Exhibit CC 05-16-2017 Study Session Item No. 1 CIP Budget PresentationCity Council ~ May 16, 2017 Public Works Department ~ Timm Borden, Director
C I P FY 2018
Capital Improvement Program
Proposed FY 2018 Planned FY 2019-2022
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Projects to be completed by June 30, 2017
Blacksmith Shop Forge Restoration
City Hall – Turf Reduction
De Anza Monument Sign
Pasadena Ave. Public Improvements (Between Granada & Olive)
Pedestrian Master Plan
Quinlan Community Center – Fire Alarm Control Panel Upgrade
Service Center-New Admin. Bldg. Feasibility Study
Sidewalk Renovation – Stevens Creek Blvd. – Stelling to De Anza
Sports Center – Resurface Tennis Courts (18 courts)
Tennis Court Resurfacing – Memorial Park
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Inclusive of all anticipated direct and indirect costs. Direct costs include project administration and
management, design/engineering services, permits, inspections and testing, and the construction
contract. Indirect costs include the city cost allocation plan.
Escalated to the project budget year shown;
Construction costs have stayed consistent with the prior year projections.
Year
Per Annum
Rate Year
Per Annum
Rate
2017 4.5% 2020 3.5%
2018 4.5% 2021 3.0%
2019 3.5% 2022 3.0%
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Categories
A- Public Safety/ Regulatory Mandate/ Grant Commitment
B- Preventative Maintenance/ Resource and Cost Efficiencies
C- Enhancement
Priorities
1. Ongoing or imminent upon FY 2017-18 Budget Adoption
2. Funded to start in FY 2017-18 but contingent on resources available after Priority 1 projects
3. Funded but contingent on resources available after Priority 1 and 2 projects
4. Planned project FY 2019-2022
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Priority 1 - 3 Projects
FY 2018 Funding
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Inclusive Play Area - Planning
Priority / Category: 1 / A – Grant Opportunities Location: To be determined
Estimated Project Costs: $30,000 Funding: FY 2018: $30,000
DESCRIPTION
This funding will be used to explore key project components such as suitable partnerships, siting considerations, cost data, and grant
opportunities. An Inclusive Play Area will be addressed included in Citywide Parks, Open Space & Recreation Master Plan.
PROJECT JUSTIFICATION
Cupertino does not currently have an Inclusive Play area (the nearest ones are in Palo Alto and San Jose). Santa Clara County
approved one-time matching funding of $10M countywide for such facilities on Feb. 28, 2017. First round grant applications are
anticipated this fall. This project will promote the city’s eligibility for grant funding for such a facility.
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
McClellan Ranch West Parking Lot Improvement
Priority / Category: 1 / C - Enhancement Location: McClellan Ranch West
Estimated Project Costs: $950,000 Funding: Prior Years: $400,000; FY 2018: $550,000
DESCRIPTION
Design and construct a new parking lot that is compatible with the creek environment at McClellan Ranch West. The improvements will
include both a partial “green” meadow-style and permeable hard surface areas, planting, and shielded pedestrian lighting.
PROJECT JUSTIFICATION
The site has been used informally for staff and overflow parking without a suitable, stable surface, and is not useable during wet weather.
The Environmental Education Center in 2015 increased the parking demand, the removal of the Simms house advanced the option to
provide the additional parking that is needed. The original project proposal was for a very minimal, informal “meadow” parking.
However, the design phase identified that at least some durable permeable surface, more planting, and pedestrian lighting for
programmed night use is desirable for the most effective use of the parking lot while balancing the sensitive-environment goals for the site.
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Outfall Repair & Slope Stabilization - Regnart Rd.
Priority / Category: 1 / A – Public Safety Location: Regnart Road
Estimated Project Costs: $400,000 Funding: FY 2018: $ 400,000
DESCRIPTION
Design and construct outfall repairs and slope stabilization along Regnart Rd.
PROJECT JUSTIFICATION
Regnart Creek runs along the east side of Regnart Rd. Erosion damage due to the winter 2017 storms necessitates
complete repairs to existing outfall and to stabilize adjacent slope from further erosion.
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Senior Center Repairs
Priority / Category: 1 / A – Public Safety &
C – Preventative Maintenance Location: Senior Center
Estimated Project Costs: $200,000 Funding: FY 2018: $200,000
DESCRIPTION
Design and construct repairs to the kitchen in-floor drains and to replace the ballroom acoustical panels; evaluate the roof
condition and potential solutions to persistent rodent nesting.
PROJECT JUSTIFICATION
The building was constructed in 2000. Code changes require that the in-floor drains be modified. The acoustical panels in
the ballroom are showing wear and tear and need to be replaced to keep the facility looking and functioning well. The
impacts of rodent nesting in the building roof is causing damage and distress to building users.
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Street Median Irrigation & Plant Replacement
Priority / Category: 1 / B – Preventative Maintenance Location: Various Locations
Estimated Project Costs: $1,410,000 Funding: Prior Years: $660,000; FY 2018: $750,000
DESCRIPTION
Design and construct replacement irrigation and plantings of street medians. Initial project on De Anza Blvd. (Bollinger
to Rodrigues).
