Loading...
B-2017-1555 • CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO:B-2017-1555 21317 METEOR DR CUPERTINO,CA 95014-1323(326 43 003) BAY AREA SOLAR SOLUTIONS INC PLEASANTON,CA 94588 OWNER'S NAME: FU HAI-YEN AND SHIAN-YAW TRUSTEE DATE ISSUED:09/12/2017 • OWNER'S PHONE:408-930-7393 PHONE NO:(925)380-9500 LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: License Class C-10 Lic.#928652 Contractor BAY AREA SOLAR SOLUTIONS INC Date 02/28/2019 X BLDG _ELECT _PLUMB MECH X RESIDENTIAL_COMMERCIAL I hereby affirm that I am licensed under the provisions of Chapter 9(commencing • with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. JOB DESCRIPTION: (N) 17-PANEL ROOF MOUNTED PV SYSTEM(5.6 KW) f hereby affirm under penalty of perjury one of the following two declarations: • 1. I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. • t , I have and will maintain Worker's Compensation Insurance,as provided for by ,.ection 3700 of the Labor Code,for the performance of the work for which this j .ermit'is issued. Sq.Ft Floor Area: Valuation:$19500.00 APPLICANT CERTIFICATION I certify that I have read this application and state that the above information'is correct.I agree to comply with all city and county ordinances APN Number: Occupancy Type: and state laws relating to building construction,and hereby authorize 326 43 003 representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save indemnify and keep harmless the • City of Cupertino against liabilities,judgments,costs,and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue against said City in consequence of the granting of this permit. WITHIN 180 DAYS OF PERMIT ISSUANCE OR Additionally,,jthe'applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. 180 DAYS FROM LAST CALLED INSPECTION. gnature ' Date 9/12/2017 Issued by:Abby Ayende Date:09/12/2017 OWNE -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the RE-ROOFS: following two reasons: All roofs shall be inspected prior to any roofing material being installed.If a roof is 1. I,as owner of the property,or my employees with wages as their sole installed without first obtaining an inspection,I agree to remove all new materials for compensation,will do the work,and the structure is not intended or offered for inspection. sale(Sec.7044,Business&Professions Code) 2. I,as owner of the property,am exclusively contracting with licensed Signature of Applicant: contractors to construct the project(Sec.7044,Business&Professions Code). Date:9/12/2017 • I hereby affirm under penalty of perjury one of the following three declarations: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER 1. I have and will maintain a Certificate of Consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance,as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code,for the performance of the work for which this California Health&Safety Code,Sections 25505,25533,and 25534. I will permit is issued. maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the 3. I certify that in the performance of the work for which this permit is issued,I Health&Safety Code,Section 25532(a)should I store or handle hazardous material. Additionally,should I use equipment or devices which emit hazardous shall not employ any person in any manner so as to become subject to the air contaminants as defined by the Bay Area Air Quality Management District I Worker's Compensation laws of California. If,after making this certificate of 'will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and exemption,I become subject to the Worker's Compensation provisions of the the Health&Safety Code,Secti s 25505,25533,and 25534. Labor Code,I must forthwith comply with such provisions or this permit shall /0 e p� be deemed revoked. miner or authorized agent: / 01 APPLICANT CERTIFICATION Date:9/12/2017 • I certify that I have read this application and state that the above information is Ci T• CTION LE DIN AGENCY correct.I agree to comply with all city and county ordinances and state laws I hereby affirm that there is a construction lending agency for/ e performance relating to building construction,and hereby authorize representatives of this city of work's for which this permit is issued(Sec.3097,Civ C.) to enter upon the above mentioned property for inspection purposes. (We)agree Lender's Name to save indemnify and keep harmless the City of Cupertino against liabilities, judgments,costs,and expenses which may accrue against said City in Lender's Address • consequence of the granting of this permit. Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal ARCHITECT'S DECLARATION Code,Section 9.18. I understand my plans shall be used as public records. • Licensed Signature Date 9/12/2017 Professional Brzoi4, isGS • . . \��// ALTERNATIVE ENERGY PERMIT APPLICATION AE ....._. i�y� COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION st��.,nsJ 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 (408)777-3228•FAX(408)777-3333•building aecupertino.ore CUPERTINO PROJECT ADDRESS AIN# 21317 METEOR DRIVE 326-430-03 OWNER NAME MICHAEL FU PHONE 408-930-7393 mfu66�)a,yahoo.com STREET ADDRESS 21317 METEOR DRIVE cITY,sTATE,ZIP CUPERTINO Fax . ' CONTACT NAME John Woolway PHONE 9253809500 E-MAIL STREET ADDRESS CITY,STATE,ZIP FAX - 6700 Santa Rita Rd Pleasanton,CA,94588 ❑OWNER 0 OWNER-BUILDER 0 OWNER