Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
14080246 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10405 MANN DR CONTRACTOR:RICHARD HARO PERMIT NO: 14080246
CONSTRUCTION
OWNER'S NAME: SHRIDAR SUBRAMANIAN 2I50 MANGIN WAY DATE ISSUED: 10/03/2014
OWNER'S PHONE: 4083525058 SAN JOSE,CA 95148 PHONE NO:(408)532-1755
LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL E] COMMERCIAL
499 SQ FT ADDITION THROUGH OUT(E)SFDWL,PORCH
License Class----—_ Licrr..4 70�1�� (15)SQ FT,REMODEL THROUGH OUT 1667 SQ FT
Contractor RlC , W Date REVISION#1-ADD 77.5 SQ FT FRONT PORCH,CHANGE
I hereby affirm that 1 am licensed under the provisions of Chapter 9 ROOF FRAMING-ISSD 1/6/2015
(commencing with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Comp nsation,as provi
ded for by Section 3700 of the Labor Code,for the
ep ance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$215000
1 ve and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this APN Number:32645021.00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that l have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct. I agree to comply with all city and county ordinances and state laws relating WITHIN 180 D PERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS F M LAST CALLED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the
granting of this permit. Additionafy,the applicant understands and will comply Issued by: Date:
with all no - int source regulati s per the Cupertino Municipal Code,Section
9.18.
l RE-ROOFS:
Signature Date f All roofs shall be inspected prior to any roofing material being installed.If a roof is
installed without first obtaining an inspection,I agree to remove all new materials for
inspection.
❑ OWNER-BUILDER DECLARATION
Signature of Applicant: Date:
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
1,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
1,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. I will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.I2 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Ai Quality Management District I
performance of the work for which this permit is issued. will maintain compliance with the Cupertino Mnicipal Code,Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sc ns 550555 Hand 11 4.
Section 3700 of the Labor Code,for the performance of the work for which this (p
Owner or authorized agent; Date:
permit is issued.
I certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code,I must 1 hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save
indemnify and keep harmless the City of Cupertino against liabilities,judgments, ARCHITECT'S DECLARATION
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting ofthis permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9.18.
Signature Date
CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10405 MANN DR CONTRACTOR:RICHARD HARO PERMIT NO: 14080246
CONSTRUCTION
OWNER'S NAME: SHRIDAR SUBRAMANIAN 2150 MANGIN WAY DATE ISSUED: 10/03/2014
OWNER'S PHONE: 4083525058 SAN JOSE,CA 95148 PHONE NO:(408)532-1755
I/Y LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL E] COMMERCIAL D
499 SQ FT ADDITION THROUGH OUT(E)SFDWL, PORCH
License Class1� Lic.# �i (15)SQ FT,REMODEL THROUGH OUT 1667 SQ FT
Contractor Q 1 L tQ AMW Date 60/4(1
1 hereby affirm that 1 am licensed under the provisions of Chapter 9
(commencing with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
mance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$215000
fi-er
and will maintain Worker's Compensation Insurance,as provided for by
on 3700 of the Labor Code,for the performance of the work for which this
APN Number:32645021.00 Occupancy'Cype:
permit is issued.
APPLICANT CERTIFICATION
I certify that 1 have read this application and state that the above information is PER T EXPIRESIF ORK IS NOT S'T'ARTED
correct. 1 agree to comply with all city and county ordinances and state laws relating WITH 180 DAYS OF PERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DA FROM LAST CALLED INSPEC ION.
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally,the applicant understands and will comply Issued by: Date:
with all non-point source regulations er the Cupertino Municipal Code,Section
9.18.
RE-ROOFS:
SignatureRJX&. Date OCA .2.1-wif All roofs shall be inspected prior to any roofing material being installed.if a roof is
installed without first obtaining an inspection,I agree to remove all new materials for
inspection.
❑ OWNER-BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for one of Signature of Applicant: Date:
the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
1,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
1,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. I will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Q lity Management District I
performance of the work for which this permit is issued. will maintain compliance w' a Cupertino Munic pal Code,Chapter 9.12 and
1 have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safcty Code,S t' ns 2 505,255 n 25534.
Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: Date: lo.;
permit is issued.
I certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code,1 must l hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save
indemnify and keep harmless the City of Cupertino against liabilities,judgments, ARCHITECT'S DECLARATION
costs,and expenses which may accrue against said City in consequence of the l understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9.18.
