Loading...
Exhibit CC 05-02-17 Item No. 17 Annual Report on the Pavement Management Program2017 PAVEMENT MANAGEMENT PROGRAM CITY COUNCIL May 2, 2017 NETWORK STATISTICS Total Miles Residential Collector Streets Arterial Streets 138 Miles 103 Miles 20 Miles 15 Miles Distribution by Area: Figure2 CC 5/2/2017 Item No. 17 1 Figure 1 ~ 100 £ 95 90 .2 85 i 80 a 75 ... 70 ~ 65 E 60 %! 55 & 50 14 12 10 ~ 8 ~ 1v 6 "" 'O ::, co 4 2 0 NETWORK PCI TRENDS 2014 2017 2015 2016 2017 (estimated} PCI OF 82 BY 2021 2018 2019 2020 2021 -Rehab -PM+ Stop Gap -Deferred Maintenance +Treated PCI CC 5/2/2017 Item No. 17 li!Arteriol Iii Collector o Residential ONetworkPO 100 90 80 70 60 50 u 0. 40 30 20 10 0 2 CC 5/2/2017 Item No. 17 STREET NETWORK CONDITION IN 2021 Timely Preventative Maintenance Saves$ P(i Good <1096O,opinQuality 409ft Drop in Quality Very Poor 0 10 ts ..;eliminates or delays spending $6 to $10 on rehabilitation or / re«mstn.ictkm he~. 1296ofUfe 20 3 CC 5/2/2017 Item No. 17 BEFORE AF-TER Pepper Tree BEFORE AF-TER Barbara Lane 4 CC 5/2/2017 Item No. 17 BEFORE AFTER Bahl Street BEFORE AFTER Linda Vista Drive 5 CC 5/2/2017 Item No. 17 QUESTIONS 6