AGENT 0 CONTRACTOR Mt/CONTRACTOR AGENT ❑ ARCHITECT 0 ENGINEER 0 DEVELOPER 0 TENANT CONTRACTOR NAME LICENSEUMBER LICENSE TYPE BUS.LIC# Lou Zughbaba COMPANY NAME E-MAIL FAX Your Energy Solutions Lou.Zughbaba@yourenergysolutions.com STREET ADDRESS CITY,STATE,ZIP PHONE 6700 Santa Rita Rd Pleasanton,CA,94588 9253809500 ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC# COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OP I!0 SFD or Duplex 0 Multi-Family PROJECT IN WILDLAND PROJECT IN STRUCTURE: CI Commercial URBAN INTERFACE AREA 0 Yes liiNo FLOOD ZONE 0 Yes pfNo SOLAR PANELS 0 ELECTRIC VEHICLE CHARGING STATION 0 SOLAR WATER HEATING 0 OTHER FOR SOLAR PANELS: NUMBER OFPANELS/UNITS: KILOWATTS(COMMERCIAL ONLY): TOTAL VALUATION: 17 5 670 $19,5nn DESCRIPTION OF WORK Instillation pf 17 Panels system size:5.610 RECEIVED BY _ . ,,A By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the property owner's beh f. I hav rad this application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating to buil - co/usi�xucttioo'n.l I authorize representatives of Cupertino to enter the above-identified property for inspection purposes. Signature of Applicant/Agent: 2 W99Date: 8131/17 SUP AL INFORMA N REQUIRED ., OFFICE USE ONLY,, W,. ❑ OVER THE COUNTER s >, xx'' 0 EXPRESS r.4;:'e U" a❑ STANDARD AF s❑. LARGE A,'', . ::.1,;.. .P.MA;JOR , .TF•a .@ . a'' PVApp_2011.doc revised 03/16/11 SMOKE / CARBON MONOXIDE ALARMS OWNER CERTIFICATE OF COMPLIANCE • y;ass. COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION CUPERTINO 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 (408)777-3228•FAX(408)777-3333•buildinqOcupertino.orq PERMITCANNOT BE FINHI ALED UNTIL'TS CERTIFICATE HAS BEEN COMPLETED,,,SIGNED AND RETURNED TO THE BUILDING DIVISION PURPOSE This affidavit is a self-certification for the installation of all required Smoke and Carbon Monoxide Alarms for , compliance with 2016 CRC Section R314, R315,2016 CBC Sections 420.6 and 907.2.11.2 where no interior access for inspections are required. GENERAL INFORMATION Existing single-family and multi-family dwellings shall be provided with Smoke Alarms and Carbon Monoxide alarms: When the valuation of additions, alterations,or repairs to existing dwelling units exceeds $1000.00, CRC Section R314,R315, and CBC Sections 907.2.11.5 and 420.6 require that Smoke Alarms and/or Carbon Monoxide Alarms be installed in the following locations: AREA SMOKE ALARM CO ALARM Outside of eachseparate sleeping area in the immediate vicinity of the X X bedroom(s)-(Smoke alarms shall not be located within 3 feet of bathroom door) On every level of a dwelling unit including basements and habitable attics X X Within each sleeping room X Carbon Monoxide alarms are not required in dwellings which do not contain fuel-burning appliances and that do not have an attached garage. Carbon monoxide alarms combined with smoke alarms shall comply with CBC Section 420.6 and shall be approved by the Office of the State Fire Marshal. Power Supply:In dwelling units with no commercial power supply, alarm(s)may be solely battery operated. In existing dwelling units, alarms are permitted to be solely battery operated where repairs or alterations do " not result in the removal of wall and ceiling finishes or there is no access by means of attic,basement or crawl space. Refer to CRC Section R314 and CBC Sections 907.2.11.4 and 420.6.2. An electrical permit is required for alarms which Must be connected to the building wiring. As owner of the:above-referenced property, I hereby certify that the alarm(s) referenced above has/have been installed in accordance with the manufacturer's instructions and in compliance with the California Building and California Residential Codes.The alarms specified below have been tested and are operational, as of the date signed below. Address: j 13/7 /�e4-e0 Permit No. �z,�r✓pl�-/SSS Specify Number of Alarms: #Smoke Alarms: 'i I #Carbon Monoxide Detectors: ` I— /have read and agree to comply with the terms and conditions of this statement Owner((oorrjOw/neer Agents)Name: �� "L lam" . Signature Date: Contractor Name: l Signature Lic.# Date: Smoke and CO form.doc revised 01/10/2017 1 2 9/5/2017 - BAY AREA SOLAR SOLUTIONS dba YOUR ENERGY SOLUTIONS 6700 Santa Rita Road #E, Pleasanton, CA 94588 Phone: (888) 888-0711 CSLB #928652 (B, C-10) EXP. 02/28/2019 X____________ ______________ ISSUED FOR: PERMIT DATE: Solar Photovoltaic System 8/28/2017 MICHAEL FU 21317 METEOR DRIVE CUPERTINO, CA, 95014 PV-1 PROJECT INFORMATION VICINITY MAP SHEET INDEX APPLICABLE CODES PLAN SET LEGEND SUB SERVICE PANEL AC DISCONNECT DC DISCONNECT SOLAR LOAD CENTER INVERTER SUB AC DC SLC INV JUNCTION BOX JB COMBINER BOX CB ABBREVIATIONS EXTERIOR INTERIOR EXT INT NEW (N) EXISTING (E) ELECTRICAL METALLIC TUBING EMT RIGID METALLIC TUBING RMT VOLTAGE OPEN CIRCUIT VOC VOLTAGE AT MAX. POWER VMP SHORT CIRCUIT CURRENT ISC CURRENT AT MAX. POWER IMP AHJ NOTES PV MONITORING METER M NOT TO SCALE NTS OCCUPANCY: R-3 CONSTRUCTION TYPE: VB UNSPRINKLERED MAIN SERVICE PANEL MSP PROJECT INFORMATION ALL WORK TO COMPLY WITH THE FOLLOWING CODES: 2016 CA BUILDING CODE 2016 CA RESIDENTIAL CODE 2016 CA MECHANICAL CODE 2016 CA ELECTRICAL CODE 2016 CA GREEN CODE 2016 CA PLUMBING CODE 2016 CA ENERGY CODE 2016 CA FIRE CODE PV-1 PROJECT INFORMATION PV-1A SITE PLAN, HOUSE PHOTO PV-2 ROOF