Signature Date
CONSTRUCTION PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION f`
10300 TORRE AVENUE• CUPERTINO, CA 95014- 5 J V
9 (408)777-3228• FAX(408)777-3333• buddin cu erti o.or
CUPERTINO
❑NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION/TI REVISI /DEFERRED GINAL PERMIT
PROJECT ADDRESS %® 151 ` W ( APN#
Q,/yV��r ,e f/�� 7
OWNER NAME �[1/,!/J��f1 Q�l�j, Q.�r � /'jt`.j� E-MAIL
STREET ADDRESSihfF]7�G!//�//c/��� ✓(�'��� , /V CITY, E �M(JJ T/ /� FAX
CONTACT NAME////�/� �/� P • L/'V L�+�✓/ E �X T , `?J
S��RESW/�'j f ,4 ,/� CITY,S�V_�6 `�1
❑ OWNER ❑ OWNER-BUILDER ❑ OWNER AGENT ❑ CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑TENANT
CON Og� LICE WR LIQ SE TYPE BUS.LIC#
COMPANY NAME J E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC#
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
DESCRIPTION OF WOR JW
41 CA
10
ode 01
EXISTING USE PROPOSED USE CONSTR.TYPE #STORIES
USE TYPE OCC. SQ.FT. VALUATION(S)
EXISTG NEW FLOOR DEMO TOTAL
AREA AREA AREA NET AREA
BATHROOM KITCHEN OTHER
REMODEL AREA REMODEL AREA REMODEL AREA
PORCH AREA DECK AREATOTAL DECKIPORCH AREA GARAGE AREA: DETACH
❑ATTACH
#DWELLING UNITS: IS A SECOND UNIT [I YES SECOND STORY C]YES
BEING ADDED? ❑NO ADDITION? []NO
PRE-APPLICATION ❑YES IF YES,PROVIDE COPY OF IS THE BLDG AN ❑YES RECEIVED BY TO J VALUATION:
PLANNING APPL# ❑NO PLANNING APPROVAL LETTER EICHLER H 1E? ❑NO
By my signature below,I certify to each of the following: I am the pr erty owner or authorized agent to act on the property owner's behalf. I have read this
application and the informatio ve provided is correct. I have re he Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relat g t buil ing construct I a 2e epresentat of Cupertino to enter the a i ve-i ntif�d�operty for inspection purposes.
Signature of Applicant/Agent: Date:
SUPPLEMENTAL INFORMATION REQ PLAN CHECK YPE. RourlNGslr
New SFD or Multifamily dwellings: Apply for demolition rmit for Er OVER-rHE COUNTER' 1 ❑"BUILDINGPLAN RE«w
existing building(s). Demolition permit is required prior to issuance of building "
permit for new building. (] EXPREss ©•''PLANNING PLA IR i Ew
_Commercial Bldgs: Provide a completed Hazardous Materials Disclosure d sTnNnARD O:PVBLIcwoRxs
form if any Hazardous Materials are being used as part of this project. 1] LARGE D,,FIRE DEPT
_Copy of Planning Approval Letter or Meeting with Planning prior to
MAJOR D SANITARY SEWER DISTRICT.
submittal of Building Permit application.
❑' ENVIRONTIENTALHEALTH
BldgApp_2011.doc revised 06/21/11
c P
CONSTRUCTION PERMIT APPLICATION ��
COMMUNITY DEVELOPMENT DEPARTMENT-BUILDING DIVISIO
10300 TORRE AVENUE-CUPERTINO, CA 95014-3255
CUPERTINO (408)777-3228•FAX(408)777-3333•build ingacupertin o.ora \
❑NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION/TT ❑ REVISION/DEFERRED ORIGINAL PERMIT#
PROTECT ADDRFSS �': � qjv� t ��.-� AP'N#
TE NAME PH NE
it {
C� i
STREET ADDRESS CITY, NATE,ZIP FAX
IJ [. • E� f �� r
CONTACT NAME *�'r /� �'1 r-�-F ,�. v i. PHONE .. l " •; E-NIA11, y q♦ i'L i •�r
STREET ADDRESSCi'1'Y STATE, ZIP �q 1 F X 7
L.
❑OWNER ❑OWNER-BUILDER ❑ OWNER AGENT AcoNTRAcToR ❑CONTRACTORAGENT ❑ ARCH1rECT ❑ENGINEER ❑ DEVELOPER ❑TENANT
CONTRACT NAME LICENSE NUMBER LICENSE TYPE BUS.LIC#
ai r , �f� T.-. a9/0
COMPANY NAME : ' ;� .P_�.1 1. 'r� E-MATE �i J! r� FAX
STREETt CITY,STATE, y - PHONE •j f •y'. t:
A.
:77 1477 Ci.. LICENSE NUMBER 1 t�a BUS.LTC#
'i!OMPANY N i i" A E-MAIL i 1 FAX
'4> t-'-j: 4�t ���, ''1 '�: i 4' („ `1 •` 'JG.-'�f. : t�
}
STR ET ADDRESS CCTV,SLATE,ZIP , .+ PHONE I ry
-2 E20' _J.7 s � 1
DESt;Rt{1�;T�f�ON t)F OR
Y'v tl .-t' . , 11 +) .rt
' l
EXISTING USE PROPOSED USE CONS TIt.TYPE #STORIES r
T`i- J r2, lJ � 1/nJ USE TYPE OCC- SQ.Fr. VALUATION(5)
EXISTG I NEW FLOOR DEMO V TOTAL
AREA ° 1'�� AREA X;A d"� AREA NET AREA
BATHROOM 1 `KITCHEN OTHER `
REMODEL AREA REMODEL AREA REMODEL AREA J-/ O
PORCH AREA DECK AREA TOTAL OECK"R�'H AREA GARAGE AREA: DCTAL7i
ATTACH ZmcJej I
#DWELLING lJ1V1'rS: IS ASECOND UNIT [:]YES SECONDSTORV ❑YEs
BEING ADDED? ONO .UNHTIoN? ONO
PRE-APPLICATION ❑YES IF YES,PROVIDE COPY OF IS THE OLDG AN ❑YES RLtEtVETI$ OTAL VALUATION.
