Loading...
B-2017-1129CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO: B-2017-1129 7545 DUMAS DR CUPERTINO, CA 95014-4310 (359 24 049) AIR & PLUMBING SYSTEMS INC LOS GATOS, CA 95032 OWNER'S NAME: STEIN JAN AND SHERRI H TRUSTEE DATE ISSUED: 07/13/2017 OWNER'S PHONE: 408-832-7219 PHONE NO: (408) 733-2000 i ICFNSFD CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: License Class C-20 Lic. #901246 Contractor AIR & PLUMBING SYSTEMS INC Date 07/31/2017 X BLDG _ ELECT _ PLUMB X MECH X RESIDENTIAL _ COMMERCIAL I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. JOB DESCRIPTION: REPLACE FURNACE (SAME LOCATION); RELOCATE AC UNIT I hereby affirm under penalty of perjury one of the following two declarations: (NEW LOCATION) 1. I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the 9Y performance of the work for which this permit is issued. 2. 1 have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this Sq. Ft Floor Area: Valuation: $11000.00 permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above Number: Occupancy Type: information is correct. I agree to comply with all city and county ordinances 59 359 24 049 3 and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue against said City in consequence of the granting of this permit. WITHIN 180 DAYS OF PERMIT ISSUANCE OR Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertin unicipal Code, Section 9.18. 180 DAYS FROM LAST CALLED INSPECTION. Signature -- Date 7/13/2017 Issued by: JASMINE ARCHBOLD Date: 07/13/2017 OWN R- ER DECLARATION I hereby affirm that I ant exempt from the Contractor's License Law for one of the RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is following two reasons: 1. I, as owner of the property, or my employees with wages as their sole installed without first obtaining an inspection, I agree to remove all new materials for compensation, will do the work, and the structure is not intended or offered for inspection. sale (Sec.7044, Business & Professions Code) 2. I, as owner of the property, am exclusively contracting with licensed Signature of Applicant: contractors to construct the project (Sec.7044, Business & Professions Code). Date: 7/13/2017 I hereby affirm under penalty of perjury one of the following three declarations: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER 1. I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance, as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code, for the performance of the work for which this California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the permit is issued. i 1. I certify that the performance of the work for which this permit is issued, I Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous shall not employ any person in any manner so as to become subject to the air contaminants as defined by the Bay Arca Air Quality Management District I Worker's Compensation laws of California. If, after making this certificate of will maintain compliance with tite Cupertino Municipal Code, Chapter 9.12 and exemption, I become subject to the Worker's Compensation provisions of the the Health & Safety Code, Sections 25505, 255�t1 25 Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked. Owner or authorized agent: APPLICANT CERTIFICATION Date: 7/13/2017 I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws f()2iSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance relating to building construction, and hereby authorize representatives of this city of work's for which this permit is issued (Sec. 3097, Civ C.) to enter upon the above mentioned property for inspection purposes. (We) agree Lender's Name to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in Lender's Address consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal ARCHITECT'S DECLARATION Code, Section 9.18. 1 understand my plans shall be used as public records. Licensed Signature Date 7/13/2017 Professional t GENERAL PERMIT APPLICATIONM, E: COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION • CUPERTINO, CA 95014-3255 10300 TORRE AVENUE 4 (408) 777-3228 • FAX (408) 777-3333 • buildinaC�cupertino.ora CUPERT INN ❑PLUMBING ' tI ECHANICAL ❑ELECTRICAL ❑MISCELLANEOUS PROJECT ADDRESS AP7\ 0\VIER NAT4E� � / 7 I PHONE �// �2 '-MAIL STREET ADDRESS � CITY, STATE, ZIP � � .,(F,4Y. CONTACT NAME f)f � L/ / / n � PHONE i' ` Cj r STREET.4DDRESS / O CITY, STATE, ZIP F FAX ❑ OW-NIER • ❑ OWNER -BT Z ---M ❑ OWNTER AGES 1 ❑ CONTRACTOR ❑ c0NTR4CTOR AGFNT ❑ ARCHITECT ❑ ENGINEER ❑ DFv-zLoPER ❑ TENANT CONTRACTOR NAME LICENSE NUMBER�6m LICENSE TYPE BUS. LI4 C014PAN7' NAME// Ile(/�^ !