Loading...
Exhibit CC 06-06-2017 Item No. 1 2017-18 Budget Bike Plan Implementation FINALCC 06/06/2017 Item No. 1 1 City of Cupertino 2016 Bicycle Transportation Plan Implementation Strategy FY17/18 1June 6, 2017 2 Trails and Wayfinding •Trail Feasibility Studies •UPRR Rail Trail - $250K •I-280 Channel Trail - $250K •Proposals due June14 •Bicycle Wayfinding Program •Project underway, ALTA Planning + Design •Citywide plan completion in September •$60K budget in current CIP CC 06/06/2017 Item No. 1 2 3 Class IV Bike Lanes •Stevens Creek Blvd Class IV Bike Lanes •Conceptual designs completed •Currently negotiating construction design contract •Business outreach to begin Summer 2017 •Tantau to Blaney, Engineering Design and Construction $1.8M •Blaney to Foothill, Engineering Design Only - $650K 4 Class IV Bike Lanes •McClellan Road Class IV Bike Lanes •Conceptual designs completed •Currently negotiating construction design contract •Neighborhood outreach has begun •Byrne to Bubb, Engineering Design and Construction - $1.2M •Bubb to Stelling, Engineering Design Only - $290K •De Anza/McClellan Engineering Design Only - $300K CC 06/06/2017 Item No. 1 3 5 Bicycle Boulevards •Bicycle Boulevards •Conceptual designs completed •Public workshop held in May •Bicycle Pedestrian Commission June 21 •Council Fall 2017 •Neighborhood meetings Fall 2017 •Construction $1.35M Budget Detail 6 Bike Plan Implementation Costs Cost, $1,000's I‐280 Channel Trail  Feasibility Study $250 UPRR Trail  Feasibility Study $250 Bicycle  Wayfinding Program $60 Stevens Creek Blvd Class IV Tantau to Wolfe, Design & Construction $1,800 Wolfe  to Blaney, Design & Construction $400 Blaney to Foothill, Design only $650 McClellan Rd Class IV Byrne to Bubb, Design & Construction $1,200 Bubb to Stelling, Design only $293 De Anza/McClellan intersection, Design only $300 Bicycle  Boulevards $1,417 Total Cost $6,620 Bike Plan Implementation Budget Budget, $1,000's Bicycle  and Pedestrian Facility Improvements $780 2016 Bike  Plan Implemtation $1,830 Bikeway Enhancements and Branding $10 Council Augmentation FY17/18 $4,000 Total Budget $6,620 CC 06/06/2017 Item No. 1 4 Bike Plan Recommendations 7 Bike Plan Recommendations Loop Trail 8 CC 06/06/2017 Item No. 1 5 Bike Plan Recommendations Class IV Bikeways 9 Bike Plan Recommendations Bicycle Boulevards 10 CC 06/06/2017 Item No. 1 6 Implementation Strategy Highest Priority Projects 11 2016 Bicycle Transportation Plan (Table 6.2)