15050071 (2)M�
CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10598 STERLING BLVD
CONTRACTOR: PAB CONSTRUCTION
PERMIT NO: 15050071
INC
OWNER'S NAME: YE FEI AND ZHANG ZISHAN
21060 HOMESTEAD RD STE 216
DATE ISSUED: 05/12/2015
OWNER'S PHONE: 4084996595
CUPERTINO, CA 95014
PHONE NO:
❑ LICENSED CONTRACTOR'S DECLARATION
JOB DESCRIPTION: RESIDENTIAL COMMERCIAL ❑
DEMOLISH (E) SINGLE FAMILY DWELLING (1137 SQ FT).
License Class_ Lic. k �y �f' � 2 � -1
2/+
Contractor PAR Cr-„�4'-,(U Ct, pyDate n 612- i 7
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000) of Division 3 of the Business & Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
Sq. Ft Floor Area:
Valuation: $9000
performance of the work for which this permit is issued.
1 have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
APN Number: 37523025.00
Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I?certify that I have read this application and state that the above information is
PERMIT EXPIRES IF WORK IS NOT STARTED
correct. 1 agree to comply with all city and county ordinances and state laws relating
WITHIN 180 DAYS OF PERMIT ISSUANCE OR
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
180 DAYS FROM LAST CALLED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
Issued Date:
granting of this permit. Additionally, the applicant understands and will comply
by-, n/
with all non -point souArce regulations per the Cupertino Municipal Code, Section
9.18.
Signature Date0�
RE -ROOFS:
All roofs shall be inspected prior to any roofing material being installed. if a roof is
installed without first obtaining an inspection, 1 agree to remove all new materials for
inspection.
❑ OWNER -BUILDER DECLARATION
Signature of Applicant: Date:
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons:
ALL ROOF COVERINGS TO BE CLASS "A” OR BETTER
I, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale (Sec.7044,
Business & Professions Code)
I, as owner of the property, am exclusively contracting with licensed contractors to
HAZARDOUS MATERIALS DISCLOSURE
construct the project (Sec.7044, Business & Professions Code).
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. twill
1 hereby affirm under penalty of perjury one of the following three
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
declarations:
Health & Safety Code, Section 25532(x) should I store or handle hazardous
I have and will maintain a Certificate of Consent to self -insure for Worker's
material. Additionally, should I use equipment or devices which emit hazardous
Compensation, as provided for by Section 3700 of the Labor Code, for the
air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued.
will maintain compliance with the Cupe tino Municipal Code, Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance, as provided for by
the Health & Safety Code, Sections 55 5533, and 25534.
Section 3700 of the Labor Code, for the performance of the work for which this
Owner or authorized agent: Date:a 5 �?
permit is issued.
I certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If, after making this certificate of exemption, I
CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code, I must
I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked.
work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
APPLICANT CERTIFICATION
Lender's Address
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
ARCHITECT'S DECLARATION
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
I understand my plans shall be used as public records.
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source regulations per the Cupertino Municipal Code, Section
Licensed Professional
9.18.
Signature Date
DEMOLITION PERMIT APPLICATION 1/05 71
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • building ,cupertino.orq
PROJECTADDRESS \ 0 Ct C r V n 31 v
AIN# ^ 175
V
,
OWNER NAME Z �\ _� r Z h 0. q�F��J Lf .
1' i f1
E-MAIL
STREET ADDRESS CITY, STArTjE, ZIP FAX
o 8 { e� �e�r; �Q , ea ��(4
CONTACT NAME Q PHONEr �i I l
r
E-T`�L4IL i I 1 Q 1�i g 1 i1L li 3 01,Z 1,
STREET ADDRESS
21e6c t�aw��s�PaA {�1 Ib
C Y, STAT`E',I ZIP,
vJST9 Ina Ca, 0( g0ly
FAX
❑ OWNER ❑ OWNER -BUILDER ❑ OWNER AGENT 21IC—INTRACTOR ❑ CONTRACTOR AGENT ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑ TENANT
CONTI�ACTOICAME A U f\��� 1 �VCfiICI
LICENSENUMBE go 5 r?