PLAN PV-2A ATTACHMENT DETAILS PV-3 ELECTRICAL LINE DIAGRAM & ELECTRICAL CALCULATIONS PV-3A ELECTRICAL NOTES PV-4 & 4A REQUIRED SIGNAGE ENPHASE AC SOLAR PV EN COMBINER BOX CITY PERFORMANCE PM MAIN BREAKER ONLY UM/MB UTILITY METER & METER RAPID SHUTDOWN BOX RS 17 X 330 W LG Electronics LG330E1C-A5 ROOF MOUNTED SOLAR PHOTOVOLTAIC MODULES 17 X 290 W Enphase Energy IQ6PLUS-72-2-US SYSTEM SIZE: 5.610 kW DC STC, 4.782 kW AC ARRAY AREA: 313 SF AHJ: CITY OF CUPERTINO APN: 326-430-03 MICHAEL FU 21317 METEOR DRIVE CUPERTINO, CA 95014 PROJECT SITE ELECTRIC VEHICLE EV CHARGER 09/12/17 B-2017-1555 Abby Ayende SEAN HATCH 09/12/17 SEAN HATCH 09/12/17 WITH ALUMINUM FLASHING ALUMINUM "L" BRACKET QUICKMOUNT ATTACHMENT UNIRAC RAIL 5/16" STAINLESS STEEL LAG BOLT MIN. 2.5"PENETRATION SEALED W/ M1 SEALANT (E) ROOF FRAMING, SEE ROOF INFO MATCH (E) ROOF SLOPE PV MODULES 514" 1 2 9/5/2017 - BAY AREA SOLAR SOLUTIONS dba YOUR ENERGY SOLUTIONS 6700 Santa Rita Road #E, Pleasanton, CA 94588 Phone: (888) 888-0711 CSLB #928652 (B, C-10) EXP. 02/28/2019 X____________ ______________ ISSUED FOR: PERMIT DATE: Solar Photovoltaic System 8/28/2017 MICHAEL FU 21317 METEOR DRIVE CUPERTINO, CA, 95014 PV-2A ATTACHMENT DETAILS SCALE: 1/2" = 1'-0" ATTACHMENT DETAIL SEAN HATCH 09/12/17 1 2 9/5/2017 - BAY AREA SOLAR SOLUTIONS dba YOUR ENERGY SOLUTIONS 6700 Santa Rita Road #E, Pleasanton, CA 94588 Phone: (888) 888-0711 CSLB #928652 (B, C-10) EXP. 02/28/2019 X____________ ______________ ISSUED FOR: PERMIT DATE: Solar Photovoltaic System 8/28/2017 MICHAEL FU 21317 METEOR DRIVE CUPERTINO, CA, 95014 SINGLE LINE DIAGRAM SCALE: N.T.S. ELECTRICAL SINGLE LINE DIAGRAM 600 V, NEMA 3R W/ EUROSTRIP OR POLARIS IT CONNECTORS JUNCTION BOX A E ELECTRICAL EQUIPMENT CALLOUTS STRINGS CONNECTED IN PARALLEL SEE PV-3A FOR ELECTRICAL NOTES PV BREAKER IS TO BE LOCATED AT THE OPPOSITE END OF THE BUS BAR FROM THE MAIN BREAKER. MODULES ARE CONNECTED IN PARALLEL, NOT IN SERIES. EACH MICROINVERTER IS EQUIPPED WITH RAPID SHUTDOWN CAPABILITIES. PV-3 TO UTILITY GRID BI-DIRECTIONAL UTILITY METER 1PH, 120/240V, 3W IRREVERSIBLE GROUNDING CONNECTION BOND TO EXISTING UFER E JB A PV BREAKER 240 V, A, 2P 20 PV BREAKER 240 V, A, 2P 20 B LOW MEAN TEMP PER ASHRAE HANDBOOK MFR VOLTAGE TEMP COEFFICIENT (oC) VOLTAGE LOW TEMP. CORR. (oC) HIGH AMBIENT TEMP (oC) CONDUIT HEIGHT (in) ROOF TOP ADDED TEMP PER Table 310.15(B)(3)© (oC) ADJUSTED TEMP TEMP CORRECTION ROOF 0 -0.27 1.07 32 0.5-3.5 22 54 .76 WALL 0 32 N/A 0 32 .96 5.610kW DC STC, 4.782 kW AC SOLAR ARRAY 17 LG Electronics 330W MODULES TOTAL PANEL DECAL LG Electronics LG330E1C-A5 330W Vmp= 33.7V Voc= 40.9V Isc= 10.45A Imp= 9.8A CEC PTC POWER=306.3W Enphase Energy IQ6PLUS-72-2-US INVERTER MAX DC VOLTAGE: 62V DC VOLTAGE INPUT RANGE: 16-62V @240V PEAK POWER TRACKING VOLTAGE: 27-45V @240V AC NOMINAL VOLTAGE/RANGE: 211-264V @240V MAX AC OUTPUT CURRENT: 1.17A CEC WEIGHTED EFFICIENCY: 97% @240V 0.29kW INVERTER UNGROUNDED ENPHASE ENERGY IQ6PLUS-72-2-US (240V) INVERTER 240 VAC, 1.17 A NEMA 3R, UL LISTED, (WITH INTEGRATED DC DISCONNECT) (E) 125A MAIN SERVICE PANEL (E) MAIN SERVICE DISCONNECT 240V, 125A NOT CENTER FED 2-POLE 25A PV BREAKER, BACKFED MAX PV VOLTAGE & CURRENT CALCS: RECORD LOW TEMP (˚C): (PER ASHRAE HANDBOOK) TEMP COEFFICIENT (Voc) PER MANUFACTURER: -0.27%/C VOLTAGE CORRECTION: 1.07 MAX PV SYSTEM VOLTAGE (PER CEC 2016 690.7): (Vcorrection * Voc) (1.07*40.9) = 43.8V MAX PV CONTINUOUS CURRENT PER CEC 2016 690.8(A)(1): 1.25 X Isc X # STRINGS 1.25*10.45 = 13.06A 120% RULE BUS BAR MAIN BREAKER ALLOWED MAX PV OCPD 125 125 25 WIRE TAG # CONDUIT WIRE QTY (CARRY CURRENT) WIRE GAUGE (AWG) WIRE TYPE WIRE LENGTH (FEET) TEMP RATING: WIRE LOCATION ADJUSTED WIRE TEMP WIRE AMP TEMP CORRECTION PER TABLE 310.15(B)(2)(a): CONDUIT FILL PER Table 310.15(B)(3)(a): WIRE OCP: TERMINAL 75oC RATING INVERTER QTY: AC OUTPUT CURRENT CEC 690.8(A) STRING AMPS GROUND SIZE GROUND TYPE OCPD CHECK 1 NONE 2 12 TRUNK CABLE 15 90°C ROOF 54 30 X 0.76 X 1 = 22.8 25 1 X 1.17 X 1.25 = 1.46 #6 SBC NONE 2 3/4" EMT 4 10 THWN-2 80 90°C ROOF 54 40 X 0.76 X 0.8 = 24.3 35 9 X 1.17 X 1.25 = 13.16 #8 THWN-2 20A 2P 8 X 1.17 X 1.25 = 11.7 #8 THWN-2 20A 2P 3 3/4" EMT 3 10 THWN-2 5 90°C WALL 32 40 X 0.96 X 1 = 38.4 35 17 X 1.17 X 1.25 = 24.86 #8 THWN-2 25A 2P BRANCH CIRCUIT # OF PANELS TILT, AZIMUTH 1 9 17°, 171° 2 8 17°, 263° TOTAL # OF PANELS 17 BRANCH CIRCUIT B B 1 MICROINVERTER PER PANEL BRANCH CIRCUIT B B 1 MICROINVERTER PER PANEL 2 1 240 V, NEMA 3R, UL 1741 ENPHASE IQ6 PLUS AC COMBINER BOX, 60A ACTUAL SYSTEM AMPERAGE: 17x1.17 = 19.89A OCPD CHECK: 19.89Ax1.25 = 24.86 25A OK SEE PAGE PV4 FOR WARNING LABEL RATING. 1 SEAN HATCH 09/12/17 1 2 9/5/2017 - BAY AREA SOLAR SOLUTIONS dba YOUR ENERGY SOLUTIONS 6700 Santa Rita Road #E, Pleasanton, CA 94588 Phone: (888) 888-0711 CSLB #928652 (B, C-10) EXP. 02/28/2019 X____________ ______________ ISSUED FOR: PERMIT DATE: Solar Photovoltaic System 8/28/2017 MICHAEL FU 21317 METEOR DRIVE CUPERTINO, CA, 95014 PV-3A ELECTRICAL NOTES ELECTRICAL NOTES ADDITIONAL AHJ REQUIRED ELECTRICAL NOTES 1. PV ARRAYS ARE PER SINGLE LINE.. 2. PV ARRAY COMBINER/JUNCTION BOX PROVIDES TRANSITION FROM ARRAY WIRING TO CONDUIT WIRING. 3. USE UFER GROUND ELECTRODE SYSTEM FROM INVERTER TO EXISTING MAIN SERVICE GROUND ELECTRODE PER CEC 250.58. 4. ALL GROUND CONNECTED TO MAIN SERVICE GROUND IN MAIN SERVICE PANEL. 