PROJECT JUSTIFICATION
Cupertino has many mounded median islands which are difficult to irrigate efficiently. Since the installation of many of
the City’s planted median islands, irrigation products and systems have improved efficiency. In addition, landscape
plantings need to be replaced as they age out. Projects to renovate the median islands will refresh the plantings and
improve the efficiency in the use of water and labor to maintain t he systems.
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
McClellan Rd. Sidewalk Installation – Rose Blossom Dr. to Hwy 85 Overcrossing
Priority / Category: 2 / C – Enhancement Location: McClellan Rd. – Rose Blossom to Hwy 85
Estimated Project Costs: $430,000 Funding: FY 2018: $430,000
DESCRIPTION
Design and construct approximately 650 LF of sidewalk on the north side of McClellan between 85 and Rose
Blossom.
PROJECT JUSTIFICATION
There is a sidewalk gap on the north side of McClellan Rd. between Rose Blossom and the Hwy 85 ov ercrossing, an active
pedestrian area that is well used by students and other residents. Installing a sidewalk in this location will provide
continuous access to and from local schools including De Anza College.
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Senior Center Walkway Replacement
Priority / Category: 2 / C – Enhancement Location: Senior Center
Estimated Project Costs: $64,000 Funding: FY 2018: $64,000
DESCRIPTION
Design and construct a replacement walkway from the parking lot to the front door. The pavers will be r eplaced with a
material that provides a more consistent surface texture.
PROJECT JUSTIFICATION
The building was constructed in 2000 and the walkway to the main door from the parking lot was installed using pavers
with concrete bands. Some wheelchair and walker users find the variable surface of the pavers to be difficult to move
across. Providing a smoother path of travel from the parking lot to the door will improve access.
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
International Cricket Ground - Feasibility Study
Priority / Category: 3 / C – Enhancement Location: To be determined
Estimated Project Costs: $20,000 Funding: FY 2018: $ 20,000
DESCRIPTION
Prepare a feasibility study for an international cricket ground.
PROJECT JUSTIFICATION
While the sport of cricket has been increasing in popularity in the US and in San Francisco bay area, there is currently no
dedicated field for play in Cupertino, including to meet the requirements for adult international play. A feasibility study
to assess the demand, possible locations for an international scale field, and the estimated costs for such an improvement,
will provide base information for a future improvement project.
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Street Light Installation – Annual Infill
Priority / Category: 3 / C - Enhancement Location: Various
Estimated Project Costs: $150,000 ($30,000 annually) Funding: FY 2018: $30,000; FY 2019-22: $30,000 annually
DESCRIPTION
Design and install street lights on an as needed basis.
PROJECT JUSTIFICATION
There are areas of the city where street light spacing is insufficient to meet current standards for illumination. Several
locations are identified annually for infill with one or two lights. An annual appropriation will allow these deficiencies t o
be readily addressed.
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Street Light Installation – Randy Ln. & Larry Wy.
Priority / Category: 3 / A – Public Safety Location: Randy Ln. & Larry Wy.
Estimated Project Costs: $367,000 Funding: FY 2018: $367,000
DESCRIPTION
Design and install street light installations to fill gaps in street light coverage.
PROJECT JUSTIFICATION
Larry Way and Randy Lane both have gaps in street light coverage that exceed the City’s street light spacing policy. Both
streets have been designated semi-rural, which has resulted in a waiver of sidewalk installation, causing pedestrians to
walk in the street. Additionally, Lawson Middle School is located immediately south of these streets with the associated
student pedestrianism. Residents have requested additional lighting along these streets, and Public Works Staff finds that
the additional lighting is warranted. This project will fill gaps in street light coverage along these streets in order to
enhance safety.
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Priority 4 Projects
Planned Projects – FY 2019–2022 Funding
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Jollyman Park Pathway Installation
Priority / Category: 4 / C – Enhancement Location: Jollyman Park
Estimated Project Costs: $700,000 Funding: FY 2019: $200,000; FY 2020: $500,000
DESCRIPTION
Design and construct a pathway around the southeastern field at Jollyman Park.
PROJECT JUSTIFICATION
Currently many visitors to this park walk a circuit around the edges of the southeastern ballfield. Installing a paved path
will provide a more stable surface for this activity, greatly increasing the paved walking circuit within the park.
Cupertino CAPITAL IMPROVEMENT PROGRAM ~ Fiscal Year 2017-2018 City Council ~ May 16, 2017
Linda Vista Park - Renovation Master Plan
Priority / Category: 4 / C – Enhancement Location: Linda Vista Park
Estimated Project Costs: $70,000 Funding: FY 2019: $70,000
DESCRIPTION
Develop a master plan for renovation of Linda Vista Park. The planning process will include community input. This
project may result in a future renovation projects that could range from $ 500,000 to $ 2,000,000, subject to the outcome of
the master plan process.
PROJECT JUSTIFICATION
Linda Vista Park was originally constructed in 1969 and modified in 1986. Areas of the park are underutilized or could be
updated or reconsidered for current recreation needs.