LICENSE TYPE
BUS. LIC #
COMPANY NAME V AI iQVC L1 �h �� 1 C ►1
S`1 J + V
E -M? II P�� 0-0 Y1JS 1 d1 C O �C`1 � ;f�
FAX tl o a -^
STREET ADDRESS
�a8� NamPstc�a�1 >(c� 2 f6
CITY TA Z
�i�e C)� q�a114
PHONE
)j
DESCRIPTION OF WORK De w Q c y s �' t 13
RESIDENTIAL X71
\}
# DWELLING
OFFICE USE ONLY'
.
FLOOR AREA v
UNITS
USE. :. 6CC TYPE SO. FF' VALLATIC&
.
COMMERCIAL+
FLOOR AREA
TYPE OF CONSTRUCTION # STORIES
Y r,
AQMD JOB NUMBER
J #: NO 14 2
RECEIVED By.;,
TOT VALUATION:
Dno
By my signature below, I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this
application and the information 1 have provided is porrekt. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to building con c n I uthorize representatives of Cupertino to enter the above -identified property for inspection purposes.
Signature of Applicant/Agent: Date:
SUPPLEMENTAL IN'FORMATIO REQ RED PRIOR TO ISSUANCE OF DEMOLITION PERMIT
OFFICE USE ONTLY
PLAN CHECK TYPE
Provide Job Number from Bay Area Air Quality Management District wlv%v.baagmd.or, @ 415-749-4762.
❑ ExPRESs .
_ Provide three copies (Residential) or six copies (Commerical) of a site plan showing protection for any trees 10"
in diameter or more at 3' above grade.
p.
❑ : STANDARD
_ Provide letter from PG&E (408-725-3325) stating all gas and electric has been disconnected.
'LARGE
Provide a letter of inspection, tests, and abatement of any Hazardous Materials. Letter to be initiated by person(s)
nJAaoR
certified in asbestos, mercury and/or hazardous material examination.
Planning Dept clearance to verify building is not considered an historical landmark. Allow 10 business days.
Provide letter of clearance of all vermin from a licensed pest control contractor.
Applicant shall call the Public Works Department at 408-777-3104 and schedule a "habitable dwelling' inspection.
Provide signed Debris Bin and Recyclable Materials form.
Demo,4pp_2013.doc revised 02/13/13
:C
CITY OF CUPERTINO D
IM -7, FEE ESTIMATOR — BUILDING DIVISION
FEE ID FLR AREA
s. f.
1 DEMORES 1,137
ADDRESS: 10598 Sterling Blvd
DATE: 05/12/2015
REVIEWED BY: Sean
ON
APN:
BP#: 50Z)oI
VALUATION: 1$9,000
*PERMIT TYPE: Demolition Permit
C/111,Ch 7YPl.
PRIMARY SFD or Duplex
USE:
Plumb. hrsp. Fee:
PENTAMATION 1SFDWL-DEM
PERMIT TYPE:
WORK
DEMOLISH E SINGLE FAMILY DWELLING 1137 SQ FT).
SCOPE
Suppl. Insp. Fee -(F) Reg. Q OT0.0
FEE ID FLR AREA
s. f.
1 DEMORES 1,137
NOTE: This estimate does not inchide fees due to other Departments (i. e. Planning, Public Works, Fire, Sanitary Sewer District, School
District, etc). These fees are based on the preliminary information available and are only an estimate. Contact the Dept for addn'l info.
FEE ITEMS (Fee Resolution //-053 Eff. 7////3)
FEE
QTY/FEE
Elea..., Check
Wech. Permit Fce-
Plumb. Permit Fee:
lilec. Permit Fee:
Other Alech. Insp
Other Plumb lnsp
0111er Etee. Ins),
Mech. Insp. Fee:
Plumb. hrsp. Fee:
Elec. Ins). Fee:
NOTE: This estimate does not inchide fees due to other Departments (i. e. Planning, Public Works, Fire, Sanitary Sewer District, School
District, etc). These fees are based on the preliminary information available and are only an estimate. Contact the Dept for addn'l info.