5. CONNECTORS SHALL BE POLARIS OR EUROSTRIP IT CONNECTORS. 6. INVERTER SHALL BE PER SINGLE LINE, SEE ATTACHED CUT SHEET. 7. AC DISCONNECT SHALL BE PER SINGLE LINE. 8. EQUIPMENT GROUNDING CONDUCTORS ON AC AND DC SIDE SIZED ACCORDING TO CEC 690. 9. ALL CONDUCTORS SHALL BE 600V, 90C STANDARD COPPER. ALL CONDUCTORS IN CONDUIT SHALL BE THWN-2. 10. MAXIMUM DC VOLTAGE DROP SHALL BE 1.5% 11. ALL CONDUCTORS SHALL BE IN CONDUIT UNLESS OTHERWISE NOTED. 12. ALL WORK TO COMPLY WITH 2016 CALIFORNIA ELECTRIC CODE, 2016 CALIFORNIA BUILDING CODE 13. EXACT CONDUIT RUN LOCATIONS SUBJECT TO CHANGE. 14. 3.0 PSF MAX (.5 PSF FROM RACKING, 2.5 PSF FROM MODULES) DEAD LOAD CONTRIBUTED FROM SOLAR ARRAY. 15. CONDUCTORS ON ROOF ARE TO BE 1/2" TO 3" OFF OF THE ROOF SURFACE. 16.GEC TO BE CONNECTED TO EXISTING UFER. IF UFER IS NOT PRESENT THEN A NEW GROUND ROD WILL BE ADDED FOR GROUNDNG PURPOSES. 17. AN INSULATED GROUNDED CONDUCTOR OF 6 AWG OR SMALLER SHALL BE IDENTIFIED AS WHITE. 18. AN EQUIPMENT GROUNDING CONDUCTOR SHALL NOT BE SMALLER THAN 14 AWG. 19. GROUNDING ELECTRODE CONDUCTOR(S) SHALL BE INSTALLED IN ONE CONTINUOUS LENGTH WITHOUT A SPLICE OR JOINT. IF NECESSARY, SPLICES OR CONNECTIONS SHALL BE MADE AS PERMITTED. RACKING & MODULES ARE GROUNDED VIA A CONTINUOUS #6AWG COPPER CONDUCTOR CONNECTED W/ UNIRAC INTEGRATED GROUNDING KIT. MODULES ARE FACTORY PROVIDED W/ 2 THREADED HOLES TO FACILITATE LANDING OF THE LUGS DC SIDE OF ARRAY IS UNGROUNDED AND THEREFORE GEC IS NOT REQUIRED. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AND BONDED IN ACCORDANCE WITH ARTICLE 250. ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE OVERCURRENT DEVICES LOCATED SO AS TO PROVIDE OVERCURRENT PROTECTION FROM ALL SOURCES PER CEC 690.9 (A) GROUNDING: UNIRAC INTEGRATED CLAMP MODEL # 30-20-27-C UL LISTED #2703 SEAN HATCH 09/12/17 1 2 9/5/2017 - BAY AREA SOLAR SOLUTIONS dba YOUR ENERGY SOLUTIONS 6700 Santa Rita Road #E, Pleasanton, CA 94588 Phone: (888) 888-0711 CSLB #928652 (B, C-10) EXP. 02/28/2019 X____________ ______________ ISSUED FOR: PERMIT DATE: Solar Photovoltaic System 8/28/2017 MICHAEL FU 21317 METEOR DRIVE CUPERTINO, CA, 95014 PV-4 REQUIRED SIGNAGE ON THE FACE OF THE MAIN SERVICE DISCONNECT PER NEC 690.15 & NEC 690.13(B): CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED ON ALL INTERIOR AND EXTERIOR PV CONDUIT, RACEWAYS, ENCLOSURES, CABLE ASSEMBLIES AND JUNCTION BOXES CRC R331.2 & CFC 605.11.1: WARNING: PHOTOVOLTAIC POWER SOURCE MARKING SHALL BE REFLECTIVE AND PLACED EVERY 10 FEET AT TURNS AND ABOVE AND/OR BELOW PENETRATIONS AND AT ALL PV COMBINER AND JUNCTION BOXES. THE FOLLOWING SIGNAGE MUST HAVE A MINIMUM OF 3/8" HIGH LETTERING, IN ARIAL FONT (NON-BOLD), WITH CAPITAL LETTERS, WHITE ON RED BACKGROUND AND ON A REFLECTIVE, WEATHER RESISTANT MATERIAL. PLAQUES SHALL BE METAL OR PLASTIC WITH ENGRAVED OR MACHINE PRINTED LETTERS, OR ELECTRO-PHOTO PLATING, IN A CONTRASTING COLOR TO THE PLAQUE. PLAQUE SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH APPROVED ADHESIVE. MINIMUM OF 3/8" HIGH WHITE LETTERING ON RED BACKGROUND. LOCATED AT BACKFED BREAKER. CEC 690.64 AND 705.12(D)(3)(4)(b) PHOTOVOLTAIC POWER SOURCE SHALL BE LABELED WITH THE FOLLOWING WARNING AT EACH JUNCTION BOX, COMBINER BOX, DISCONNECT, AND DEVICE WHERE ENERGIZED, UNGROUNDED CIRCUITS MAY BE EXPOSED DURING SERVICE PER CEC 690.35(F). WARNING ELECTRIC SHOCK HAZARD. THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED. ANY PHOTOVOLTAIC DC CONDUCTORS ENTERING THE BUILDING SHALL BE INSTALLED IN A METALLIC RACEWAY AND SHALL ALSO HAVE LABEL IDENTIFIED EVERY 10 FEET - AND WITHIN 1 FOOT OF TURNS OR BENDS AND WITHIN 1 FOOT ABOVE AND BELOW PENETRATIONS OF ROOF/CEILING ASSEMBLIES, WALLS OR BARRIERS. WARNING INVERTER CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE. ON FACE OF THE SERVICE METER PANEL PER CEC 690.54 & CEC 705.12(D)(4): WARNING DUAL POWER SOURCE. SECOND SOURCE IS A PHOTOVOLTAIC SYSTEM ON FACE OF THE SERVICE METER PANEL PER CEC 690.56 (C): PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN ADJACENT TO THE MAIN SERVICE DISCONNECT PER NEC 690.15 & NEC 690.13(B): MAIN PHOTOVOLTAIC SYSTEM DISCONNECT WARNING AC MICRO INVERTERS LOCATED ON ROOFTOP ARRAYS. PLAQUE TO BE INSTALLED AT ELECTRIC SERVICE: SIGNAGE AT CONDUIT & BOXES: SIGNAGE AT MAIN SERVICE PANEL: 1 MSP1 FRONT OF HOME CAUTION SERVICE POINT & UTILITY METERING (N) SOLAR ARRAY YOU ARE HERE METEOR DRIVE 21317 METEOR DRIVE, CUPERTINO, CA 95014 (N) ENPHASE AC COMBINER BOX MAP PLACARD ON FACE OF THE MAIN SERVICE PANEL: MSP2 MSP3 MSP4 MSP5 MSP6 2 MSP7 RATED AC OUTPUT CURRENT = 19.89A AC NORMAL OPERATING VOLTAGE = 240V SEAN HATCH 09/12/17 1 2 9/5/2017 - BAY AREA SOLAR SOLUTIONS dba YOUR ENERGY SOLUTIONS 6700 Santa Rita Road #E, Pleasanton, CA 94588 Phone: (888) 888-0711 CSLB #928652 (B, C-10) EXP. 02/28/2019 X____________ ______________ ISSUED FOR: PERMIT DATE: Solar Photovoltaic System 8/28/2017 MICHAEL FU 21317 METEOR DRIVE CUPERTINO, CA, 95014 PV-4A REQUIRED SIGNAGE ON DISCONNECTING MEANS IN 1 4" HIGH LETTERING PER CEC 690.17 (E). WARNING ELECTRICAL SHOCK HAZARD. DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. LABEL FOR SOLAR AC DISCONNECT PER NEC 690.15 & NEC 690.13(B): PHOTOVOLTAIC AC DISCONNECT ON FACE OF THE UTILITY AC DISCONNECT: PHOTOVOLTAIC DISCONNECT FOR UTILITY OPERATION ON FACE OF THE UTILITY AC DISCONNECT PER NEC 110.27(C): WARNING TURN OFF