Exhibit CC 06-20-2017 Item No. 9 2016 Bicyle Transportation Place Implementation Presentation 6/20/2017
�21,o City of Cupertino
2016 Bicycle Transportation Plan
Implementation
I
June 20,2017 1
9/
CAPITALIMPROYEMENI PROGRAM
li.ral tex M17--20I8 CUPEBTINO
2M Bike Pian Impizmematinn
BWPn Eml L'P94RK
n_1
CIPCaI�e}= I
Enralinn: kxnw+laKalians
tJimaled Pmjxl GUFs: 5])H)faAl
OFSCRIPFION
LkatgexWc. high Pd YImPmnmmnMe.2016 R�yde Lanrymlamn V1m.
PROJECrjumInC ION
Tin MW Wenlif imP—naakd and Prbdlk:ben.—uWf-1.sd 6igtk
aroPon, mmarry."Iharoalan;ngr"j—am PaaPmro b W.6— p.In EY 2M-:
te:
• 1-EiM(.'NnM Trail"Ii6ty SlWy t6TA,OM)
• UPRRT,.1MF &1Byf—y C`-2SlA M
• Bkyda Waynnding P•nf{a'n('20AdU)
• Sle.rna(ieetBwMxJ S.yxaW 0.bl,ax
P".1-i
Iantao Iu WOk,IWPaW C--k.(Slwo"
.. W.M..81va)-,Dsiv—f C.—iun(a MMD)
iii. Blanet"k LwxhilLfMign Onlp(g(CU,MtI
• M.Clcibn Rail Sepxatd BiG Lalrc
Ph—I b iMvd�
i.By b9abb,VWIM aW C�mlrwWn(+.7,]OAJ1Q01
ii.IIu66 k•SldRng,[sign a,al GOm1.Od"wn(L'93,Uk7J
iiL CY AnaN�1.(kalu.Inler.•aeeLnr,CL.ign(WyO 7IMI
• tlkxk Baukrani.Impkmml h-01rIJ,Ca)
Page iJ 41-17
Cin'W Cuprtm�
FY SI]-3nadYLWp+-AHFYL'fl)1'ROPtSfA) 2
1
6/20/2017
June 611 Proposed CIP for 2016 Bike Plan Implementation
• I-280 Channel Trail Feasibility Study($250,000)
• UPRR Trail Feasibility Study($250,040)
• Bicycle Wayfinding Program($W,000)
• Stevens Creek Boulevard Separated Bike Lane
Phase 1 to include:
i. Tantau to Wolfe,Design and Construction($1,800,000)
ii. Wolfe to Blaney,Design and Construction($400,000)
iii. Blaney to Foothill,Design Only($650,000)
• McClellan Road Separated Bike Lane
Phase 1 to include:
i. Byrne to Bubb,Design and Construction(51,200,000)
ii. Bubb to Stelling,Design and Construction($293,000)
iii. De Anza/McClellan Intersection,Design Only($300,000)
• Bicycle Boulevards Implementation($1,417,000)
3
� a2016 Bike Plan Implementation
• Alta Planning + Design
• Transportation Planning Firm
• Developed 2016 Bicycle Transportation Plan
• High-level master plan document
• Toole Design Group
• Transportation Planning and Engineering Firm
• Developed Class IV conceptual designs for
McClellan Road and Stevens Creek Blvd
• Developed Bike Boulevard concepts
• HMH Engineers
• Civil Engineers, developed cost estimates
based upon Toole's conceptual designs
4
2
6/20/2017
a
Types of Barriers
#` l
ti
�\eea ots �\g S �o\\at�,s\a��ets aatt�etS
t\g�d Q o�c�etie
c
5
z
Types of Barriers
5�
TWA
Flexible Posts Precast Curb Concrete Barrier
$30-$50k $600-$800k $700-$900k
Raised Median Raised Bikeway
$900k-$1.1 M $1.3M-$2.OM 6
3
6/20/2017
Driveway Treatments
McClellan Road
• Conceptual Study Proposed Cross-
Sections
4
MIMI
i-
s
4
6/20/2017
Bike Plan Implementation
AltaHMH(engineering estimate based on Toole's
(Master Plan Costing) concepts)
Total
(inc.design,
Subtotal(construction inspection,
only) continqencies)
(Stevens Creek Blvd Cl IV �/Signals I $4,690,000 $7,270,000
Lo Signals 1 $4,120,000 $2,200,000 $3,400,000
(McClellan Road(HS to HS) I /Signals II $3,510,00J $5,780,000
1 6/o Signals 1 $1,230,00jil $2,575,00 $4,200,000
(Bike Boulevards I I $410,00dl $921,00dj $1,610,00D
9
Protection at Intersections
ry
•
10
5
6/20/2017
� o High School-to-High School
Detail by Segment
McClellan, Byrne to Torre (Class IV, Protected)
(Incs.Signal mods, design*, contingency, construction,and inspection)
Assumes approx. 11 residential property donations and no cost for
necessary right of way to reconfigure De Anza/McClellan intersection) $4,650,000
Regnart Creek Trail, Pacifica to Creekside Park
(Uses Master Plan cost from Alta, then applies factors for design*,
contingency, construction,and inspection similar to those used in the
engineering estimates developed by HMH) $1 ,100,000
Creekside Park to Cupertino HS (Class III, Bike Blvd)
(Incs. design*, contingency, construction, and inspection) $30,000
Monta Vista HS to Cupertino HS Subtotal $5,780,000
(Cupertino HS to Eastern City Limits (Class III, Bike Blvd)
(Incs.Design*,design contingencv,construction,and inspection) $230,000
Design includes community outreach and environmental review 11
Bike Boulevard Connection
De Anza to Cupertino HS to Easterly Border
I
END CLASS III ! a END CLASS l` I
BIKE BLVD i BIKE ROUTE
i• �
END CLASS III
BIKE BLVD
START LAS$
� 111 BIKE BLVD �ll
wll tld Y ,II
START CLASS III i )I
BIKE ROUTE ' �(
START CLASS III
sY y =BIKE BLVD
P JECT LIMITS
12
6
6/20/2017
Regnart Creek Trail — Class I Bikeway
Pacifica to Cupertino to Cupertino HS
LST
i f
_ `W
V
ROOR _ g - Ui�U L
TWIG
M �
Uj
123- �-
13
7