PUNNING APPL# NO PUNNING APPROVAL LF-TFA F.ICRLFR BOMF.? ❑NO
By my signature below,1 certify to each ofthe following: I am theowner or authorized agent to act o e property owner's behalf I have read this
application and the information 1,WweWovided is correct_ T have read Jhe Description of Work and verify it is accurate- I agree to comply with all applicable local
ordinances and state laws rely' Idi eonstructit I au esentadves of Cupertinio to enter the above-identified property for inspection purposes.
Signature of Applicant/Agent: — �L Date:
SUPPLEMENTAL INFORMATION REQUk ll
PLAN CHIECt[gypg ROUTING SLIP
_New SFD or Multifamily dwellings: Apply for demolition permit for nwit Tim-t OtlNTER bill"ING PIAN REYIEW
existing building(s). Demolition permit is required prior to issuance of building
permit for new building. .-ExF rt UAN1WGPLANREVIEW
_Commercial Bldgs: Provide a completed Hazardous Materials Disclosure STANDARD 0 x arwou"
form if any Hazardous Materials are being used as part of this project. 0
_Copy of Planning Approval Letter or Meeting with Planting prior to
submittal of Building Permit application. 1N.4JtHt �TITARY SE�YTaR utRTRTCT
a ENVIROT+MENTALHEALTH
BldgApp_2011.doc revised 06121111
CITY OF CUPERTINO
FEE ESTIMATOR- BUILDING DIVISION
ADDRESS: 10405 mann dr DATE: 12/03/2014 REVIEWED BY: Mendez
APN: BP#: `VALUATION: 1$12,000
°PERMIT TYPE: Building PermitPLAN CHECK TYPE: Addition
PRIMARY SFD or Duplex PENTAMATION
USE: PERMIT TYPE:
WORK REVISION #1- ADD 77.5 SQ FT FRONT PORCH CHANGE ROOF FRAMING
SCOPE
E17-- E] --i-
NOTE: This estimate does not include fees due to other Departments(i.e.Planning,Public Works,Fire,Sanitary Sewer District,School
District,etc. . These ees are based on the prelimina information available and are only an estimate. Contact the Detor addn'l info.
FEE ITEMS(Fee Resolution II-053 Ef' - J :L FEE QTY/FEE MISC ITEMS
Plan Check Fee: $0.00 Select a Misc Bldg/Structure
Suppl. PC Fee: Q Reg. 0 OT Q,0 hrs $0.00 or Element of a Building
PME Plan Check: $0.00
Permit Fee: $0.00
Suppl. Insp. Fee-(D Reg. Q OT 0,0 hrs $0.00
PME Unit Fee: $0.00
PME Permit Fee: $0.00
0
Work Without Permit? 0 Yes d No $0.00 )
Advanced Planning Fee: $0.00 Select allon-Residential E)
Building or Structure
i
Strong, Motion Fee: IBSEISMICR $1.56 1 # Revisions
Bids Stds Cornmission Fee: IBCBSC $1.00 $716.00 IREVRESADD Addition
SUBTOTALS: $2.56 $716.00 TOTAL FEE: $718.56
Revised: 10/01/2014
CITY OF CUPERTINO
FEE ESTIMATOR- BUILDING DIVISION
ADDRESS: 10405 mann dr DATE: 08/25/2014 REVIEWED BY: Mendez
APN: BP#: -VALUATION: $215,000
;-PERMIT TYPE: Building Permit PLAN CHECK TYPE: Addition
PRIMARY 2nd Unit? •Yes No PENTAMATION
USE: SFD or Duplex OTC? ®Yes (j)No PERMIT TYPE: 1 R3SFDADD
WORK 499 sq ft addition through out a sfdwl porch 15 sq ftremodel through out 1667 sq ft
SCOPE
OCCUPANCY TYPE: TYPE OF FLR AREA PC FEES PC FEE ID BP FEES BP FEE ID
CONSTR. s.f.
R-3 (Custom) II-B,111-B,IV,V-B 514 $2,654.00 IR3PLA'CK $1,666.00 IR3INSP
TOTALS: 514 $2,654.00 $1,666.00
MECH,HOURLY 0 Yes (2) No PLUMB,HOURLY Q Yes Q No ELEC,HOURLY 0 Yes (2)No
NOTE: This estimate does not include fees due to other Departments(i.e. Planning,Public Works, Fire,Sanitary Sewer District,School
District, etc. . These ees are based on the prelimina information available and are only an estimate. Contact the De t or addn'1 info.
FEE ITEMS (Fcc Resolution 11-053 L ,,7'1=73� FEE QTYIFEE MISC ITEMS
Plan Check Fee: $2,654.00 1 667 s.f. Remodel, Other
Suppl. PC Fee: Q Reg. Q OT 0.0 hrs $0.00 $5,172.00 IREMRESz
PME Plan Check: $0.00
Permit Fee: $1,666.00
Suppl. Insp. Fee:Q Reg. Q OT 0.0 hrs $0.00
PME Unit Fee: $0.00
PME Permit Fee: $0.00
0
Work Without Permit? 0 Yes 0 No $0.00 0
Advanced Planning Fee: IPLLONGR $71.96 Select a Non-Residential G
Building or Structure
i
Stroll& Motion Fee: IBSEISMICR $27.95 Select an Administrative Item
Bldg Stds Commission Fee: IBCBSC $9.00
SUBTOTALS: $4,428.911$5-7172-0-0- TOTAL FEE: $9,600.91
Revised: 07110/2014
Building Department
City Of Cupertino
10300 Torre Avenue
/Telephone:
upertino, CA 95014-3255
408-777-3228
CU P E RTI NO Fax: 408-777-3333
CONTRACTOR/ SUBCONTRACTOR LIST
JOB ADDRESS: fj /(//(/ PERMIT#
OWNER'S NAME: 106& PHONE# O,G - !-32
GENERAL CONTRACTOR: 121.6 Q BUSINESS LICENSE# Z _4044
ADDRESS:/Zl5DM&W(JJ Uf CITY/ZIPCODE: ,`j 5C
*Our municipal code requires all businesses working in the city to have a City of Cupertino business license.
NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO
BUSINESS LICENSE.
I am not using any subcontractors:
Signature Date
Please check applicable subcontractors and complete the following information:
%/ SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets & Millwork 4 f '2
Cement Finishing
Electrical
Excavation
Fencing
Flooring/Carpeting
Linoleum/Wood
Glass /Glazing
Heating
Insulation
Landscaping
2*-1i2F" V195K! � 174nepe 'D&.uv2
Masonry
Painting/Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Co tra or Signature Date
CALGREEN SIGNATURE DECLARATI
737F
F I L.
Project Name:
Project Address:
Project Description:
SECTION 1 - DESIGN VERIFICATION
Complete all lines of Section 1 —"Design Verification"and SUBMIT THE ENTIRE CHECKLIST(COLUMNS 2 AND 3)
WITH THE PLANS AND BUILDING PERMIT APPLICATION TO THE BUILDING DEPARTMENT.
The owner and design professional responsible for compliance with CalGreen Standards have reviewed the plans and
certify that the Items checked above are hereby incorporated into the project plans and will be implemented into the
project in accordance with the requirements set forth in the 2013 Califomia Green Building Standards Code as adopted by
the City of Los Altos.
Owner's Signature Date
Owner' a(Please Print)
.16,J)IO-A-19 -
Desigrf Professional's Signatu Date
Design Professional's Name(Please Print)
Signature of Green Point Rater Date
Name of Green Point Rater(Please Print) Phone No.
Email Address for Green Point Rater License No.
SECTION 2 — IMPLEMENTATION VERIFICATION
Complete,sign and submit the completed checklist,including column 3,together with all original signatures on Section 2
to the Building Department PRIOR TO BUILDING DEPARTMENT FINAL INSPECTION.
I have inspected the work and have received suffi lent documentation to verify and certify that the project identified above
was constructed in accordance with this Green B [ding Checklist and in accordance with the requirements of the 2013
California Green Building Standards C e as a ted by the City of Los Altos.
Signature o rKV
Date
i
Name of Licensed Green Point Rater(Please Print) Phoffie No.
Email address for Licensed Green Point Rater License No.
yos 1,t.TOS.�,•
2013 CALGREEN RESIDENTIAL CHECKLIST
MANDATORY ITEMS
COMMUNITY DEVELOPMENT DEPARTMENT-BUILDING DIVISION
KIRK BALLARD, BUILDING OFFICIAL
ONE NORTH SAN ANTONIO ROAD • LOS ALTOS, CA 94022-3088
(650)947-2752 • FAX(650)947-2734• WWW.LOSALTOSCA.GOV
PURPOSE:
The 2013 CALGreen Code applies to all newly constructed hotels, motels, lodging houses, dwellings,
dormitories,condominiums, shelters,congregate residences, employee housing,factory-built
housing and other types of dwellings with sleeping accommodations and new accessory buildings
associated with such uses. This section also applies to additions and alterations where there Is an
Increase in conditioned space and specifies that these requirements only apply to the specific area of
the addition or alteration. Existing site and landscaping improvements that are not otherwise
disturbed are not subject to the requirements of CALgreen.
**If your arolect totals 300 SQ. ft or less of addition and/or structural remodeled area combined
you will NOT be required to obtain a third-party rater. You will still be responsible to follow all
Residential Mandatory Measures as applicable to your project Please incorporate all pages of this
checklist except the CALGreen Signature Declaration page Into your plans**.
Project Name: S �� 'A►�l•q-kl
Project Address: /�r/I d?
Project Description, q&e -bR)P T k_-6 YdO29!&
Instructions(for projects of 300 sq.ft.or more):
1. The owner or owner's agent shall employ a licensed qualified green-pant rater(www.builditgreen.org)experienced with
the 2013 California Green Building Standards Codes to verify and assure that all required work described herein is properly
planned and implemented in the project
2. The green-point rater,in collaboration with the owner and the design professional shall review Column 2 of this
checklist,and initial all applicable measures,sign and date Section 1-Design Verification at the end of this checklist,
prior to submittal. Applicant to include these pages into the construction plans as well as provide(2)separate 8-112"x 11"
signed copies.
PRIOR TO FINAL INSPECTION BY THE BUILDING DEPARTMENT,the green-point rater shall complete Column 3
and sign and Date section 2-Implementation Verification at the end of this cheddist and submit the completed form to
the Building Department.
COLUMN 2 COLUMN 3
MANDATORY FEATURE OR MEASURE Project Verification
Requirements Rater to verify during
Rater to initial construction as
applicable measures applicable to project
prior to submitting
forms
Plan" Qesi�ln
site Development
4.106.2 A plan is developed and implemented to manage `n
storm water drainage during construction. l'
Pollutant.Control
4.504.1 Duct openings and other related air distribution component
openings shall be covered during construction.
