SUBPANEL SPECIFICATIONSZ"6.1 E -1_.-u-_ N,— Enphase Envoy -S CLEAN SOLAR INC_ MODEL NUMBERS wr-:,F, r S Standard ---_p a__ , a--.-; S ro -r„- _a _ _a- —hl w .r, a> '. L o- Trua —nizermq { 5gn, ----. 1445 KOLL CIRCLE, ENV -S-4A F 0-2 SUITE 109 Frph—_ R.. .e.ea p _ vo, S,.f '.T -crt _ .aay +. ll mtegrated nevenue grade V prodjell San Jose, CA 95112 . � — . a s e En-Dh w t -'-w o <: Cr:S as -EC- - , v inRa �.20 _ _ r _ g ase L.- _ - ..., -- - u_i a _ OC -c_ on _ ^, v cors mp! - ACC€SOR S -re e-fel,) -- _n_h e i C Connecte --- -- - - GI I y' a 3 acne II z rrc_e z a a e cC Cont LIc # 910849 _� Sere— da'a have En:& ,e "'."1CY^i..T 2nd _Taly w SEI -I 0� es -0' n_.o,,a`.t a,M _ and th=ehsx_g' Mande, rethere -sa w_=e .va service i-tF I taaEle=, _ www_ c eanso ar com so _. _-e forecur- ne-sir e, remolc ma,me,ancp arc! Ce- fonit gcl For hr, He's SA45 2L. _,. ., __. ,,., o_ .,:e C.,[!e 'ic,<rcrr-oe_ enable e -Ig -:C'G- yef"' r of Lp 3 Ii .3- s stcrr C-2C' .IT r4i-2JCd) POWER RE@uiIR€M rN T 5C. rc 2,J ... .... ......... ... 60 . NV -S AB --!2 ........ ......... ......... ......... ........ _ _ and Al are, e_ n C AsENcaPl- CLEANSQLAR CNnSuMn 0, MCnjon-�,_o .C} Sas _ e .0l2,IaC, hale EN IS- _ l - -ct-' q +r _ - ._.. �., c _- ..nag _an r -es - - CAPACITY r _ :=' L tih - .u.r . d-"' . u _v.=e ilLm_£. ... .. n'._ .e,> Pe ed--. --.U> ..^, .,Du ----. ----. ----. ----. ----. ----. ----. MECHANICAL DATA O me. _.,n_ .,x ,x Ed ----. ----. ----. ----. ----. ----. ---.6 ,, x12,6 1.4.5.. .... x " -X 1.8'e 4V2ia'i Ambient'_en?era,_ure range i7.6 no °8 Q) --I 65 ts9`s -4u to 4c`CiO'tc 115 E'is irsiali24n an e-_.a_.>� S ,-art c n-, = r' do_.eo' SIR tce e_.'xcMIA eipe3Renelasune. -•`` na es —0 baled mcnitorIng 00:reYerS - - - • a - -. `-`' _ '- i Bioi of'--• '..+mcai oris for INTERNET CONNECTION' OPTIONS f<<cC 3.2 .hal r....... ......... ......802 h.4 r;;_. ......... ......... ......... ......... ......... ......... re:.. ... es _ fo Msbile G -o. _ _ w _5 .. N m d � 0 j, SI.mU=.e COMPLIANCE _ o � C :Tr ane R N m = � aace-r corfichratisint, y 'Sf,CSA C-2.2 Nc Elt=l^' Q U Q m pe U I� - chane a r-� s I r Part 1 Class E, ICES ij pe LEE lle,iio_ no ..., k - „ ;-:r �: R, e.;- EC:EN D10-10-1 FNSO06. . Ef 6 a0o-E-S, Er s 0 0'. EN a_.d o- - U w Y z N � 00 —.� ?Malar t _ a -:ANSI 220 acc-,r -r - u 5 E by _. t, `20 O O O � W Z Lr d � N Reliable De<igr:ed for mstalavo rdcor.. ,,. -tcoors RIve-vesr wa:rary U � U U w O d wm a JPH re ariYhaSa offerings, •.; ' Ie Nrri ';,Oi_,ori; == O IS[t G45fl§?a€B.iOT LISTED p�d� E. 42°/' 7 -u 2.1I`6re ahowL �rchace Ci`erl^CSls:i$fl #$S@.CfC " $ ip$ v. 4/21/17 . i` ;ng Department SHEETmIsER 3y PINuong Devres MONITORING SPECIFICATIONS Z"6.2 N_ 11111-0i Specifications Plugging In Use only a 120 volt, 208 volt or 240 volt AC supply, 50/60 hertz wall outlet that has a dedicated Note: Always inspect the Mobile Connector for damage prior to each use. CLEAN and properly grounded circuit, and is rated for at least 15 amps. 1. Ensure that the Mobile Connector's adapter matches the outlet you want to use. For SOLAR INC. If possible. use a dedicated receptacle with a single socket. If the receptacle has two sockets, do instructions on how to change the adapter, see Changing the Adapter. 1445 KOLL CIRCLE., not plug any other items into the other socket. 2. Plug the Mobile Connector's into the power outlet. The adapter should be fully inserted into SUITE toe The Mobile Connector is 20 feet (6 meters) Tong. Use an existing outlet or install a new outlet the power outlet. San Jose, CA 95112 within approximately 13 feet (4 meters) of the vehicle's charge port and at least 18 inches (45 cm) above the ground The charge port is located on the driver's side of the vehicle, behind a door that is part of the rear tail light assembly. ! Cont Lic # 910849 Warning Do not use an extension cord, a multi-outlet adapter, amulti-plug, a conversion www ceansoarcom plug, or a power strip to plug in the Mobile Connector. m. of Charging Time `) -' Charging times vary based on the voltage and current available from the power outlet, subject to S various conditions. Charge time also depends on ambient temperature and the vehicle's Battery CLEANSQLAR temperature. If the Battery is not within the optimal temperature range for charging, the vehicle heats or cools the Battery before charging begins. ?' `\\\ For the most up-to-date information on how long it takes to charge your Tesla vehicle, go to www.tesiamotors.com Adapters 3. With your vehicle unlocked, press the button on the top of the Mobile Connector. The charge The Mobile Connector includes two outlet adapters: one for a standard 110 volt household outlet port door opens. and a second adapter for a 240 volt outlet. For faster charging, use a 240 volt outlet. Consult an Note. Your vehicle is unlocked when the key is nearby. You can also open the charge port door electrician to install a 240 volt outlet where you plan to park your Tesla vehicle. using any of these methods: NEMA 14-50 240V Outlet RVs and Campsites Touch Controls > Charge Port on the touchscreen. • Touch the battery icon at the top of the touchscreen to display the Charging screen, then touch Open Charge Port. at • Hold down the rear trunk button on the key for 1-2 seconds. o co _ O ry m = r Q U Q o m N r U p� O LEE HCC) H CC) O O O N� Z at w at N d U U w d 4. Plug in your Tesla vehicle. Additional adapters are available for purchase. For details, go to: www.tesiamotors.com. —N sl JP" Note: Illustrations in this document are for demonstration purposes only. E rE. 4/20/17 Eg v 4/21/17Bull ding Department By - De s EV CHARGER SPECIFICATIONS Z "7