Loading...
Exhibit CC 08-15-2017 Item No. 17 Transportation Impact Fee PresentationCC 08-15-2017 Item No. 17 1 12City of Cupertino Proposed Traffic Impact Fee Study TIF Cost Per Trip Calculation Total Cost of TIF Projects a $193,849,000 Share Allocated to New Development b 31% Net TIF Project Costs c = a * b $59,780,125 Growth in PM Trips d 10,120 Cost per Trip = c / d $5,907 Source: EPS and Stantec. Category Formula Amount 13City of Cupertino Proposed Traffic Impact Fee Study Maximum Allowable TIF * Total TIF per Unit cost is calculated from the $5,907 per trip Land Use Residential Single Family $5,968 / unit Multi-Family $3,700 / unit Non-residential Retail $9.60 / sqft. Office $16.81 / sqft. Hotel $3,272 / room Other $6,025 / trip Total TIF per Unit * CC 08-15-2017 Item No. 17 2 14City of Cupertino Proposed Traffic Impact Fee Study Staff Recommend Exemptions •Tenant improvement projects, unless the project results in an intensification of land use; •New or intensified development may be subject to a credit for development existing on the site, unless property is vacant more than one year; •Public facilities; •Residential accessory structures.