4.504.2.1 Adhesives,sealants and caulks shall be compliant with
VOC and other toxic compound limits.
4.504.2.2 Paints,stains and other coatings shall be compliant with
VOC limits. n J
4.504.2.3 Aerosol paints and coatings shall be compliant with 'v rl
product weighted MIR limits for ROC and other toxic compounds.
4.504.2.4 Documentation shall be provided to verify that compliant
VOC limit finish materials have been used.
4.504.3 Carpet and carpet systems shall be compliant with VOC
limits. n
4.504.4 80 percent of floor area receiving resilient flooring shall `v
comply with the VOC-emission limits defined in the Collaborative for
High Performance Schools(CHPS) High Performance Products
Database or be certified under the Resilient Floor Covering Institute
(RFCI)FloorScore program;or meet California Dept.of Public
Health,"Standard Method for the Testing and Evaluation of Volatile
Organic Chemical Emissions from Indoor Sources Using
Environmental Chambers",Version 1.1,February 2010(also known
as Specification 01350.
4.504.5 Particleboard, medium density fiberboard(MDF)and +,
hardwood plywood used in interior finish systems shall comply with N
low formaldehyde emission standards.
Interior Moisture Control
4.505.2 Vapor retarder and capillary break is installed at slab on-
grade foundations. ,�, '•
4.505.3 Moisture content of building materials used in wall and floor
framing is checked before enclosure. P4
1
Environmental Comfort
4.507.2 Duct systems are sized,designed,and
equipment is selected using the following methods: ! '
1. Establish heat loss and heat gain values according to ANSI/ rf
ACCA 2 Manuel J-2004 or equivalent. �,••'�
2. Size duct systems according to ANSI/ACCA 1 Manual D-2009 or
equivalent.
3. Select heating and cooling equipment according to ANSI/ACCA
3 Manual S-2004 orequivalent.
l natallar and Agmial Inai w or Qualffl-caflom
Qualifications
702.1 HVAC system installers are trained and certified in the
proper installation of HVAC systems.
702.2 Special inspectors employed by the enforcing agency must
be qualified and able to demonstrate competence in the discipline
they are inspecting.
Verifications
703.1 Verification of compliance with this code may include
construction documents,plans,specifications builder or installer
certification,inspection reports,or other methods acceptable to the
enforcing agency which show substantial conformance
1. Green building measures listed in this table may be mandatory if adopted by a city, county,or city and county as
specified in Section 101.7
2. Required prerequisite for this Tier.
3. These measures are currently required elsewhere in statute or in regulation
4.106.3 Construction plans shall indicate how site grading or
a drainage system will manage all surface water flows to
keep water from entering buildings.
General
4.201.1 Building meets or exceeds the requirements of the
California Building Energy Efficiency Standards3.
j& of ftakway aim Conurrm9-0
Indoor Water Use
4.303.1. Plumbing fixtures(water closets and urinals)and fittings
(faucets and showerheads)installed in residential buildings shall
comply with the prescriptive requirements of Sections 4.303.1.1 L�
through 4.303.1.4.4. '�J
4.303.2 Plumbing factures and fittings required in Section 4.303.1
shall be installed in accordance with the Califomia Plumbing Code,
and shall meet the applicable referenced standards. ►
Outdoor Water Use
4.304.1 Automatic irrigation systems controllers installed at the time
of final inspection shall be weather or soil moisture-based.
NktMM- MUMd ft" OO Ef ftIVA
Enhanced Dumblifty and Reduced Maintenance
4.406.1 Annular spaces around pipes,electric cables,conduits or �`
other openings in plates at exterior walls shall be protected against
the passage of rodents by closing such openings with cement
mortar, concrete masonry or similar method acceptable to the
enforcing agency.
Construction Waste Reduction, Disposal and Rec On
4.408.1 Recycle and/or salvage for reuse a minimum of 50 percent
of the nonhazardous construction and demolition waste in
accordance with one of the following:
1. Comply with a more stringent local construction and demolition
waste management ordinance;or
2. A construction waste management plan per Section 4.408.2;or
3. A waste management company per Section 4.408.3;or
4. The waste stream reduction alternative per Section 4.408.4.
Building Maintenance and Operation
4.410.1 An operation and maintenance manual shall be provided to
the building occupant or owner.
EbLVIRQNMZNT
Flee laces
4.503.1 Any installed gas fireplace shall be a direct-vent sealed-
combustion type. Any installed woodstove or pellet stove shall
comply with US EPA Phase II emission limits where applicable. VA
Woodstoves,pellet stoves,fireplaces shall also comply with
applicable local ordinances.
UTILITY RELEASE REQUEST FORM
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
CUPERTINO 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255
(408)777-3228• FAX(408)777-3333•buildingo1cuoertino.org
PURPOSE
For residential single family or duplex construction,there are cases where gas and electric utilities are
requested to be released prior to the issuance of the certificate of occupancy. Upon approval from the
building inspector, the City of Cupertino is allowing both utilities to be released prior to the final sign-off of
the building.
INSTRUCTIONS
1. Download this form at: http://v;mv.cupertino.or2/index.aspx?pa2e=297.
2. Complete the form and obtain signatures from both the owner of the property and the primary contractor.
3. Fax, E-Mail, Mail or hand deliver the original signed form to:
City of Cupertino
Building Division
Attn: Utility Release Request Form 408-777-3228 office
10300 Torre Ave. 408-777-3333 fax
Cupertino, CA 9,5014 buildingacu ertino.org
4. Schedule a Gas Meter Release inspection (4403) and/or Electric Meter Release inspection (9404). Please
note, a Gas Test inspection (#506) is required prior to or at the same time of the Gas Meter Release
inspection.
BUILDING INFORMATION (Please complete the following information):
APN � �Dn t BLDG PERMIT#: ` DATE:SITE
ADDRESS:
OWNER'S NAME' PHONE#:
R-SV A RAM")/l FAX#:
MAILING ADDRESS (if different from site address):
l O 110 ' 14N N o
COW^f'(IGO !"�T�"O FAX#E#: � S • �'L •I
COcP�fL� - Pte; : 40$
I request the City to release my utilities prior to obtaining a final inspection approval for the building. I fully understand the occupants of
the building cannot move into the residence until they receive all of the required final sign-offs and the City has issued a certificate of
occupancy for the b 'Idin .
Owner:................... ....Print:.... ........Date:...... . .�..Ct.. ...
Contractor:. ........................Print:..... ............. ...... '. . ..........................Date:...... ... . . . .. .. ....
UtilitvReleaseForm 2011.doc revised 08/09/11
SimSan Jose
Water San Jose Water Company
Company Water Services Administration
1265 S.Bascom Ave.,San Jose,CA 95128
1265 S. Bascom Ave. Facsimile: 1 408 279-7889
San Jose,CA 95128-3514 Writer's Direct Dial: 1 408 279-7983
March 9, 2015
ZVEW
RECEIVE11)
MAR 11 2015
Shridar Subramanian
10405 Mann Drive
Cupertino, CA._95014 B-------
� 7 Ueyod- 4(p
Reference: 10405 Mann Drive, Cupertino
Dear Mr. Subramanian:
The purpose of this letter is to inform you of the procedures you need to follow to finalize
the installation of a new water service for this project. You will be required to hire a contractor to
perform the service installation work to our standards and under our inspection. It is suggested,
but not required, that you contact one of our general contractors to have this work performed.
They are West Valley Construction at (408) 371-5510, and Lewis & Tibbitts at (408) 925-0220.
In any case, your contractor must possess a valid license to perform this type of work, and must
obtain a permit from the City of Cupertino to perform the work.
Based on the data that was provided on our water service questionnaire, our Engineering
Department has determined that a 1%" copper service with a check valve and pressure regulator
is required for this house. The piping from the check valve/meter to the house should be 2" in
size. By copy of this letter, we are informing the City of Cupertino of our determination, and I
have enclosed our standard service drawing that details an approved installation. The
meter/check valve (service connection) defines the point at which you receive service, and the
point where the owner's piping begins. The owner of the property is responsible for all piping
and equipment past the check valve.
Please note that in addition to the check valve in the meter box, you must also install a
rubber seated single check valve (property of the owner) on the internal plumbing of the house.
The location of the check valve must be where the fire sprinkler piping tees off from the domestic
piping. Also, the water pressure in this area is over 80 PSI. San Jose Water Company
recommends that a pressure regulator be installed on private service lines that will prevent
pressure in excess of 80 PSI from entering the structure. Please contact your plumber regarding
this matter.
4
i
• CALGREEN RESIDENTIAL CHECKLIST - MANDATORY
ITEMS
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
CUPERTINO ALBERT SALVADOR, P.E.,C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE •CUPERTINO,CA 95014-3255 S �
(408)777-3228• FAX(408)777-3333•buildingQcupertino.org
PURPOSE: ` ' -
The 2013 CalGreen Code applies to all newly constructed hotels, motels, lodging houses, dwellings,
dormitories, condominiums, shelters, congregate residences, employee housing, factory-built housing and
other types of swellings with sleeping accommodations and new accessory buildings associated with such
uses. Existing site and landscaping improvements that are not otherwise disturbed are not subject to the
requirements of CALGreen.
Project Name: 54112A6-12 x;0,61401, Jf ALIAA,�` A1-21921TI©Al
Project Address: 1-04p.S d'Zaw doz ,
Project Description: ADZ)1A,6 4WF & a-bm. =WQp Q 3 Zgv, ,
Instructions:
1. The Owner or the Owner's agent shall employ a licensed professional experienced with the California
Green Building Standards Codes to verify and assure that all required work described herein is properly
planned and implemented in the project. ,,p
2. The licensed professional, in collaboration with the owner andbe de�igri` rofessional shall initial Column
2 of this checklist, sign and date Section 1 - Design Verification'atthe e d of this checklist and have the
checklist printed on the 1ppr9ved plans for the project.
3. Prior to final inspection by the Building Department, the licensed professional shall complete Column 3
and sign and date Section 2 - Implementation Verification at the end of this checklist and submit the
completed form to the Building Inspector.
Column 2 Column 3
MANDATORY FEATURE OR MEASURE Project Verification
Requirements
. .
.1 PLANNING AND DESIGNs
t �
ii n, and Desl<gnP Site Deve[opment
4.106.2 Storm water drainage and retention during construction. A plan is
developed and implemented to manage storm water drainage during ❑X ❑
construction.
4.106.3 Grading and paving. The site shall be planned and developed to
keep surface water away from buildings. Construction plans shall indicate how ® ❑
site grading or a drainage system will manage all surface water flows.
Page 1 of 5 CalGreen_2014.doe revised 01/15/14
1
A4.2 '
6eneraf
4.201.1 Low-rise residential buildings shall meet or exceed the minimum
standard design required by the California Energy Standards.
A4.3 WATER EFFICIENCY 1 CONSERVATION
indoor Water Us+
4.303.1 Water conserving plumbing fixtures and fittings. Plumbing fixtures
(water closets and urinals)and fittings (faucets and showerheads)shall comply
with the following:
❑ 4.303.1.3.2 Water Closets.The effective flush volume of all water closets
shall not exceed 1.28 gallons per flush. Tank-type water closets shall be
certified to the performance criteria of the U.S. EPA WaterSense
Specifications for Tank-type Toilets.
❑ 4.303.1.3.2 Urinals. The effective flush volume of urinals shall not
exceed 0.5 gallons per flush.
❑ 4.303.1.3.1 Single Showerheads. Showerheads shall have a maximum
flow rate of not more than 2.0 gallons per minute at 80 psi. Showerheads
shall be certified to the performance criteria of the U.S. EPA WaterSense
Specification for showerheads.
❑ 4.303.1.3.2 Multiple Showerheads serving one shower. When a
shower is served by more than one showerhead,the combined flow rate of
all showerheads and/or other shower outlets controlled by a single valve
shall not exceed 2.0 gallons per minute at 80 psi,or the shower shall be
designed to allow only one shower outlet to be in operation at a time.
❑ 4.303.1.4.1 Residential lavatory faucets. The maximum flow rate of
residential lavatory faucets shall not exceed 1.5 gallons per minute at 60
psi. The minimum flow rate of residential lavatory faucets shall not be less
than 0.8 gallons per minute at 20 psi.
❑ 4.303.1.3.2 Lavatory faucets in common and public use areas. The
maximum flow rate of lavatory faucets installed in common and public use
areas (outside of dwellings or sleeping units) in residential buildings shall
not exceed 0.5 gallons per minute at 60 psi.
❑ 4.303.1.4.3 Metering faucets. Metering faucets when installed in
residential buildings shall not deliver more than 0.25 gallons per cycle.
❑ 4.303.1.4.4 Kitchen Faucets. The maximum flow rate of kitchen faucets
shall not exceed 1.8 gallons per minute at 60 psi. Kitchen faucets may
temporarily increase the flow above the maximum rate, but not to exceed
2.2 gallons per minute at 60 psi, and must default to a maximum flow rate
of 1.8 gallons per minute at 60 psi.
4.303.2 Standards for plumbing fixtures and fittings. Plumbing fixtures
and fittings shall be installed in accordance with the California Plumbing Code,
and shall meet the applicable standards referenced in Table 1401.1 of the
California Plumbing Code.
Page 2 of 5 CalGreen 2014.doe revised 01115114
Outdoor NNater Use
4.304.1 Irrigation controllers. Automatic irrigation systems installed at the
time of final inspection shall be weather-based.
❑ 4.304.1.1 Controllers shall be weather-or soil moisture-based controllers
that automatically adjust irrigation in response to changes in plants' needs
as weather conditions change.
❑ 4.304.1.2 Weather-based controllers without integral rain sensors or
communication systems that account for local rainfall shall have a separate
wired or wireless rain sensor which connects or communicated with the
controller(s). Soil moisture-based controllers are not required to have rain
sensor input.
A4.4 MATERIAL
t
Enhanced Or III and R;ed ce 11 me n x
I
4.406.1 Rodent proofing. Annular spaces around pipes, electric cables,
conduits, or other openings in plates at exterior walls shall be protected
against the passage of rodents by closing such openings with cement mortar,
concrete masonry or similar method acceptable to the enforcing agency.
w
Cc nstructlon Waste Reduc ion isposal and 4k,
4.408.2 Construction waste management plan. Where a local jurisdiction
does not have a construction and demolition waste management ordinance, a
construction waste management plan shall be submitted for approval to the
enforcing agency.
Buildhng Maintenance and C3peratron T A
4.410.1 Operation and maintenance manual. At the time of final inspection,
an operation and maintenance manual shall be provided to the building
occupant or owner.
. .
.5 ENVIRONMENTAL QUALITY
Al
T laces 5
� 3
4.503.1 General. Install only a direct-vent sealed-combustion gas or sealed
wood-burning fireplace, or a sealed woodstove.
Pollutant Control
4.504.1 Covering of duct openings and protection of mechanical
equipment during construction. Duct openings and other related air 0
distribution component openings shall be covered during construction.
4.504.2.1 Adhesives, sealants and caulks. Adhesives, sealants and caulks
shall be compliant with VOC and other toxic compound limits.
4.504.2.2 Paints and coatings. Paints, stains and other coatings shall be
compliant with VOC limits.
4.504.2.3 Aerosol paints and coatings. Aerosol paints and other coatings
shall be compliant with product weighted MIR Limits for ROC and other toxic 0
compounds.
Page 3 of 5 CalGreen_2014.doc revised 01/15/14
4.504.2.4 Verification. Documentation shall be provided to verify that ,
compliant VOC limit finish materials have been used. ® ❑
4.504.3 Carpet Systems. Carpet and carpet systems shall be compliant with ❑
VOC limits.
4.504.4 Resilient flooring systems. Eighty (80) percent of floor area
receiving resilient flooring shall comply with the VOC-emission limits defined in
the Collaborative for High Performance Schools (CHPS) Low-emitting ❑X ❑
Materials List or be certified under the Resilient Floor Covering Institute (RCFI)
FloorScore program.
4.504.5 Composite wood products. Particleboard, medium density
fiberboard (MDF), and hardwood plywood used in interior finish systems shall ❑X ❑
comply with low formaldehyde emission standards.
InterldeMol'A'Urd�Gontrol� E ''
4.505.2 Concrete slab foundation. Required vapor retarders and capillary © ❑
breaks are also required to comply with CalGreen Section 4.505.2.1.
4.505.3 Moisture content of building materials. Moisture content of building ® ❑
materials used in wall and floor framing is checked before enclosure.
Indoor Alr Quality and exhaust'
4.506.1 Bathroom exhaust fans. Exhaust fans which terminate outside the © ❑
building are provided in every bathroom.
777
Ent' I Comfort
4.507.2. Duct systems are sized and designed and equipment is selected
using the following methods:
1. Establish heat loss and heat gain values according to ACCA Manual J or
equivalent. ❑
2. Size duct systems according to ACCA 29-D (Manual D)or equivalent.
3. Select heating and cooling equipment according to ACCA 36-S (Manual S)
or equivalent.
INSTALLER AND SPECIAL - QUALIFICATIONS
Qualifications
702.1 Installer training. HVAC system installers are trained and certified in ® ❑
the proper installation of HVAC systems.
702.2 Special inspection. The Licensed Professional responsible to verify
CALGreen compliance is qualified and able to demonstrate competence in the X❑ ❑
discipline they inspect and verify.
.Yerificatlons
703.1 Documentation. Verification of compliance with CALGreen may
include construction documents, plans, specifications, builder or installer
certification, inspection reports, or other methods acceptable to the enforcing ❑
agency which show substantial conformance. Implementation verification shall
be submitted to the Building Department after implementation of all required
measures and prior to final inspection approval.
Page 4 of 5 CalGreen_2014.doc revised 01115114
r
Shridar Subramanian
March 9, 2015
Page Two
If you would like to proceed with the service work, please sign, date, and return the copy
of this letter with a construction deposit as discussed below. Also include the address where the
monthly billings should be sent. Monthly billings start when the meter is installed, and a copy of
our rate schedule is enclosed for your information.
You must also submit a deposit in the amount of $2,222.00 to cover the cost of our
reviews and inspection, and the purchase and installation of the new meter, pressure regulator and
check valve. Please make your check payable to San Jose Water Company.
At the appropriate time, you will need to provide our Construction Department at least one
week notice for inspection services. Your contact is Daryl Lambert, who can be reached at (408)
279-7830. A San Jose Water Company inspector must witness the actual tap of the water main.
Once the service lateral and meter box have been installed and approved, we can install the meter
and check valve at your request.
If you have any questions, or require further information, please contact me at(408) 279-
7800, extension 5805.
Sincerely,
Jay Coito
Water Services Representative
JC:bt
Enclosures
FIP#15-030
cc: Building Department,City of Cupertino
Richard Haro Drafting and Planning
ACKNOWLEDGED AND AGREED MONTHLY BILLINGS TO:
Responsible Party Name
Signature Address
Print Name City
Date Phone Number
CALGREEN SIGNATURE DECLARATIONS
,.,_. �._CtCS.IYt- ..,_C?��--.L2�Cl_�-�►�1 �_
qr� �e cae 1�n� Ki+ehf�n a�► K;�c hen e,����n5 re l4 ec,�dn� FAu t� wn fc
SECTION DESIGN VERIFICATION
C;fi JeCtiO'- . - esigl Veril cat,onand ui is __>r piotUad cneckiist(c lu ns 1 a :,i a^ i
?L3 ifie F3UIlCairt^t��;^.cf;r _. ,.
. _ n�ris>s �:nai reso, cnshe cor,nlian_.. .. -+( a.G: er Smrdards havere:ise_he utnom z_
:`'.2CKP B: GI•'e 8C?IlBfeC}'incort Orc?tu { !-.1. tle "f tl C n, t e d {
C', plaans a. d kill be mple,� er ire°o ���e
pit,' p r Gu reme�;ts set ert^in the Zliforr�ia Green, Build°r.g Standards. Come
T .
F
{ 1
A `f
Lc,+
r� IN 2 - IMPLEMENTATION VERIFICATION
`..i;?i''-lt`: ::1'n(JetG'dli2CK)lSi. 1tli�ll dl^ij c,)iUilm 3,together v,,!h all oris final signatures o1'. S@Ctior!
or to 3LIi'dlrtg Deoazrtment '^a7F C44n„
Y: F ave,eresV8d ;t+do_u rr,F`.`.ation `o;/erif a,r,:Ce;t!N 4 hal the.DrGjG'Ct iden6 e
;G'ja ,. .o-+, itl.S G:Gs!)3 1:,+ *he kl'st ...0 .l accordance wi'h`he rein!
i bre_n :'=i.Acim Standards i..tjCe ai adoc te''i.1v ti C;fy of CLireruno.
Y
i
t