FEE ITEMS (Fee Resolution //-053 Eff. 7////3)
FEE
QTY/FEE
MISC ITEMS
Plan Check Fee:
Suppl. PC F-ce
Plumb./Rlech-,Elee
Permit Fee:
$574.00
Suppl. Insp. Fee -(F) Reg. Q OT0.0
hrs
$0.00
P1umb.!11 Rech.: Elec
Plumb./fi-fech. -Elec~ Pern?il Fee.
'Onstruction Tac:
Administrative Fee:
I-Vork Without Permit?
Advanced Planning Fees
�
Travel Documentation Fees:
Strong; Motion Fee: IBSEISMICR
$1.17
Select an Administrative Item
Bldg Stds Commission Fee: IBCBSC
$1.00
SUBTOTALS:
1 $576.171
$0.00 TOTAL FEE:
7 $576.17
Revised: 04/01/2015
CUPERTINO
CONTRACTOR / SUBCONTRACTOR LIST
Building Department
City Of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
Telephone: 408-777-3228
Fax: 408-777-3333
JOB ADDRESS: l05 9
�E c���
BUSINESS NAME
PERMIT # /-3O :5 AD _7 /
OWNER'S NAME: /Yj��
yG / _
PHONE #
GENERAL CONTRACTOR:
Cement Finishing
BUSINESS LICENSE #
ADDRESS: / O
4; - f.4
# /
CITY/ZIPCODE:
*Our municipal code requires all businesses working in the city to have a City of Cupertino business license.
NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND ALL SUBCONTRA ;ure
HAVE OBTAINED A CITY OF CUPERTINO
BUSINESS LICENSE. k4
I am not using any subcontractors: Q`6--12- k 15
Sig a Date
Please check applicable subcontractors and complete the foIIowing information:
V
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring / Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner / Contractor Signature Date
tv
lj City of Cupertino
Public works Department
Environmental Programs Division
10300 Torre Ave
Cupertino, CA 95014
CUPENTINO GREEN
Program (408) 777-3354
Construction and Demolition Recycling Diversion
Requirements and Instructions
Covered projects, or all construction, demolition and renovation projects that are 3,000 square feet or more
are required to complete a Waste Management Plan for the City of Cupertino demonstrating that 60% of the
material generated is recycled, in compliance with ordinance CMC 16.72.050. At the conclusion of the project
a Construction Recycling Report must be filed with the Public Works Department/Envirornrrental Division
shovving the tons recycled and disposed by material type. Use tonnage information from weight tags provided
by facilities to quantify total estimated waste and percentages for materials. Weight Tags of all material
recycled and disposed must be submitted with the final report in order to receive a Final Building
Inspection.
Recology is the only debris bin service provider franchised to do business in Cupertino.
Debris from a project 3,000 square feet or more in Cupertino can be collected and
disposed by using:
Please check all that apply:
I am not using a Recology debris bin, however, the project is less than 3,000 s.£, e.g. buildings, patios,
sidewalks, driveways.
❑ I will use a Recology debris bin. By Agreement with the City, Recology will prepare my required
Waste Management Plan & Recycling Report. Contact Recology: (408) 725-4020.
❑ I am not using a Recology debris bin. I will provide the following submittals to the City's Public
Works Department, showing that I have recycled at least 60% of all construction demolition material:
Ask for the Construction & Demolition Recycling Packet from the Building Department and
complete the following:
✓ Submit a Construction and Denzolition Waste Managenzent Plan with your building permit
application. No fee for this plan. Forms are available at the Building/Public Works counter and online
at ww-w.cupertino.org/environmental. Report the tonnage recycled and disposed, by material type.
Recycling facilities inust be selected from the City's approved list of Recycling Resources.
✓ Submit a Construction. Recycling Report form.. The report is required before the Building
Department will schedule a final inspection. The reportform is available at the Building/Public
Works Counter and onliAe tih 1l cupertirro.o�, /e�n�ironmental.
Signature:
Name: (printed)
Title: _
Phone: _
Project Address:
This form to remain in the project's building permit file for the duration of the project.
Revised 317112 1
Date: 0 6 12_ 1 S
lid
4 So
a0"
I
I I/i
TYR POST
EL EVAT'ION
NOTES;
I. THE DEVELOPER SHALL INSTALL THE " TREE PROTECTION" DEVICES
PRIOR TO THE START OF GRADING OR CLEARING WORK.