PHOTOVOLTAIC AC DISCONNECT PRIOR TO WORKING INSIDE PANEL. ON FACE OF THE AC DISCONNECT PER CEC 690.54: SIGNAGE AT AC DISCONNECT: C1 ON THE INSIDE AND THE OUTSIDE OF THE LOAD CENTER: WARNING ELECTRIC SHOCK HAZARD SOLAR PHOTOVOLTAIC COMBINER NO ADDITIONAL LOADS ALLOWED SIGNAGE AT SOLAR LOAD CENTER: AT THE UTILITY INTERACTIVE INVERTER OR GROUND FAULT INDICATOR STATING PER CEC 690.5(C): WARNING ELECTRICAL SHOCK HAZARD. IF A GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNDERGROUNDED AND ENERGIZED. SIGNAGE AT GROUND FAULT INDICATOR: C2 C3 C4 C5 B1 RATED AC OUTPUT CURRENT = 19.89A AC NORMAL OPERATING VOLTAGE = 240V E1 PV SYSTEM AC DISCONNECT SEAN HATCH 09/12/17 Innovation for a Better Life The LG NeON® 2 ACe is embedded AC module, which combines LG NeON® 2 high power DC module and Enphase Micro inverter IQ6+. As they are combined, LG NeON® 2 ACe can simplify all the processes such as logistics, installation, and monitoring. 60 cell LG Electronics is a global player who has been committed to expanding its capacity, based on solar energy business as its future growth engine. We embarked on a solar energy source research program in 1985, following 2 years, thereafter. In 2013, NeON™ (previously known as Mono X® NeON) & 2015 NeON2 with CELLO technology won “Intersolar Award”, which proved LG is the leader of innovation in the industry. About LG Electronics Enhanced Long-term Reliability The LG NeON® 2 ACe has a 15 mm distance between the DC module and the Microinverter. The distance mitigates any impact to performance and reliability High Power Output The LG NeON® 2 series modules are proven to produce Safer Solar Roof System The LG NeON® 2 ACe produces safe AC voltage and complies with NEC 2014 and 2017 standards. User Friendly Monitoring Remote Monitoring and Management with Enphase Enlighten software, the LG NeON® 2 ACe is easy to monitor and manage from any web connected device. multiple PV system components into a single product SKU. Making it easier to order, store, and transport. Quick Installation Installation of the LG NeON® 2 ACe is a two step process of lifting the inverter and connecting the cable without the need to install the inverter, reducing installation labor. LG330E1C-A5 Innovation for a Better Life Mechanical Properties Cells Cell Vendor Cell Type Cell Dimensions # of Busbar Dimensions (L x W x H) Weight Front Load Rear Load Cooling Enclosure Environmental Rating Operating Ambient Temperature Storage Temperature Glass Frame Inverter Model (Utility Interactive) 6 x 10 LG Monocrystalline / N-type 161.7 x 161.7 mm / 6 inches 12 (Multi Wire Busbar) 1686 x 1016 x 40 mm 66.38 x 40 x 1.57 inch 19.0 kg / 41.88 lb 6000 Pa 5400 Pa Natural convection - No fans Outdoor - NEMA 250 type 6 (MIC) -40 ~ +65 °C (-40 ~ +149°F) -40 ~ +85 °C (-40 ~ +185°F) High Transmission Tempered Glass Anodized Aluminum Enphase IQ6+ Microinverter * The distance between the center of the mounting/grounding holes. Characteristic Curves Current (A) Isc, Voc, Pmax (%) Voltage (V) Temperature (°C) North America Solar Business Team LG Electronics U.S.A. Inc 1000 Sylvan Ave, Englewood Cliffs, NJ 07632 Contact: lg.solar@lge.com www.lgsolarusa.com Copyright © 2017 LG Electronics. All rights reserved. 01/01/2017 LG330E1C-A5 L Dimensions (mm/in) DC Electrical Properties (STC*) Module Maximum Power (Pmax)* Power Tolerance (%) 0 ~ +3 * STC (Standard Test Condition): Irradiance 1,000 W/m², Ambient Temperature 25 °C, AM 1.5 * The nameplate power output is measured and determined by LG Electronics at its sole and absolute discretion. 330 W 330 19.3 10.00 1000W 600W 200W 800W 400W 4.00 2.00 8.00 4.00 0.0 10.0 30.0 20.0 40.0 Isc Voc Pmax 140 100 20 60 -40 90 25 120 80 40 Module Fire Performance Solar Module Product Warranty Micro Inverter Warranty Output Warranty of Pmax (DC) (Measurement Tolerance ± 3%) UL 1741, UL 1703 UL 1741 / IEEE 1547, UL 62109-1 FCC Part 15 Class B, ICES-0003 Class B CAN/CSA-C22.2 NO.107.1-01 Type 1 (UL 1703) 12 years 25 years Linear Warranty* AC Module Micro Inverter * 1) 1st year : 98%, 2) After 1st year : 0.55% annual degradation, 3) 25 years : 84.8% DC Temperature Characteristics NOCT* Pmpp Voc Isc 45 ± 3 °C -0.37 %/°C -0.27 %/°C 0.03 %/°C * NOCT (Nominal Operating Cell Temperature): Irradiance 800 W/m2, ambient temperature 20 °C, wind speed 1 m/s AC Electrical Properties Peak Ou tput Power (VA) Max. Continuous Output Power (VA) Nominal Voltage / Range (V) Nominal Output Current (A) Nominal Frequency / Range (Hz) Power Factor / Adjustable Max. Branch Circuit Over Current Protection Number of Max. AC Modules (EA) 290 280 240 / 211 ~ 264 1.17 60.0 / 59.3 ~ 60.5 1/0.7 leading…0.7 lagging 97.0 20 13 20 -25 0 50 -75 40 / 1.6 105 / 4.1 200 / 7.9 300 / 11.8 Ø 4.3 / 0.2 Grounding holes (8ea) 1016 / 40 (Size of short side) 976 / 38.4 175 / 6.9 (Distance between grounding & mounting holes) 1686 / 66.4 (Size of long side) 1086 / 42.8(Distance between mounting holes) 1286 / 50.6(Distance between mounting holes) Frame Cross-section Mounting holes (8ea) 8.5 x 12 / 0.3 x 0.5 Drain holes (16ea) 8.0 x 3.0 / 0.3 x 0.1 29 / 1.1 40 / 1.6 12 / 0.5 SEAN HATCH 09/12/17 The high-powered smart grid-ready Enphase IQ 6 Micro™ and Enphase IQ 6+ Micro™ dramatically simplify the installation process while EGLMIZMRK XLI LMKLIWX IJƤGMIRG] JSV QSHYPIPIZIP power electronics. Part of the Enphase IQ System, the IQ 6 and IQ 6+ Micro integrate seamlessly with the Enphase IQ Envoy™, Enphase Q Aggregator™, Enphase IQ Battery™, and the Enphase Enlighten™ monitoring and analysis software. The IQ 6 and IQ 6+ Micro extend the reliability WXERHEVHW WIX JSVXL F] TVIZMSYW KIRIVEXMSRW ERH YRHIVKS SZIV E QMPPMSR LSYVW SJ TS[IVSR XIWXMRK )REFPMRK )RTLEWI XS TVSZMHI ER MRHYWXV]PIEHMRK [EVVERX] SJ YT XS  ]IEVW Enphase IQ 6 and IQ 6+ Microinverters To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Microinverters Easy to Install • Lightweight and simple • Faster installation with improved two-wire cabling • Built-in rapid shutdown compliant (NEC 2014) Productive and Reliable • Optimized for high powered 60-cell and 72- cell* modules • More than a million hours of testing • Class II double-insulated enclosure Smart Grid Ready ŵ 'SQTPMIW [MXL Ƥ\IH TS[IV JEGXSV ZSPXEKI ERH frequency ride-through requirements • Remotely updates to respond to changing grid requirements ŵ 'SRƤKYVEFPI JSV ZEV]MRK KVMH TVSƤPIW * The IQ 6+ Micro is required to support 72-cell modules To learn more about Enphase offerings, visit enphase.com k  )RTLEWI )RIVK] %PP VMKLXW VIWIVZIH %PP XVEHIQEVOW SV FVERHW YWIH EVI XLI TVSTIVX] SJ )RTLEWI )RIVK] -RG  INPUT DATA (DC) IQ6-60-2-US AND IQ6-60-5-US IQ6PLUS-72-2-US AND IQ6PLUS-72-5-US Commonly used module pairings¹ 195 W - 330 W + 235 W - 400 W + Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules 1E\MQYQ MRTYX (' ZSPXEKI 48 V 62 V Peak power tracking voltage 27 V - 37 V 27 V - 45 V Operating range 16 V - 48 V 16 V - 62 V 1MR1E\ WXEVX ZSPXEKI 22 V / 48 V 22 V / 62 V 1E\ (' WLSVX GMVGYMX GYVVIRX QSHYPI -WG 15 A 15 A 3ZIVZSPXEKI GPEWW (' TSVX II II (' TSVX FEGOJIIH YRHIV WMRKPI JEYPX 0 A 0 A 4: EVVE] GSRƤKYVEXMSR  \  YRKVSYRHIH EVVE] 2S EHHMXMSREP (' WMHI TVSXIGXMSR VIUYMVIH %' WMHI TVSXIGXMSR VIUYMVIW QE\ % TIV FVERGL GMVGYMX OUTPUT DATA (AC) IQ6-60-2-US AND IQ6-60-5-US IQ6PLUS-72-2-US AND IQ6PLUS-72-5-US Peak output power 240 VA 290 VA 1E\MQYQ GSRXMRYSYW SYXTYX TS[IV 230 VA 280 VA Nominal voltage/range² 240 V / 211-264 V  : ·   : 240 V / 211-264 V  : ·   : Nominal output current 0.96 A 1.11 A 1.17 A 1.35 A Nominal frequency 60 Hz 60 Hz )\XIRHIH JVIUYIRG] VERKI 47 - 68 Hz 47 - 68 Hz Power factor at rated power 1.0 1.0 1E\MQYQ YRMXW TIV  % FVERGL GMVGYMX 16 (240 VAC) 13 (240 VAC) 14 (single-phase 208 VAC) 11 (single-phase 208 VAC) Overvoltage class AC port III III AC port backfeed under single fault 0 A 0 A Power factor (adjustable) 0.7 leading ... 0.7 lagging 0.7 leading ... 0.7 lagging EFFICIENCY @240 V $ : · @240 V $ : · ')' [IMKLXIH IJƤGMIRG] 97.0 % 96.5 % 97.0 % 96.5 % MECHANICAL DATA Ambient temperature range -40ºC to +65ºC Relative humidity range 4% to 100% (condensing) Connector type MC4 or Amphenol H4 UTX (MQIRWMSRW ;\,\(  QQ \  QQ \  QQ [MXLSYX FVEGOIX Weight 1.5 kg (3.3 lbs) Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree 4( )RZMVSRQIRXEP GEXIKSV]  9: I\TSWYVI VEXMRK Outdoor - NEMA 250, type 6 (IP67) FEATURES Communication Power line Monitoring Enlighten Manager and MyEnlighten monitoring options Compatible with Enphase IQ Envoy Compliance UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 8LMW TVSHYGX MW 90 0MWXIH EW 4: 6ETMH 7LYX (S[R )UYMTQIRX ERH GSRJSVQW [MXL 2)' ERH NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC ERH (' GSRHYGXSVW [LIR MRWXEPPIH EGGSVHMRK QERYJEGXYVIVŭW MRWXVYGXMSRW  2S IRJSVGIH ('%' VEXMS 7II XLI GSQTEXMFMPMX] GEPGYPEXSV EX enphase.com/en-us/support/module-compatibility.  2SQMREP ZSPXEKI VERKI GER FI I\XIRHIH FI]SRH RSQMREP MJ VIUYMVIH F] XLI YXMPMX] Enphase IQ 6 and IQ 6+ Microinverters SEAN HATCH 09/12/17 Rapid shutdown is built-in What’s new in NEC 2014?NEC 2014, Section 690.12 applies to PV conductors over 10 feet from the PV array and requires that the conductors power down to 30 volts and 240 volt-amperes within 10 seconds of rapid shutdown initiation. Enphase® Energy // Rapid Shutdown ® To learn more, visit enphase.com The 2014 edition of the National Electrical Code (NEC 2014) added new rapid shutdown requirements for PV systems installed on buildings. Enphase Microinverters fully meet rapid shutdown requirements in the new code without the need to install any additional electrical equipment. Enphase comes standard with rapid shutdown capability Residential Microinverter Commercial Microinverter All Enphase microin- verters, even those that were previously installed, inherently meet rapid shutdown requirements, no additional equipment or workarounds needed Enphase microinverterscan safely shut downautomatically, leavingonly low-voltage DCelectricity isolated tothe PV module String inverters require work arounds for rapid shutdown Residential String Inverter Commercial String Inverter Work around. Specialized Rapid Shutdown electrical box installed on the roof within 10 feet of array. Work around.String inverter installedon roof, a hostileenvironment that stringinverters are not built to live in. Work around. Shutoff switch that is easily accessible to firstresponders on the ground. Work around.Extra conduit in installation. SEAN HATCH 09/12/17 The Enphase IQ Combiner™ with Enphase IQ Envoy™ consolidates interconnection equipment into a single enclosure and streamlines PV installations by providing a consistent, pre-wired solution for residential applications. Enphase IQ Combiner (X-IQ-AM1-240-B) To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Networking Smart • Includes IQ Envoy for communication and control • Flexible networking supports Wi-Fi, Ethernet, or cellular Simple • Three pre-installed 20 A / 240 VAC circuit breakers • Provides production metering and consumption monitoring. Reliable ŵ (YVEFPI 2680GIVXMƤIH 2)1% X]TI 3R enclosure • Five-year warranty To learn more about Enphase offerings, visit enphase.com © 2017 Enphase Energy. All rights reserved. All trademarks or brands in this document are registered by their respective owner. 