Loading...
Exhibit CC 06-20-2017 Item No. 9 2016 Bicyle Transportation Place Implementation Presentation 6/20/2017 �21,o City of Cupertino 2016 Bicycle Transportation Plan Implementation I June 20,2017 1 9/ CAPITALIMPROYEMENI PROGRAM li.ral tex M17--20I8 CUPEBTINO 2M Bike Pian Impizmematinn BWPn Eml L'P94RK n_1 CIPCaI�e}= I Enralinn: kxnw+laKalians tJimaled Pmjxl GUFs: 5])H)faAl OFSCRIPFION LkatgexWc. high Pd YImPmnmmnMe.2016 R�yde Lanrymlamn V1m. PROJECrjumInC ION Tin MW Wenlif imP—naakd and Prbdlk:ben.—uWf-1.sd 6igtk aroPon, mmarry."Iharoalan;ngr"j—am PaaPmro b W.6— p.In EY 2M-: te: • 1-EiM(.'NnM Trail"Ii6ty SlWy t6TA,OM) • UPRRT,.1MF &1Byf—y C`-2SlA M • Bkyda Waynnding P•nf{a'n('20AdU) • Sle.rna(ieetBwMxJ S.yxaW 0.bl,ax P".1-i Iantao Iu WOk,IWPaW C--k.(Slwo" .. W.M..81va)-,Dsiv—f C.—iun(a MMD) iii. Blanet"k LwxhilLfMign Onlp(g(CU,MtI • M.Clcibn Rail Sepxatd BiG Lalrc Ph—I b iMvd� i.By b9abb,VWIM aW C�mlrwWn(+.7,]OAJ1Q01 ii.IIu66 k•SldRng,[sign a,al GOm1.Od"wn(L'93,Uk7J iiL CY AnaN�1.(kalu.Inler.•aeeLnr,CL.ign(WyO 7IMI • tlkxk Baukrani.Impkmml h-01rIJ,Ca) Page iJ 41-17 Cin'W Cuprtm� FY SI]-3nadYLWp+-AHFYL'fl)1'ROPtSfA) 2 1 6/20/2017 June 611 Proposed CIP for 2016 Bike Plan Implementation • I-280 Channel Trail Feasibility Study($250,000) • UPRR Trail Feasibility Study($250,040) • Bicycle Wayfinding Program($W,000) • Stevens Creek Boulevard Separated Bike Lane Phase 1 to include: i. Tantau to Wolfe,Design and Construction($1,800,000) ii. Wolfe to Blaney,Design and Construction($400,000) iii. Blaney to Foothill,Design Only($650,000) • McClellan Road Separated Bike Lane Phase 1 to include: i. Byrne to Bubb,Design and Construction(51,200,000) ii. Bubb to Stelling,Design and Construction($293,000) iii. De Anza/McClellan Intersection,Design Only($300,000) • Bicycle Boulevards Implementation($1,417,000) 3 � a2016 Bike Plan Implementation • Alta Planning + Design • Transportation Planning Firm • Developed 2016 Bicycle Transportation Plan • High-level master plan document • Toole Design Group • Transportation Planning and Engineering Firm • Developed Class IV conceptual designs for McClellan Road and Stevens Creek Blvd • Developed Bike Boulevard concepts • HMH Engineers • Civil Engineers, developed cost estimates based upon Toole's conceptual designs 4 2 6/20/2017 a Types of Barriers #` l ti �\eea ots �\g S �o\\at�,s\a��ets aatt�etS t\g�d Q o�c�etie c 5 z Types of Barriers 5� TWA Flexible Posts Precast Curb Concrete Barrier $30-$50k $600-$800k $700-$900k Raised Median Raised Bikeway $900k-$1.1 M $1.3M-$2.OM 6 3 6/20/2017 Driveway Treatments McClellan Road • Conceptual Study Proposed Cross- Sections 4 MIMI i- s 4 6/20/2017 Bike Plan Implementation AltaHMH(engineering estimate based on Toole's (Master Plan Costing) concepts) Total (inc.design, Subtotal(construction inspection, only) continqencies) (Stevens Creek Blvd Cl IV �/Signals I $4,690,000 $7,270,000 Lo Signals 1 $4,120,000 $2,200,000 $3,400,000 (McClellan Road(HS to HS) I /Signals II $3,510,00J $5,780,000 1 6/o Signals 1 $1,230,00jil $2,575,00 $4,200,000 (Bike Boulevards I I $410,00dl $921,00dj $1,610,00D 9 Protection at Intersections ry • 10 5 6/20/2017 � o High School-to-High School Detail by Segment McClellan, Byrne to Torre (Class IV, Protected) (Incs.Signal mods, design*, contingency, construction,and inspection) Assumes approx. 11 residential property donations and no cost for necessary right of way to reconfigure De Anza/McClellan intersection) $4,650,000 Regnart Creek Trail, Pacifica to Creekside Park (Uses Master Plan cost from Alta, then applies factors for design*, contingency, construction,and inspection similar to those used in the engineering estimates developed by HMH) $1 ,100,000 Creekside Park to Cupertino HS (Class III, Bike Blvd) (Incs. design*, contingency, construction, and inspection) $30,000 Monta Vista HS to Cupertino HS Subtotal $5,780,000 (Cupertino HS to Eastern City Limits (Class III, Bike Blvd) (Incs.Design*,design contingencv,construction,and inspection) $230,000 Design includes community outreach and environmental review 11 Bike Boulevard Connection De Anza to Cupertino HS to Easterly Border I END CLASS III ! a END CLASS l` I BIKE BLVD i BIKE ROUTE i• � END CLASS III BIKE BLVD START LAS$ � 111 BIKE BLVD �ll wll tld Y ,II START CLASS III i )I BIKE ROUTE ' �( START CLASS III sY y =BIKE BLVD P JECT LIMITS 12 6 6/20/2017 Regnart Creek Trail — Class I Bikeway Pacifica to Cupertino to Cupertino HS LST i f _ `W V ROOR _ g - Ui�U L TWIG M � Uj 123- �- 13 7