2. THE CITY RESERVES THE RIGHT TO ISSUE A "STOP WORK" NOTICE IF
THE "TREE PROTECTION " DEVICES ARE NOT INSTALLED OR IF THE
DEVICES ARE NOT MAINTAINED PROPERLY.
3. SEE THE PROJECT GRADING PLAN FOR SPECIFIC TREES THAT REQUIRE
PROTECTION. ALL SPECIMEN TREES REQUIRE PROTECTION UNLESS
OTHERWISE NOTED,
4. NO EXCAVATIONS WITHIN THE "TREE PROTECTION AREA" ARE ALLOWED
UNLESS UNDER THE SUPERVISION OF A REGISTERED TREE SERVICE COMPANY.
5. ANY FILLING WITHIN THE "TREE PROTECTION AREA" SHALL BE DONE IN
ACCORDANCE WITH A DETAILED IMPROVEMENT PLAN APPROVED BY THE CITY,
6. NO TRIMMING, CUTTING,OR PRUNING OF DESIGNATED TREES CAN OCCUR
WITHOUT A REGISTERED TREE SERVICE COA4PANY.
7. CONSULT ORDINANCE 779 OF THE CITY OF CUPERTINO FOR PERMIT
REQUIREMENTS AND EXCEPTIONS.
S. TEMPORARY CHAIN LINK FENCING IS AN ACCEPTABLE SUBSTITUTE TO
THE WOOD CONSTRUCTION. k
TREE PROTECTION STANDARDS
BY
m"'awumm I
Pacific Gas and
& Electric Company=
DATE: MAY 11T",2015
CITY OF CUPERTINO
10300 TORRE AVE
CUPERTINO CA 95014
SUBJECT: REMOVAL OF GAS SERVICES (METER & REG) ON:
10900 No. Blaney Avenue
Cupertino, CA 95014
MARCH 19TH,2015 @ 10598 STERLING RD, CUPERTINO CA 95014
CvT C9) M+4tiv '4-9--z.0/5'
SUBJECT: ELECTRIC SERVICES WAS CUT AT POLE ON :
MARCH 2OTH,2015 @ 10598 STERLING RD, CUPERTINO CA 95014
If you have any question contact us at (408) 725-3325
?rely,
ific Gas & Electric Compa
OeAnza Service Planning
10900 N Blaney Ave
CUPERTINO CA 95014.
4 -FOOT Hrc,{i FENaNa
�"- -- TYPICAL. TREE PROTECTION-EEN
TYPICAL BARK PROTECTION NOT TO SCALE
NOT TO SCALE
1. Prior to any construction operations contractor shall construct and maintain, for each protected tree on a construction site, a protcefve fencing
which encirctes the outer limits of the critical root zone(CRZ) of the tree to protect it from construction activity, The CRZ is calculated 1.25 feet
times the -diameter of the trunk ineasured in incises 4,5 feet above the natural grade).
2. All protcodye fencing shall be in place prior to commencement of any site work and remain in place until all exterior construction activity at the
site has been completed,
3, Protective fencing shall be at least six (6) feet high, clearly visible, and shall have a tree protection sign affixed to the fence every twenty (20)
feetiu such s manner to be clearly visible and legible to workers on the site at a distance of twenty4ive (25) feet. The sign(s) slsali read "Tree
Protection Z me Keels out",
4. The owner shall cause the required fencing and siguage to be installed and maintained for the duration of the construction,
5. In situatlons where a protected tree remains in the immediate area of intended construction and the tree may be in danger of being, damaged by
construction equipment or other activity, the contractor or subcontractor shall protect the tree with 2"x4" lumber onoiroW with wire or outer
weans that do not damage the tree. The intent is to protect the trunk of the tree against incidental contact by large constmetion equipment.
6. Material Storage: No storage or placement of materials intended for use in construction or waste materials acoumulated due to excavation or
demolition shall be placed within the lhoits of the critical root zone of any protected tree.
7. Equipment Clcaningtf.iqusd Disposal: No equipment shall be cleaned or other liquids, Uicluding, vritlsout limitation, paint', oil, solvents, aspbait,
concrete, mortar or sbuilar materials deposited or allowed to flow into the critical root zone of a protected tree,
S. Tree Attaclunents: No signs, wires or other attaohinents, other than those of a protective nature, shall be attached to any protected tree.