2017-04-20 MODEL NUMBER -5 'SQFMRIV <-5%1& IQ Combiner with Enphase IQ Envoy™ for integrated revenue grade PV production metering %27- '   ERH STXMSREP GSRWYQTXMSR QSRMXSVMRK   ACCESSORIES SVHIV WITEVEXIP] )RTLEWI 1SFMPI 'SRRIGXƎ ')0013()1 + ')0013()1 + 4PYK ERH TPE] MRHYWXVMEP KVEHI GIPPYPEV QSHIQ [MXL ƤZI]IEV HEXE TPER JSV W]WXIQW YT XS  QMGVSMRZIVXIVW %ZEMPEFPI MR XLI 97 'EREHE 1I\MGS 4YIVXS 6MGS ERH XLI 97 :MVKMR -WPERHW [LIVI XLIVI MW EHIUYEXI GIPPYPEV WIVZMGI MR XLI MRWXEPPEXMSR EVIE 'SRWYQTXMSR 1SRMXSVMRK '8 CT-200-SPLIT 7TPMX GSVI GYVVIRX XVERWJSVQIVW IREFPI [LSPI LSQI GSRWYQTXMSR QIXIVMRK   ELECTRICAL SPECIFICATIONS Rating Continuous duty Solar branch circuit breakers Three 2-pole 20 A/240 VAC DIN rail-mounted breakers 1E\MQYQ W]WXIQ ZSPXEKI 240 VAC Rated output current 48 A Rated input current, each input  % 1E\MQYQ JYWIGMVGYMX FVIEOIV VEXMRK SYXTYX  % 4VSHYGXMSR 1IXIVMRK '8 200 A solid core pre-installed on solar busbar and wired to IQ Envoy MECHANICAL DATA (MQIRWMSRW ;\,\(  \  \  GQ ű \ ű \ ű Weight  OK  PFW Ambient temperature range { ' XS { ' { XS { * Cooling Vented, natural convection, plus heat shield Enclosure environmental rating 3YXHSSV 2680GIVXMƤIH 2)1% X]TI 6 TSP]GEVFSREXI GSRWXVYGXMSR Wire size  XS  %;+ GSTTIV GSRHYGXSVW JSV FVERGL MRTYXW  XS  %;+ GSTTIV GSRHYGXSVW JSV GSQFMRIH SYXTYX Follow local code requirements for conductor sizing. Altitude 8S  QIXIVW  JIIX INTERNET CONNECTION OPTIONS Integrated Wi-Fi FKR Ethernet  'EX) SV 'EX  984 )XLIVRIX GEFPI  RSX MRGPYHIH Cellular 3TXMSREP ')0013()1 + SV ')0013()1 +  RSX MRGPYHIH COMPLIANCE Compliance, Combiner 90  Compliance, IQ Envoy 90  '%2'7% ' 2S   '*6 4EVX  'PEWW & -')7  -)')2  )2 )2 )2 )2 1IXIVMRK %27- ' EGGYVEG] GPEWW  Enphase IQ Combiner SEAN HATCH 09/12/17 SEAN HATCH 09/12/17 SEAN HATCH 09/12/17 SEAN HATCH 09/12/17 SEAN HATCH 09/12/17 Business Stream ProductsRenewable and Solar Technology TÜV Rheinland PTLPhotovoltaic Testing Laboratory2210 South Roosevelt StreetTempe, Arizona 85282Main Phone: 480-966-1700Main Fax; 775-314-6458Email: info@tuvptl.com TÜV RheinlandNorth America Holding, Inc.1 Federal StreetBoston, MA 02110Main Phone: 617-426-4888Main Fax: 617-426-6888Member ofTÜV Rheinland GroupAttn: John Nagyvary Unirac Inc. 1411 Broadway Blvd Albuquerque, NM 87102 Phone: +505 242 6411Email: john.nagyvary@unirac.com Email:MWitt@us.tuv.comDecember 19, 2014 UL SU 2703 Fire Testing Completed Type of Equipment: PV Mounting System Model Designation: Unirac Roof Mount Test Requirement: UL Subject 2703, Issue 2 TÜV Rheinland File Number:L1-URC140731-RMTÜV Rheinland Project Number:URC14 0731Dear Mr. Nagyvary, This letter is confirmation that the Unirac Roof Mount (RM) PV Mounting System hassuccessfully completed fire testing according to the UL Subject 2703 with references fromUL1703 rev. May 2014 standard.Congratulations on this achievement.The Unirac Roof Mount (RM) PV Mounting System has demonstrated compliance with aClass A Fire Rating when installed with the following Fire Types: • Type 1• Type 2• Type 3Complete test results, including any necessary mitigation measures for the fire rating, canbe found in report R1-URC140731-RM. This correspondence may be used as a Letter of Compliance (LOC) indicating the UniracRoof Mount (RM) PV Mounting System has met the relevant system fire requirements. Sincerely, Mark Witt Engineering Manager TÜV Rheinland PTL, LLC SEAN HATCH 09/12/17 SEAN HATCH 09/12/17 GET OFF THE ROOF FASTER THAN EVER BEFORE SMSOLAR MOUNT SOLARMOUNT defined the standard in solar racking. New enhancements are designed to get installers off the roof faster than ever before. Components are pre-assembled and optimized to reduce installation steps and save labor time. Our new grounding & bonding process eliminates copper wire and grounding straps to reduce costs. Utilize the microinverter mount with a wire management clip for an easier installation. OPTIMIZED COMPONENTS • VERSATILITY • AVAILABILITY • DESIGN TOOLS ROOF MOUNT SYSTEMS NEW ENHANCEMENTS ELIMINATE THE GROUNDWIRE FROM YOUR SOLARMOUNT ARRAY LOSE THE COPPER & LUGS INTEGRATED GROUNDINGPOWERED BY: UL2703 BONDING & GROUNDING SYSTEM FIRE CLASSIFICATION CLASS A - TYPE 1, 2, 3 & 10 MODULES MECHANICAL LOADING LISTED UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT ENGINEERING EXCELLENCE UNMATCHED EXPERIENCE PERMIT DOCUMENTATION DESIGN TOOLS CERTIFIED QUALITY BANKABLE WARRANTY PROTECT YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN OPTIMIZED COMPONENTS INTEGRATED BONDING & PRE-ASSEMBLED PARTS Components are pre-assembled and optimized to reduce installation steps and save labor time. Our new grounding & bonding process eliminates copper wire and grounding straps or bonding jumpers to reduce costs. Utilize the microinverter mount with a wire management clip for an easier installation. VERSATILITY ONE PRODUCT - MANY APPLICATIONS 4XLFNO\ VHW PRGXOHV ˊXVK WR WKH URRI RU DW D GHVLUHG WLOW DQJOH &KDQJH PRGXOH orientation to portrait or landscape while securing a large variety of framed PRGXOHV RQ ˊDW ORZ VORSHG RU VWHHS SLWFKHG URRIV $YDLODEOH LQ PLOO FOHDU DQG GDUN DQRGL]HG ˉQLVKHV WR RXWSHUIRUP \RXU SURMHFWV ˉQDQFLDO DQG DHVWKHWLF DVSLUDWLRQV AVAILABILITY NATIONWIDE NETWORK Unirac maintains the largest network of stocking distributors for our racking VROXWLRQV 2XU SDUWQHUV KDYH GLVWLQJXLVKHG WKHLU OHYHO RI FXVWRPHU VXSSRUW DYDLODELOLW\ DQG RYHUDOO YDOXH WKHUHE\ SURYLGLQJ WKH KLJKHVW OHYHO RI VHUYLFH WR users of Unirac products. Count on our partners for fast and accurate delivery to meet your project objectives. Visit Unirac.com for a list of distributors. AUTOMATED DESIGN TOOL DESIGN PLATFORM AT YOUR SERVICE &UHDWLQJ D ELOO RI PDWHULDOV LV MXVW D IHZ FOLFNV DZD\ ZLWK 8%XLOGHU D powerful online tool that streamlines the process of designing a code FRPSOLDQW VRODU PRXQWLQJ V\VWHP 6DYH WLPH E\ FUHDWLQJ D XVHU SURˉOH DQG recall preferences and projects automatically when you log in. You will enjoy the ability to share projects with customers; there’s no need to print UHVXOWV DQG VHQG WR D GLVWULEXWRU MXVW FOLFN DQG VKDUH SMSOLAR MOUNT BANKABLE WARRANTY $V D +LOWL *URXS &RPSDQ\ 8QLUDF KDV WKH ˉQDQFLDO strength to back our products and reduce your risk. +DYH SHDFH RI PLQG NQRZLQJ \RX DUH UHFHLYLQJ SURGXFWV RI H[FHSWLRQDO TXDOLW\ 62/$502817 is covered by a 10-year limited product ZDUUDQW\ DQG D \HDU OLPLWHG ˉQLVK ZDUUDQW\ TECHNICAL SUPPORT Unirac’s technical support team is dedicated to answering questions & addressing issues LQ UHDO WLPH $Q RQOLQH OLEUDU\ RI GRFXPHQWV LQFOXGLQJ HQJLQHHULQJ UHSRUWV VWDPSHG OHWWHUV DQG WHFKQLFDO GDWD VKHHWV JUHDWO\ VLPSOLˉHV your permitting and project planning process. CERTIFIED QUALITY PROVIDER Unirac is the only PV mounting vendor with ISO FHUWLˉFDWLRQV IRU   DQG 2+6$6  ZKLFK PHDQV ZH GHOLYHU WKH KLJKHVW VWDQGDUGV IRU ˉW IRUP DQG IXQFWLRQ 7KHVH FHUWLˉFDWLRQV GHPRQVWUDWH RXU H[FHOOHQFH DQG FRPPLWPHQW WR ˉUVW FODVV EXVLQHVV SUDFWLFHV INTEGRATED BONDING MIDCLAMP INTEGRATED BONDING SPLICE BAR INTEGRATED BONDING MICROINVERTER MOUNT w/ WIRE MANAGEMENT INTEGRATED BONDING L-FOOT w/ T-BOLT NEW ENHANCEMENTS R © PUB - 150101 - DIGITAL UPDATES SEAN HATCH 09/12/17 :(6-7 SMOKE / CARBON MONOXIDE ALARMS OWNER CERTIFICATE OF COMPLIANCE i Szss L COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION CUPERTINO 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 (408)777-3228•FAX(408)777-3333 •building( cupertino:orq PERMIT CANNOT BE FINALED UNTIL THIS CERTIFICATE HAS BEEN COMPLETED,,STGNED.AN])RETURNED TO THE BUILDING )IVISION . �� , ,...:�. w.��xi�'.-,.�"'t.. _.•, .m m.,.�-mo.'s"...�« ,'a"<.:�. ,-.. .,.. �.. .<=.«� .,a.tixi,.� K...,.+ .,�,.....r,:..�.,.m, PURPOSE This affidavit is a self-certification for the installation of all required Smoke and Carbon Monoxide Alarms;for compliance with 2016 CRC Section R314, R315,2016 CBC Sections 420.6 and 907.2.11.2 where rio interior access for inspections are required, GENERAL INFORMATION Existing single-family and multi-family dwellings shall be provided with Smoke Alarms and Carbon Monoxide alarms. When the valuation of additions, alterations,or repairs to existing dwelling units exceeds $1000.00, CRC Section R314,R315, and CBC Sections 907.2.11.5 and 420.6 require that Smoke Alarms and/or Carbon Monoxide Alarms be installed in the following locations: AREA SMOKE ALARM CO ALARM Outside of each separate sleeping area in the immediate vicinity of the X X bedroom(s)-(Smoke alarms shall not be located within 3 feet of bathroom door) On every level of a dwelling unit including basements and habitable attics X X Within each sleeping room X Carbon Monoxide alarms are not required in dwellings which do not contain fuel-burning appliances and that do not have an attached garage. Carbon monoxide alarms combined with smoke alarms shall comply with CB Section 420.6 and shall be approved by the Office of the State Fire Marshal. Power Supply:In dwelling units with no commercial power supply, alarm(s) may be solely battery operated. In existing dwelling units, alarms are permitted to be solely battery operated where repairs or alterations do not result in the removal of wall and ceiling finishes or there is no access by means of attic,basement or crawl space.Refer to CRC Section R314 and CBC Sections 907.2.11.4 and 420.6.2. An electrical permit is required for ' alarms which must be connected to the building wiring. As owner of the above-referenced property, I hereby certify that the alarm(s) referenced above has/have been installed in accordance with the manufacturer's instructions and in compliance with the California Building and California Residential Codes.,The alarms specified below have been tested and are operational, as of the date signed below. Address: 7 /3/7 /4&e()/- A-1u -Qi. Permit No. rZa17-ism Specify Number of Alarms: #Smoke Alarms: I "5 I #Carbon Monoxide Detectors: I ! I I have read and agree to comply with the terms and conditions of this statement Owner(or Ownerl! Agent's)Name: !� Gi f + Signature Lr..• •• • Date: Contractor Name: Signature Lic.# Date: Smoke and CO form.doc revised 01/10/2017 I ' . d