�Y.r 24I E -AL FAX STREET ADDRESSj // 0 CITY, STATE, ZIP O� / PHONE � � a} ARCHITECT/ENGINEER NAI,4E LICENSE NUMBER BLIS. LIC' COMPANY NAME E-MAIL FAX STREET ADDRESS CITY, STATE, 'LIP PHONE USE OF ❑ SFD or DUPLEX PROJECT ZN w aDLP„ND ❑ -YES PROJECT A1' ❑ 1 -ES BUII.DAG:❑ COA�A;ERCIAL URBAN ThTERFACE AREA ❑ NO FLOOD ZONE El NO IS THE BLDG AN ❑ 1TS EICIiLER HOME? El NO DESCRIPTION OF WORK C13 � C TOT -4L VALUATION: RECEIVED B By my signature below, 1 certify to each of the following: lain the propea owner or authorized agent to act on the proper owner's behalf. I have read this application and the information I have provided is correc rea the Descriptio f Work and veriA it is accurate. I agree to comp y witb all applicable local ordinances and state laws relating to building cons thorese-tom gs eff pertTp Imo to enter the above-identifid prope for inspection purposes. Signature of.ApplicanvAgent: Date: / SUPPLEMENTAL IINTFORMATION REQUIRED � OFFICE LSE ONLY � - � " k < '❑ 04 ER'THE-COU'T7'ER <, , z� ST4�DARD � ;^r ED L4RGE 1]Y 1.24JOR� F _ MEPA1isc,4pp_2011.doc revised 05/21111 J I A I t Ur UALJr-UMN IA ALTERATIONS - HVAC Fal CEC-CFIR-ALT-03-E (Revised 01/16) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE CF1R-ALT-03-E Alterations - HVAC CZ 1, 3 to 7 and 16 (Page 1 of 1) Site Address: '— / n Enforcement Agency: Date Prepared: Permit#: < vG � Q p cc Equipment Type Equipment Efficiency New: Ducting or Lineset Required R -value Conditioned Z Floor Area (ft ) Thermostat ❑ Packaged SystemEvaporator Coil AFUE COP ❑ R-6 (CZ 1-10,12&13) Ducts Served by system 11Setback ElSplit System;_0 Condensing Unit SEER ($.R-8' (CZ 11,14-16) Ducts ft (If not already -/ HSPF El R-2.8 Lineset' present, must 'Q/Furnace Lineset EER be installed) HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one of the options below. At permit application this form is allowed to be filled out by hand. For final inspection all forms are to be registered (no hand filled forms allowed) and a copy left on site. ❑ 1. HVAC Changeout/Repair Required Compliance Documents to be left on site for Final: (Can include new ducting) All Equipment, CFIR-ALT-02-E Condenser Unit, Evaporator Coil, CF2R: MCH -01, MCH -20-H Air Handler/Furnace CF3R: MCH -20-H Installer Requirement: Duct leakage (515% or, 510% to outside, or seal all accessible leaks) Exempted from duct leakage testing if: 111. Duct system registered with HERS provider as previously sealed, or ❑ 2. There is less than 40 linear feet of duct in unconditioned space, or ❑ 3. Existing duct systems are constructed, insulated or sealed with asbestos (list manufacture date of building_ 2. New HVAC System Required Compliance Documents to be left on site for Final: All new equipment and All New Ducts' CF1R-ALT-02-E CF2R-MCH-01-E, MCH -20-H, MCH -22-H, MCH -(23 or 24)-H CF3R-MCH-20-H, MCH -22-H, MCH -(23 or 24)-H' Installer Requirement: Duct leakage < 5%, Fan Efficacy (0.58W/CFM), Air Flow >_ 350 CFM/ton (or Standards Table 150.0-B / C alternative) ❑ 3. All New Ducts with Replacement Required Compliance Documents to be left on site for Final: Includes replacing or installing All New CFIR-ALT-02-E Ducts' and one or more of the following: CF2R-MCH-01-E, MCH -20-H, MCH -(23 or 24)-H Condenser Unit, Evaporator Coil, Furnace CF3R-MCH-20-H, MCH -(23 or 24)-H Installer Requirement: Duct leakage < 5%, Air Flow >_ 350 CFM/ton (or Standards Table 150.0-13 / C alternative) ❑ Exempted from duct leakage testing if existing duct systems are constructed, insulated or sealed with asbestos. ❑ 4. New Ducting over 40 feet Required Compliance Documents to be left on site for Final: Adding or replacing ducts in unconditioned CF1R-ALT-02-E space but less than All New Ducts' CF2R-MCH-20-H CF3R-MCH-20-H Installer Required to: Duct leakage (< 15% or, < 10% to outside, or seal all accessible leaks) ❑ Exempted from duct leakage testing if existing duct systems are constructed, insulated or sealed with asbestos. ' All new ducting requires R-8 insulationwhen more than 40 ft installed in CZs 11 & 14-16 and R-6 in CZs 1-10, 12 & 13, and R-6 insulation when less than 40 ft installed. This includes in walls, between floors etc. ' A New Duct system is when the duct system is constructed of at least 75 %new duct material, and up to 25%may consist of reused parts from the dwelling unit's existing duct system (e.g., registers, grilles, boots, air handler, plenums, duct material. a R-2.8 (1" thick insulation) for linesets 1" and less. Contractor (Documentation Author's /Responsible Designer's Declaration Statement) I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document. 3. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the requirements of Title 24, Parts 1 and 6 of the California Code of Regulations (CCR). 4. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the CCR. 5. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans - d specifications submitted to the enforcement agency for approval with this buil g pe mit application. Responsible Designer Name: / � Al__ esponsible Designer Signature: Date Signed���, /,, Licensee/2 �A v` Company: Address: City/State/Zip: Phone: For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300