9. Vehicular TraffEo: No vehicular and/or constmation equipment traffic or parking shall take place within the critical root zone of any protected
tree other than on existing street pavement.
10. No heavy equipment, including but not liusited to trucks, tractors, trailers, bulldozers, cxcavntors, skid steer tractors, trenchers, compressors,
and limsts, shall be allowed inside the drip -line of any protected tree on any construction site.
11. Grade Menges: No grade changes shalt be allowed within the limits of the critical root zone of nny protected tree unless adequate protective
construction methods are approved in advance in writing by the city
12. Impervio.as Paving: No paving wids asphalt, concrete or other impervious materials shall be placed within the limits of the critical root zone of
a protected free, unless expressly permitted by the public works Dept
13. hoot Pruning: All roots two inches or larger in diameter which are exposed as aresult of trenching or other excavation shalt be cut off square
with it sharp medium toodi saw and covered with natural fiber bur]ap within two hours of fidtial exposure,
14. All public sidewalks shall remain open, No and clear for public access, unless closure is permitted by the Public Works Department,
REVISED 5/13
6-4
t
,I IFAIL
N.T.S.
NOTE:
1. EXISTING STRUCTURE TO BE REMOVE
MAIN WATER, ELECTRICAL AND GAS SHALL BE SHUT OFF.
2. THERE IS ONE STREET TREE, MODESTO ASH AND ONE 6" DIA
TRUNK TREE IN REAR YARD, WHICH REQUIRED TREE PROTECTION ,
ALL EXISTING FRUIT TREE AND SHRUB ON SITE SHALL BE REMOVE.
3. REMOVE (E) DRIVEWAY PAVER UP TO PROPERTY LINE, DRIVE WAY
CURBCUT AND SIDE WALK OUT SIDE OF PROPERTY LINE SHALL
REMAIN IN PLACE
(E) TREE TO
REMAIN AND ---�
PROTECTED
DURING
CONSTRUCTION,
SEE DETAIL1
D-1
REMOVE (E)
TREES
REMOVE (E)
TREES
REMOVE (E)
CONC. PAVER
SIDE WALK I
o I
e I
I
e I
I
I
e
I
II
I
s'
10
TOP OF BANK
REMOVE ALL (E)
CONC PAVER
P.U.E. & 5MINAGE EASEMENT
------------------------
REMOVE
_ _____________________REMOVE (E) CONC PAVER
_____________________l.,
� l
� II
i
I
I
t I�
I
I,
i II
I I
L-----------------------------�
REMOVE (E) CONC PAVER
`1REMO
2 `� 1•.rT8 TREES (E)
r I I -..w
AT24A• � �.-•••-
I STU,j�P REMOVE (E)
%. ♦ ELECT. METER ,---------------------.
REMOVE (E)
HOUSE
ONE-STORY HOUSE
FE=101.7
i REMOVE
i ALL
1
BRICK
WALK
i 1
REMOVE (E)
GAS METER
AND UNDER
GROUND PIPE
PER PG&E
J Cm---�,
REMOVE
,WEED
'CONC i
(4110
i \ i
CO
---<.__... — --A-----_—___—
REMOVE (E)
TREES
(E) TREE TO REMAIN AND
PROTECTED DURING
CONSTRUCTION, SEE DETAIL
L�2°37'00" R=1170'
1T2 L=53.43'
�, •1910MIN1940
0
REMOVE (E) r . w
TREES N
0
x
r i
o I
04
cv
I
cc
�
�
..;EPARTkAIENT
Wr'
\\.___REMOVE/
1
¢
U -)
E
i I �. ED
00
Z
I , `.
APPROVED
I T24
TOP OF BANK
REMOVE ALL (E)
CONC PAVER
P.U.E. & 5MINAGE EASEMENT
------------------------
REMOVE
_ _____________________REMOVE (E) CONC PAVER
_____________________l.,
� l
� II
i
I
I
t I�
I
I,
i II
I I
L-----------------------------�
REMOVE (E) CONC PAVER
`1REMO
2 `� 1•.rT8 TREES (E)
r I I -..w
AT24A• � �.-•••-
I STU,j�P REMOVE (E)
%. ♦ ELECT. METER ,---------------------.
REMOVE (E)
HOUSE
ONE-STORY HOUSE
FE=101.7
i REMOVE
i ALL
1
BRICK
WALK
i 1
REMOVE (E)
GAS METER
AND UNDER
GROUND PIPE
PER PG&E
J Cm---�,
REMOVE
,WEED
'CONC i
(4110
i \ i
CO
---<.__... — --A-----_—___—
REMOVE (E)
TREES
(E) TREE TO REMAIN AND
PROTECTED DURING
CONSTRUCTION, SEE DETAIL
L�2°37'00" R=1170'
1T2 L=53.43'
�, •1910MIN1940
0
REMOVE (E) r . w
TREES N
0
x
.... ......... ....a
........ ...
... .. at
... ....... ...
. .... . ... ......... .....
. ..... O
........ .... .. ....
... ... .... ... ..
.. .. ...... ..
... ... .. ... N
.S.'.T U*.'D 1'.0.'a
... ....... ..... ...�
..................................�,
...................................
.................................
.......................... ........ R
,P:,408,892,5020.'F,'4Q8:;37`i:fir
Project:
ZHANG RESIDENCE
New Custom Homes
10598 Sterling
Cupertino, CA 95014
Applicant:
Mrs. Zishan Zhang
10598 Sterling
Cupertino, CA 95014
Tel. 408.725.3692
Arch itent:
STUDIO 61 ARCHITECTS, Inc.
12480 Saratoga Ave.
Saratoga, CA 95070
T: (408) 892.5020
F: (408) 871.6923
Email: FRANKLHO@YAHOO.COM
K
5�5ARCH T
v � pY,t. C
* NP. C29889 *
RE .2/28/17
le
OF CAol
STRUCTURE ENGINEER:
�'JELOPIL9ENT
z
; .�- : r-��-.-. - • -a
w
�
..;EPARTkAIENT
o
1
¢
.... ......... ....a
........ ...
... .. at
... ....... ...
. .... . ... ......... .....
. ..... O
........ .... .. ....
... ... .... ... ..
.. .. ...... ..
... ... .. ... N
.S.'.T U*.'D 1'.0.'a
... ....... ..... ...�
..................................�,
...................................
.................................
.......................... ........ R
,P:,408,892,5020.'F,'4Q8:;37`i:fir
Project:
ZHANG RESIDENCE
New Custom Homes
10598 Sterling
Cupertino, CA 95014
Applicant:
Mrs. Zishan Zhang
10598 Sterling
Cupertino, CA 95014
Tel. 408.725.3692
Arch itent:
STUDIO 61 ARCHITECTS, Inc.
12480 Saratoga Ave.
Saratoga, CA 95070
T: (408) 892.5020
F: (408) 871.6923
Email: FRANKLHO@YAHOO.COM
K
5�5ARCH T
v � pY,t. C
* NP. C29889 *
RE .2/28/17
le
OF CAol
STRUCTURE ENGINEER:
PLANNING DEPT
CUPERTINO
1/811=11-011
a
sue:
4.23.2015
Sheet Title:
DEMOLITION SITE PLAN
Sheet No.:
�'JELOPIL9ENT
; .�- : r-��-.-. - • -a
UUILDI;�: J;�'lSIQN
..;EPARTkAIENT
i
- CU���RT!N
0
APPROVED
MAY 12 2015
is set f Plc"S sr Act-'at,ons '.!�
to
Me d_.
kept at the
,;on. it is I -
�.
,res ora':c�ris
' ,�
�a enY
— -_
_
on sane,
r to deviate
S, Nr ,,_�
3 ^a f
N
�- din Offieia!
C
be
' - an SOecl a'
�eld to
SHA' �
�L �' rT
t all
ny N�l�. '15�'
`�� ti {oldton,
,S
yll� �i
' La.x
D•h
PE
w
wELC�
4¢
UL)
NO. Revision Date
Drawn By:
Date:
PLANNING DEPT
CUPERTINO
1/811=11-011
a
sue:
4.23.2015
Sheet Title:
DEMOLITION SITE PLAN
Sheet No.: