Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
14090120
CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 22249 HAMMOND WAY CONTRACTOR:SLINGSHOT POWER INC PERMIT NO: 14090120 OWNER'S NAME: MAY TOPPER 164 MAIN ST DATE ISSUED:09/18/2014 OWNER'S PHONE: 6502699644 LOS ALTOS,CA 94022 PHONE NO:(650)308-9055 LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL E] COMMERCIAL 0 INSTALL 42 ROOF TOP, FLUSH MOUNTED PV PANELS License Class Lie.# i1 y (I 0.29KW) > Contractor ��t� t��"ti T r���� Date � I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$40000 I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:34258005.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct. 1 agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FROM ED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the granting of this permit. Additionally,the applicant understands and will comply Is Date: l with all non-point source regulatigns per the Cupertino Municipal Code,Section 9.18. ROOFS: Signature Date r/ ��/ All roofs shall be inspect r any roofing material being installed. if a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION Signature of Applicant: Date: I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS 7'O BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) 1,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should 1 store or handle hazardous 1 have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District 1 performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and 1 have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 5505,25 and 25534. Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: Date: permit is issued. I certify that in the performance of the work for which this permit is issued,l shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that 1 have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments, ARCHITECT'S DECLARATION costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with al I non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.l 8. Signature Date �v ALTERNATIVE ENERGY PERMIT APPLICATION a COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION A 10300 TORRE AVENUE •CUPERTINO, CA 95014-3255 AE CUPERTfNO (a, (408)777-3228• FAX (408)777-3333• buildingcupertino.org �kl PROJECT ADDRESS Z ` ^'} �j 1 W�v' 7APN# I, Z ^ 5-2—� _ OWNERNAME PHONE � E-MAIL �I 2 r C -i 4 �O�p � pA He I I nye STREET ADDRESS2 .� Z 4CITY, STATE,ZIP FAX C ca E E t('T1 N a (A ")Sv l� CONTACT NAME . JC II PHONE E-MAIL 7 G N,i 2i,J S �1` 1`I I', SPN STREET ADDRESS CITY,STATE,ZIP FAX (4+ �1 Vh►iIN Ji LOS IAL-M5 , (A `(ya 2 2 ❑OWNER ❑ OWNER-BUILDER ❑ OWNER AGENT CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑ TENANT CONTRACTOR NAME S L I G S 1 c w K LICENSE NUMBER,) LICENSE TYPE /) BUS.LIC# COMPANY NAME E-MAIL (• L, FAX L C 6 SLlnJC,S>•+oj Pc;aEQ1 P4C r?fghy+ � s, (�51�,. �r�ur.^. (�..,•. *.sem $b"1 •. clYS` STREET ADDRESSI�eCITY,STATE,ZIP PHONE 4 o iiiras `itio 2- i Z14, flit 5- ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC# COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OF ljy SFD Or Duplex ❑ Multi-Fam17 PROJECT IN WILDLAND PROJECT IN STRUCTURE ❑ Commercial URBAN INTERFACE AREA ❑ Yes PI'NO FLOOD ZONE ❑ Yes Q'NO SOLAR PANELS ❑ ELECTRIC VEHICLE CHARGING STATION ❑ SOLAR WATER HEATING ❑ OTHER: FOR SOLAR PANELS: NUMBER OF PANELS/UNITS: q2 KILOWATTS(COMMERCIAL ONLY): X•z 17 r: TOTAL VALUATION://�0 r u o y DESCRIPTION OF WORK l� � JYv / P/1I I.w U�i V L L !Q ( t, 11v �` J .�Lr.�..,I�r o✓ 'V 2 IZ W By my signature below,I certify to each of the following: I am the property owner or authorized agent o act on the perty owner's behalf. I have read this application and the information I have provided is-correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating to uilding co st uction. I authorize representatives of Cupertino to enter the above-identi1fied property for inspection purposes. Signature of Applicant/Agent: Date: / g/ �y SUPPLEMENTAL INFORMATION REQUIRED OFFICE USE ONLY - ca I] OVER-THE-COUNTER a ❑' EXPRESS U ' x ❑ STANDARD U < ❑ LARGE a. ❑ MAJOR PVApp_2011.doc revised 03/16/11 CITY OF CUPERTINO FEE ESTIMATOR- BUILDING DIVISION ADDRESS: 22249 HAMMOND WAY DATE: 09/18/2014 REVIEWED BY: MELISSA APN: 342 58 005 BP#: 7� *VALUATION: 1$40,000 'PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration / Repair PRIMARY SFD or Duplex PENTAMATION SOLAR-RES USE: PERMIT TYPE: WORK INSATLL 42 ROOF TOP FLUSH MOUNTED PV PANELS 10.29k SCOPE Lj NOTE: This estimate does not include fees due to other Departments(i.e.Planning,Public Works, Fire,Sanitary Sewer District,School District,etc.). Thesefees are based on the prelimina information available and are oniv an estimate. Contact the Dept/or addn'l info. FEE ITEMS (Fee Resolution I1-053 Eff 71'13) FEE QTY/FEE MISC ITEMS Plan Check Fee: $0.00 = # Alternative Energy System Suppl. PC Fee: (j) Reg. ) OT 0.0 hrs $0.00 $236.00 IPHOTOVRES Photovoltaic System PME Plan Check: $0.00 Permit Fee: $0.00 Suppl. Insp. Fee:) Reg. 0 OT 0.0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 T_T_ 0 Work Without Permit? 0 Yes ) No $0.00 ) Advanced Planning Fee: $0.00 Select a Non-Residential ) Building or Structure Strong Motion Fee: IBSEISMICR $5.20 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $2.001 1 SUBTOTALS: $7.20 $236.00 TOTAL FEE: 1 $243.20 Revised: 08120/2014 WATER-CONSERVING PLUMBING FIXT RES OWNER CERTIFICATE OF COMPLIANC = ILE COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION _ Zo t� CUPERTINO 10300 TORRE AVENUE• CUPERTINO, CA 95014-3255 (408) 777-3228 - FAX (408) 777-3333-buildin(Igcupertino.or L/ Owner Name �J l�r"`ES '� M C'- "1 � '� Permit No. Address �Z Z �'1 A� ,t',-,_ PERMIT CANNOT BE FINALED AND COMPLETED UNTIL THIS CERTIFICATE HAS BEEN { t I -91,, TRM TO THE RUILDIN DIVISION Please refer to the attached California Civil Code Sections 1101.1 — 1101.8 which are part of this Certification form. 1. is your real property a registered historical site? ❑ Yes Civil Code Sections 1101.1 through l 101.8 do not apply. Sign below and skip the rest of the form. Owner' Signature: 1`` � Date: V No Go to Question 2. 2. Does your real property have a licensed plumber certifying that,due to the age or configuration of the property or its plumbing, installation of water-conserving plumbing fixtures is not technically feasible? ❑ Yes Civil Code Sections 1101.1 through 1101.8 do not apply. ❑ The licensed plumber's certification has been provided to the Building Division. Sign below and skip the rest of the form. Owner' Signature: Date: /No Go to Question 3. 3. is water service permanently disconnected for your building? ❑ Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Sign below and skip the rest of the form. Owner' Signature: Date: C No Go to Question 4. 4. is y r real property built and available for use or occupancy on or before January 1, 1994? No My real property is built and available for use or occupancy after January 1, 1994. Civil Code Sections 1101.1 through 1101.8 do not apply. Sign below and skip the rest of the form. Owner' Signature: Date: ❑ Yes My real property is built and available for use or occupancy on or before January 1, 1994. Civil Code Sections 110 1.1 through 1101.8 apply. Refer to the attached. My property is a single-family residential real property. See Civil Code Section 1101.4. On and after January 1, 2014, building alterations or improvements shall require all non-compliant plumbing fixtures to be replaced with water-conserving plumbing fixtures throughout the building. On or before January 1, 2017, all non-compliant plumbing fixtures shall be replaced with water-conserving plumbing fixtures (regardless of whether property undergoes alterations or improvements). ❑ My property is a multifamily residential real property. See Civil Code Section 1101.5. On and after January 1,2014, specified building alterations or improvements shall require non-compliant plumbing fixtures to be replaced with water-conserving plumbing fixtures. On or before January 1,2019,all non-compliant plumbing fixtures shall be replaced with water- conserving plumbing fixtures throughout the building(regardless of whether property undergoes alterations or improvements). ❑ My property is a commercial real property. See Civil Code Section l 101.5. On and after January 1,2014,specified building alterations or improvements shall require non-compliant plumbing fixtures to be replaced with water-conserving plumbing fixtures. 58407 20/4.doc revised 03//8//4 On or before January 1, 2019, all non-compliant plumbing fixtures shall be replaced with water- conserving plumbing fixtures throughout the building (regardless of whether property undergoes alterations or improvements). I/We,the owner(s)of this property,certify under penalty of perjury that non-compliant plumbing fixtures have been replaced with water-conserving plumbing fixtures in accordance with Civil Code Sections 1101.1 through 110 1.8,the current California Plumbing Code and California Green Building Standards Code,and manufacturer's installation requirements,and that the water-conserving plumbing fixtures comply with the requirements as indicated in the table below. Owner's(or Owner Agent's)Signature: Date: Upon completing and signing this Certificate,please return it to the Building Division in order to final your permit. Non-Compliant Water-Conserving Plumbing Fixture Plumbing Fixturel (Fixture Complying with Current Code Applicable to New Construction) Maximum Water Usage/Flow Rate Fixture Type 2013 CPC Ch. 4 2013 CPC Ch. 4 2013 CPC Ch. 4 Water Usage 2013 CALGreen Div. 4.3 2013 CALGreen Div. 4.3 2013 CALGreen Div. 5.3 /Flow Rate Single-Family Multi-Family Commercial Residential Residential Water Closets Exceed 1.6 Single flush toilets: 1.28 gallons/flush (Toilets) Gallons/flush Dual flush toilets: 1.28 gallons/flush effective flush volume (the composite, average flush volume of two reduced flushes and one full flush Urinals Exceed 1.0 Gallons/flush 0.5 gallons/flush Showerheads Exceed 2.5 2.0 gallons per minute @ 80 psi. Also certified to the performance criteria of gallons per minute U.S. EPA WaterSense Specification for Showerheads (A hand-held shower is considered a showerhead.) For multiple showerheads serving one shower, the combined flow rate of all showerheads and/or other shower outlets controlled by a single valve shall not exceed 2.0 gallons per minute @ 80 psi, or the shower shall be designed to allow only one shower outlet to be in operation at a time. Faucets— Exceed 2.2 gallons Maximum 1.5 gallons per Within units: 0.5 gallons per minute @ 60 Lavatory per minute minute @ 60 psi; minimum Maximum 1.5 gallons psi Faucets 0.8 gallons per minute @ per minute @ 60 psi; 20 psi minimum 0.8 gallons per minute @ 20 psi In common and public use areas: 0.5 gallons per minute @ 60 psi 1.8 gallons per minute 60 si Faucets— Exceed 2.2 gallons 1.8 gallons per minute @ 1.8 gallons per minute 1.8 gallons per minute @ 60 Kitchen per minute 60 psi @ 60 psi psi Faucets May temporarily increase May temporarily up to 2.2 gallons per increase up to 2.2 minute @ 60 psi, and must gallons per minute @ default to maximum 60 psi, and must 1.8 gallons per minute @ default to maximum 60 psi 1.8 gallons per minute Where faucets meeting @ 60 psi the above are unavailable, Where faucets meeting aerators or other means the above are may be used to achieve unavailable, aerators or reduction. other means may be used to achieve reduction. 1. If the existing plumbing fixture water usage/flow rate is equal to or lower than the figure shown, it is not required to be upgraded. SB407 2014.doc revised 03118114 CALIFORNIA CIVIL CODE SECTIONS 1101.1-1101.8 Civil Code Division 2. Property Part 4. Acquisition of Property Title 4. Transfer Chapter 2. Transfer of Real Property Article 1.4. Installation of Water Use Efficiency Improvements ........ 1101.1 — 1101.8 1101.1. The Legislature finds and declares all of the following: (a)Adequate water supply reliability for all uses is essential to the future economic and environmental health of California. (b)Environmentally sound strategies to meet future water supply and wastewater treatment needs are key to protecting and restoring aquatic resources in California. (c)There is a pressing need to address water supply reliability issues raised by growing urban areas. (d)Economic analysis by urban water agencies has identified urban water conservation as a cost-effective approach to addressing water supply needs. (e)There are many water conservation practices that produce significant energy and other resource savings that should be encouraged as a matter of state policy. (f) Since the 1991 signing of the "Memorandum of Understanding Regarding Urban Water Conservation in California," many urban water and wastewater treatment agencies have gained valuable experience that can be applied to produce significant statewide savings of water, energy, and associated infrastructure costs. This experience indicates a need to regularly revise and update water conservation methodologies and practices. (g)To address these concerns, it is the intent of the Legislature to require that residential and commercial real property built and available for use or occupancy on or before January 1, 1994,be equipped with water-conserving plumbing fixtures. (h)It is further the intent of the Legislature that retail water suppliers are encouraged to provide incentives, financing mechanisms, and funding to assist property owners with these retrofit obligations. 1 101.2. Except as provided in Section 1101.7,this article shall apply to residential and commercial real property built and available for use on or before January 1, 1994. 1101.3. For the purposes of this article: (a) "Commercial real property" means any real property that is improved with, or consisting of, a building that is intended for commercial use, including hotels and motels,that is not a single-family residential real property or a multifamily residential real property. (b) "Multifamily residential real property"means any real property that is improved with, or consisting of, a building containing more than one unit that is intended for human habitation, or any mixed residential-commercial buildings or portions thereof that are intended for human habitation. Multifamily residential real property includes residential hotels but does not include hotels and motels that are not residential hotels. (c) "Noncompliant plumbing fixture"means any of the following: (1)Any toilet manufactured to use more than 1.6 gallons of water per flush. (2)Any urinal manufactured to use more than one gallon of water per flush. (3)Any showerhead manufactured to have a flow capacity of more than 2.5 gallons of water per minute. (4)Any interior faucet that emits more than 2.2 gallons of water per minute. (d)"Single-family residential real property" means any real property that is improved with, or consisting of, a building containing not more than one unit that is intended for human habitation. (e)"Water-conserving plumbing fixture" means any fixture that is in compliance with current building standards applicable to a newly constructed real property of the same type. (f) "Sale or transfer" means the sale or transfer of an entire real property estate or the fee interest in that real property estate and does not include the sale or transfer of a partial interest, including a leasehold. 1 101.4. (a)On and after January 1, 2014,for all building alterations or improvements to single-family residential real property, as a condition for issuance of a certificate of final completion and occupancy or final permit approval by the local building department,the permit applicant shall replace all noncompliant plumbing fixtures with water- conserving plumbing fixtures. (b)On or before January 1, 2017, noncompliant plumbing fixtures in any single-family residential real property shall be replaced by the property owner with water-conserving plumbing fixtures. (c)On and after January 1, 2017, a seller or transferor of single-family residential real property shall disclose in writing to the prospective purchaser or transferee the requirements of subdivision (b)and whether the real property includes any noncompliant plumbing fixtures. 1101.5. (a)On or before January 1, 2019, all noncompliant plumbing fixtures in any multifamily residential real property and in any commercial real property shall be replaced with water-conserving plumbing fixtures. (b)An owner or the owner's agent may enter the owner's property for the purpose of installing, repairing, testing, and maintaining water-conserving plumbing fixtures required by this section, consistent with notice requirements of Section 1954. (c)On and after January 1, 2019, the water-conserving plumbing fixtures required by this section shall be operating at the manufacturer's rated water consumption at the time that the tenant takes possession. A tenant shall be responsible for notifying the owner or owner's agent if the tenant becomes aware that a water-conserving plumbing fixture within his or her unit is not operating at the manufacturer's rated water consumption. The owner or owner's agent shall correct an inoperability in a water-conserving plumbing fixture upon notice by the tenant or if detected by the owner or the owner's agent. (d)(1)On and after January 1, 2014, all noncompliant plumbing fixtures in any multifamily residential real property and any commercial real property shall be replaced with water-conserving plumbing fixtures in the following circumstances: (A)For building additions in which the sum of concurrent building permits by the same permit applicant would increase the floor area of the space in a building by more than 10 percent,the building permit applicant shall replace all noncompliant plumbing fixtures in the building. (B)For building alterations or improvements in which the total construction cost estimated in the building permit is greater than one hundred fifty thousand dollars($150,000), the building permit applicant shall replace all noncompliant plumbing fixtures that service the specific area of the improvement. (C)Notwithstanding subparagraph(A)or(B), for any alterations or improvements to a room in a building that require a building permit and that room contains any noncompliant plumbing fixtures, the building permit applicant shall replace all noncompliant plumbing fixtures in that room. (2)Replacement of all noncompliant plumbing fixtures with water-conserving plumbing fixtures, as described in paragraph(1), shall be a condition for issuance of a certificate of final completion and occupancy or final permit approval by the local building department. (e)On and after January 1, 2019, a seller or transferor of multifamily residential real property or of commercial real property shall disclose to the prospective purchaser or transferee, in writing, the requirements of subdivision(a) and whether the property includes any noncompliant plumbing fixtures. This disclosure may be included in other transactional documents. 1101.6. The duty of an owner or building permit applicant to comply with the requirements of this article shall be postponed for one year from the date of issuance of a demolition permit for the building. If the building is demolished within the one-year postponement,the requirements of this article shall not apply. If the building is not demolished after the expiration of one year,the provisions of this article shall apply, subject to appeal to the local building department, even though the demolition permit is still in effect or a new demolition permit has been issued. 1101.7. This article shall not apply to any of the following: (a)Registered historical sites. (b)Real property for which a licensed plumber certifies that, due to the age or configuration of the property or its plumbing, installation of water-conserving plumbing fixtures is not technically feasible. (c)A building for which water service is permanently disconnected. 1101.8. A city, county,or city and county, or a retail water supplier may do either of the following: (a)Enact local ordinances or establish policies that promote compliance with this article. (b)Enact local ordinances or establish policies that will result in a greater amount of water savings than those provided for in this article. SMOKE / CARBON MONOXIDE ALARMS HUE ELI OWNER CERTIFICATE OF COMPLIANCE COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION 91/ CUPERTINC? 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 (408)777-3228 • FAX (408)777-3333•tgilding(c cupertino.org C)�� 1, Permit No. Address Baa�{ l�d 4 q.VU��1 #of Alarms Smoke: I Carbon Monoxide: PERMIT CANNOT,BE F'INALED AND COMPLETED UNTIL THIS CERTIFICATE HAS BEEN ..mss. ,� .,x,',i A 1D ,,�, f� TO THE BUILDING DIVISION y .-mow;. •, PURPOSE This affidavit is a self-certification for the installation of all required Smoke and Carbon Monoxide Alarms for compliance with 2013 CRC Section R314, 2013 CBC Sections 420.6 and 907.2.11.2 where no interior access for inspections are required. GENERAL INFORMATION Existing single-family and multi-family dwellings shall be provided with Smoke Alarms and Carbon Monoxide alarms. When the valuation of additions, alterations, or repairs to existing dwelling units exceeds $1000.00, CRC Section R314 and CBC Sections 907.2.11.5 and 420.6 require that Smoke Alarms and/or Carbon Monoxide Alarms be installed in the following locations: AREA SMOKE ALARM CO ALARM Outside of each separate sleeping area in the immediate vicinity of the X X bedroom(s) On every level of a dwelling unit including basements X X Within each sleeping room X Carbon Monoxide alarms are not required in dwellings which do not contain fuel-burning appliances and that do not have an attached garage. Carbon monoxide alarms combined with smoke alarms shall comply with CBC Section 420.6 and shall be approved by the Office of the State Fire Marshal. Power Supply: In dwelling units with no commercial power supply, alarm(s) may be solely battery operated. In existing dwelling units, alarms are permitted to be solely battery operated where repairs or alterations do not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl space. Refer to CRC Section R314 and CBC Sections 907.2.11.4 and 420.6.2.An electrical permit is required for alarms which must be connected to the building wiring. As owner of the above-referenced property, I hereby certify that the alarm(s) referenced above has/have been installed in accordance with the manufacturer's instructions and in compliance with the California Building and California Residential Codes.The alarms have been tested and are operational, as of the date signed below. 1 have read and a ree to comply with the terms and conditions of this statement Owner(or Owner Agent's) ame: ,fir lSignature...... ................. .......!................................................................................Date: Contractor Name: Signature...................................................................Lic.# ......................................Date: ................... Smoke and CO form.doc revised 03118114 r slingsh� = t... Own Your Energy" Sheet Index SYSTEM DESIGN RECEIVED 1...Title and Index _ $ 2...Roof Plan&PV Panel Layout "CT ��� 0 3...Inverter,Cutoff Switch location&Main Panel Details w"_ WUNITY DEVEL PMENT DEPARTMENT 4...PV Schematic System Wiring Diagram BUILDING DIVI ION - CUPERTIV 5...String Current&Voltage Calculations 6...Roof&Electrical Load Calculations APP 10VED set of plans and spe fications-MUST be kept at the SYSTEM COMPONENTSx Ite during COi,Str'uctl n. It is'onlawful to make any 7...Solar Panel nges or alteratior s on same, or to deviate 8...Inverter e`rom, without apprc val from the Building Official. 9...Optimizer Stamping of!nis plan nd specifica!ions SHALL NOT 10-12...PV Rail Mounting System ;;id to permit or to b an approval of the violation 13...Roof Mounting Hardware ny provisions of any ity Ordinance or State Law. 14...Warning Labels for Placement on System a SYSTEM INSTALLATION Y E 15...General Notes Roof Mounting Hardware U I T # 16...Grounding Systems: Integrated Grounding 17...Grounding Systems:Weeb Lug PL41T PLANS 8� SYSTEM TECHNICAL NOTES CKED ~ 18...Torque Information And Grounding Information nA 2 19...General Notes,CEC Effective Jan 1,2014 20...Electrical Notes 21...Technical Notes:Optimizers LANNING DEPT, 22...Installtion Notes:Optimizers 23...Fire Bulletin ]DATE Additional Installation manuals,other hardware references and X 61,01G. DEPT. certifications available upon request Slingshot Power,Contractor • Equipment in this Photovoltaic System Title Sheet & Sheet Index �, l_; T' slingshot . _ �� 10.29 kW PV System 1 Story Curved Tile a s I N C Date: 30-Sep-14 Project Details: Page Number: '' -R±-"l Building Department 164 Main St.,Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper � PTlif'T Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way California State Lic: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA «' VIEVVED FOR GODS 1QPdtP,�.� I VIt SCE Reviewed By OFFICE COPY s N NOTE "W No: To SCALE W E CC�c.. r'=syr cif Photovol.aic Parels are piivrra-d by 'ual !ir+lsi nw.r.urFrr��enls avid sw se NOT by quess .-,oris :o comply with 5 Califorria F.re LAWS regulating Inverter Emergency Roof Accei�>% PV P,irrl St ;ihrxj AC Disconnec Adlustn*r*.s�mll be made for roof ver,ting Main panel Theses re+gulatior,s are i•+nlable upon reques- ° CALIFORNIA DEPARTMENT of ® FORESTRY C ' and FIRE PROTECTION ® ® / OFFICE OF THE STATE FIRE MARSHAL SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE Ilrr partrsyrstrp iAi isi:erest i kxal fire e► offals, budding ofrc(als, ard irdus:ry representatives) o � q0 _F-R7'_1N, ao �3uildino Dept, Front of the House GCT 0 2' 2014 Roof Plan Notes: AEl` -All panels are mount fj!jsh to the roof. { 0311 X Garage Slingshot Power, Contractor Equipment in this Photovoltaic System Roof Plan & PV Panel Layout Islingshot 10.29 kW PV System 1 Story Curved Tile Date: 30-Sep-14 Project Details: Page Number: P J g 164 Main St., Los Altos, CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way California State Lic: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino, CA s L S h! ` DC to Inverter Wire&Conduit a i n Breaker will PV Wire in Free Air orTHHN-2/THHN in d ated to 17 to conduit(3/4"EMC) Minimum 10AWG Cu Wire each(rated aeom adat a Solar 90degC) break . Laundr Positive, Negative Bare Copper EGC or SOLAR CUTOFF SWITCH Insulated EGC in conduit(3/4 EMT)to keep S an will be --- �- - - ---- From PV Panels on Roof rated fro OA to On Outside Wall Next to Meter to comply with CEC 690.17 - Switch or Circuit 50A Breaker pwrsub s Ptv INVERTER Mounted on OUTSIDE WALL �� to clear gas meter into house and to conform with Title 5 PG&E Requirements AC M nV t Units are mounted to be seen. DC/AC cutoff switches on inverters to REVIEWED r�;=. CL7i�E COMPLY AGE be less than five feet off the ground. Inverter SolarEdge Inverter to Load Center AC Disconnect to Main Panel Reviewed '`moo SE-10000A-US Minimum 10AWG Cu Wire(rated 75degC) PV Wire in Free Air or THHN-2/THWN-2 in Conduit Revd �i L1, L2,and Neutral 10AWG Ground Wire Minimum 6AWG Cu Wire Each(rated 90degC) Solar Main non-fusable cutoff switch Kep under 1.5%voltage drop(conduite Positive,Negative Copper EGC or Insulated EGC in located next to meter. 3/4°EMT) Conduit Keep under 2%voltage drop X Slingshot Power, Contractor Equipment in this Photovoltaic System - Islingshot. 10.29 kW PV System 1 Story Curved Tile PV Equipment & Main Panel Location Date: 30-Sep-14 ProDetails: Page Number: 1 g 164 Main St., Los Altos, CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 3 California State Lic: B984488 1 Inverter Used SolarEdge SE-10000A-US Drawn: Paul Sherer City: Cupertino, CA r Tag Desciption Make and Model QTY/OCPD Specifications Electrical Plan notes 1 Solar PV Module Sunpower SP-R-245NE-WHT-D 42 tiiiiioas - -- __ _. -PV system will be interconnected to the 2 Panel optimizer SolarEdge P350 42 See o timizer specifications on page 9 main panel with a 60A breaker ' 3 Grounding Electrical Conductor Southwire bare copper 10AWG Bre copper 10AWG grounding wire -Optimizer limit string power to 5250W and 4 DC Conduit and Conductor Cerrowire PV wire and 3/4" EMT conduit 10AWG 600V PV wii:90"C in 14"EMT Conduit for+DC apd-DC require a minimum of 8 panels for startup 5 Inverter SolarEdge SE-1000OA-US 1 S tanel specifications on page 8 operation. Please see page 21 for optimizer 6 AC utility safety diconnect switch EATON DG222URB 60A NEMA 3R,6OA 24tivAC,,i-rule+uriruseo',Ktiifeblade 1pckable switch theory of operation. 7 Load Center N/A 'N/A N/A -string of QuantityW panels are tied to 8 AC Conduit and conductor Cerrowire THHN and 1" EMT conduit 6AWG Cerrowire THHN 75'C for Li,L2,N inverter. 9 Main electrcial service disconnect Siemens 200A zooSte"" 200A ^s QPMH UL listed service breaker -Keep DC runs below 2%voltage drop,and 10 Main Load Center Siemens 200A Main service bus 44 "Vow 240VAC,200A MAX,NEMA 311 All-in-one Outdoor AC runs below 1.5% All work shall be in compliance with: 2013 CA Residential Code 2013 CA Electrical Code M ® 2013 CA Mechanical Code 0 0 o U u 2013 CA Plumbing Code r 2013 Cupertino Municipal Code EE O O OA- In 4 2 Ground Check Ground and neutral to direct earth connection.All Panels and mounting hardware also check. .Bpf j=e page 7, 10GEC Building iaep� f O O O Main Breaker will beFEE LEIderated to 175A to REVIEI�IED 0R. COUE C0rvilp1 r;;; acommadate the solar Reviewed By �Es� fjf� breaker. Laundry `f� ! -, O o O — subpanel will be derated - - J. from 90A to 50A X Slingshot Power, Contractor . slingshot. Equipment in this Photovoltaic System 10.29 kW PV System 1 Story Curved Tile PV System Schedule and Wiring Diagram Date:• 30-Sep-14 Project Details: Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 4 California State Lic: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA For Load Calculations with Power Optimizers solar=eeSingle Phase Inverters for North America (Note Optimizers are Temperatuer independent so calcs based on various SE3000A-US/SE380OA-US/SE5000A-US/SE6000A-US/ SE760OA-US/SE1000OA-US/SE11400A-US local temperatures are invalid) SE30DDA-US i SE3800A-US i SE50DOA-US ! SE16-0 A U5 I SE760oA-USSE10000A-US SE11400A-US P OUTUT -- - -- 9980 @ 208v _ Nominal At Power Output 3000 3800 5000 6000 7600 114,00 VA 5400 208 V 108W @ 208V 100W 01240V Max.AC Power Output 3300 4150 I 6000 8350 12000 VA 5450.@?hQV, ... .,. .. . .. . .10950.�°1240V. ... There is 1 inverter with 2 string , of 21 identical Sunpower 245W panels. AC Output voltage Min:Nom.-Max S" AC Output Voltage Mln,-Nom:MaxPl r We assume a MPP voltage for each module of VMPP = 40.5V. This means 211-240 264.Vat AC Frequency Min-Nom:Max.al 59.3-60-60.5 Iwith HI country setting 57 60.60 5) Hz Max Continuous Output Current 12S 16 24 @ 208V 25 32 48 @ 208V 47S A the input voltage to the ower optimizer Is 40.5V and them input current is 21.0D 240,,. 4z �4ou 245W/40.5V = 6.05A. Uti6t)� _islanding Protection,Courttry Configurable Thresholds Yes...... ... ... Yes INPUT Recommended Max.DC Powerul -----�. 3750 4750 6250 7504 9500 12400 14250 W The input voltage to the inverter is controlled by a separate feedback _(5>n#...m. ........ . ............ ... ................................ ................ .... .......... . ........... .. ..... ........... .............. ... ........... Transforert r-less,U9round . ed Yes Max.Input Voltage 500 vdC loop. Nom.DC in ut volts a 325 @ 208V 1 350 0 240V Vdc 16.5 @ ) Max.Input Current`TI 9.5 13 208V 33 6 '08V 18 23 34.5 Adc ... ..............1. 155,@.24DV. .............. 30.5 240V ..... ... Max.Input Short Circuit Current....... ........ ................... ............ .... ...'�S ... . The inverter requires a constant 350V. Since there are 21 serial connected Reverse-Polarity Protection ,..Yes , 97.5 @ 208V Y modules, each providing 245W, the Input current for each string to the Malom� ebon 97.7 982 98398.3�� 98 98 98 l6 CEC weighted Efficiency 97 5 98 975 97.5 ,9j.5 @?240v. 97.5 % inverter Is: 5145W/350V = 14.7A. . ....... ........ ......9... ...�.IA 0..94W..«f........... ... @ 20. ... . .. ... 97 V Nights m e Power Cauu mption <2.5 <4 W ADDITIONAL FEATURES Ethernet,Z%Bee(oPbonaq • Revenue Grade Data.ANSI C12.1 " Thus the DC bus current flowing through each of the power optimizers Supported Communication interfaces l - -- -85485.85232, onaN 1 Rapid Shutdown-NEC 2014 690.12 Functional' enabled when SolarEdge rapid shutdown kit Is irtstalled1% must be 14.7A. This means that each power optimizer in this example --STANDARD COMPLIANCE Saf?SY.. ...... ......UL2741,,UL16998,UL2998 t CSA 22,2..... .. ....... ...................... Grid Connection Standards lE EE 1547 provides an output voltage of 245W/14.7A = 16.67V. In this case, the .-Emissions..,._ . FCC parti 5 class 8 INSTALLATION SPECIFICATIONS _ power optimizers are acting as down converters. AColltputconduit sae/AWGrange 3/4"min imum 116-6 AWG 3/4'minimum/ ,fid (P DC input conduit size IN of strtngs/ 3/4"minimum/1-2 strip C`�' A' TI I AWG range ,.,, _ strings/16-6 AWG .. 3/4 ,minimum/1-2 slit r ...... . ...... .. . P,:714r,5�4",Dimensions with Safety Switch 30.5 x 12.S x 7/ I 30 5 x 12.5 x 7.51 in% �UIICIIng � HxWxD 775x31 .x,172 _,.,,, 775,x,315 x191,,,,,.„. 30Sx125x10.5/7 Y3Y 601 1�Bp�- ent The various system currents and voltages in this case are Illustrated in ) Weight with SafetySwitch 51.2/23.2 54.7/24-7 . k Sheet 19 for MPPT sheet 8 for the inverter, and sheet 9 for the PV panel. .cooling Natural Convection 1.11. --..1 �.L 2;; 4 1 1 Nohe ..<25. <50 .. .. .. ABA,._, Min:Max.Operating Temperature .13to+140/-25to+fi0(-40to+60version available" REVIEWED f-- R` (){)E C(�(��+F:I r ` Range.................................... ...............-,.......................-...... .. t (rl< Protection Rating.... j .... NEMA 3R ,-, rZr�1 J1x REF: Verification of Wire Sizes for PV Systems Calculation & CEC Table For other rcgio+»I settlngspkau canmct SONrtdee srpport GYIC NI�� b'� �ifi fy li { a�lknhed to 12S%for IoAors vherethe ye"averagehigh tomperabare b above77'F/25-C and w 1359E tor botto•M.were it b below 77'F/2S'C, , / '� For Oe�led lnrorma0on,r.rerto him:/Jwww..mrareove.uxMtet/otlhllnw:nx ec evr.irin,eukfe ad/ 310.16 Optimizers MPPT Type Systems. aA Plthersurr+al source may baused;the lnverterwili it nsov t cwrera to tht u du staled. W Pevenue gtd de kine Rei P/N: OORSB-51. OrINR2 /J 01 papkJ shutdown tit P/N SE 1000MSP51 -40+e 1-P/N:SF-X4-U5000NNU4 Slingshot Power, Contractor Equipment in this Photovoltaic System w 10.29 kW PV System l Story Curved Tile String Current and Voltage slingshot. Date: 30-Sep-14 Project Details: Page Number: P J g 164 Main St., Los Altos, CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 5 California State Lic: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA Standard Method Residential Service Calulation ROOF LOADING 1.0 General Lighting:220.1,Total 4000 Sq Ft. 12000 VA Minumum 2x6 Rafters @ 24" OC or Equivalent Small Appliance: 220.52(a) 4 Circuits x 1500 VA 6000 VA Laundry: 220.52(b) Solar Panel Dead Weight Loading Calculation Roof Structure System: Circuits x 1500 VA 0 VA Solar system consists of 42 solar modules Applying Demand Factors:Table 220.42 Mounting system is 84 points of connection with the roof 1st 3000 VA x 100% 3000 VA Next 3000 VA x 35% 1050 VA Panel Weight Calculation: 12000 Remaining VA x 25% 3000 VA Solar Module Weight............33.1 lbs TOTAL..................................................................... 7050 VA Mounting System Weight............75 lbs 2.0 Fixed Appliances: 220.53 "It shall be permissible to apply a demand factor of 75%for four appliances other than eletric ranges, clothes dryers,space heating equip, air-conditioning equip.) Total Panel Weight = ((#of modules)x(module wt))+(mounting system wt) YES/NO VA ((42 x 33.1)+ 75) = 1465.2 lbs Dishwasher YES 900 VA Disposer YES 600 VA Point Load Calculations = (total panel weight)/(# of points of connection) Microwave YES 1125 VA (1465.2/84) = 17.4 lbs Compactor NO 0 VA Pool/Spa YES 12000 VA Solar Module Area = (#of modules)x(Solar module area) Attic Fan No 0 VA L= 61.4 Other 0 0 VA (42 x 1927.96) = 562.32 ft^2 W = 31.4 TOTAL..................................................................... 10968.75 VA YES/NO 3.0 Eletric Dryer: (5000VA) 220.55,Table 220.54 Total Spacing Area = 5000 VA x 100% YES 5000 VA (# spaces bet modules)x(Inter-module spacing)x(panel L or W) / 144 4.0 Cooking Equipment:Table 220.54 Inter-Module Spacing = 1 in Oven 7200 VA x100% YES 7200 VA ((42 x 1) x 61.4)/ 144= 1.49 ft^2 Range 11000 VA x 100% YES 8000 VA Col C kW Other 0 0 VA ELECTRICAL LOAD TOTAL TOTAL..................................................................... 15200 8.0 Service Total VA= 44218.75 Total Panel Area = ((total solar module area)+(total spacing area) 5.0 Heating or A/C: 220.60(non-coicident loads) VA VA/240= 184.2448 Amps (562.32+ 1.49) = 563.81 ft^2 Heating unit 1500 VA x 100% NO 0 VA The Sum of the rated-current for the solar r...._ A/C Unit 6000 VA x 100% YES 6000 VA breaker and the°main breaker cannot exceeds of a Heating Pump 1500 VA 100% ENO 0 VA 120%of the bus bar's rating ""�s neer? .nf DISTRIBUTED LOAD = (total panel wt)/(total panel area) (loads)............................Take Largest Load 6000 (National Electric Code Section 690.64) r; (1465.2/563.81) = 2.6 lbs/ft^2 6.0 Largest Motor 220.14(c) =430.24&440.6 0 VA 0 VA x 25% - �;r ,,E i ne point ioaarng ana aisiriouiea ioaarng snouia oe oeiow ounaing aepartment requirements 7.0 EV Charger Level 2 (5400)VA NO I 0 VA S I Ings h dr,PowerF OntfafstOr for structural analysis Distributed Loading-Max 51bs/ft^2 Equipment in this Photovoltaic System slingsh , :r 10.29 kW PV System 1 Story Curved Tile Roof and Electrical Loading Calculations D 30-Sep-14 Date: p Project Details: Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 6 California State Lic: 6984488 1 Inverter Used SolarEdge SE-10000A-US Drawn: Paul Sherer City: Cupertino, CA SUNPOWER C61IEkS THE BEST COMBINED POWER AND PRODUCT WARRANTY POWER WARRANTY PRODUCT WARRANTY w. HIGH PERFORMANCE & EXCELLENT DURABILITY vs K III ,�:•. es c E , eoa 7s SERIES is is m 2S 5 tois 20 .a Yon- Yoa. More guaronived power:95%for first 5 years, Combined Power and Product defect 25 year coveroge •20.1 R',efficiency -0.4%/yr.to year 25.1 that includes panel replacement costs.° Ideal for roofs where space is al a premium f or where future expansion might be I ELECTRICAL F OPERATING CONDITION AND MECHANICAL DATA needed. F40.5 E19.235 F T __v_ _.. � Temperature -d0°C to+85°C Nominal Power"(Pnom) 235 W Wind:2400 Pa,245 kg/m2 front 8 back •High performance E20-245 PANEL Power Tolerance +5/-096 Max loud 2 Snow:5400 Pa,550 kg/m Front Delivers excellent performance in real world Avg.Panel Efficiency" 19.3% j Impact resistance 25mm diameter had at 23 m/s conditions,such as high temperatures, HIGH EFFICIENCY' Rated Voltage(Vmpp) 40.5 Vclouds anal low light. _ _ i Appearance Class A Generale more energy per square meter Rated Current limpp) 6.05 A 5.80 A Solar Cells 72 Monocrystallino Mrxceon Gen II e Proven value Open-Circuit Voltage(Voc) 48.8 V 48.4 V Tempered Glass High transmission tempered Anti-Reflective E-Series residential panels convert more sunlight to electricity _. p• !8 P Designed far residential roof"- . E-Series o ShorFCircuit Current Lu 6.43 A 6.18 A ) _ _ f I Junction Banc IP-65 Rated producing 36.6 more power per panel,'and 6096 more energy per ! _ i panels deliver the features,value and square meter over 25 years. ° Max.System Voltage 8 600 V UL Connectors Yukita fYS•254/YS255) performance for any home. -- - I Maximum Series Fu 20 A Frame Class 1 block anodized(highest AAAA rating) HIGH ENERGY PR U I N Power Temp Coef. -0.38%/°C Weghr 15 kg Produce more energy per rated watt Voltage Temp Coef. -132.5 mV/7-C High year one performance delivers 7-9%more energy per rated Current Temp Coef. 3.5 mit/°C TESTS AND CERTIFICATIONS wart.'This advarrage increases over time,producing 20%6 more Standard tests IEC 61215,IEC 61730,UL 1703 REFERENCES: ._ _. energy over the firs!25 years to meet your needs.'° 1 AN comparisons are SPR-E20-327 vs.a representative conventional Quality tests ISO 9001:2008,ISO 14001:2004 panel:240W,approx.1.6 m2,15%efficiency. EHS Compliance RoHS,OHSAS 18001:2007,lead Free, 2 PVEtidLtion Lobs'SunPover Shading Study,'Feb 2013. PV Cycle _ 3 Typically 7-9%more energy per valt,BEW/DNV Engineering"SunPower Ammonia test IEC 62716 Maxeon'Soler Cels:rartdamerltdy better, Yield Report;Jan 2013. ,l 4 SunPower 0.25%tyr degradation vs.1.096/yr cony.ponel.Campeau,Z_ Salt Spray test IEC 61701 (passed maximum severity) Frig reared ler perk.,m3nce.des gneJ ktr Jtrab,ty- at al.SunPower Module radotion Rale,"SunPower white Deg paper,Feb PID test PotsrniaFlnduced Degradation free: 100pV10 2076 2013:Jordon,Dirk'Sunpower Test Report,'NREL Oct 2012. °9_.... _-_ Engineered for peace of mind 5'SunPower Module 40-Year Useful Life'Sun Power white paper,Feb Available listings TUV,MCS,UL,JET,KEMCO,CSA,CEC,FSEC 110% Watt Designed f0 deliver consistent, trouble-free � 00� 2013.Useful He is 99 out of 100 panels operating at more than 70%of energy over a very long lifetime.'' rated pOwef. 90% 35%— 6 Out of oil 2600 panels listed in Photon International,Feb 2012. Designed for durability &0 year 25 7 8%more energy than the average of the top 10 panel companies tested The Sunpower Maxear.$alar Cell is the S 80% in 2012(151 panels,102 companies),Photon Irternational,March 2013. ll ` 8 Compared with the top 15 manufodurers,SunPower Warranty Review, only cell built on a solid copper foundation. LL 70% Feb 2013, inii 798 mm Virtually impervious to the corrosion and 60% 9 Some exclusion appy.See warranty for details. cracking that degrade Conventional ' 50% 10 5 of top 8 panel manufacturers were tested by Frounhofer ISE,"PV Panels j�a s �' 0 5 10 +5 20 25 Module Durability Initiative Public Report,'Feb 2013. �"► Years 11 Compared with the ton-stress-i"ad control panel.Atlas 25+Durability + ® 1 r— S L 1'Y #1 Ranked in Fraunhofer durability tes!." test report,Feb 2013. 46 nim-P{ -- 1559 mm- --- t4 i'Y rz 12 Standard Test Condition 1000 W/m2 irradiance,AM 1,5,25'C. t �IJIf(ilnq !] 100%power maintained in Alas 25' J P—er ce 1 Hgh I l _, rtM +Powe,at High iernps i' 13 Basal on average of measured power values during production tom--- "'r rf%r1t comprehensive PVDI Durability res+." N1.LighNrduced - 'fi t "T r, Degrodatjon 20114 '$ I High Average Wogs �,/ �Beller Lowdrght and I t C V I c'1'i! r EU .- � ISpectrolReaponse ._ I, /a 21: hligh Periaxnance .� .NCE , 1. ` _.. I Amt Refkcare Gfass See h .//.+w«.sunpo+verc ��VIP �' orp.wmAods for more reference infonnotion. 0 — For more details,see awarded dotmFeeh wvw.surVa.emwp.wm/dalosMsK Read safety and installation imirudrans before ruing t:s product. V"2013 SmPow.r Carpo ti—Ar dphe—d.U NPOWER he SUNPOWER toep.114)MCN,MORE ENERGY.FOR LIFE,and%GNATURE ar.nad—kr w r.Rhr.r.d wad•vohr d S,N ,ao,ponron.sp.dfiw .k d d d' 6,d,t —&j-b B.mW"+e.o4,oar.. sunpawarca.p.cam Slingshot Power,Contractor sunpowercorp.com oa .,e soseles Atiurw Equipment in this Photovoltaic System . slingshc.>t10.29 kW PV System 1Story Curved Tile Solar Panel: Sunpower SPR-245NE-WHT-D Date: 30-Sep-14 Project Details: Page Number: 164 Main St., Los Altos, CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 7 California State Llc: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino, CA solar=@@Single Phase Inverters for North America SE3000A-US/SE3800A-US/SE5000A-US/SE6000A-US/ solar O I a r=@@ SE7600A-US/SE10000A-US/SE11400A-US _ _ — _ 7. — - ----� SE3000A-us SE3800A-US SE5000A-US I SEi000A-6STSE7tia00A-Us SE1WWA US SE11400A-US=_ OUTPUT Nominal AC Power Output 3000 3800 5000 6000 7600 9980 0 208V 11400 VA SolarEdge Single Phase Inverters , 0 ... loo0 @208 5400 208V 10800 @ 208V .... Max.AC Power Output 3300 4150 6000 8350 12000 VA For North America _ ........ . a . ..._ .... AC Output Voltage Min.-Nom:Max!u 183-208-.2 29 Vac - - ✓ - ✓ AC Output Voltage Min.-Nom:Max!U J ✓ ✓ J ✓ ✓ J SE3000A-US/ SE380OA-US/ SE5000A-US/ SE6000A-US 211-240-264Vat AC Frequerxy Mm Nom:Max.tu 59.3 60 60-5 IwithHi country.setifn$S7 60.-60.`'L...... Hz 48 208V Max.Continuous Output Curre24�208V nt 125 16 25 32 47.5 A ..... .2}.�'-240V... .... ... .. .42 240V GFDI1 A UtllEty Monitoring,islandirtg Protection,Country Configurable Thresholds —__.___.... yes Yes -- ' INPUT _ _ _ _ Recommended Max.DC Powera' 3750 .,.1....4750 6250 1 750 9500 12400„, `14250 W.' t (5?S)......................... ... .... 1 l 111 ! 0'.." Ungrounded Yes Max Input Voltage.. ..._ 5,0.... ..,.. VdC Nom DC input Voitap. 325 @ 208V/350 240V Vtic,... ... .Adc Max.Input Currentr'r 955 5.�.2a0v,1 18....... ...-..�....... ..305 240V .l......34S... a Max.Input Short Circuit Current45 Adc ...................... ................................................. ................. Reverse-Polarity Protection Yep Ground Fault Isolation Detection 600kasensitivky Maximum inverter Efficient y 97:7 98Z 983 98.3 98 98 98 % 975 LV209V 97 208V i CECWeighted Efficiency 97.5 .., ,96` ..., 975...,. 97.5 97.5 % f ........... ..48 0?240V.. . 97.5 ??94v.. ... ............ ........ I Nighttime Power Consumption K Z.5 _y <4 W ADDITIONAL FEATURES _ Su ortedCommurtication Interfaces 85485,RS232,Ethernet, Bee(optional) ...... ... ........................ ........ ... .. ..... . I.......... .. ......... ... .. .. .. .. ... Revenue Grade Data,ANSI C12 1 Opdonalt" Rapid Shutdown-NEC 2014 690,72 Functionality enabled when SolarE a rapid shutdown kit is inStaNedm STANDARD COMPLIANCE — - Safety UL1741,UL16998,UL1998,CSA 22.2 Grit!Connection Standards IEEE1547 .- ..................................... ......... Emissions __ _ _FCC sc rt1lassB INSTALLATION SPECIFICATIONS AC output conduit size/AWG range 3j4"minimum/16.6 AWG 3/4"minimum/8-3 AWG DC input conduit size/p of strings/ a3/4"minimum/1-2 strings/16-6 AWG 3/4"minimum(1-2 strings/14.5 AWG AWG.ri)n64.. .......... ..... ............ ..... ................................................ ..... .. ...... Dimensions with Safety Switch 30 5 x 725 x T/ 30;5 x 125 x 7.5/ 30 5 x 12 5 x 10.5/ in/ 775 .. mm,... The best choice for SolarEdge enabled systems WetghtwlthSafetySwkch 51.2/232 54.7 24.7 s. 9/401x3 x2 � lb/kg.. Cooliri> Natural Convection Fans(user replete - Cvf - Superior efficiency(97.5%) Nokse.... .... ..... ................... .... .... .. ....... SzS....,........ ..... `50.'......��:b.�.:7E.. deA.... 3U1l(jlf)g Min:Max.0peratingTemperature 1 .. ,- t-CSmall,lightweight and easy to install on provided bracket 13 to+140/ 25 to+6a(a0 to+50 version avatlable'") ,w ( -F/ (tpent - Built-in module-level monitoringProtectionRating...._. .. .NEMA 3R .......... ............ .... rC ... ..{ .'. r °$+;1, ..... . ............. .. ... _.. .. .. .NEMA311 ................... .. - Internet connection through Ethernet or Wireless wFw otherm ,tel � y. •lo setttr`s p4aae wntact SdarEdee sWDor1. Outdoor andindowinstallatton R1umhedt129%for bcatio wAvaethe veoivera•ehkh e.ammis=,7.7F/2S'cru4t.135%fr bct..,r,e.ert:bewwzry25'c F.,d.WWd 1,aom,.+t-,-f. bhom,in:,,:-:�..�<. se-nt ar.n.�-n..d.e� ,...,..t.N..,d� 01 A Nyher-a"t w my may be vsed;the 1wnv wiz".It its i P A[ rte to th.wales stated. Li )� 1�I`' ,r - Fixed voltage inverter,DC/AC conversion only %I di l g y a'Neveaue Mde inverter P/N:sExxxxA�tb000NNt12 Integral AC/DC Switch a'Rapid sftut&nn tit Kit Y 30MR50-51 •40-a-P/N:SEm A-US0W WU4 Slingshot Power,Contractor Equipment in this Photovoltaic System Inverter: SolarEdge SE-10000A-US slingsh'.1 - t» 10.29 kW PV System 1 Story Curved Tile Date: r:30-Sep-14 Project Details: Page Number: p � g u e 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 8 California State Lic: 8984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA =@@ Soar+ - • - SolarEdge Power Optimizer soIar Module Add-On for North America P300 / P350 / P400 / P405 P300 P350 P4D0 P405 SolarEdge Power Optimizer - 1 (Lor fi0-Call enodule�, 72-CNI rnOduk I {tor 96-call modules) , (forthln film modus")INPUT Rated Input OC Power" 300 350 400 405 W Module Add-On For North America _.._.. -.... . . . Absolute Maximum Input Vok go (Voc at lowest temperature) 48 60 SO 125 Vdc MPPT Operating Range 8. 48 B„60 8 80 32.5-105 Vdc P300 / P350 / P400 / P405 MaxlmumShort0rcult.Current(Isc) 10 Adc _ Maximum DC In t C 12.5 Adc F.uCurrent..... . .. .. . . _.. ... ... . Maximum Efficiency _....._.... . _... . .... ... _ .. ... .. .... Weighted Efficiency 98.8 % • Overvoltage Category OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING INVERTER) Maximum Output Current 35 ! A Maxhnum Output Vdtage 60 85 Vdc ..__ _ _.. _. -....._ -_...i. ..._._.. OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) _ _ - ..._....__ _ .___.. Safety Output Voltage per Power 0ptimizer1 1 Vdc _ STANDARD COMPLIANCE EMC FCC Part35 Class B,IEC61000-6 2 IEC61000-G 3 ..... .,. . .. ...,... • Safety ...... _ IEC62109.1(ciass 11 safetYl.UL1741. RoHS Yes IN STA LLATI ON SPECIFICATIONS *; Maximum Allowed System Voltage1000 '—Vdc Dimensions(w x l x H) 141 x 2.12.x 40.5/5.55 x 8.34 x 1 59 mm/In NJeight(Including cables) 950/2.1 i gr/Ib ..... .. .............. .. ... . .. . .... ... . _ r' Input Connector MC4/Amphenol/Tyco MC4 output Wlre Type/Connector - Double Insulated;Amphenol ... ., ... .. .. ..... ..... } ..,. .. ... .... .. Output WireLength 0.9S/3.0. ,.1., 1.2/3.9. � m(R ....... .. .. ,. i Operating TemperaW re. ^B?... . . .. . . 40-+85/ 40-+185 C �. .. Protection Raring IP65/NEMA4 -r" ................. - ... _ _ .. -. _ .. .... Relative Humidity 0 300 % v�` �i Patetl STC W++..di. .nWuk Mod We of uv Io.57........ .... .. ...........: .. .. ....... ... ... .......... ............. poaw ak+enCa�b+N PV SYSTEM DESIGN USING A SOLAREDGE INVERTERm SINGLE PHASE THREE PHASE 206V THREE PHASE 480V Minimum String Length 10 (Power Optimizers) $ 18' I............... . ... .. . .. . .. ............. ....... . Maximum String Length t , (Power Optimizers) 25 25 50.............. fi URS R _ .... ..........1,........, ... ............, ..................,._.......,.... ..I....... .. .. .... . Maximum Power per String 5250 6000 12750_ 'iuildi g ...,...-..... .............. ............... ........ ... . ......... ._.... ................Yes.... _..,..... ......._. Parallel Strings of Different Lengths rtment PV power optimization at the module-level orOrlentat o,n5 `y 4 �1 :i — Up to 25%more energy °inlsr,dxlw�.deo°..wra,..aoaao/vascywooira�o/r�co�,on,un,�. GCT a 2 2rai4 - Superior efficiency(99.5%) REVIE:i EU rUR. Cooe r I - Mitigates all types of module mismatch losses,from manufacturing tolerance to partial shading diF'. - Flexible system design for maximum space utilization �t���E - Fast installation with a single bolt " 'IehlBd E�f �- - Next generation maintenance with module-level monitoring - Module level voltage shutdown for installer and firefighter safety www.solaredpe u5 Slingshot Power,Contractor • Equipment in this Photovoltaic System • s n g s h �� 10.29 kW PV System 1 Story Curved Tile Optimizers: SolarEdge P350 Date: 30-Sep-14 Project Details: Page Number: p 1 g 164 Main St., Los Altos, CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 9 California State Lic: 8984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino, CA S(AarMf.AEnt Alkld Clamp 111:-IX.3azi�,o wzxa,. xeur `` _,tam SolarMount Technical Datesheet ' 'g • tiled cheap eraterlal:t7ne Otto fd%v►4a1g e,arrded a.rrrrtvta iM41Ia"F1Mv o/Ua/wt•11Lid BaW sfbys-6005..T5.9196-T5.W61•T6 " � LNtimaM lansile:38ks,YkId-35 Kv >�olsrMolxt#Mo •C tedlal Hardarare._._.__. _.__._._.._._.__._.__._._.__».._ 1 '� - FiW ci Cp w a•aht 01050 tis( •-.: fLid dae�a weight OA50 itis{23g) 8060MVP 6 waft Com,. <r. -,«, «. ,,«. .« ,«._..----- ,,, ,,�.« . .1 - *, A1awmbleanddlosba ka+ds we vAid wft%►ar s�a�enls aae IN"ildClarrip.«. ,.. . . --------- . . . «,,,, ,n.,.«,, _,._.«... _..,2 aawavdaleidaamtfln+gtoadhaffoadUKI ACdocitnen ,,.«,« « ,„ , •2 vaLpm repm sed to abWatile anddesign ked cnpacly of a sikVbe 1paftfMquntdsem CommWo Iiaed"m------------------ nid cbnV amenity y whenused w M a Sobvik unise3esbeamto L,-Foot......................... .. ................ r « .,.«« ------------_----,«.. .3 eetsain a macre in the dketsm iutealed 4 - Avm"bteMid dafflp wilt one Lh =1+,20 Tbdi and one!r:,20 ASTM[F5%9esrated ft mge nut 1#saam + Uv*ark-Wibe and fgtrbn In I Oft-{ma of torque FMAistance fat foes and sdety fatacrs ane de4ownined a=arhng is pati 1 sec:fonr 9efthe 2005A:1uw&►cna Oftign Uaruaa and 3ird party test remulls frim an IAS ar:caediled lnbaratry AppShd Lead Avwrage Aao,wable safety Design Raslstmas aolalrMlokint MOCiLItF-- Connection Harcl.�a� � - oiro� unnai■ Load Faclea, LOW enact, .,�,.•. �,. 11m;4N) I"(N) las 1-134 0 Tons+cn,Y s 2020 S%7I 891 039M} 227 1348;5994} (-667 SolarMouratBrttom Up Module Clip Transrarm,2-- 520£2313'I 229,1017} 2.27 346x15391 0.•65 4�a if f iea 302600C Y sicin X-m 1194;'5312) 490 V 179 p 2 A-- 741 �i.'�951 0.620 • Ro4lorr Up Clip infledar Ona ofilte blowing elctaaded ahwrllmm r-x Wnhlr aflnya 03wb- 6.BIa&Tesk Mal-TIB cx,,rWoka w,*5!Wd im ro*,..-low roftd t1llirrerteUnaile:Ms.Yiatt 35h Sol.arMourrt End Clalrrp FfrlisirClear Arrndled P&INS 3&aaatt *Itt 373[tC7B saat� doll4rr Up e�P wietglab-9DS7 ba{T+l� 3SaM32 33210} 183"fi0MitflsC 363ti ..�"•,. a�lf Afowebtaanddastan meds ae vivid when G[snparrads we 392mic 39ZCCa__' 3Ct�3C•:'i3 38-b73�G ] r aeeoembied w9i� Ifl aafiaa baenra aaeordonp b au:fae9aed 3"kTr9r 34-016•-r_ tL 2ry a'- ,a W"C I 'End ckanv nrsaderia 1.Qne of 1he fa ah,-ig waded ainimm e UNI RAC doeuneris ;a[dy%.d 5 T5,610-5 T5,IBM TO �- Aasm&b wile oro W-20AMU F5M bd,ane yS aOASTU F50 _ j Lkinntetenslla:3&%;Y,dd.35 �.. saraled lisnge rW,and ane W ifd we*" Finish:Oeav,a 17arkA.rnadkad lase ari.a&k&and gghun to 10nshsof krqua _ }r - End damp weight ,arwms based on Heigra_-a.+J5a tbm a0q) Reaislenea bdos and safely ttcams we dale•nined aocardkV in Ena Gtin + A'Ova•.rie and demgn'aadss;evalid rAien caz!pomm-art .- pat 1 eacilh on eofa 2M5Atuprirusn DmignHlFaranl andlhlyd• �- '�Saoabd .num,ding to as:hOr,uwd U 10RAC chn:rtoe.," poly Imlrands f0m an JAB aged hbaralrsy Fiarge lkf - Vasueas represent!be alc•rra54 and dee;yn iced cawp3dly of a h mbli a edge mart be"MVparlad by Re berm end darzp assernby w7aesr med vrF'i e 5aa,,Vc nt sexes besn to a NOaE ON VAkS EIC InAM waahw an ball hesel aidaof esaeertllt -teal a m.mdta a i,tie direetcra nd emoted DO NOT ifatld wanhm wdw mrm&d tlenga n t - Aaserr le w%�one Ul*= '/.-20 T.bal and one W 20ASTM F59* s I aerated targe rut 316 Appliet load Awarape At+►Ms•64 soft iodise ttsretslsaio � L:-se a if-sae and Saha i 3a 10 ft i5t ai:artµe �UII(jlr lll*Oen V11110040 Load F*UK 1.100d 01 :slanOeiaCkrrS�Ads�fe4vt '.tsY7artdt99t"t'sredaoo( cfPalgtu j �,r r 400) me(II) FS 64{19 pad 1 secban 9 c f the 2D]5 kinidn:rr Des4grr Warud aid:ftr& ;s Y pastyte:0 re;aa user W IAS acacned*d I.&OiraerSy 2 I1}17. 11 A �f r 1neM Y+ Iwo(8W7)) Etl6 4aoriz} � 103E{A4fQ) �l162 1 - Uud,fess mz,be;-ssta.aid a:eat»1-5 in,;horn eftw erd c I a bean, _ U i _ Tranrtors%Xt 1120416 4= 3A3 407 1 I L441 I-x xD.7-tM R� 27(11 p) 2A4 d1 (101) 0.416 --, Ai?dredie•r $raaitf Reba; Leads Lnedf �� (=U inM.I. an 4N) fay lt•rIM View ed a oasenrr0ne Womad a,avine w+4sa now Tom man,Ya 1321 M TBP 529¢2352► 2-90 ®000 4355]1 "Cis B. Taa wa,,%a.3s R5{2791 14 451) 4:5a 21(,92) WIA30 -;-:_�t,rs •�i�r.ialos wiatr�A1A -d - X: 142483M 5212311 2.72 1 79 3491 0_555 Slingshot Power,Contractor Equipment in this PhotovoltaicSYstem PV Mounting Rail System: Unirac Solarmount slingshat, 10.29 kW PV System 1 Story Curved Tile Date: 30-Sep-14 Project Details: Page Number: P J i; 164 Main St., Los Altos, CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper O Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way California State LIc: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino, CA . . Datasheets a1U N I RAC SoLAuMoum Technical Datasheets iFUNIRAC• Sola.rMourrt Beard Connection Hardware Sola rMlourrt Bearns SolarMount L-Foot reit No. 3191320, 310132G-B, 3161f33C,310168G-B, 3,71FID Pari No. 304400410, 304000D 3162CSC,310208C-B, 310246G, 31024OG-B, 3132.40D, Ldroat mabo ai-Ow of to falzm i amirudad a0=inam:alkya:8i e& 4141144M,A 1016a W.41(12041A,410 240M + T5.610&75,Wei-i8 Uginmft tsrdIs.:3MQsi,YSoW.35 Yos • /idsh Onar or On*Amdmd Pnopertim; lbits Soim"awd SoLwMaurrt 11D + 13FooJ srrYght rales basad an��-4S t5�c�98gk • Alia abb and dmaW k m ds ane vsdid&#=amrtpa rmf:as PJsan,Mwighi st 2A 3.A aam+MiDd%th.Sds UOUFd ssrius Leans a000r4 V ka aU roiaod DUN Lt"IF4ACda WffN1fr App raxrnadn VVk& hi.(aar rind 9) P# 6.8.11 1.271 1.F Xd + For tis 600lto to L.Faat aan od"am +AnownNie waft ano ASTM P693%'-16 Ihax ihesd w mwand ano Total Crass Sndfian Ama irr? 0-676 1.499 m laet ASTM'F5911 Wmwaiad Unpa nud 'y am, fr'' •usb a z-sn=and t9fti n,in 33 64hs arlanqun Soden Mo&i n PGA-4 bar* 0153 4.8018 i- RasYaterrm Vie'and anioly faaierss ora dadrsrrirod aaemrrdmS Japan! t aodem9dJho3i1061ei�rtrr�u,eu'I y�nMarardlandJhrd #}ind Saaam.NadL_s(,eAx=j le 4.113 0.221 Y rmeils frarm an AS ac cmdiad lisraimyr j IiY!?TLr: Losdr aro S#ran lar tiw L 4%akta boom aardwdian ariyr,be Mamerd of km*m Qt..Am* in- 04,064 1.450 r scars to cb*dlL load lirdks for stomdoK isg soss*r,ar o&w r attaahrsntnastirad Mm"efdafAW656[4',4ai-I W GJO" 0.287 Itadxs of Caym6m(X'AUrm# in 4294 1..1710 ;:► r� Direclim IA*mata AYasrabkoLaad lraetm L 4 gn R�Mm"Ita Asdiaaaf�®flexr Aries) in02544.BOt2 ibs Ji) an(" 1s lbs M) • ' SEdsnp,z* 1706()856} 755 P315" 230 1141 q W77{ OA46 Tandem,Y,+ 1859 jA266Jj 7077 X8144 201 106.9 J054 0,575 L7a+r•sgora XWOdU a Y,her U-A&M n ed Caopmmmr,Y, 3258(1 44W) 1325 f58" 2A6 1 2004(8913),l 0-615 T®aaca,x! 48t(2162)1 213 r 49+ 2281 323(143a)I "CA SLOTFOR T4K_LT 0At 1.21$-1 F HM 9�'YM %OT FOR T-DOLT LOW YHE11 NEAR SCREW2X SLOT FSR � MDTFLYi BEe7TOM10YLR 3 3d10 BOTT(.W CLIP 3.dt1a T 9LYT FOR HEX OCLT 01 %37 FE:a. t ., HEX OQLT .ABT -M t 2183 Y Y l!75 Sc11or1liaurrE®eam, SoAmWam-1 t4$Asam CiRmrSr�ra ae+l'sso�,ir�[t+aa:1l�6 At1r0 Slingshot Power,Contractor Equipment in this Photovoltaic System slingsh11 � w, r 10.29 kW PV System 1Story Curved Tile PV Mounting Rail System: Unirac Solarmount Date: 30-Sep-14 Project Details: Page Number: P 1 g 164 Main St., Los Altos, CA 94022 Equipment Type Manufacturers and Model Version: 1,0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper 11 Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way California State LIc: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino, CA ■ 11-10 SSW- STRUCTURAI.ENGIN January 20,2011 Erm UniRae 1411 Broadway Boulevard NE Albuquerque,New Mexico 87102-1545 s3574 TEL:(505)242-6411 * 31-17 FAX:(505)242-6412 � Cx' ��'�! Attu.:Engineering Department, Re: Engineering Certification for UniRac's SolarMount Code-Complaint Installation Manual 227.3 PZSE,Inc.-Structural Engineers bas reviewed UniRac's"SolarMount Code-Complaint Installation Manual 227.3"published October 2010 and specifically"Part I.Procedure to Determine the Design Wind Load",and "Part I1: Procedure to Select Rail Span and Rail Type". The procedures are used to determ_ne the calculation of the design wind force,load combinations,applied loading and rail selection. All information,data and analysis contained within the Installation Manual are based on,and comply with the following: 1. 2009 International Building Code,by International Code Council,Inc.,2009 2. 2010 California Building Code,by California Building Standards Commission,2011 3. Aluminum Design Manual:Specifications and Guidelines for Aluminum Structures.by The Aluminum Association,2005 This letter certifies that the structural calculations contained within UniRac's"SolarMount Code-Complaint Installation Manual 227.3 are in compliance with the above Codes. if yo have any questions on the above,do not hesitate to call. L)P Since ely, � 3UIIdinC ,� sJ GCT 0 , J 2f. Paul cher,SE-President i�EVIEI �tU � �? Revievved B X 8137 Sunset Avenue,Suite 120 • Fair Oaks,CA 95628 916.961.3960 916.961.3965 f • wwwl;S'.(OH Slingshot Power,Contractor Equipment in this Photovoltaic System gQ slingshat- 10.29 kW PV System 1 Story Curved Tile PV Mounting Rail System: Unirac Solarmount Date: 30-Sep-14 Project rolect Details: Page Number: 164 Main St., Los Altos, CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 12 California State Lic: 8984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino, CA ITEM NO. DESCRIPTION QTY. 1 Flashing 1 Spun Cone, Standard Flat Tile Mount I QMSFT 18"xl8"x.032"xl.46"Cone* --- _-_— 2 QBase Primary flashing 1 —-_. . ` - 10 �-- Additional Dimensions 3 QBase I Hex Bolt, 5/16"x 3/4",Grade 8 1 5 Lag Screw, Hex Head, 5/16"X 3", Zinc 2 8 —THIS EDGE TOWARDS ROOF RIDGE 6 EPDM Rubber Counter Flashing 1 7 POST, 1.25"OD x 4.5", 6061-T6 1 Washer,Sealing,/5/16"ID x 1-1/8"OD, 6 8 EPDM 1 9 Washer, Fender, 5/16"X 1",SS 1 t 9:4.2.5 10 Washer, Split-Lock,5/16",SS 1 1 1 Hex Bolt, 5/16"x I",SS 1 f } I S r - 18.00 650 --� 1 v.00 f _L _.�----- 81 I 9,401 1 ------•-----0SUB FLASHING(ITEM 4) --03 p... 9;,1. 18.00 I 1 ) 4 .� I -'�- -' ---- --- e --- 1.44 / \ # TOP FLASHING(ITEM 5) ,:t.331, TITLE: Quick MS Ut) ount PV AVAILABLE IN MILL, QMSFT: f 1,50 TITLE: BRR CLEAR NZEOANIODIZED D STANDARD FLAT TILE MOUNT r -r— Conled NotCnpYert DoQMSFT: ABASE STANDARD FLAT FINISHES `_�-� TILE MOUNT UNLESS OTHERWISE-SPECIFIED: SIZE DRAWN BY: RAD REV DIM@YdONS Ake M INCIffs UNLESS OTNER'N'3E SPAC441M t TOLERANCES. A ABASE(ITEM 2)and POST(ITEM 7) MENSbNS AK IN INCHES SIZE CRAWi1BY: RAD REV FRACTON.ALt fns DATE: 5/16/2072 T0L9WNCL1. rennnAe+AMO ec"WwaM A DALE. al25l201a 2 TME 3�fOZN L.Yi CGYi7NN®1�'Y15 CRAYnuGCM1IXLPeCP6MCFQU,= MOUInW A;.�7 RlQV,OLIJCr�^�a:,vPAPCP A.' DO H07 SCALE DRAWING TWO PUCE DECMAL t.C2 W,ACIONALS I/C MOILLr�n..e NOOl�GI w wvrntn^rnovf rNe WeTB1PHaA52Ci.,acuCr l,Y,A.ad`wePPOMO.iC THREE PLACE pervw l�OS SCALE:1:5 WEIGHT:I SB SHEET IOF2 , , ,,,, u .ra.en aairxnew+rn raaa.<..:.:.,.,,ror,c pp„OtSCAtEnAAKVK. TWOPLACENCAL .18 W65PL nets PIACE OEcn.+A:t.l2s_ sc,uE_1s-wec:rrt;2,is... 5HE1r:ZoF2- Lag suit speemcat(ons Specific GmAry 2:48 Sr t6 shah par 2S Meead depth 516'shell pe;I-thread depth r''� 1c ,PF Dou"F1r.Larch SO 1330 255 -Douplea Fir,SOWI .. AS 1176 235 -— .-.-- . - --� --- ..__ -_ P I iIErgMnmm Sprue.Lodgepole Phu(MSR 16W f 8 higher) 46 1176._-.. 235JL1LHem,Fir .43 1060 212 .�,� '----.. �i 0 Mem,Flr(NorM) 61176 236Southern pe,. .55 1535 307 _V1E11dC-Spruce,tine.Fir .42 1026 205V,PIM.FIr(E of2 n1illlorl pal and NoergradesofMSR and MEL) ,50 1330266fSources:American Wood Coundl,NDS 200S,Table 112 A 11.3.2 A Slingshot Power,Contractor Nom 11 Thread must be embedded In a rafter or other SMICtural roof member. 2)See BC for required edge distances. Equipment in this Photovoltaic System slingsh<;A. 10.29 kW PV System 1Story Curved Tile Roof Mounting Hardware: QMS PV Flat Tile Date: 30-Sep-14 Project Details: Page Number: p 1 g 164 Main St., Los Altos, CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 12 California State Lic: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA The following signage is required to be installed: (a)Per Sect ion 690.17 2010 CEC,where both the line and load side terminals of any disconnect may be live in the"OFF"position the following WARNING LABELS warning shall be placed on the front of the disconnect"WARNING LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION" WHITE LETTERS ON RED BACKGROUND AND NON-BOLD ARIAL OR SIMILAR FONT, MARKING SHALL BE OF REFLECTIVE, WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT - - - - - - - � M WARNING <- - - - - - - POWER SOURCES WARNING SECOND SOURCE IS PHOTOVOLTAIC SYSTEM INVERTER OUTPUT THE SECOND POWER SOURCE IS LOCATED ON PHOTOVOLTAIC SYSTEMI CONNECTION DO • • • MAIN PANEL (Minimum size 1� • OPEN—CIRCUITAC VOLTAGE 48.8Vdc AXIMUM SYSTEM VOLTAGE 500 PV SYSTEM AC DISCONNECT� � w A w� . • 6.35Amps NORMALWARNING AC OPERATING VOLTAGE • ELECTRIC SHOCK HAZARD 690.14,690.15,690.54 SHORT CIRCUIT CURRENT Amps IF • GROUND FAULT - - - - - - Inverter INDICATED,NORMALLLY Watts . . . . - %- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - go o MAY :• UNGROUNDED ENERGIZED! DC � Appendix C:Safe DC 690.5(c) ` ` When AC supply to the inverter is shut off(by shutting off the AC breaker at the site),or when the .` inverter ON/OFF switch is turned to OFF,the DC voltage drops to a safe voltage of IV per optimizer.The 0 SolarEdge inverters are certified for compliance with the following standards as disconnection devices � `� � g p� g ` WARNING-ELECTRIC SHOCK HAZARDfor PV generators,meaning that they can replace a DC disconnect: OFCA DC CONDUIT(EVERY DO NOTTOUCH 10')INTERIOR OR EXTERIOR TERMINALS ON BOTH LINE AND LOAD SIDES MAY IEC 60947-3:1999+Corrigendum:1999+A1:2001+Corrigendum 1:2001+A2:2005; \ SFM REQUIREMENT �' OPEN POSITION TO BE METALLIC AND •'• DIN EN 60947-3 REFLECTIVE J/B VDE 0660-107:2006-03 i IEC 60364-7-712:2002-05 PV SYSTEM DC DISCONNECTDIN VDE 0100-712:2006-06. POWERRATED MAX POINT ,D CAUTION • - - - - - - - - - -> RATEDPOWER '• •LTAGE-23.8 VDC In compliance with these standards,the disconnection mechanism operates as follows:1 Turn the MAXIMUM •LTAGE- 500 VDC inverter ON/OFF switch,located at the bottom of the inverter,to OFF,or disconnect the AC by shutting SHORT • 0' off the AC breaker at the site.The DC voltage displayed on the inverter LCD begins to decrease.lf the AC ARRAY - •• •' •• breaker was shut off,the LCD does not display.In this case,wait five minutes.2 When the DC voltage reaches a safe voltage,the PV connectors at the input to the inverter can be disconnected.A galvanic separation then exists between the PV array and the inverter.The disconnection is safe even under single fault conditions. d WARNING! V � PER� 'N California Solar Permitting Guidebook Slingshot Power,Contractor Under single fault conditions,the Safe DC voltage is only guaranteed when using modules of up-to: :�uilriinq Dep'nm@Rf 95Voc when using the single phase inverter70Voc when using the three phase inv iter, ' . V) loi4 Equipment in this Photovoltaic System Warning Labels for Placement on System REVIEVVEU G slingshc--)t 10.29 kW PV System 1 Story Curved Tile 1 UR r' 0��E Date: 30-Sep-14 Project Details: Page Number: peV;P _,. 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 J j B f Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 13 California State Lic: 8984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA i Classic Conduit Composition Mount I QMCC -- --- _ 1 Lag Stolt Specifications rrEM NO. DESCRIPTION OTY. THIS EDGE TOWARDS ROOF RIDGE 1 FLASFCNG,9'x 12'X.040',5052,MILL 1 8padec Graviity 1l4-shaft per,914•gaesd depth 114•shalt per 1•Usaad deptl 2 GOLOCK,CONDUIT,VII 6061-T6,MILL 1 WASHER,SEALING,1/4-ID X 7/8"OD,EPDM Douglas For,Lards SO 353 323 9 BONDED SS I __ —. __. __ 4 LAG SCREW,HEX HEAD,1/4"x 2-1/2,18.855 I Douglas For,SOUP, -46 353 202 Enge6nam Spruce,Lodgepole PWm(LtSR 16M F d highml 46 953 202 AVAILABLE IN MILL,CLEAR ANODIZED, ' AND BRONZE ANODIZED FINISHES. Hem.Fir .43 313 179 Hem.Fir(North) As 353 202 SouRlern Pine As 455 260 12.0 ----- — —- Spruce.Pins.Fu .42 — 302 173 Spruce,Pine-Fr(E of 2 rrallon psi and higher grades of MSR and MEL) 50 390 225 CONDUIT CLAMP1.3 NOT INCLUDE ^ 23 ! 2.5 3 4.5 2 9.0 .79 1 Quick Mount PV TIRE -f - QMCC:CLASSIC CONDUIT COMPOSITION MOUNT QM Flat Tile SUE DRA"BY RAD REV QM Classic CONDUIT ii,eaC„s in w e.cm tOt[w+cs A DATE 9M4l�L113 4 r CONDUIT i4. ° �3" 'S.1 dPd'a�` .TfiYIiB. 0••'"••�•eddo. wQ.a oo„a�[aaw..� n«an oriw i n sine13 . 1:0.68 $"a,1n1 ORDER OF INSTALLATION: 1) Locate Rafter, Mark Hole Location, and Drill Pilot _es SUP T R , INO Hole i4iloinc ops ert4 2) Seal Pilot Hole with Sealant4. �, 3) Insert Flashing �� � V� T V1 ��, , 4) Place Mount r'0, 5) Install Lag Bolt with Sealing Washer or Sealant X - ` 6) Install Foot with Bolt and Washers Slingshot Power,Contractor slin1 1 Equipment in this Photovoltaic System gshot. 10.29 kW PV System 1 Story Curved Tile General Notes Roof Mounting Hardware Date: 30-Sep-14 Project Details: Page Number: P 1 g 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 14 California State Lic: 8984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA r am SOLAIRMOUrcr Top Mounting UniRac Grounding Clips and WEEBLugs - 225.6 UGC-1 T clamps cl cicxnps j' Modde w Nb I Figwr,26.90.UGG!grounding `_"•'� "-1 11GC I wt t dip into top mountirg dor of rail Intertek I I Torque ntoduh%in ptace on top of dip.Nibs willpemrtrate rail anod. ULS—dwdW - ization and create grounding path .. __. . :._... through rail(see Fig.3,reversx•side). Solor.MuunCB rail(eny type] Figure 27.Insert a bolt In the W EEBLug aluminum rail or through the clearance hole in the stainless steel flat washer.Place the stainless steel flat washer on the bolt oriented so the dimples will contact the •"� aluminum rail.Place the htg portion on the bolt and sraorless steel flat WWI washer.Install stainless steel flat washer,lock washer and nut. W EEBI g ' Tighten the nut until the dimples are - eompleray embedded into the rail and lug.The embedded dimples make } Stairiess Steel Flat agas-tight mechanical connection Washer(WEEK( and ensure good electrical connection between the aluminum rail and the Chin and ms.aw"d�parsocfy. lug through the WEEB. �;;, ""' r oun l8 tail Y ��,... (any NIx) r+dr Figure 28.UGGllayoutforeven and odd number of modules in row. '7C"denotes places to install UGC-1. Even Number of Modul m in row i`^U P ER NO x � uil�ina Dei Kmenf r:j 0 f° 2,r"4 Odd Number of All."s in row me U N I RAC pub 110617-2cc June 2011 N .2011 by Umar-M A MITI GROUP CDAW WY Aa rtghn reserved Slingshot Powerr,Contractor Equipment in this Photovoltaic System slingshcpt. 10.29 kW PV System 1 Story Curved Tile Grounding Systems: Integrated Grounding (IG) Date: 30-Sep-14 Project Details: Page p � g Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 15 California State Llc: 8984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA WEEBLugIntertekAUTHORIZATION TO MARK µ The WEEB Lug cons�sts of a WEEB (Washer, Electrical Equipment Bond), lay-in lug. and hardware. It is used with one solid or stranded Copper wire (6AWG to 14AWG), or two copper wires (10AWG to 12AWG) This authorizes the application of the Certification Mar*lsj shown below to the models described in the Product(s) to provide a continuous ground on roof or ground mounted solar systems. Unlike traditionW lay-in lugs, Covered section when made in accordance wrth the conditions set forth in the Certd,cation Agreement and Listing Report This authorization also applies to multiple listee modelis, identified on the correlation page of the Listing the WEEB Lug does not require surface preparation on rail or module to install. The WEEB Lug is Report insta:led using a 114.20 stainless steel screw which tightens the WEEB. allowing the specialised teeth to This document is the property of Intertek Testing Services and is not transferable. The certification marks) may be en^bed into anodized aluminum, galvanized steel, or any electrically conduc hve metal to establish a gas applied only at the location of the Party Authorizod To Apply Marts. tight electrical connection. The tin-plated Lug assures minim rTt contact resistance and protection against corrosion, The copper Wire is Gram Address: 44 Pe pies Fid LLC Addresmanutas: Same as Applicant ped by a 114-28 Stainless steel screw, which is horizontal to the tang for �P� easy access when mounted under a PV modu:e, The taw profile of the WEEB Lug allows it to be installer Address: ,�r1i�Yd124-n Add,.�s: in a variety of positions and comes With hardware to mount it to a rail or through a 1/4 inch clearance holo. Country: USA Cou^by: Contact: Ms. Maggio Dula o Mr.Brian Wiley Contact: Phone: (845)247 4708 Phone: FAX: (845)247 7438 FAX: Email: pauiom'llc.00m Email: Party Authorized To Apply Mark: Same as Manufacturer Matenal: 344 stainless. steel, tin-plated copper. outdoor rated Report taming Office: Lake Forest.CA.USA 'OF Low profile design control Number: 3098177 Authorized by: Multiple equipment ground conductor allowance: Witfiam T Starr,Ccrtdication Manager One 14 AWG to 6 AWG or two 10 AWG, two 12 AWG Listed to ANSI/UL 467 by Intertek ETL r - - c(&US Y r Intertek What is a WEEB? a This document supersedes all previous Authorizations to Mar*for the noted Report Number. The WEEB (Washer, Electrical Equipment Bond)is the first production part specifically 1�'r"ffiiRt g �. R« .-bw.a�¢..�, .w .J Or 1b aGisA a 5^=+�.R +•Y,m3afisA atG sp,: . .y.vgG yplf,�d,i..^,a. \. %n W b'Ji•ru.YYi a0ra�.r t',0,ar+Wco^aw Y411N awe.„s rd IAb«,qi brr O✓`r CV.�sAr.A,t f„Upt - �-.:osa -�.C'y s sr r'- � , :..r+pY'yi W 6r'j}a wusv v+.d intended for use in grounding photovoltaic systems. There is a family of WEEB parts,one for grounding EroP.s.tl@f.Aaaa�rx=„► �.,,,. t.,.,. �► ,.m. G.� � .vr.� mM=a.nx��l,. ,�.,lp, ��Qa'<.,.,c�.l�no ,..� ,.'rt.yo0 fa ha oordtigr•a i!d[i.','9»Xy�W4.r*,X A�1'0 a Aa Y WA.lry d 4`t 1 Nk.„r<.WIN —'—W C-0014 N i AA oN each kind of photovoltaic mounting system. The WEEBs are used to bond photovoltaic _i are•t**pmor wb,a ,y. 6 Y zAa.„A.-~.a.0 VaJ .c �:.-.r.'v t.W,pow ea"u 'QAnwow Ali,..0 of 1"Ca l%ulcr RaA.r wcaavn wt tw modules to the mounting structure.Aground is connected to the resulting composite structure .. . 1 -;_-0ra.'1t41W '..'r..«.s+a so that the photovoltaic modules are also grounded.This Is more technically described in Irtenek resting Sennaes NA Inc. NEC sections 250.136 and 250.134 and discussed at the company website, httpUwww_we- 165 Man Street.Corland.NY 13045 IIC.com/WEEB nec.htmi. Telephone BOG 345 3851 of 607-753 6711 Fax sol-756-6689 Staridard(s): UL Standard for Safety for Grounding and Banding Equipment,UL 467,9th Edition_,issued 2007.•09x`21 Are WEEBs listed? / Grounding and Bond Equipment, CSA 22.2#41.5th Edition. September 2007 Yes, all WEEBS meet ANSI/UL 467, standard for grounding and bonding equipment. TestingProdu«; Devices was performed by Intertek ETL. The WEEB are listed to US and Canadian standards. A copy Bonding Devices Model numbers WEEB-9.5. WEE:B'9.5NL,WEE B,11.5. WEE6.15.8,WEER�ATF:.: of the certificate is available online at htto:/Iwww.we-Ilc.coml.PDF/ETL mark.Wf WE.EB•CL,WEEB'CMC.WEEB CSG,WEEB,DMC.WEEB-DPF•WEEB JJR, WEEB-K MC,WEEB4eSf9 Modeta WEEB-PMC,WEIR-SCR,WEEB-SMC,WEEB-SCR, WEEB•SSF,WEEB-SSR.WEEB•UGC2:;WEE-$� �,�` ' UIR,WEEB-UMC.WEEB-WMC,WEEB-WMR1,WEEB-WMR2,Doubly Wedge Solar Giant•W EEBL• 7)F` Why UL 467 and not UL 1703,standard for photovoltaic modules? 6.7,Bonding Jumper 6.7,W EEBL-8.0.Bonding Jumper 8.0.WEEBL,8;�@W�cfing Jumper 8.2,WEEBL ANSt/UL 1703 only covers photovoltaic modules. Since the WEEB parts involve both module 15-8 and mounting system,the more general standard.ANSl/UL 467 is required. Also, since 9;*4 ANSVUL 467 was written with AC systems in mind it is a much more severe specification. All )UL , ,�'d�E WEEBs are tested to carry a current of 1530 Amperes for 6 seconds. This is much more than any photovoltaic module can source and is why the WEEBs offer better lightning protection Slingshot Power,Contractor' --"`"�'' �a4:-yr than previous grounding methods. . sI • Equipment in this Photovoltaic System In s h�e: 4 �.. 10.29 kW PV System iStory Curved Tile Grounding Systems: WEEB Lug - UL & Technical Date: 30-Sep-14 Project Details: Page Number: P 1 g 164 Main St., Los Altos, CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 17 California State Lic: B984488 1 Inverter Used SolarEdge SE-10000A-US Drawn: Paul Sherer City: Cupertino,CA Two Pole,Ground and Neutral Torque Information As the neutral point of an electrical supply system is often connected to earth ground,ground and neutral are closely related. Under certain conditions,a conductor used to connect to a system neutral is also used for grounding(earthing)of equipment and structures. Current carried on I.All top down clamps must be installed with anti-seize to prevent galling and provide uniformity in clamp load. Unirac a grounding conductor can result in objectionable or dangerous voltages appearing on equipment enclosures,so the installation of grounding Inc.recommends Silver Grade LocTite Anti-Seize Item numbers: 38181,80209,76732,76759,76764,80206,and 76775, conductors and neutral conductors is carefully defined in electrical regulations. Where a neutral conductor is used also to connect equipment or equivalent. All 1/4-20 hardware used in conjunction with top down clamps must be installed to 5 - 10 ft-lbs of torque. enclosures to earth,care must be taken that the neutral conductor never rises to a high voltage with respect to local ground. 2.Solar panel flange nuts tighten installed to 5 10 ft-lbs of torque. 3.Inverter cover screws tighten to 13.2 in-lbs. Definitions 4.DC Array input to inverter wire size up to#4AWG tighten to 13 in-Ibs.torque Ground or earth in a mains(AC power)electrical wiring system is a conductor that provides a low impedance path to the earth to prevent 5.RS-485 Terminals tighten to 8 in-lbs.torque hazardous voltages from appearing on equipment(the terms "ground"(North American practice)and "earth"(most other English-speaking 6.Wiley Electronics WEEB UMC or UGC-I grounding clips in combination with or End clamps and 1/4-20 bolt and countries)are used synonymously here).Under normal conditions,a grounding conductor does not cant'current.Neutral is a circuit conductor flanged nut,torqued to 120 in-lbs. If the Solarmount-I system is used grounding is achieved with the UniRac UGC-2 1/4- that carries current in normal operation,which is connected to ground(or earth). In a polyphase or three-wire(single-phase) AC system,the 20 bolt and flanged nut torqued to 120 in-lbs. When using methods 2,3,4 or 5 the array frame(racking). neutral conductor is intended to have similar voltages to each of the other circuit conductors. By this definition,a circuit must have at least three wires for one to serve as a neutral. In the electrical trade,the conductor of a 2-wire circuit that is connected to the supply neutral point and earth ground is also referred to as the"neutral".[I]The NEC and Canadian electrical code only define neutral as the first of these. In North American use,the second definition is used in less formal language but not in official specifications. In the UK the IET definition of a neutral conductor is one connected to the supply system neutral point,which includes both these uses.All neutral wires of the same electrical system should have the same electrical potential,because they are all connected through the system ground.Neutral conductors are usually insulated for the same voltage as the line conductors,with interesting exceptions.[2] Ufer around Circuitry Neutral wires are usually connected at a neutral bus within panelboards or switchboards, and are"bonded"to earth ground at either the The Ufer Ground is an electrical earth grounding method developed during World War II.lt uses a concrete-encased electrical service entrance,or at transformers within the system. For electrical installations with three-wire single phase service,the neutral electrode to improve grounding in dry areas.Thetechnique is used in construction of concrete foundations. point of the system is at the center-tap on the secondary side of the service transformer. For larger electrical installations, such as those with polyphase service,the neutral point is usually at the common connection on the secondary side of delta/wye connected transformers. Other Construction: Concrete is naturally basic(has high pH). Ufer observed this means that it had a ready supply of ions and so arrangements of polyphase transformers may result in no neutral point,and no neutral conductors.Combining neutral with earth Stray voltages provides a better electrical ground than almost any type of soil. Ufer also found that the soil around the concrete became created in grounding(earthing)conductors by currents flowing in the supply utility neutral conductors can be troublesome. For example, "doped",and its subsequent rise in pH caused the overall impedance of the soil itself to be reduced.[3]The concrete special measures may be required in barns usedfor milking dairy cattle.Very small voltages, not usually perceptible to humans, may cause low enclosure also increases the surface area of the connection between the grounding conductor and the surrounding soil, milk yield,or even mastitis (inflammation of the udder).[3] So-called "tingle voltage filters" may be required in the electrical distribution which also helps to reduce the overall impedance of the connection. system for a milking parlour.Connecting the neutral to the equipment case provides some protection against faults, but may p roduce a dangerous voltage on the case if the neutral connection is broken.Combined neutral and ground conductors are commonly used in electricity Ufer's original grounding scheme used copper encased in concrete.However,the high pH of concrete often causes the supply companies'wiring and occasional) for fixed wiring in buildings and for some specialist applications where there is I ittle alternative, copper to chip and flake. For this reason,steel is often used instead of copper.When homes are built on concrete slabs,it such y p g y g g p pp such as railways and trams. Since normal circuit currents in the neutral conductor can lead to objectionable or dangerous differences between is common practice to bring one end of the rebar up out of the concrete at a convenient location to make an easy local earth potential and the neutral,and to protect against neutral breakages,special precautions such as frequent rodding down to earth connection point for the grounding electrode.[4]Ufer grounds,when present,are preferred over the use of grounding rods. (multiple ground rod connections), use of cables where the combined neutral and earth completely surrounds the phase conductor(s),and In some areas(like Des Moines, Iowa) Ufer grounds are required for all residential and commercial buildings.[5]The thicker than normal equipotential bonding must be considered to ensure the system is safe. conductivity of the soil usually determines if Ufer grounds are required in any particular area. Shared neutral An Ufer ground of specified minimum dimensions is recognized by the U.S.National Electrical Code as a grounding A shared neutral is a connection in which a plurality of circuits use the same neutral connection.This is also known as a common neutral, and electrode.[6]The grounding conductors must have sufficient cover by the concrete to prevent damage when dissipating the circuits and neutral together are sometimes referred to as an Edison circuit. high-current lightning strikes.[7] Sinele phase A disadvantage of Ufer grounds is that the moisture in the concrete can flash into steam during a lightning strike or similar Main article: Split-phase electric power In split phase wiring, for example,a duplex receptacle in a kitchen,devices may be connected with a high energy fault condition.This can crack the surrounding concrete and damage the building foundation.[8] cable that has three conductors, in addition to ground.The three conductors are usually coloured red,black,and white. The white serves as a common neutral,while the red and black each feed,separately,the top and bottom hot sides of the receptacle:Typically such receptagjl s are supplied from two circuit breakers in which the handles of two poles are tied together for a common trip. If two large appliances arekl it t'' once,current passes through both and the neutral only carries the difference in current.The advantage is that only three wires are regiiirudto X serve these loads, instead of four. If one kitchen appliance overloads the circuit,the other side of the duplex receptacle,will be shut off as well. This is called a multiwire circuit.Common trip is always required if there are loads that use more than one phase simvltaneo-usly. The common Slingshot Power,Contractor trip prevents overloading of the shared neutral if one device draws more than rated current. & - Equipment in this Photovoltaic System slingshG>t. 10.29 kW PV System 1Story Curved Tile Torque Information & Grounding Inforr tiow. Date: 30-Sep-14 Project Details: Page Number: P 1 g 164 Main St., Los Altos,CA 94022 Equipment Tvpe Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 18 California State Lic: 6984488 1 Inverter Used SolarEdge SE-10000A-US Drawn: Paul Sherer City: Cupertino,CA GENERAL NOTES.(Cont) UNGROUNDED PANEL EJ POSITIVE GROUNDED PANEL ❑ GENERAL NOTES 1. Local utility provider shall be notified prior to use and activation of any NEGATIVE GROUNDED PANEL � solar photovoltaic installation. ABBREVIATIONS Main Service Disconnect: 2.No sheet metal or tech screws shall be used to ground disconnect A...........Ampere MICROINVERTERS El enclosure with tin-plated aluminum lugs; proper grounding/ground bar kits AC........Alternating Current CAUTION should be used. BLDG.. Building Structure SOLAR SYSTEM CONNECTED CONC...Concrete. THIS PROJECT SHALL COMPLY WITH: 3.All exterior conduit, fittings,and boxes shall be with rain tight and DC.........Direct Current THE: 1. Residential buildings -the marking may be placed within the main approved for use in wet locations.(NEC 314.15a). EGC.......Eirect Current Grounding Conductor 2010 CA BUILDING CODE service disconnect.The marking shall be placed on the outside cover if the EGC.......Equip g 2010 CA PLUMBING CODE main service disconnect is operable with the service panel closed. 4.Adequate spacing are maintained between any plumbing vents extending EMT.......Elestrical Metal Tubing 2010 CA RESIDENTIAL CODE through the roof and the underside of the photovoltaic panels. GALV....Galvanized 2010 CA ENERGY CODE 2.Permanent labels shall be provided,no sharpie marking will be allowed . GEC. .....Grounding Electrode Conductor 2010 MECHANICAL CODE covering shall be minimum 4". within any main service panel or subpanel. 5. Separation distance measurement from bottom of panel to top of roof GEC.ND .....Ground 2010 CA CITH/COUNTY FIRE CODE HDG.......Hot Dipped Galvanized I..............HottiCurrent 3.Markings: Verbiage,Format,and Type of Material.a.Verbiage: 6.Grounding bushings are required around pre-punched concentricCalifornia ode ot Regulations CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED knockouts on the do side of the system. (NEC 250.97). Imp.........Current At Maximum Power Title 24, Part 3 FROM THE PV SOLAR SOURCES WITH DISCONNECT Isc...........Short Circuit Current LOCATED AS SHOWN 7. Back-fed breaker must be at the opposite end of bus bar from the main kVA........Kilovolt Ampere California kW..........Kilowatt Building Standards Commission breaker or main lug supplying current from the utilities. k W.......Kilo Bearing Wall Based on 2011 National Electrical Code's b. Format: um ........Minim (1)White Lettering on a red background 8.All conductors exposed to sunlight are listed as sunlight resistant. MIN........Minimi (2)Minimum 3/8 inches letter height NEUT.....Neutral (3)All letters shall be capitalized 9.No building,plumbing or mechanical to be covered by the solar array. NTS........Not To Scale OC..........On Center p 11 ate. B. Marking Requirements on DC Conduit,Raceways, Enclosures,Cable 10. Smoke alarm and carbon monoxide alarm required per CRC R314& PL...........Property Line , Assemblies, DC Combiners,and Junction Boxes: 8315. 1 POI.........Point of Intersection 1. Markings: Placement, Verbiage,Format and Type of Material.a. 11.All work to comply with 2010 California Building Code;2010 PV..........Photo Voltaic Schedule Permanent Placement: Markings shall be placed every 10 feet on all interior Electrical Code[2008 NEC] -article 690,all manufacture's listing and SCH........ EFFECTNE and exterior DC conduits, raceways,enclosures,and cable assemblies, at installation instructions. SS...........Stainless Steel JANUARY 1,2014STC........Standard Testing Conditions �F-. :~A, A!=••,��,..,,,,,• ---nv..•..+-,t.;..��,•. turns,above and/or below penetrations,all DC combiners, and junction boxes. 12. Inspection required for roof connection mounting assemblies prior to TYP........Typical 2Pole......Grounding System(N) &GND installing solar module. UPS........Uninterruptible Power Supply B. Verbiage: 13.This system is GRID-INTERTIED VIA a UL Listed or OSHA UFER......Grounding system to foundation V.............Volt CAUTION SOLAR CIRCUIT Approved Test LAB certification ID. Vmp........Voltage at Maximum Power C.The following label shall be placed on all AC disconnects: 14.This System has no batteries,No UPS. Voc.........Voltage at Open Circuit W............Watt CAUTION SOLAR CIRCUIT DISCONNECT FOR UTILITY 15.SOLAR Mounting Rails,SubRails, Poles are all to be grounded to earth. 3R...........NEMA 3R,Raintight OPERATION All Work to be done to 2010 California Electrical Code(CEC)and shall aUilrii� De; also comply with 2008 National Electric Code as amended by the 2013 X CEC Slingshot Power,Contractor Equipment in this Photovoltaic System slingsh 10.29 kW PV System 1 Story Curved Tile General Notes@vie1SF?rl Date: 30-Sep-14 Project Details: P 1 Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 19 California State Lic: 8984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA I ELECTRICAL NOTES ELECTRICAL NOTES(Cont) LEGEND 1.No guardrails are required for installed solar energy devices pursuant to LAMC 91.1013.5 17.All ungrounded conductors of a multiwire branch circuit will be identified ny phase and system per E)Utility Meter& 210.5 Warning Label 2.AII PV System components shall be listed by a recognized testing agency ( i.e.: UL,OSHA test Labs etc) 18. Either UL Laboratories or an OSHA Test Laboratory certifying station shall be listed on all equipment in compliancewith 110.3 Inverter W/Integrated 3.Wiring material shall be suitable for sun exposure and wet location,field applied protective coatings DC DISCONNECT are not acceptable. 19 Circuits over 250V to Ground shall comply with 250.97,250.92(B) 4.AIIPV modules and associated equipment and wiring material shall be protected from any physical 20 DC Conductors either do not enter the BLDG or are run inmetalic raceways or enclosures to the first DC DISCONNECT& damage. accessible DC disconnecting switch means per 690.3(E) WARNING LABELS 5.1n one and two family dwellings, live parts in PV source circuits amp output circuits over I50volts 21.All wires shall be provided with proper strain relief and any anti abrasion systems at all entry into to ground shall not be accessible to other than qualified persons while energized. boxes as required by UL or OSHA ListingsAC DISCONNECT& 6.All Field installed junction,pull and outlet boxes located behind modules or panels shall be 22.All Modular/or module frames shall be grounded to earth at the UL-or OSHA Listed Location WARNING LABELS accessible directly or by displacement of a module(s)or panel(s)secured by removable fasteners. provided by the manufacturer using proper Isted grounding hardware. rl JUNCTION BOX Tsigns shall be posted adjacent to each PV disconnect and inverter to indicate 23.Module frames/framework(s), rails and posts shall be bonded with equipment ground conductors and grouunded at the main electric panel. "PHOTOVOLTAIC SYSTEM" 11 DC COMBINER BOX& 24.The DC grounding electrode conductor shall be sized according to 250.166(B)and 690.47 WARNING LABELS 8.All Wiring shall comply to CEC Table 310.16 for sizing 25.The installing Contractor will confirm that proper earth to ground installed in the building eith 9. When a BACKFED BREAKER is the method of utility interconnection, Breaker shall not read line UFER or Two pole systems. Q DISTRIBUTION PANEL and load. &WARNING LABELS 26.EACH MODULE SHALL BE GROUNDED USING UL LISTED CU/TIN GROUNDING LAY- 10. All conduit,fittings, boxes shall comply with NEMA NEC 314.15A IN LUG LOCATED AT THE MANUFACTURER'S SPECIFIED LOCATION ON THE MODULE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND IN ACCORDANCE CEC L LOAD CENTER& 11.There shall not be any hanging wires underneath any PV panels(CEC 110.12) WITH A CONTINUOUS BARE CU WIRE SUCH THAT REMOVAL OF A MODULE FOR WARNING LABELS SERVICE SHALL NOT INTERRUPT GROUNDING OF REMAINING MODULES. ALL PANELS 12. Equipment Grounding conductor shall be#6 AWG unless not subject to damage(CEC250.120C) GROUNDED TO EACH OTHER&FRAME BY A MINIMUM#6 BAE GROUND WIRE TO MAIN PANEL GROUND TO EARTH '"r'+ DEDICATED PV 13.Working Clearances around the existing electrical equipment and well as the new electrical SYSTEM METER equipment will be maintained in accordance.(CEC 110.26) 27National Electric Code 690.64 Point of Connection The output of a utility- interactive inverter shall be connected as specified in 690.64,Bus or Conductor Rating.The sum of the ampere ratings of over 14.There will be Labels to indicate PV-SOLAR AC Breakers in Main Panel current devices in circuits supplying power to a bus bar or conductor shall not exceed 120 percent of the CONDUIT RUN rating of the bus bar or conductor. In systems with panel-boards connected in series,the rating of the ON EXTERIOR "DO NOT RELOCATE SOLAR BREAKERS IN THIS PANEL" first over current device directly connected to the output of a utility- interactive inverter(s)shall be used in the calculations for all bus bars and conductors. d*a i;4W 15.All terminal connections shall be rated at least 90 degrees C. CONDUIT RW 16.All terminals that are of the disconnecting means may be energized in the open position,a sign f p?rtmPnf shall be provided warning of the electrical hazards 690.17 X dI1�T Slingshot Power,Contractor REVIEWED rUK Co 1-'ANCE s • _ Electrical Notes Equipment in this Photovoltaic System Reviewer ( I s h- , tet.. 10.29 kW PV System 1 Story Curved Tile Date: 30-Sep-14 Project Details: p J Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 2 0 California State Lic: 8984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino, CA L . Fixed String Voltage-Theory of Operation ivca,conai�ons Paiw.i Shading L � _ • + t _ _, ._.. __ The system maintains a fixed string voltage regardless of string characteristics and environmental conditions.This application note details the concept of operation of the fixed string voltage and its .ous4eJregtowted 4y"I z i« ` 1 benefits. .I4010!I;se*-a -?OOO ri ISM Concept of Operation 3 The power optimizer is a DC-DC power optimizer integrated into each module,replacing the junction tyott.aV fiexamoep-S1Y box.The power optimizers, using an input control loop,perform per module MPPT and enable L WO t.rrr-*+t •TIOW/32V• .;^► performance monitoring of each module. In an independent process,the power optimizers enable the } inverter to automatically maintain a fixed string voltage,at the optimal point for DC-AC conversion by the inverter,regardless of string length and individual module performance.The operating principles of thesystem are illustrated in the following example which examines a system's behavior '•Pow" - r under varying conditions. iawwzt a POWW`fir'` The example system consists of 10 20OW modules.Each module has a power optimizer connected to Figure 1: Operation under Ideal Conditions figurr 3'Srtnmr;o Comparison it,which is essentially a DC/DC buck-boost converter with an MPPT controller.The power optimizers areserially-connected to form a string;multiple strings can be connected in parallel to the same input of the inverter.The inverter is a single stage current source- it continuously adapts the f - WA current it draws from the PV array in order to keep the input voltage constant. • j-.Y^4't..'!ce(r[.z'Pt.pt•._i,.y low[-W-,, The ower optimizer is highly efficient,maintaining over 98.8%weighted conversion efficiency over a L!— yj, •in"c,.n ev rrcrst - ISKIW t ISM-S,17A wide range of conditions. However, for calculation simplicity, we assume 100%power optimizer ° efficiency in this example. 200VO 11 1 11 11 Fixed String Voltage Benefits f _ t♦ MOP vak go M The fixed string voltage maintained by power optimizers provide multiple benefits: ; :MOP(,rear% =aaw,2^ _J gbh G T7 rr OHt to V 0sitP� WW i% 17A 3 to 4-n Flexible Design mismatched modules can be serially-connected in a string.The number of modules in _' . a single string is not dependant on module output voltage and therefore a wide string length range is 4+7 � '� • tam s sem, permitted 1. High Inverter Efficiency and Reliability Figam 7:Operation with Partial Shading The inverter components work at a fixed voltage,operating under less stress.The inverter always operates at a voltage that enables optimal DC-AC inversion efficiency, independent of string length or environmental conditions. Reduced Installation Cost-longer strings, lower BoS element count and installation cost and labor. Temperature Indifference -the fixed string voltage completely removes thetemperature constraints which strongly limit string length in traditional systems. s. —•. -.•' '� .�o-�ice,�r L .. ad Improved Safety -all power optimizers start up in"safety IV output" mode until the power optimizers 3u'Ic�tr,g �p .r"t777@!?f are connected to a functioning inverter.Additionally, in the event of a gridpower shutdown,the }( modules immediately stop producing power and revert to this mode. � 1 �� Slingshot Power,Contractor REVIEWS A, slingshot,. Equipment in this Photovoltaic System Technical Note• Optimizers Reviewed E ����10.29 kW PV System 1 Story Curved Tile . Date: 30-Sep-14 Project Details: Page Number: P 1 g 164 Main St., Los Altos,CA 94022 Equipment Tvpe Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 21 California State Lic: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA ,4AE .; 2NA Sene1 PcrAo--' (AxrnA.'eE 3NA Sene Power Opurrsz-,er r - AC =- 711 Conduit Nuts 1 Figure 14: Insetting the AC and OC Condors OUW rput JDC+ I I — Dt_ -r + _.�----"'•"'"""' • � i nput - Connect to Module Figure 15: inverter DC Terminals Pyre 4: Power i ptinuzer Connectors �g C lD E A 8 Tern-anal -y Connectors Figure 16: Inverter AC Terrrlinal Blocks For Installation of the SolarEdge - ,, — --- Inverter and the SolarEdge Optimizer i -Partmeni Figure 5: Polllllw Opatntzers Connected in Serres X „ Please Reference these documents SlingshotPowertContractor LvlEwE;u vFc C()t.7E C:,-- IPFt_ LANCE Islingshic.A.. Equipment in this Photovoltaic System Install Optimizer/Combiner: SolarEdge '��V1e,� o �; / .�,rJCE 10.29 kW PV System 1 Story Curved Tile Date: 30-Sep-14 Project Details: Page Number: P 1 g 164 Main St., Los Altos, CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 22 California State Lic: 8984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino, CA otig California State Fire Marshal California State Fire Marshal Information Bulletin 14-002 Information Bulletin 14-002 Issued:Febnmry 14,2014 The requirements of the IBC Section 1509.7.2 will need careful examination in its application. The language of this section states that the fire classification of PV systems must match the minimum FIRE CLASSIFICATION FOR ROOF MOUNTED SOLAR PHOTOVOLTAIC required fire classification of the roof assembly over which they are mounted as required in IBC Section PANELS/MODULES [SYSTEMS]AND APPLICATION OF THE 2013 CALIFORNIA 1505. With any rooftop structure, the PV structure should not degrade the fire resistance properties of BUILDING STANDARDS CODE the roof, so as not to place the building and its inhabitants at an unanticipated risk. However, straightforward implementation of this requirement is not possible for the following reason(s). On January 1, 2014 the 2013 Califomia Building Standards Code, California Code of Regulations (CCR), Title 24, became effective. As part of the 2013 California Building Standards Code, Part 2 and PV modules are a component of a rooftop mounted PV system and, although PV modules can receive a Part 2.5 provisions for the fire classification of roof mounted photovoltaic panels/modules[systems]were fire classification rating in accordance with UL 1703, there are currently no PV systems with a fire updated to comply with the most recent edition of Underwriters Laboratories Inc. (UL) 1703 Standard for classification rating. Thus, as currently written, Section 1509.7.2 refers to the fire classification rating of Flat-Plate Photovoltaic Modules and Panels published in October 2013, a system,and this exact approach is not yet achievable. The Office of the State Fire Marshal(OSFM)was recently informed by industry that presently there is an In the absence of a PV system fire rating, it may seem appropriate to substitute the PV module fire insufficient supply of UL 1703 compliant Class A, Class B or Class C fire rated tested and listed classification rating in order to achieve the desired result, which is the preservation of the roof photovoltaic panels/modules [systems] to meet present demand. This circumstance may prohibit the assembly's original fire classification. However,simply using the PV module fire classification rating may permitting of projects to install solar photovoltaic systems on roofs,which in tum curtails efforts to meet not provide the desired result in most cases. current sustainability goals. The issuance of the most recent edition of UL 1703 and its adoption into the Over the past five years, rigorous testing by UL and Solar ABCs revealed that the performance of a 2013 California Building Code(CBC), specifically Section 1505.9 and California Residential Code(CRC) system (which includes PV modules on standoff mounted racks)exposed to fire or flame is not the same Section R902.4 necessitates the need for guidance from the OSFM on this matter. These sections read as that of a module alone. Currently, modules receive a fire classification rating based on testing the in part: module alone, not as part of a PV system. The results of these tests show that actual performance of a "Rooftop mounted photovoltaic panels and modules(systems)shall be tested, listed rack-mounted PV system exposed to fire or flame is strongly dependent on the mounting geometry of and identified with a fire classification in accordance with UL 1703..." the PV array and properties of the components that make up the speck PV module type,but the results are not necessarily dependent on the fire classification rating of the module. (A summary of this research In view of the effective date of the building standards identified above, and to provide suitable time for is published in a Solar ABCs report available at: the testing and listing of photovoltaic panels/modules [systems]to meet the current UL 1703 standard, http://www.solarabr-s.org/about/publications/reports/flammability-testing/index.html) the Office of the State Fire Marshal recommends that local authority having jurisdiction accept photovoltaic panels and modules having a Class C rating under the previous version of UL 1703 (2002 As a result of this testing and in consideration of the current requirements of IBC Section 1509.7.2, a edition with revisions through April 2008)or UL 790 (2004 edition with revisions through October 2008). working group composed of representatives from the PV industry, the roofing industry, standards This recommendation is based on the photovoltaic testing that was done during the past five years by development, the building and fire enforcement community, and government laboratory experts UL and Solar America Board for Codes and Standards (Solar ABCs) and is discussed in the developed and proposed a new test methodology to determine fire classification ratings for PV systems. "Background and Justification"section of this bulletin. The new test methodology was adopted by the ANSI/UL 1703 Standard Technical Panel, and was published October 25,2013. Background and Justification: The 2013 California Building and Residential Code as noted above are primarily based on national Proposed Emergency Regulations: model codes promulgated and published by the International Code Council and in turn adopted by The Office of the State Fire Marshal is presently developing emergency building standards to temporarily reference into Title 24 Parts 2 and 2.5. The promulgation of these model codes provided the basis for stay the effective date of CBC Section 1505.9 and CRC Section R902.4 for 180 days. This proposed the provisions relating to PV in the California Codes. The 2012 International Building Code (IBC) rulemaking is anticipated to be before the California Building Standards Commission for action at its Section 1509.7.2 includes requirements for fire classification of rooftop mounted photovoltaic (PV) scheduled April 22, 2014 meeting. This information bulletin serves as an interim alternative providing systems and the 2012 International Residential Code(IRC)Section M2302.2.1 includes requirements for guidance until such action can be accomplished. noncombustible or fire-retardant materials. A key objective of the adopted code requirement is that the Questions or comments regarding this Information Bulletin should be directed to Division Chief installation of PV does not diminish the minimum fire safety requirements for the roof. Roof systems Kevin Reinertson, Code Development and Analysis at (916) 327-4998, or by electronic mail to have long received fire classification ratings. These ratings are based on the ability to prevent a fire from kevin.reinertson@fire.ca.gov. penetrating through the roof and the ability to minimize the spread of a fire along the roof surface. y + rtrTIPW X For wore information please Visit 0Uf website http://osfm.fire.ca.gov Slingshot Power,Contractor Equipment in this Photovoltaic System J `�-utvlslingsh(!�)t 10.29 kW PV System 1 Story Curved Tile COSFM: Information Bulletin �awev, r gr � Date: 30-Sep-14 Project Details: Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 23 California State Lic: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA slingsha>t- �j+! G� !� aD/3 �A C�n%1j PLOT PLANS j� / NECKED BY Own Your Energy` DAVE J� Sheet Index LANiVING DEPT: �� 100� SYSTEM DESIGN DAZE 0 PGG2 1...Title and Index BLDG. DEP1`. 2...Roof Plan& PV Panel LayoutO 3...Inverter,Cutoff Switch location&Main Panel Details °Z.°�o °- �� �°� "��° ? F 4...PV Schematic System Wiring Diagram �`���°'7�'s �' ®�� 5—String Current&Voltage Calculations A. U o�d� °Z'P s% ��°� �9q 6...Roof&Electrical Load Calculations ,� :} �y 4° deo- 'o 2 �'���, G�, SYSTEM COMPONENTS , o 7...Solar Panel _ . A °may°�o� �Q p� � 8...Inverter �`' /G��Lr� ®0 eco sy � �`0 9...Optimizer 10-12...PV Rail Mounting System Jr o O 13...Roof Mounting Hardware 14...Warning Labels for Placement on System v SYSTEM INSTALLATION 15...General Notes Roof Mounting Hardware 16...Grounding Systems: Integrated Grounding .. 17...Grounding Systems:Weeb Lug 101 SYSTEM TECHNICAL NOTES `aUPER EI D i Building Deya en�t 18...Torque Information And Grounding Information 19...General Notes,CEC Effective Jan 1, 2014 SEP 18 2 4 20...Electrical Notes 21...Technical Notes:Optimizers REVIEWED FOR (.,ODE C;OMPL! E 22...Installtion Notes:Optimizers �7 23...Fire Bulletin OFFIe"' �"•• � �.�� Reviewed Bye` ------------ -----------___—_--------------- -u �, Additional Installation manuals,other hardware references and X certifications available upon request Slingshot Power, Contractor Equipment in this Photovoltaic System slingshot- 10.29 kW PV System ItStory Curved Tile Title Sheet & Sheet Index I . Date: 18-Sep-14 Project Details: Page Number: 164 Main St.,Los Altos,CA 94022 Eauioment Tyne Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way Caiifomia State Lic: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA N NOTE Mw No'. To SCALE W E Lara'=or•ti of Pix)!ovol'aw Pi4f f i'v' •d! by '.t.:r�al fif4d nuea-,ur�-gywi', ,ti id NOT by guess wbfk :o c�111,Ay ICallforria Fife LAWS fe_)Ula:rr,"-i Inverter En-ergercy Rcpt Azcess PV Par+4 Sf;:-rli(.o AC Disconnect A,tijLis, r er:s unll ;tri nuide for roof vertinq Main panel These reyula*xtNrs are avrlab+e uplo, req�rN�, CALIFORNIA DEPeNRYMENT of ® FORESTRY arta FIRE PROTECTION "ICE OF THE STATE FIRE NiARSW+L- SOLAR PHOTOVOLTAIC rNSTALLATION GUIDELINE Ir );irtf er�,fvi>with �r.: rt!ti'f ! Ft�c.A t �_' offrc"lls, burldrnq officials ard wdus:ry rareser;a,rve-�.! CUP 'NO �• ;kid ` Bu'lding Depprtrne IT 18 �• iF r� 294 front of house i�,� - e W .. P.EVIEVjED FGR CODC CO%f P!, Ard". Rev ev _d By r ® Roof Plan Notes: �. -All panels are mount flush to the roof. ce FOS To Slingshot Power, Contractor Eauipment in this Photovoltaic System Roof Plan & PV Panel Layout slingshot.. 10.29 kW PV System -may Curved Tile _ Date: 18-Sep-14 Project Details: Page Number: 164 Main St.,Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 2 California State Lic: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA DC to Inverter Wire&Conduit Main Breaker will be PV Wire in Free Air or THHN-2/THHN in derated to 175A to conduit(3/4"EMC) Minimum 10AWG Cu Wire each(rated acommadate the solar 90degC) breaker. Laundry Positive, Negative Bare Copper EGC or SOLAR CUTOFF SWITCH Insulated EGC in conduit(3/4 EMT)to keep subpanel will be From PV Panels on Roof On Outside Wall Next to derated from 90A to Meter to comply with CEC SOA 690.17 - Switch or Circuit Breaker cam,: • INVERTER � � ^ ty,�_ .� q�c�►. 'X�7. Mounted on OUTSIDE WALL �< to clear gas meter into house and to conform with Title 5 PG&E JPA Requirements AC M Units are mounted to be seen. InV - CUPERTiNC DC/AC cutoff switches on inverters to Buildin! / � g tie partme i°r be less than five feet off the ground. Inverter SolarEdge Inverter to Load Center AC Disconnect to Main Panel ! � •a! SEP 1 8 214 SE-10000A-US Minimum 10AWG Cu Wire(rated 75degC) Pv Wire in Free Air or THHN-2/THWN-2 in Conduit Solar Main non-fusable cutoff switch L1,1-2,and Neutral 10AWG Ground Wire Minimum 6AWG Cu Wire Each(rated 90degC) REVIEWED FOR. CODE COMIDL Kep under 1.5%voltage drop(conduite Positive,Negative Copper EGC or Insulated EGC in located next to meter. 3/4 EMT _ Conduit Reviewed By Keep under 2%voltage drop Slingshot Power, Contractor Equipment in this Photovoltaic System slingshot 10.29 kW PV System 3ftory Curved Tile PV Equipment & Main Panel Location Date: 18-Sep-14 Project ect Details: Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way { California State Lic: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino, CA J Tag Desciption Make and Model QTY/OCPD Specifications Electrical Plan notes 1 Solar PV Module Sun ower SPR-245NE-WHT-D 42 See panel specifications on e 7 -PV system will be interconnected to the 2 Panel optimizer SolarEdge P350 42 See (miters iftcations on pa e 9 main panel with a 60A breaker 3 Grounding Electrical Conductor Southwire bare copper 10AWG Bare copper 10AWG groundingwire -Optimizer limit string power to 5250W and 4 DC Conduit and Conductor Cerrowire PV wire and 3/4" EMT conduit 10AWG 600V PV wire 900C in 3/4"EMT Conduit for+DC and-DC require a minimum of 8 panels for startup 5 Inverter SolarEdge SE-1000OA-US 1 See panel specifications on e 8 operation.Please see page 21 for optimizer 6 AC utility safe diconnect switch EATON DG222URB 60A NEMA 3R,60A 240VAC,2-Pole unfused,Knifebiade lockable switch theory of operation. 71 Load Center N/A N/A N/A -string of QuantltyW panels are tied to 8 AC Conduit and conductor Cerrowire THHN and 1" EMT conduit 6AWG Cerrowire.THHN 756.0 for L1,L2,N inverter. 9 Main electrcial service disconnect Siemens 200A 17SA 200A typeQPMH Ut listed service breaker -Keep DC runs below 2%voltage drop,and 10 Main Load Center Siemens 200A Main service bus 200A 240VAC,200A MAX,NEMA 311 All-in-one Outdoor AC runs below 1.5% ® All work shall be in compliance with: 5 2013 CA Residential Code r 0 t. -� 2013 CA Electrical Code _ LJ " l1 �- /1^0\ 2013 CA Mechanical Code o 0 0 r - 2013 CA Plumbing Code 2013 Cupertino Municipal Code f / 7", � YM 9 2 round LiG # Check Ground and neutral to direct earth connection.All Panels and mounting ® hardware also check. Reference page 7, 10-12 1 Gc ° ° ° 7_� _ ,F y.. �, Building Department 444 Main Breaker will be SEP 114 Sr- 1 r-I{ A- derated to 175A to acommadate the solar REVIEWED FOR CODE CONIPR iANC breaker. Laundry Reviewed By 0 0 0 ,. , subpanel will be derated - _ - from 90A to 50A X Slingshot Power, Contractor Eauinment in this Photovoltaic Svstem ingshot. 10.29 kW PV System � Curved Tile PV System Schedule and Wiring Diagram Date: 18-Sep-14 Project Details: Page Number: 164 Main St.,Los Altos,CA 94022- EauinmentTvpe -Manufacturers and-Model lerston: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:6SO-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 4 California State Lic: 8984488 1 Inverter Used SolarEdge SE-10000A-US Drawn: Paul Sherer City: Cupertino,CA For Load Calculations with Power OptimizersSO I a r, Single Phase Inverters for North America (Note Optimizers are Temperatuer independent so calcs based on various _ SE3000A-US/SE3800A-US/SE5000A-US/ SE6000A-US/ S E760OA-U S/S E10000A-US/S E11400A-US local temperatures are invalid) __._ ___ __ SE3000A US SE3800A-US SES___A-US SE6000A-US J SE71S00A-US SE10000A-US SE1140OA-US OUTPUT 9980 @ 208V Nominal AC Power Output 3000 3800 5000 6000 7600 11400 VA . .. ...... J.... .. . 10000 240V • • 54 0� $8U. 6. 10800 @ 208V ,.. • Max,AC Powei Output 3300 } 4150 8 6000 8350 109.0�ip 240V 12D00 VA There is 1 inverter with 1 string , of 21 identical Sunpower 245W panels. AC Output Voltage Min.-Nom.-Max511 i... ., 1........✓ . AC Output Voltage Min Nom Max1° J J J J ✓ v/... J We assume a MPP voltage for each module of VMPP = 40.5V. This means 211 240-264Vac l } AC Frequency Mtn Nom Max " 59.3 60-60.5(with KI country setting S7;60 60,53 fig the input voltage to the power optimizer is 40.5V and the input current is Max Continuous0utputCur rent 125 16 24@208v 2S I 32 ( 475 A .. .. .... .,....... 4 240y.. .A2 +240V... ,,. .... 245W/40 5V = 6 05A GFDI 1' ' _. . ............. ............ ........ .............. • • • Utility Monitorinj3,Islanding Protection,Country Configurable Thresholds ___-_ Yes - Yes INPUT y---^- Recommended Max.DC Power¢' ,(STC). _.... ........... ... ... 3750 4750 6250 7500 9500 12400 14250 W The input voltage to the inverter is controlled by a separate feedback .. ..... ...." ."..111" ... . .".""" "......."..""""""" ."""..."." . . . ......."".. Transformer-less,Un rounded Yes Max.input voltage S00 VC Idc loop Nom.Dnput Voltage. 325 @ 208V/350 @a 240V ....... ... Vdc 16.5 @ 268V 33 @ 208V Max Input Current 9.5 13 18 23 34.5 Adc .. ...................I...... ......]....... ....... .1S-5.�.240v ..,._...........1...".. 30.5,�240v. . Max.Input Short Circuit Current 45 Adc The inverter requires a constant 350V. Since there are 21 serial connected .........I—........ ................ ... - ...... Reverse•PotantyProtection _ .... ....,. ..Yes...... ....... ... ..... .... . modules, each providing 245W, the input current for each string to the Maxium I verotea lffi pency�on ... 97.7 t. .."g8 2 ... 98;3 600k.98 3nsmvf 98 98 98 % ... " 1 97.5 208V 97 @ 208V CEC Weighted Efficiency 975" ' l......48 ..1..9$0. 97.5 47 5 97.5 % inverter is: 5145W/350V = 14.7A. ..... .............. . 240V 1 9t.5.�240V. ... .Nighttime Power Consumption_ <2.5 <4 W ADDITIONAL FEATURES Revenue Grade Data,ANSI interfaces 854$5,852... Ethernet,Zrgeee(options.) Supported Communication Thus the DC bus current flowing through each of the power optimizers IC12.1 Opaoge'r, 1 Rapid Shutdown-NEC 2014 690.12 Functionality enabled when SolarEdge rapid shutdown kit is installedK must be 14. STANDARD COMPLIANCE 7A This means that each power optimizer in this example - -----Safe .'y UL1741,Ut1699B,01.1998,CSA 22.2 Grid Connection Standards IEEE1547,.,, provides an output voltage of 245W/14.7A = 16.67V. In this case, the 'EriltSslOFLS " _ - -_ FCC partly Class B INSTALLATION SPECIFICATIONS power optimizers are acting as down converters. ACoutputconduit size/AWGrange 3/4"minimum/16-6 AWG 3/4"min AWG .. ....... ................. .... ... . ....... DC input conduit size;iY of stnngs/ t�'t �1 .. ...... ..... . ... .. .. i ... L+lJ t I lsf Dimensions with Safety Switch 30.5 x 12.5 x 7/ 30.5 x 12.5 x 7.5/ 12 _ 21.."{ . • • 3 4 minimum/1-2 strings 16.6 AWG 3f 30.5 x 125 x 10 5/ 75 x x 2f�0 1 I' 1.n/ I Jj CU PERT various system currents and voltages in this case are illustrated in cHxWxD) _ 775 x 315 x 172 775 x315 x 191 mrn, g Depa en4 Weight wrthSafety Switch 51.1/13.2 547/14.7 88.41 1 Ib/k$ - Sheet 19 for M PPT sheet 8 for the inverter, and sheet 9 for the PV panel. �ooling .... Natural Convection Fans(user replace w f r P Noise 25...... ........ . 50 �... .. ��.. 1fi Min.-Max.Operating Temperature -13 t Rangg................................... . .- ..... ...... o(140/:25 W o60I�Oto+60versi..... .labletWa `!I_.... . Protecr� on Rating .... .-.. ..NEMA 3R... .. .. ............ .... .. .. .. �} .. ....I .....-. � �!4'ipr � is .... .. .. ... REF: Verification of Wire Sizes for PV Systems Calculation & CEC Table :Ff�IY orolherredoroltettingspkaxeconxtSdarEdteswport ilt�G. ed �Lirrnked to 125%for b<adorawherethe yeariy average high tenverewre is above 777725"C.nd to 135%f-budom where it n bebw 77'F/25*C. For detalY.A irdorm atlon,rater to titin:/l�vww.sd aredee.ul/r51M/odlxllnwan er dr ouerv7.w eude m! C 310.16 Optimizers MPPT Type Systems• higem her wrr-t X. ay b..-,d;the ihKnf.l fed its Input cur r ent to the www toted. .1 R¢venue gerde even.P/N:SF aA-U50MNNR.2 ^'Rapid shutdown Mit WN:SE WDO'R5o51 -40 aersion P/N:SE-A-US000NNU4 Slingshot Power, Contractor Equipment in this Photovoltaic System slingsha>t 10.29 kW PV System Curved Tile String Current and Voltage Date: 18-Sep-14 Project Details: Page N p j g umber: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 5 California State Lic: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA Standard Method Residential Service Ca u ation ROOF LOADING 1.0 General Lighting: 220.1:Total 4000 Sq Ft. 12000 VA Minumum 2x Rafters @ 24" OC or Equivalent Small Appliance: 220.52(a) 4 Circuits x 1500 VA 6000 VA Laundry:220.52(b) Solar Panel Dead Weight Loading Calculation Roof Structure System: �o Circuits x 1500 VA 0 VA Solar system consists of 42 solar modules Applying Demand Factors:Table 220.42 Mounting system is 84 points of connection with the roof 1st 3000 VA x 100% 3000 VA Next 3000 VA x 35% 1050 VA Panel Weight Calculation: 12000 Remaining VA x 25% 3000 VA Solar Module Weight............33.1 lbs TOTAL..................................................................... 7050 VA Mounting System Weight............75 lbs 2.0 Fixed Appliances: 220.53 "It shall be permissible to apply a demand factor of 75%for four appliances other than eletric ranges,clothes dryers,space heating equip,air-conditioning equip.) Total Panel Weight = ((# of modules)x(module wt))+(mounting system wt) YES/NO VA ((42 x 33.1)+ 75) = 1465.2 lbs Dishwasher YES 900 VA Disposer YES 600 VA Point Load Calculations = (total panel weight)/(# of points of connection) Microwave YES 1125 VA (1465.2/84) = 17.4 lbs Compactor NO 0 VA Pool/Spa YES 12000 VA Solar Module Area = (# of modules)x(Solar module area) Attic Fan NO 0 VA L= 61.4 Other 0 0 VA (42 x 1927.96) = 562.32 ft^2 W= 31.4 TOTAL........................................................... .. ............. 10968.75 VA YES/NO +^ CUP ;7 3.0 Eletric Dryer: (5000VA) 220.55,Table 220.54 �' �' Ouddsn Total! Spacing Area = 5000 VA x 100% YES I 5000 VA _ r c, (#spaces bet mod ules)AInter-module spacing)x(panel L or W) / 144 4.0 Cooking Equipment:Table 220.54 J� i Inter-Module Spacing = 1 in Oven 7200 VA x100% YES 7200 VA �rVIEVVED F:C)r� ((42 x 1)x 61.4)/ 144= 1.49 ft^2 Range 11000 VA x 100% YES 8000 VA Col C kW Other 0 0 VA ELECTRICAL LOAD TOTAL TOTAL..................................................................... 15200 8.0 Service Total VA= 44218.75 Total Panel Area = ((total solar module area)+(total spacing area) 5.0 Heating or A/C:220.60(non-coicident loads) VA VA/240= 184.2448 Amps (562.32+ 1.49) = 563.81 ft^2 Heating unit 1500 VA x 100% NO 0 VA The Sum of the rated current for the solar A/C Unit 6000 VA x 100% YES 6000 VA breaker and the main breaker cannot exceed Heating Pump 1500 VA 100% NO 0 VA 120%of the bus bar's rating DISTRIBUTED LOAD = (total panel wt)/(total panel area) (loads)............................Take Largest Load 6000 (National Electric Code Section 690.64) (1465.2/563.81)= 2.6 lbs/ft^2 6.0 Largest Motor 220.14(c)=430.24&440.6 0 VA 1 0 VA x 25% i ne point ioaaing ana aisuinutea ioaaing snouia ne neiow nuiiaing aepariment requirements 7.0 EV Charger Level 2 (5400)VA NO 1 0 VA Slingshot Power, Contractor for structural analysis Distributed Loading-Max 51bs/ft^2 Equipment in this Photovoltaic System slingshot- 10.29 kW PV System 3�e?yCurved Tile Roof and Electrical Loading Calculations Date: Project at 18-Sep-14 p P o�ect Details: Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph: 650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 6 California State Lit: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA JJ! SUNPOWER OFFERS THE BEST COMBINED POWER AND PRODUCT WARRANTY POWER WARRANTY PRODUCT WARRANTY HIGH PERFORMANCE & EXCELLENT DURABILITY '00'' 5i eI s More guarontsed power:95%for first 5 years, Combined Power and Product defect 25 year coverage • 20.1%effi01ency -0.4%/yr.to year 25.b that includes panel replacement costs.° Ideal for rcofs where space is at a premium EUECiRICAU OPERATING CONDITION AND MECHANICAL DATA or where future expansion might be nE20-245E19�235 Temperature -40°Cfo+$5C needed. Nominal Power" Pnom 235 W( ) Max load Wt^d:2400 Pa,245 kg/m Front 8 back High performance 0 7a5 PAhIIiI Power Tolerance +5/-ooi Snow:5400 Pa,550 kg/m2 front Delivers excellent performance in real world Avg.Panel Efficiency" 19.3% Impact resistance 25mm diameter hail at 23 m/s conditions,such as high+ernperaruies, HIGH EFFICIENCY• Rated Voh e V 40.5 V a8 f ) Appearance Class A clouds and low light."' Rated Current(Impp) 6.05 A 5.80 A Solar Cells 72 Monocrystalline Mcxecn Gen II Generate more energy per square raster uY e Proven value E Scics residential assts ce ve'r more sunli ht to efectrici OpenCircuit Voltage(Vocl 48.8 V 48.4 V Tempered Glass High transmission tempered AntfReRective Designed for residential rocFrops, E Se * E--",--ries p g N Shat-Circuit Current(Isc) 6.43 A 6.18 A Junction Box IP-65 Rated eels deliver the features, value and produr_i xg 36��more power per panel, and 60°�more energy per f� = Max.System Voltage 8 600 V UL Connectors Yukita(YS-254/YS-255) performance for any home. square mete over 25 years. Maximum Series Fuse 20 A Frame Class 1 black anodized(highest AAMA raring) HIGH ENERGY PRODUCTION' Power Temp Coef. -0.38%/'C Weight 15 kg Produce more energy per rated wolf Voltage Temp Coef. -132.5 mV/,C High year one performance delivers 7.9%mote energy per roved Current Temp Coef. 3.5 mA/'C TESTS AND CERTIFICATIONS war, '-This advartoge increases over time, prcducing 20°.mote REFERENCES: Standard tests IEC 61215,IEC 61730,UL 1703 energy over the first 25 years to meet your needs'.'' 1 All oomporisons are SPR-E20-327 vs.a representative conventional Quality tests ISO 9001:2008,ISO 14001:2004 panel:240W,opproz 1.6 m2,15%efficiency. RoHS,OHSAS 18001:2007,lead free, 2 PVEvduion labs"Sun Power Shading Study,"Feb 2013. EHS Compliance PN Cycle 3 Typically 7-9%more energy per wcrN,BEW/DNV Engineering"SunPo er Ammonia test IEC 62716 Maxeon'"Solar Cels:Fundomen•ofly bei et. Su Yield Report;'Jan 2013. Salt Spray test IEC 61701 Eng,�.:r_d ler perbrrmnce.des�.gned k+r dvrab.l ry. 4 nPawer 0.25967yr degradation.s.1.0%/yr mnv.panel.Campeau,Z. SP Y (passed maximum severity) Ervt et al."SunPower Module Degradation Rate;SunPow•er white paper,Feb PID test Potentiollnduced Degradation free: 1 ODOV'0 3t 20 e'Ener 2013;Jordan,Dirk'SunPowef Test Report,'NREL,Oct 2012. Available listings IUV,MCS,UL,JET,KEMCO,CSA,CEC,FSEC Engineered for peace of mind M r U°f Per Watt 5'SunPower Module 40-Yeor Useful Life'Sun Power white poper,Feb Designed to deliver consistent, trouble-free a 2013.Useful life is 99 out of 100 panels operating at more than 70%of I oak energy over a very long lifetime.'`'' rated power. 6 Out of all 2600 ponds listed in Photon International,Feb 2012. Designed for dwobility 2 Po% yea 25® 7 8%more energy than the averoge of bre top 10 panel companies festedUPE. �- The Sun Power Maxean Solar Cell is the c'''i SosG in 2012(151 panels,102 companiesl,PFtoton InterrtrNional,Mardi 2013. } i t �' 70'% 8 Compared with the top 15 marxAadurers.SunPover Warranty Review, -, y omycell built on a solid ccpfr_; founda'ion. Feb 2013. 4 � R`,�' Buil Building Dora ent 798 mm r Virtually lenpervious to the CUr rosin n and 60% 9 Some exclusions apply.See warranty for details. cracking tsar degrade Conventional ;0.y 10 5 of top 8 pone)manufctu arers were tested by Fraunhofer ISE,-PVt = Panels.-! `� 0 5 10 is 20 25 Module DurabilityInitiative Public ��C3 t q °1��1s Repan,"Feb 2013. !- U L '1 Years 11 Compared with the non-stress-tested control panel.Atlas 25t Durability #1 Ranked in Fraunhofer durability rest.'' >_ �n test report,Feb 2013. 46 trim-.{L- _ :559 mn�- - )00%power mairsained in Atlas,25- 12 Stonclard Test Conditions(1000 W/m2 irradiance,AM 1.5,25'C). ��E V I E��l�f=�i f U�r /� r P comprehensive PVDI Durability rest.:' Puwer or 11,9h S mpa 13 Bored on average of measured power values during product on po li _�E v(�,Ji 'A ✓t,,F ' !Na tghutndixad 1 Reviewed O`f. c �i Dagrculor"+on Ft•tth Nvern{y WuM. 't l;Rcnet Low.LNhr and - tpw-�rcl Reponse t'gh-P.,rforrrgnce u Anr:Refbceve Glens See help://w.,w.wn;owercorp.comAacr,for mora referenos information. ----- For more details,tee extended dolasheet:npoorp.com/dahrhmts.Read safely and installation instructions before using Ifis product. x„ler 2013 S-P."+r caporasw..N,:rrr..d.supowEx th.SUNrowER eeeoe.,-kXWv,mORE ENERGY.FOR LIFE-,ad Swrurule p .od.-A.oos .d d - .(Set-C-1poroeon.Spdfic* id.ddln/:sd.-he wnpowercorpCom Slingshot Power,Contractor sunpowercorp.com Equipment in this Photovoltaic System slingshat. 10.29 kW PV System -34lery Curved rileSolar Panel: Sunpower SPR-245NE-WHT-D Date: 18-Sep-14 Project Details: P t p � age Number: 164 Main St.,Los Altos,CA 94022 Equi[)ment Tvne Manufacturers and Model Version: 1.0 -- Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 7 California State Lic: 8984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA solar=@@Single Phase Inverters for North America SE 3000A-US/SE3800A-U S/SE 5000A-US/SE6000A-US f - solar=@@ � SE7600A-US f SE10000A-US/SE11400A-US SE3000A-US�SE3800A-US SEWMA-US SE6000A-us I SE7600A-US SE10000A-US SE31400A-LIS T� OUTPUT _ Nominal AC Power Output 3000 3800 5000 6000 7600 9980 @ 208V 11400 VA • _ 1000Q @? V __ SolarEdge Single Phase Inverters Max.AC Power Output 3300 4150 5400@ 208V 6000 8350 10800 @ 208V 12000 VA naso-@zaov. .......... ..... ................ .1.9950.@zaQv. For North America AC Output Voltage Min.-Nom.-Max-ill V V 183-z08-229 Vac ........................................... 11,11. J J J 1111. ................ ........... 1111 ,................. .................. 1111....... AC Output Voltage Min.-Nom: .•0 Max SE3000A-US/ SE380OA-US/ SE5000A-US/ SE6000A-US zll-zao-26avac AC Fr uen Min:Nom:Max.l" .. .59.32460 6 � (with . .ttin$ . -6 .......................... ... 1111 1111. .._. ... ... 1111. 1111 . ......�....�T..............._..._.,.-. 1111... .... ll 5(withHlcountrysletting57-60:60.5) ... 11_11 H2 Max.Continuous Output Curren[ 12.5......1......16......1 ..21�d1 240V �.......25.. ....!.......3 ... ...1...98.@ 4 ...�... ..47.5....... 111,1 A..... 111...._.....1.... ..........._,.......... 1111 . GFDI 1 A ..................... 1'Island 1111 . .. ..............._..,_................__...._........................................_1111._..1111.,..............._..... ... 1111... • v Ube Monitoring=,IslandIng Protection,CountryConfigurable Thresholds Yes _ Yes INPUT Recommended Max.DC Power-01 ...................._1111.._1111.. ......3750......... . ........4750 6250....... ...........1111.. .......7500....-1111 .......9500......... .......12..400........, .........14250....... ..W....... r Transformer-less,Ungrounded Yes 1111 .. 1111 Max Inptrt.Voltage ....... .. . .. .. .. 500. .. .1.11.1.. 111,1.. .. ... .. ...Vdt .. 12 ,1111 Nom.DC Input Voltage .. . 325 @ 208V/350 @ 240V Vdc 1 �•^'"+ 1I jI 16S @ 208V 33 @ 208V A . 2 �• Max.Inpdc utCurrentn 9.5......1......13......1.15:5.@.2a0v.1......15......... .....23.......1..3U.5�.240v..1......34.5....... ...A .... .....P...................... ' Max.Input Short Circuit Current 45 Adc .......... .....................1 ........ Reverse-Polari Protection Yes -- .... ................................................. ........................._..._................. 1111. .......... .. ......... 1111 .. ,.......... 111,1... .. .. Ground-Fault Isolation Detection 600k.5enstovlty ......................................... ................ ............... ..............._. 1111. _11,11 1111. M xi In cl n a mum verter Effi e c 7.7 1 8. 98 98 98 ......................_......'!,. 1111... 1111,9.......,. .....4�.....,. 983 9 3 ......... °�..... 97.5 @ 208V 97 @ 208V CK Weighted Efficiency . . ..... 95...... 97.5 97.5 97.5 % _1111 �.240r!.. 97.5 @ 240\... i Nighttime Power Con sumptiori <2.5 <4 W ADDITIONAL FEATURES Supported Communicatitxt Interfaces 85485,RS232,Ethernet,ZgBee(optional) . . .. ... .. Revenue Grade Data,ANSI C4z �� Ciptlonaf� -_ a 1111. .,., .. .. ........ ............T. 1111.. Rapid Shutdown-NEC 2014 690.12 Functionality enabled when SolarEdge rapid shutdown kit is installed"') STANDARD COMPLIANCE Safety......,.. ................. ....... UL1741,UL3699B UL1998tCSA22,2 # _. .. .. . GndConnttctionStandards IEEE1547 , .. .. ........... ........ ...._.... 1111. 1111... Emissions _ _ FCC partly class B _INSTALLATION SPECIFICATIONS _ AC outptrt Con du if sire/AWG range 3/4"minimum J 16-6 AWG... 3/4"minimum/8-3 AWG ...........8.............................. ................................................ ....................................................................... ... 1111.. DC input conduit size/N of strings/ AWG ran e,-.,., 3/4"minimum/1.2strings/166AWG 3/4"minimum/1.2I- --strings/ rc+ '� ^ ..... ... ......._.. .... ... .. ... 4sZf (F�� Dimensions with Safety Switch 30.5 x 12.5 x 7/ 30.5 x 12S x 7.5/ / 5in/ - 11�C (HxWxd) Pl .. ... _ ..,,.., ,,... ....775x i15,x 172-._„--, 775 x,315 x191.. .... 30.5x12,5x 20.5 . mm -, Building L, -.enf Weight with Safety Switch 51.2/2 3.2 54.7/24 7 88.4/40.1 The best choice for SolarEdge enabled systems .... .. .... .�... Cooling Natural Convection Fans(user re lace ........ 111,1.. ..................... .,.......,..................................,.,.,.,....,...... ,............. .., ® - Superior efficiency(97.S%) No _...... ........................._....`25......................_......... ....... ....,............`. ..... (.+EI..I � O LUall dffir Min:Max.Operating Temperature Small,lightweight and easy to install on provided bracket -13 to x140/-25 to*60(-40 to*60 version available' ) 'F/'C - ra Range...........................1 111.... _.._1111}��.�/i - Built-in module-level monitoring Protection Rating NEMA 3R �WE� (DR GOlI� (,V l _.......... ... ......................._...................................._ ........_...._.................. .......................1. ...,... P C. - Internet connection through Ethernet or Wireless (14wother nQiorsel se d gsplease c 1-1 SdwEd;e SWPort ,E MUmltedio 125%Fur locnlons emwBtheymrtrivNKehAghtempwawrefsabove77'F/z5Y Mdto 13S%Fur btltio-hwelt is bebw7YF/25'C. 'Reviewed B� - Outdoor and indoor installation For dalmiedirroemetwn,Rte.tonno:/nvnw.dereme,.mtesredtar vertw or o-MAne guide ad( Fixed voltage inverter,DC/AC conversion only P3A hlshercvrreni source my beused;the hweter wo link tslnput twmv to the vxlues staled. Revenue Ndeinvert.PM:SE-.4x U5000NNR2 - Integral AC/DC Switch o'Repidzh tdo. kit wKScwuu-RSas1 "-e0.e Ws PM:SF-A-US000111U4 Slingshot Power,Contractor slingshot9kWPS Equipmentin this Photovoltaic System Inverter: SolarEdge SE-1000OA-US 10.29 kW PV System .ami y Curved Tile Date: 18-Sep-14 Project Details: Page Number: 164 Main St., Los Altos,CA 94022 Equipment Tyne Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 8 California State Lic: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA • solar=eeSolarEdge Power Optimizer solar.=@a Module Add-On for North America P900 / P350 / P400 / P405 P300 P350 P400 P405 INPUT SolarEdge Power Optimizer - r 6D cell rrodu4's) (for 72-rWl modules (for 95-r.•II m��d�.tp s) (fnr thin film mnA�dr,) _ - Rated Input DC Power"' 300350 400 405 W Module Add-On For North America 48 .. .. bo...... . 8a 125 Absolute Maximum Input Voltage (Voc at lowest temperature) . . MPPT Operating Range _. .._. - 1._ 8 . 5........ .. 8-60 . . 3-80 ... 011 105 .Vdc P J O 0 113:i 0 f P 40 0 /: P 4 Q 5 Maximum Short Circuit Current(Isc) .. , .. .. .. .. .. .. 10 .. . Maximum DC Input Current 12.5 Ad- Maximum Efficiency 99.5 Weighted Efficiency 98.8 • Over noItageCategory II OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING INVERTER) Maximum Output Current 15 Adc MaximuMOL ft put Voltage 60 85 Vdc ---- - — - _ -_ -- ---- - - -- OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) Safety Output Voltage per Power Optimlier i Vdc STANDARD COMPLIANCE EMC FCC Part15 Class B iEC61000 6 2,IEC6100"-3 Safety JEC62109 1(class 11 safety),UL 1741 . . . .. .. .. ..... . .. ... .... . .. . .. ...... .... .. .. .. ......... . _.. RoHS Yes INSTALLATION SPECIFICATIONS _ tlG - -_ _ FJ a Maximum Allowed System Voltage - 1000 - Vdc - Dlmensions(W x L x H) 141 z 212 x 40.5,15.55 x 8.34 x I. rnm/in .. _.....-.._. .._ .. ...._..... . _. _...... ....... .. .._ .._.. _ _ . .. ..... .. .- Weight(including cables) 950/2.1 gr/Ib .. _ _ ..._......... . Input Connector .... MC4/Amphenol/Tyco MC4 Output Wire Type/Connector Double Insulated;Amphenol Output W ire Length._ __ 0.95/3.0 1.2/3 9 M/ft Operating Temperature Range -40 +85/-40-a185 C/ F ......... .:a• Protection Rating IP65/NEMA4 Relative Humidity _ 0-.100. % .. ... .... . _.... _ . ... ......_ .. . _.. ._... ._. Mated STC pcwe,d I"noduM.Wdtd*ol up to-5%0-tole M a/prvW. PV SYSTEM DESIGN USING SINGLE PHASE THREE,PHASE 208V THREE PHASE 480V A SOLAREDGE INVERTER"1 y Minimum String Length $ 10 18 - - (;UPI (Power Optimizers) RTINC Maximum String Length "i uilding o , (Power Optimizers) 25 25 y t _ . .. 50.. . . . r ii Maximum Power per String 5250 6000 12750 ~ _` i SEP 1 2014 PV power optimization at the module-level Or �Oflentatipn5 Yes �EVI��+/gyp F•C) ParallelstringsofDifferentLengths Co — Up to " mCC)JC ore eviergy a„nalatbaetltnrticlV 6Wtl Papp P39gPa00lD�dIV700honAAq i oh LiAir�fC.� — Superior efficiency(99.5%) E'VtPWP(j 6� Mitiga;rs all types of module mismatch losses,from manufacturing tolerance to partial shading - Flexible system design for maximum space utili-ation - Fast installation with a single bolt CE 0 — Next generation maintenance wish module-level monitoring — Module level voltage shutdown for installer and firefighter safety F4 FRANCE JAPAN CHINA , ISRAFL - AUSTRAtIA wwwsolaredge.w, Slingshot Power,Contractor Equipment in this Photovoltaic System slingshot.. 10.29 kW PV System .� Curved Tile Optimizers: SolarEdge P350 Date: 18-Sep-14 Project Details: Page Number: J g 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way California State Uc: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA Datasheets eFUNIRAC• • . .sheets a-PUNIRAC saiarMount Mid camp P&A14o 3011'XG 3t211MD 3d1'2.103C,. 382114A, ' SolarMount Technical Datasheet ;' ' '�" Fablfaal►lw�►laAsl�ra1111 Dog aky"tM05-aleria&-TSe f 1-T6ikiaati0lye'rtirud4?daluttui:un W"d Fb , ..111MO M tmaS,B38ksi. e W 5 U]lknafs adriile:38kei,Yee U:36 ksi SolarMountMOduM ConriecdonHwdware-...................................._..._..._--------_._ 1 Finish.aWar tor Dak/l,totlued eatbomUP NlOdde C>ry._...._..._._._......_._-._.__._._.__.-._.«_._.__._._.__._._.__.._.t Mid damp wa9t 0.45D ft(23g) ` A1�.F-it' a fid des ig a f�adet are%Nfid wh&A ootrdponeith are ls�id Clamp. ._.__._.„. «._._.__._.__._. .__._...._-._.__._....__._._.__._.__._._.__....2 attembferl ao0ardirny b autvodoad UNIRA�Cdiaounienh End Clamp.-....-_......._......................................................................2 Vaiieeae,Y lie rspre alrwtabie and dfesign:ioad eapaciy cf a rWing b SolarMounteearn C=vmw ion Widvraes...._.----------------------------------------3 �� nnid damp aze-mdly vMen vxe.dwM a SoLmMountee ko-s bem"n to Lfoot......................................................................................3 in Q*dieCSM int"led SolarMount Ommis...._......_......._........................_...._......._..........4 Assemble mid[urnµwith ort4 Uniaac W-2D T-bdlt arta.onLe!,,.'-2D A'S"M F494 aedralodifisnge not use a td-=b a ad%titan kr 10 ft las of torque _ Rewakvit*f elor3 and salefy facklrs are dek.•+mined a]Cordiny b Pari 1 sed mini Sof the 2DD5 Al<oQn un Desiy a Manua and UrdF p”lost ami its Tnm an IAS ace"te d Ubmaluy ApplktdLand Average Atkw ble Safety Design AashtmWe SolarMount Module Connection Hardware - - Diructim uwttwte toad Fades Load F=ftK _. an pt) ba(N) FS 8•s(" g Torimm.Y+ 2020(8967) 891 (390) 2.27 1340(6994) 0.067 SotarMount Bottom Up Module Clip Tra irwrso.2.1 520(2313) 229(161T) 217 346(1539) 0.86s 7D21DW Y Std+ng,xt 1191(5J12) ADD 42179) 2A4, 741 P2951 0.630 MOW" • Beb m Up cap n diiftt one of ale�+e scalded ailndnusn r7o-„ark u s>e,easro In stcn.a.rb.r•roma lydtcm BMrt (hWea-mio ah"w X46.BfO&T5,0061-TB up • IAtlod*andia.MOL Yid!!_35 kd ",ii3'Mount EM C Wnp Boa Vp ca aviilp -Ow 1 ala(" pan lsna 342mc;C;3W211M.302102D.mailer, 30=r3D,MM".3021040 =19"C,3120MIX Seam - _ • AhYmt eanddest(k haft m*ti1ffid 1MMn peMmems ale u2r�r 34200110,312MM 3020OaC.303MD„ aaserrtElad wi►SoiatUiorid aefea babas ase b muster m d ` Of�1e 3*aM*r-3411 160.3e?t16C,31*2*tIC .3AM2C End CWNV nis ental:Ckie at tteRMO^ing ectuded aruninull UOiAC downie ra ys:6OD5-TS.,6445 T5,6881 T8, Ame sr*6 wah one 5f.'.RQASTM F5�Eos,see yf.:20ASTla F5s1 _ -= Ultimate tei.rd kr.98kS�Y�dd:3.5 ksi reraadtanpa nil,and one 3S•art atsdtar Finldh:Clear or ilarkAncdicett • Use sniesk*acrd SoMm to WMMof arque to '- End CL"vreighit vaii t3 besett aahe4j C--0,058 ft;Mq) - - - Re brim iedDs and asafdy atlori are deierllirMd aaear)drtg b Old C:irAp 1tA3d wd*&W d asignK ads arreva6d%henattrr oorten :Sae pall 1 seeiort hofD1e 20o6Ailnlinlnl Oasfgn iasralal and lfllyd• Scatsd -"' assat,bkdf woordirtij le at Thor aecf UNIPAC d ucurram3ts --= -_ psg asiraelrs fan an IAS aeoaidliaed kEarafty Fango Nra Vmbm aep**ant the akd w it:a suiddesiga%u&d eapafAV of a ~ `` Ynduit arae nrrl M luny suppaled ey UO besan and dattp as sewbly wbe n used illi a Sd3aaMouti series bee retain aftoatle i1 the dfret:iotr NOTE * IN 1AiIlOOft DuUM wa0man Ed Mad ddeof ss swiklyt A +� AsBeltNe led/!one lJtritaO W-2DT-bot and me!h=20ASTiA DO NOT IneW wa0w under aa•sied aenpe roa 1 fig; UI I(j;� .4seraied l!anye.rout �vj(° 9 �p ' f1flPnf dt" 1.-ds y�B-> rnd 59 ML-A b to f"M of torque 1 f Appatd Load Avara4s Aaotwbie sltfr�r Dwipn irrrintarros - 9"444n UMsfe load bamboo Load Ranl6tc • ft SlaldefwlorS;uW"%L-1yfariorzavedLeiOrminedleoodnby -moi SEP 18 2fot4 as(K) be(M) Fs in.(14 • part 1 seeior)9 of Ste 2Q85A1w,maall Oersiyn faanus anti u kdl lraadoati Ya 10Ee 008 088 Y µany test mou Its from an us aeored d ed'laboratory ��E VI E � ( 7) Pam 228 �10M(1816) �� �j ^ `�rJL7i_ � MO&O&s rnuel be ins�d at cast 1.5 in frcm eiitaer end a a burr+ a n. ., 1p4tnabr.a..xde 1120 o+e 320114" a�a 4arr 1 84/1 P-x - Sk tp.za 01202) 27(1101) 2A4 41 (181) (Leis - . . Alp" d Lid Avers" Afiowabfo Satiety Design RdrsJ§tanos eVleWed Si-. Direeb ar Uthnalo Lcod tractor. Loads FacboS - lbs,M) lbs(N) RS lbs(14 m a'Wr a ga~ft.daall~anoee6 Ton sm.Y+ 1.321156(17" 529(2862) 2.50 amtM57) 0A606 Transroso,It 63(279) 14(81) 41.58 21(,92) 0.3-30 Dine",c,sas7 m r.:y_:-.r..14m.°tend Slid( xt 142 30 521231li 2.72 79 0.555 Slingshot Power,Contractor - Equipment in this Photovoltaic System slinPV gshot,. 10.29 kW PV System Curved Tile Mounting Rall System: Unlrac Solarmount . Date: 18-Sep-14 r 'I p Project Details: Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 10 California State Lic: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA - - : N UNIRA . at UNI, SolarMount Beam Connection Hardware SolarMount Beams SofarMount L-Foot Part11o.3i0132C, 310132C-13,3101680,3101681;-B,31oicBr Psis Nay.3040000, 3040001) 31020aC,3102060-f3,310240C,3102"C43,310240D. • Lgoot anadrLal:Urno d fha faltawsrrg axYaidod4Mrrnarxam aitlays:6006 41014414,41.0168111,41020411[.410:24.0111 TS.6'10 S.M.606146 + Wtlroatotensifo:3akia,Yald:35ks Finish:Cbar or Onik AnodLmd Properties Unft SW11Modant Sa4artAoard HD t� Ldamn s bored an Irragfnt:-02 b5lhs(90g) + = A Ib and design flames am v4d wtion amma non>s are saam Haight in 2.5 3A awsumaibd wain SaiaMauA soma,booms aoca"brng to aa4m4zod -©dr UNIMCdacunbardbs ApproxmaW Wmylnt 19 anew 9) P4 0.811 1..271 L 07--ml Rort the bsmn to LAO*Ower soNon •An®omhlairMarm ASTU F5133 W-16 no x hand mmwandam ROMGrass waGamlAaoa me 0B76 LOW lar! ASTM F594 Wsocalod flange n+d XAango. f'l •Use ant,mmo and trganio n IoW It_ha of tarafiw Sade"Madsina Q(A" are 0.a1_1 3 0.899 • Rawslanm facloa and safn tV faclom aro datarm nod aaoordrng to pari 1 sockin 94 to 2005 AbTn-uwm Dans gn Manua and 1hr6rmrtf lad Sada an Madnaks ,A as) in' 0.113 0-221 Y rarmft fawn an IAS aeoandtod idwvalory 4 NOTE Lands am given for the L-FaoRto born carr roatkm ordp;be MamarrtofLrroa�e Qf Aad arra 4464 1.+150 I.x sraa to check load Hraits for stermic ;lap saaesw,ar e4lrsr at achnsiirtroadbed Mamard of beafn(Y%4u=) in, 0.044 0.267 Ra*n of Qyaafan(X-Ar" in 0289 1.170 sn Apoed L"d Aanrags Ssfaty 8rslgn It"istan" Oireatfan U111mate ANaseafrla Land faafor, Land Rawtar Radrras of{3yrniivn(Y Area) 0254 0.502 ,>trs M on(tq P$ its#a) @ Sid ng.2t 17{36 JUN) 755{3356) 2.84 1141(5097) O 646 Tor®arn.Y+ 1859(8269) 707!(31411) 2.63 1089(4755) 0.575 OW.Wlican vedsse td foams Wram-K"d Caagxasan,Y• 3258(14492) 1325(5893) 2AB 2004(SM 3) 0.615 _ T®vomo,Xt 486(2162) --21-3(9-40)T 228 323(1-afi) 0A M SiOTfOR OV Sc 0]R rAAyT f(;R T-BOLT OR 1..T2tl� '7tD[MEAD 9C1�W %'VEX HEAD S(3rEMf fz� 2X SLOT TW Ylr)T FOR 6oTroM CL.fP 2-WO EK")M I33P T :-uuo 2316 �.. SLOT FOR �X �r tt 5t I7T FOR I i65 ;fIDL DOLT ,1 I(jIR 'JSr HEX e<xT .E.� eAaren 397 5 ? 014 �- +yE 12lY! Y y 7..9715 REV►EViEC ri_11:,, ►x ►x k t 'Ar4CE SoiYirAlourrt9ome "aob411arn11tDBeam ��'Viewed By gal Wf&dr+aoe61dW in re>n bM"tips rks.d Slingshot Power,Contractor " Equipment in this Photovoltaic System slinPV gshot.. 10.29 kW PV System �„ Curved Tile Mounting Rail System: Unirac Solarmount Date: 18-Sep-14 Project Details: Page Number: p � g u er 164 Main St.,Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way California State Lic: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA II"1C STRU(TURALENGINEERS January 20,2011 �f ETh UniRac � 1411 Broadway Boulevard NE Albuquerque,New Mexico 87102-1545 o 53878 TEL: (505)242-6411 * J1-13 FAX:(505)242-6412 Attn.: Engineering Department, Re: Engineering Certification for UniRac's SolarMount Code-Complaint Installation Manual 227.3 PZSE,Inc.-Structural Engineers has reviewed UniRac's"SolarMount Code-Complaint Installation Manual 227.3"published October 2010 and specifically"Part I. Procedurc to Determine the Design Wind Load",and "Part II: Procedure to Select Rail Span and Rail Type". The procedures are used to determ_ne the calculation of the design wind force,load combinations,applied loading and rail selection. All information,data and analysis contained within the Installation Manual are based on,and comply with the following: 1. 2009 International Building Code, by International Code Council, Inc., 2009 2. 2010 California Building Code.by California Building Standards Commission,2011 3. Aluminum Design Manual: Specifications and Guidelines for Aluminum Structures,by The Aluminum Association,2005 This letter certifies that the structural calculations contained within UniRac's"SolarMount Code-Complaint Installation Manual 227.3 are in compliance with the above Codes. , CUPERTIIS- ' +t� l wilding Dep,,irlinenf If yo, have any questions on the above,do not hesitate to call. Since el , � = a SEP 1 8 2011= y mev ewed By _�' � f`7r7�=�' Paulacher, SE-President X 8137 Sunset Avenue,Suite 120 • Fair Oaks,CA 95628 • 916.961.3960 • 916.961.3965f • WWWY S soM Slingshot Power,Contractor slingsh Equipment in this Photovoltaic System at. 10.29 kW PV System Curved Tile PV Mounting Rail System: Unirac Solarmount 18-Sep-14 Date: Project Details: Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 12 California State Lic: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA ITEM NO. DESCRIPTION QTY. 1 Flashing, Spun Cone, 1 Standard Flat Tile Mount I QMSFT 18"x18"x.032"x1.46"Cone 2 QBase Primary flashing 1 `' — — Additional Dimensions 3 QBase 1 4 Hex Bolt, 5/16'x 3/4", Grade 8 1 5 Lag Screw, Hex Head, 5/16"X 3", Zinc 2 �` �� THIS EDGE TOWARDS ROOF RIDGE 6 EPDM Rubber Counter Flashing 1 7 POST, 1.25"OD x 4.5", 6061-T6 1 _ ..a.32 8 Washer, Sealin g5/16"ID x 1-1/8"OD, 1 S /EPDM y. " 9 Washer, Fender, 5/16"X 1",SS 1 1 4.25 10 Washer, Split-Lock, 5/16",SS 1 3•4' 1 1 Hex Bolt, 5/16"x 1.., SS 1 I .uo 1 - 6.50 � 18.(30 — �J SSUB FLASHING (ITEM 4) J O 2.50 �1 1 — I s.W r -- ----—------- -- --Z� ` 1.44 TOP FLASHING(ITEM 5) TITLE: 5.00 QUICK Mount PV AVAILABLE IN MILL, QMSFT: t TITLE: CLEAR BRON BRONZE D STANDARD FLAT TILE MOUNT —L �°"Do�c op"" QMSFT: QBASE STANDARD FLAT FINISHES TILE MOUNT UNLESS OTHERWISE SFECIFIED: SIZE DRAWN BY: RAD REV f DW,E At4C S ARE M WCHE' ) DeaADWIESS%A F n�NCHES�. TOLERANCES: A DATE: 5/I6/2012 ABASE (ITEM 2)and POST(ITEM 7 sae DRAWN BY: RAD REV FRA.cTO.UI:1n 6 TOLERANCES: '2 fpH164[t uq COMt10fNW TWO PLACE DECIIAAI DATE: 4/25/2014 Ti@ r's05t1�:-0r l COrd/JI l®IN M-.LRwIIA K C'H[iQ1 vROep,IY p 7UUL IJOi.I R .w•.Y i�FOM.0^.G.•.vAT,pP K, DD NOT SCALE DRAWING = FRACTIONAL S I/8 AA•OLt w"M�1IT TME WRTIM Peolne.o:OF:-.Lt I.IOut w is 9101mrM. THREE PLACE OCC.NW 1.006 SCALE:1:5 WEIGHT:1,98 S1'LEET l OF �e,.nwA++a<aeurv.,row..w.orl•e wur.oa+raouelNann.+..,.n«cox-c.....e..s DO NOT SCALE qu..Wlvp fMO PiACE DECRUI t.la ,n,ou w^u. ww>+Ir.emsvawoxc. ,..•ctiowo TNRM PLACE DECMAL 1 12 _-.SCALE.1:3WBG-g_2-16 SHEET 2012 Lag Bolt Specifications Sprrckk Grelrily tree&16'shad per 25'tN,ad oegn 61,6'MIM Pa 1'61reao deph 1{:� �vCUPE `T° " ' Buildin ep Doupes FV.La" .so ,330M � 'I g D.. �rtment plae DouFir,sold, - A6 1176 236 .%"� Engeirrenn Spruce.Lodgepole PIM(MSR ISM f b Pd") .46 1175 236 11 } HNA Fir .d3 ,060 212 -�y`P E+ 2014Han.Flr(NOM) .s6 1776 236 . Southern Pk* .55 ISM 307--- -- _ ?EVIEVVED FOR. C;QL7E COP�A.P! Spruce.PM.Ftr .42 1026 205 $puce•PM_Fir(Ed2m0bnpMsdhiyMryrtlRsalMSRold ME1) •50 +330 __ _.266 Reviewed F3 Sources:American Wood Council,NDS 2005.Table 11.2 A,11.3.2 A Slingshot Power,Contractor Notes` I)Thread must be embedded In a rafter or other structural roof member. 2)See IBC for required edge distances. Equipment in this Photovoltaic System slingshot.. 10.29 kW PV System -fit- Curved Tile Roof Mounting Hardware: QMS PV Flat Tile Date: 18-Sep-14 Project Details- Page Number: er. 164 Main St., Los Altos,CA 94022 Eauigment Type - Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 12 California State Lic: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA L following signage is required to be installed: Per Sect ion 690.17 2010 CEC,where both the line and load side terminals of any disconnect may be live in the"OFF"position the following WARNING LABELS ning shall be placed on the front of the disconnect"WARNING LINE AND LOAD TERMINALS MAYBE ENERGIZED IN THE OPEN POSITION". WHITE LETTERS ON RED BACKGROUND AND NON-BOLD ARIAL OR SIMILAR FONT, MARKING SHALL BE OF REFLECTIVE,WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT WARNING WARNING > 1(m)< DUAL POWER SOURCES INVERTE. •UTPUT SECOND SOURCEPHOTOVOLTAIC CONNECTION THE SECOND POWER SOURCE IS LOCATED ON PHOTOVOLTAIC SYSTEM •• NOT RELOCATETO MAIN PANEL 690.64(B)(7)-705.12(D)(7) 1 , 1 • AC OPEN—CIRCUIT r , + �.8 1 MAXIMUMS00 r \ PV SYSTEM AC DISCONNECT RATED AC OUTPUT CURRENT-42 AMPS OPERATING CURRENT 407M Amps\ WARNING AC NORMALOPERATING V• • -240VOLTS GROUNDELECTRIC SHOCK HAZARD 690.14,690.15,690.54 Amps IF A FAULT IS - - - - - - - Inverter I SHORT CIRCUIT CURRENT • - -` - - - - - - - - - - - - - - - - - - - - - - - - - - - - - MAXIMUM POWER Watts DED CONDUCTORS \ ENERGIZED!MAY BE UNGROUNDED DC AND \ Appendix C:Safe DC 690.5(c) ` \ When AC supply to the inverter is shut off(by shutting off the AC breaker at the site),or when the \\ \ inverter ON/OFF switch is turned to OFF,the DC voltage drops to a safe voltage of 1V per optimizer.The \ ` \ SolarEdge inverters are certified for compliance with the following standards as disconnection devices \ WARNING • ' •• for PV generators,meaning that they can replace a DC disconnect: OFCA DC CONDUIT(EVERY \ •• NOT TOUCH 10' INTERIOR OR EXTERIOR \ • :• •TERMINALS� ••• • � \ � IEC 60947-3:1999+Corrigendum:1999+A1:2001+Corrigendum 1:2001+A2:2005; SFM REQUIREMENT �' \ •IN THE OPEN POSITION TO BE METALLIC AND \\ 690.17 DIN EN 60947-3 REFLECTIVE J/B \\ VIDE 0660-107:2006-03 \ IEC 60364-7-712:2002-05 \ PV SYSTEM DC DISCONNECT DIN VIDE 0100-712:2006-06. \ RATED MAX POWER •• •• CAUTION SOLAR CIRCUIT — — — — — — — RATED MAX POWER '• •LTAGE-23.8 VDC In compliance with these standards,the disconnection mechanism operates as follows:1 Turn the VOLTAGEMAXIMUM SYSTEM 500 VDC inverter ON/OFF switch,located at the bottom of the inverter,to OFF,or disconnect the AC by shutting •' 8.04 `• off the AC breaker at the site.The DC voltage displayed on the inverter LCD begins to decrease.lf the AC ARRAY •• / breaker was shut off,the LCD does not display.In this case,wait five minutes.2 When the DC voltage reaches a safe voltage,the PV connectors at the input to the inverter can be disconnected.A galvanic separation then exists between the PV array and the inverter.The disconnection is safe even under of gnu single fault conditions. h WARNING[ Under single fault conditions,the Safe DC voltage is only guaranteed when using mod o: C UPFR 'rl l California Solar Permitting Guidebook Slingshot Power,Contractor 95Vocwhen using the single phase inverter70Voc when using the three phase 0 RUilding Depo rtMent $T . 18 Equipment in this Photovoltaic System Warning Labels for Placement on System '`� '' 0. ��� slingshot.. 10.29 kW PV System -�,► Curved Tile Date: 18-Sep-14 Project Details: Page Number:' ' c.� ��tdLE 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Reviewed i Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 13 California State Uc: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA Classic Conduit Composition Mount I QMCC REM NO. DESCRIPTION QTY. Lag Bolt Specifications THIS EDGE TOWARDS ROOF RIDGE — — SpacMe Grevlty .....,v4" shah per 1 3/4-thread depth 114-Shall per 1'thread depth -. .. 1 FLASHING.9'X 1?X.040".5052,MILL I _ 2 QSLOCK,CONDUIT,5/I6'.6061-T6.M1LL 1 _. __.._.— ,_----._ ._--- -- WASHER,SEALING,1/4"ID X 7/8-OD,EPDM Douglas Fir,Larch .50 393 225 3 BONDED SS - 4 1 LAG SCREW,HEX HEAD, 1/4"x 2-1/2-,18-8SS Douglas Fir.South .46 353 202 Engelmann Spruce.Lodgepote Pine(MSR 1650 f 8 higher) "46 353 202 AVAILABLE IN MILL,CLEAR ANODIZED, Hom,Fir -43 313 179 AND BRONZE ANODIZED FINISHES. Hem,Fir(North) 46 353 202 Southern Pine .55 455 260 12.0 Spruce.Pine-Fir 42 302 173 Spruce.Pine.Fir(E of 2 million psi arta higher grades of MSR and MEL) 50 393 225 CONDUIT CLAMP — --- __ 1.3 NOT INCLUbE 4 2.3 2.5 3 4.5 2 9.0 .79 ouick Mount PV - QMCC: CLASSIC CONDUIT J COMPOSITION MOUNT QM Flat Tile o"s""t SIZE DRAwNsy: RAc REV QM Classic CONDUIT 06112.0 SAYr N M06 ro-Clizi s A DAZE: 9/24=13 4 ' r A CONDUIT w.or$C.1!D"—G `c�.A�:i+ scAir a wi c .O-m sir 1 011 ORDER OF INSTALLATION: OUPEPTft; 1) Locate Rafter, Mark Hole Location, and Drill Pilot Uilding Hole 3t 18 1014 2) Seal Pilot Hole with Sealant REVIEIr/ED FOR CODE C0rv1F) ,er, 3) Insert Flashing Reviewed 13� rd�E 4) Place Mount 5) Install Lag Bolt with Sealing Washer or Sealant 6) Install Foot with Bolt and Washers X Slingshot Power,Contractor Equipment in this Photovoltaic System slingshot, 10.29 kW PV System - —@ %K' Curved Tile General Notes Roof Mounting Hardware Date: 18-Sep-14 Project Details: Page Number: P- 1 g 164 Main St.,Los Altos,CA 94022 Eauinment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper 14 Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way Califomia State Lic: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA SOLARMOUfff Top Mounting UniRac Grounding Clips and WEEBLugs - 225.6 UGC-I lap t7lovnrinp clamp: qO I 1 7-bill i �'.' •-� Nb c --I Figure 26.Slide UGG I grounding ( UGC-1 ❑ 1- dip into top mounting slot of mil. kltertek I I Torque modules in place on lop of dip.Nibs will penetrate rail arrod- ULRe..dwdsi7 - - - imrion and creategrounding path _ .. _ . .. ._ through rail(sae Fig.3,re--side). SolarMcxrnW ral(any type)` Figure 27.Insert a holt in the W E EBLug altuninum rail or through the clearance hole in the stainless steel flat washer.Place the stainless steel flat washer on the holt.oriented s/f so the dimplrs will contact the alwninum rail.Place the lugportion IS(E„ on thebolt and stainless steelflat ( ` washer.Install stainlesssteelflat wffBLUg washer.lack washer and nut. Tighten the nut until the dimples are completely embedded into the rail and lug.The embedded dimples rnalce Slairiess Steel pbl a gastight mechanical connection washer(WEER) and ensure good electrical connection --'"�+y between the aluminum rail and the :- µ Up and huge em cold�ep..1y. lug through the WEER ,, ounto rah :r (orn type) Figure28.UGGllayoutforeven and old numberof modules in row. "X"denotes places to install UGC-1. &m Nwnber of Modules In row t 18 'j� r reviewed By. ✓i-: �;�fi:.:.;,: Odd Munb-of Modules in row ::e'U N I RAC pub 2011 Justene 2011 X CD 2011 by Unitaq Inc A HIM 5ROW COW~ All rights reserved. Slingshot Power,Contractor " Eauinment in this Photovoltaic System slingshot.. 10.29 kW PV System �,► CurvedTile Grounding Systems: Integrated Grounding (IG) Date: 18-Sep-14 Project Detail p � s Page Number: 164 Main St.,Los Altos,CA 94022 Eauiament Tvoe Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 15 California State Lic: B984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA WEEBLug AUTHORIZATION TO MARK The WEEB Lug consists of a WEEB tWasher, Electrical Equipment Bond), lay-in :ug, and hardware. It is used with one solid or stranded copper wire (6AWG to 14AWG), Or two copper wires (10AWG to 12AWG) This authorizes the appircauon of the CertAicatron Mark{s) shown below 10 the models described � the Producers) Covered section when made in accordance with the conditions set forth n The Certification Agreement and Listing to provide a cont<.uous ground on roc!or ground mounted' solar systems. Un Ike traditional lay-in lugs, Report. This authorization also applies to multiple Iislee modeles. dent;fred on the correlation page of the Listing the WEEB Lug does not req;, re surface preparation on rail or module to install. The WEEB Lug is Report. Insta led using a 1/4-20 stainless steel screw which tightens L'ie WEEB, ailowtng the specialized teeth to This document is the property of Irt¢rtEtk Testing Services and is not transferable. The cartArGatrOn markis- may be embed into anodized aluminum, galvanized steel. or any CecUically conductive metal to estate ash a gas applied only at the location of the Party Authorized To Apply Mark. tight electrical connection. The tin-plated Lug assures minimum contact resistance and protection against Manuf 44 Peopbs Rd Address: corrosion, The hopper wire Is camped by a 114-28 stainless steel screw, which is horizontal to the tang for Applicant Electronics. LLC Addrescturer: Same as Applicant Address: � ss: easy access when mounted under a PV mlodU e. The tow profile of the WEEB Lug allows it to be installed Augerl,es, NY 12477 in a variety of positions and comes with hardware to mount it to a rail or through a 1/4 inch cfearanoe hole. country USA Country: Contact: Ms, MaWie Duka or Mr.Bnan Wrfoy Contact: Phone: r84 5. 247 4708 Phone: FAX: (845, 247 7438 FAX: Ercall: pauKr7+we Ilc.com Email: Party Authorized To Apply Mark: Same as Manufacturer • Material: 304 stalr.Css steel, tin-plated copper, outdoor rated Report Issuing Office: Lake Forest. CA. USA Lowrofile design p 9 Control Number: 30981 77 Authorized by: ` • ML! ple equipment ground conductor a owranco: William 7, Starr.Cetiftatron Manager One 14 AWG to 6 AWG or two 10 AWG, two 12 AWG • Listed to ANSUUL 467 by In'ertek ETL - C us CUPER a, Intertek SwIding Departmer . What is a WEEB? , i. This document supersedes al previous Authorizations io MarK tot 1-tvtiotad Report Number, The WEEB (Washer. Electrical Equipment Bond) is the first production part specifically .! , Tom / -a "•"` intended for use in grounding photovoltaic systems. There is a family of WEEB parts• one for ° • >n:ax- �_.�- r- 1> - . 4� 0 1.1^ each kind of photovoltaic mounting system. The WEEBs are used to bond photovoltaic "" ' ' L `"'`�` "` " �`"""° ` ....:,: • M. .' fY�. 5 R �-!:.kb r,.r... ✓'•1a h: raNipiYw �u..L+d��•Sn t t t. `1 >1 �s..�.° �Y.O.$n.Y w" ry ,. -a.c. .,_ x. rr.urro eau .r.... �_.�,. spa, ci. ". r,..ItL U �I��I/ t 1��r �.�!7{ �,�i:'fY 'A(`1 C modules to the mounting structure.Aground is connected to the resulting composite structure '• " so that the photovoltaic modules are also grounded. This is more technically described in lrnenoK e4rw-rigServcos NA Inc. NEC sections 250.136 and 250.134 and discussed at the company website. hILp-!'.'www_we- 165 P-14:,Slroel Cort avid.NY 13045 ilev ewed 6y. Ilc,00mlWEE6 nec.html. \ _. TOeprrone 900.345 3851 or 607.7535'!1 Fax 607 756.6699 Standard(s): UL Standard for Safety for Grounding and Bona;ng Equipment. UL 467. 9th Editionssued 2047:09:21 Are WEEBs listed? Grounding and Bonding Equpnnent. CSA 22.2 A41, Sth Ed iron. September 2007 Yes, all WEEBS meet ANSIIUL 467, standard for grounding and bonding equipment_ Testing E,.>-.'-• Product: Bonding Devices was performed by Intertek ETL. The WEEB are listed to US and Canadian standards. A copy Bonding Devices Model numbers WEEB 9.5, WEEB 9.5NL.WEEB 11.5. WEEB 15.8. WEEB ATF. of the certificate is available online at htto://www.we-llc,com/PDF/ETL mark.adf WEEB CL.WEEB•CMC. WEEB CSG.WEEB DMC. WEEB DPF,WEEB JJR. WEEB K144C, WEEB KSR Models: ,WEEB PMC.WEEB SCR,WEEB-SMC. WEEB SCR, WEEB•SSF.WEEB SSR,WEEB UGC2. WEEB' �. UIR.WEEB UMC.WEEB WMC,WEEB WMR 1.WEEB WMR2.Double WodGe Solar Grant,WEEBL Why UL 467 and not UL 1703, standard for photovoltaic modules? 6.7. Bonding Jumper 6.7, W EEBL8.0.Bonding Jumper 8.0.WE EBL 8.2. Banding Jumper 8.2.WEEBL ANSUUL 1703 only covers photovoltaic modules. Since the WEEB parts involve both module and mounting system. the more general standard,ANSUUL 467 is required. Also. since ANSUUL 467 was written with AC systems in mind it is a much more severe specification. All X Jvr� WEEBs are tested to carry a current of 1530 Amperes for 6 seconds. This is much more than any photovoltaic module can source and is why the WEEBs offer better lightning protection Slingshot Power,Contractor than previous grounding methods. Equipment in this Photovoltaic System n 10.29 kW PV System �► Curved Tile Grounding Systems: WEEB Lug - UL & Technical sligshot Date: Page um 18-Sep-14 Project Details: Pa Number: p / 164 Main St., Los Altos,CA 94022 Equipment Tyne Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 17 California State Lic: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA Two Pole,Ground and Neutral Torque Information As the neutral point of an electrical supply system is often connected to earth ground,ground and neutral are closely related.Under certain conditions,a conductor used to connect to a system neutral is also used for grounding(earthing)of equipment and structures.Current carried on FF11AA11wn clamps must be installed with anti-seize to prevent galling and provide uniformity in clamp load.Unirac a grounding conductor can result in objectionable or dangerous voltages appearing on equipment enclosures,so the installation of grounding Inc.recommends Silver Grade LocTite Anti-Seize Item numbers: 38181,80209,76732,76759,76764,80206,and 76775, conductors and neutral conductors is carefully defined in electrical regulations. Where a neutral conductor is used also to connect equipment or equivalent.All 1/4-20 hardware used in conjunction with top down clamps must be installed to 5- 10 ft-lbs of torque. enclosures to earth,care must be taken that the neutral conductor never rises to a high voltage with respect to local ground. 2.Solar panel flange nuts tighten installed to 5 10 ft-lbs of torque. 3.Inverter cover screws tighten to 13.2 in-lbs. Definitions 4.13C Array input to inverter wire size up to#4AWG tighten to 13 in-lbs.torque Ground or earth in a mains(AC power)electrical wiring system is a conductor that provides a low impedance path to the earth to prevent 5.RS-485 Terminals tighten to 8 in-lbs.torque hazardous voltages from appearing on equipment(the terms"ground"(North American practice)and"earth"(most other English-speaking 6.Wiley Electronics WEEB UMC or UGC-1 grounding clips in combination with or End clamps and 1/4-20 bolt and countries)are used synonymously here).Under normal conditions,a grounding conductor does not cant'current.Neutral is a circuit conductor flanged nut,torqued to 120 in-lbs.if the Solarmount-1 system is used grounding is achieved with the UniRac UGC-2 1/4- that carries current in normal operation,which is connected to ground(or earth).In a polyphase or three-wire(single-phase)AC system, the 20 bolt and flanged nut torqued to 120 in-lbs.When using methods 2,3,4 or 5 the array frame(racking). neutral conductor is intended to have similar voltages to each of the other circuit conductors.By this definition,a circuit must have at least three wires for one to serve as a neutral. In the electrical trade,the conductor of a 2-wire circuit that is connected to the supply neutral point and earth ground is also referred to as the"neutral".[I]The NEC and Canadian electrical code only define neutral as the first of these.In North American use,the second definition is used in less formal language but not in official specifications. In the UK the IET definition of a neutral conductor is one connected to the supply system neutral point,which includes both these uses.All neutral wives of the same electrical system should have the same electrical potential,because they are all connected through the system ground.Neutral conductors are usually insulated for the same voltage as the line conductors,with interesting exceptions.[2] Ufer eround Circuitry Neutral wires are usually connected at a neutral bus within panelboards or switchboards,and are"bonded"to earth ground at either the The Ufer Ground is an electrical earth grounding method developed during World War H.It uses a concrete-encased electrical service entrance,or at transformers within the system.For electrical installations with three-wire single phase service,the neutral electrode to improve grounding in dry areas.Thetechnique is used in construction of concrete foundations. point of the system is at the center-tap on the secondary side of the service transformer.For larger electrical installations, such as those with polyphase service,the neutral point is usually at the common connection on the secondary side of delta/wye connected transformers.Other Construction: Concrete is naturally basic(has high pH).Ufer observed this means that it had a ready supply of ions and so arrangements of polyphase transformers may result in no neutral point,and no neutral conductors.Combining neutral with earth Stray voltages provides a better electrical ground than almost any type of soil.Ufer also found that the soil around the concrete became created in grounding(earthing)conductors by currents flowing in the supply utility neutral conductors can be troublesome.For example, "doped",and its subsequent rise in pH caused the overall impedance of the soil itself to be reduced.[3]The concrete special measures may be required in barns usedfor milking dairy cattle.Very small voltages,not usually perceptible to humans, may cause low enclosure also increases the surface area of the connection between the grounding conductor and the surrounding soil, milk yield,or even mastitis(inflammation of the udder).[3]So-called"tingle voltage filters"may be required in the electrical distribution which also helps to reduce the overall impedance of the connection. system for a milking parlour.Connecting the neutral to the equipment case provides some protection against faults,but may produce a dangerous voltage on the case if the neutral connection is broken.Combined neutral and ground conductors are commonly used in electricity Ufer's original grounding scheme used copper encased in concrete.However,the high pH of concrete often causes the supply companies'wiring and occasionally for fixed wiring in buildings and for some specialist applications where there is 1 ittle alternative, copper to chip and flake.For this reason,steel is often used instead of copper.When homes are built on concrete slabs,it such as railways and trams. Since normal circuit currents in the neutral conductor can lead to objectionable or dangerous differences between is common practice to bring one end of the rebar up out of the concrete at a convenient location to make an easy local earth potential and the neutral,and to protect against neutral breakages,special precautions such as frequent rodding down to earth connection point for the grounding electrode.[4]Ufer grounds,when present,are preferred over the use of grounding rods. (multiple ground rod connections),use of cables where the combined neutral and earth completely s base conducf&r(s�-a'tid`-i_ . .. In some areas(like Des Moines,Iowa)Ufer grounds are required for all residential and commercial buildings.[5]The thicker than normal equipotential bonding must be considered to ensure the system is safe. ;;gilding E�pR '" ' conductivity of the soil usually determines if Ufer grounds are required in any particular area. Shared neutral <` An Ufer ground of specified minimum dimensions is recognized by the U.S.National Electrical Code as a grounding A shared neutral is a connection in which a plurality of circuits use the same neutral connection.This f y}m as arcommdn neutral,and electrode.[6]The grounding conductors must have sufficient cover by the concrete to prevent damage when dissipating the circuits and neutral together are sometimes referred to as an Edison circuit. high-current lightning strikes.[7] RVIEW U Uft GUIDE .; - ;.;F" i Sinele phase <` A disadvantage of Ufer grounds is that the moisture in the concrete can flash into steam during a lightning strike or similar Main article: Split-phase electric power In split phase wiring, for example,a duplex receptacle in a kitchen,d Vw►�I�\bonnec'tedywith a f high energy fault condition.This can crack the surrounding concrete and damage the building foundation.[8] cable that has three conductors,in addition to ground.The three conductors are usually coloured red,black,and white.The white serves as a common neutral,while the red and black each feed,separately,the top and bottom hot sides of the receptacle.Typically such receptacles are supplied from two circuit breakers in which the handles of two poles are tied together for a common trip.If two large appliances are used at once,current passes through both and the neutral only carries the difference in current.The advantage is that only three wires are required to X serve these loads,instead of four.If one kitchen appliance overloads the circuit,the other side of the duplex receptacle will be shut off as well. This is called a multiwire circuit. Common trip is always required if there are loads that use more than one phase simultaneously. The common Slingshot Power,Contractor trip prevents overloading of the shared neutral if one device draws more than rated current. Equipment in this Photovoltaic System slingshot,. 10.29 kW PV System Bey Curved Tile Torque Information & Grounding Information Date: Project 18-Sep-14 e p ct Det it a s Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 18 California State Lic: 6984488 1 Inverter Used SolarEdge SE-10000A-US Drawn: Paul Sherer City: Cupertino,CA GENERAL NOTES(Cont) UNGROUNDED PANEL ❑ POSITIVE GROUNDED PANEL ❑ " GENERAL NOTES I.Local utility provider shall be notified prior to use and activation of any NEGATIVE GROUNDED PANEL Q solar photovoltaic installation. ABBREVIATIONS ❑ Main Service Disconnect: 2.No sheet metal or tech screws shall be used to ground disconnect A...........Ampere MICROINVERTERS enclosure with tin-plated aluminum lugs;proper grounding/ground bar kits AC........Alternating Current CAUTION should be used. BLDG.. Building Structure SOLAR SYSTEM CONNECTED CONC...Concrete. THIS PROJECT SHALL COMPLY WITH: 3.All exterior conduit,fittings, and boxes shall be with rain tight and u Cr DC.........Direct Current THE: 1.Residential buildings-the marking may be placed within the main approved for use in wet locations.(NEC 314.15a). EGC.......Eirect C Grounding Conductor 2010 CA BUILDING CODE service disconnect.The marking shall be placed on the outside cover if the main service disconnect is operable with the service panel closed. 4.Adequate spacing are maintained between any plumbing vents extending ( )"•""'•'Existing 2010 CA PLUMBING VODE through the roof and the underside of the photovoltaic panels. EMT.......Electrical Metal Tubing 2010 CA RESIDENTIAL CODE 2.Permanent labels shall be provided,no sharpie marking will be allowed GALV....Galvanized 2010 CA ENERGY CODEGEC.......Grounding Electrode Conductor 2010 MECHANICAL CODE within any main service panel or subpanel. 5. Separation distance measurement from bottom of panel to top of roof GND.......Ground 2010 CA CITH/COUNTY FIRE CODE covering shall be minimum 4". L... Dipped Galvanized .......Hot HDG 3.Markings: Verbiage,Format,and Type of Material.a. Verbiage: 6.Grounding bushings are required around pre-punched concentric ......Hot Current California Code of Regulations CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED knockouts on the do side of the system. (NEC 250.97). Imp.........Current At Maximum Power Title 24, Part 3 FROM THE PV SOLAR SOURCES WITH DISCONNECT Isc...........Short Circuit Current LOCATED AS SHOWN 7.Back-fed breaker must be at the opposite end of bus bar from the main kVA........Kilovolt Ampere California Building Standards Commission breaker or main lugsupplyingcurrent from the utilities. kW..........Kilowatt Based on 2011 National Electrical Code"' b.Format: LBW.......Load Bearing Wall (1)White Lettering on a red background 8.All conductors exposed to sunlight are listed as sunlight resistant. MIN••••••••Minimum (2)Minimum 3/8 inches letter height (N)..........Neutral 3 All letters shall be capitalized 9.No building,plumbing or mechanical to be covered b the solar arra NEUT.....Neutral O P g'P g Y Y NTS........Not To Scale C �. B.Marking Requirements on]JC Conduit,Raceways, Enclosures,Cable 10. Smoke alarm and carbon monoxide alarm required per CRC R314& OC..........On Center pL...........Property Line K � Assemblies,DC Combiners,and Junction Boxes: R315. POI.........Point of Intersection 1.Markings: Placement, Verbiage,Format and Type of Material.a. 11.All work to comply with 2010 California Building Code;2010 PV..........Photo Voltaic Schedule Permanent Placement:Markings shall be placed every 10 feet on all interior Electrical Code[2008 NEC]-article 690,all manufacture's listing and SCH........ EFFECTIVE and exterior DC conduits,raceways, enclosures,and cable assemblies,at installation instructions. SS...........Stainless Steel JANUARY 1.2014 turns,above and/or below penetrations,all DC combiners,and junction STC........Standard Testing Conditions �� • w --W•.., -� - boxes. 12.Inspection required for roof connection mounting assemblies prior to TYP........Typical installing solar module. 2Pole......Grounding System(N)&GND B.Verbiage: UPS........Uninterruptible Power Supply - -. CUPERTINO 13.This system is GRID-1NTERTIED VIA a UL Listed or OSHA UFER.....Grounding system to foundation ��uilhing DepaPnf V.............Volt CAUTION SOLAR CIRCUIT Approved Test LAB certification ID. Vmp........Voltage at Maximum Power ��y C.The following label shall be placed on all AC disconnects: 14.This System has no batteries,No UPS. Voc.........Voltage at Open Circuit W............Watt ..........NEMA3R,Rainti t � --__--A;�=,.i � U� (`.C)� r„ E ��i�;PL'fkN 3Rt'.E CAUTION SOLAR CIRCUIT DISCONNECT FOR UTILITY 15. SOLAR Mounting Rails, SubRails,Poles are all to be grounded to earth. 81i REV 1 B OPERATION All Work to be done to 2010 California Electrical Code(CEC)and shall also comply with 2008 National Electric Code as amended by the 2013 X CEC Slingshot Power,Contractor Equipment in this Photovoltaic System slingsh -�t 10.29 kW PV System Curved Tile General Notes Date: 18-Sep-14 Project Details: Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 19 California State Uc: 8984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA ELECTRICAL NOTES ELECTRICAL NOTES(Cont) LEGEND 1.No guardrails are required for installed solar energy devices pursuant to LAMC 91.1013.5 17.All ungrounded conductors of a multiwire branch circuit will be identified ny phase and system per E)Utility Meter& 210.5 Warning Label 2.All PV System components shall be listed by a recognized testing agency(i.e.:UL,OSHA test Labs etc) 18.Either UL Laboratories or an OSHA Test Laboratory certifying station shall be listed on all equipment in compliancewith 110.3 fl° Inverter W/Integrated 3.Wiring material shall be suitable for sun exposure and wet location,field applied protective coatings DC DISCONNECT are not acceptable. 19 Circuits over 250V to Ground shall comply with 250.97,250.92(B) 4.A11PV modules and associated equipment and wiring material shall be protected from any physical 20 DC Conductors either do not enter the BLDG or are run inmetalic raceways or enclosures to the first DC DC DISCONNECT& damage. accessible DC disconnecting switch means per 690.3(E) WARNING LABELS 5.In one and two family dwellings, live parts in PV source circuits amp output circuits over 150volts 21.All wires shall be provided with proper strain relief and any anti abrasion systems at all entry into to ground shall not be accessible to other than qualified persons while energized. boxes as required by UL or OSHA Listings Q' AC DISCONNECT& WARNING LABELS 6.All Field installed junction,pull and outlet boxes located behind modules or panels shall be 22.All Modular/or module frames shall be grounded to earth at the UL-or OSHA Listed Location accessible directly or by displacement of a module(s)or panel(s)secured by removable fasteners. provided by the manufacturer using proper lsted grounding hardware. -J JUNCTION BOX 7.signs shall be posted adjacent to each PV disconnect and inverter to indicate 23.Module frames/framework(s), rails and posts shall be bonded with equipment ground conductors and grouunded at the main electric panel. "PHOTOVOLTAIC SYSTEM" DC COMBINER BOX& 24.The DC grounding electrode conductor shall be sized according to 250.166(B)and 690.47 WARNING LABELS 8.All Wiring shall comply to CEC Table 310.16 for sizing 25.The installing Contractor will confirm that proper earth to ground installed in the building eith 9.When a BACKFED BREAKER is the method of utility interconnection,Breaker shall not read line UFER or Two pole systems. DISTRIBUTION PANEL and load. &WARNING LABELS 26.EACH MODULE SHALL BE GROUNDED USING UL LISTED CUTIN GROUNDING LAY- 10.All conduit,fittings, boxes shall comply with NEMA NEC 314.15A IN LUG LOCATED AT THE MANUFACTURER'S SPECIFIED LOCATION ON THE MODULE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND IN ACCORDANCE CEC ( 1 LOAD CENTER& 11.There shall not be any hanging wires underneath any PV panels(CEC 110.12) WITH A CONTINUOUS BARE CU WIRE SUCH THAT REMOVAL OF A MODULE FOR WARNING LABELS SERVICE SHALL NOT INTERRUPT GROUNDING OF REMAINING MODULES. ALL PANELS 12.Equipment Grounding conductor shall be#6 AWG unless not subject to damage(CEC250.120C) GROUNDED TO EACH OTHER&FRAME BY A MINIMUM#6 BAE GROUND WIRE TO MAIN PANEL GROUND TO EARTHS DEDICATED PV 13.Working Clearances around the existing electrical equipment and well as the new electrical SYSTEM METER equipment will be maintained in accordance.(CEC 110.26) 27National Electric Code 690.64 Point of Connection The output of a utility- interactive inverter shall be connected as specified in 690.64,Bus or Conductor Rating.The sum of the ampere ratings of over ?"' c u® R -p ' 14.There will be Labels to indicate PV-SOLAR AC Breakers in Main Panel current devices in circuits supplying power to a bus bar or conductor shall not exceed 120 percent of the ai 3ui �j rating of the bus bar or conductor.In systems with panel-boards connected in series,the rating of the h` _- :;` OWN EXTERN "DO NOT RELOCATE SOLAR BREAKERS IN THIS PANEL" first over current device directly connected to the output of a utility- interactive inverter(s)shall be used E ` 1 ®�� in the calculations for all bus bars and conductors. �,�,f 15.All terminal connections shall be rated at least 90 degrees C. CONDUIT RUN /.P Vi_ 16.All terminals that are of the disconnecting means may be energized in the open position,a sign shall be provided warning of the electrical hazards 690.17 X 1Y Slingshot Power,Contractor Equipment in this Photovoltaic System Electrical Notes slingshc;t. 10.29 kW PV System Curved Tile D 18-Sep-14 ate: Pr oject Details: Page Number: 164 Main St.,Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 20 California State Lic: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA Z #,a,► ��c a CtylYdlbQRi F'a:vel 5hetlir�;: Fixed String Voltaee-Theory of Oaeration5 7A - The system maintains a fixed string voltage regardless of string characteristics and environmental t- conditions.This application note details the concept of operation of the fixed string voltage and its °, it k tIeLk. benefits. Concept of Ooeration 2 Thepower optimizer is a DC-DC power optimizer integrated into each module,replacing the junction Is AAP" 410ftW+exai*na*i-5 z 1: s kaw -rrw^rt - "MW Vv-t AA box.The power optimizers,using an input control loop,perform per module MDPT and enableR performance monitoring of each module.In an independent process,the power optimizers enable the inverter to automatically maintain a fixed string voltage,at the optimal point for DC-AC conversion 1, Ll by the inverter,regardless of string length and individual module performance.The operating * principles of thesystem are illustrated in the following example which examines a system's behavior M tdcrlaiw Amm .X*W under varying conditions. "iadar!jwtem 00AW- "LLVW The example system consists of 10 20OW modules.Each module has a power optimizer connected to Figure 1: Operotior+ under!cleat Condition-N Figure I Sr onrrrio CorriparAim it,which is essentially a DC/DC buck-boost converter with an MPPT controller.The power optimizers areserially-connected to form a string;multiple strings can be connected in parallel to the as► same input of the inverter.The inverter is a single stage current source-it continuously adapts the I - current it draws from the PV array in order to keep the input voltage constant. a ink of vc�bt-V{°ri Astcd b►+�t+i • 350V' The ower optimizer is highly efficient,maintaining over 98.8%weighted conversion efficiency over a _ . 'X s tis""7°'4 -Laeow/3Sov-S 374 wide range of conditions.However,for calculation simplicity, we assume 100%power optimizer t efficiency in this example. 1 s M" Urnitas#t eh.arr p 01 UV s MPO' �kzFvt -100W 3740-&25A taitput uoiwwe: NOW l 5,37A- 37.2V Fixed String Voltage Benefits The fixed string voltage maintained by power optimizers provide multiple benefits: --a 'swag C�sranJ•t x r* z sa�*e¢.al npM1 1 IHtr =3$kA Flexible Design mismatched modules can be serially-connected in a string.The number of modules in a single string is not dependant on module output voltage and therefore a wide string length range is max,Pow"= team permitted 1. High Inverter Efficiency and Reliability Figure 2: Operation with Partiul.Shading The inverter components work at a fixed voltage,operating under less stress.The inverter always operates at a voltage that enables optimal DC-AC inversion efficiency, independent of string length or environmental conditions. Reduced Installation Cost-longer strings,lower BoS element count and installation cost and labor. =, Building Denaelft Temperature Indifference-the fixed string voltage completely removes thetemperature constraints ISSEP 18 2014 which strongly limit string length in traditional systems. _ Improved Safety-all power optimizers start up in"safety 1V output" mode until the power optimizers REvIEIA/El=+ rOR CODE WMP!_; NCE are connected to a functioning inverter. Additionally, in the event of a gridpower shutdown,the X Jvy� ed By _�::� "' modules immediately stop producing power and revert to this mode. Slingshot Power,Contractor Equipment in this Photovoltaic System slingsh r.,.>t 10.29 kW PV System Curved Tile Technical Note: Optimizers D 18-Sep-14 Date: 18 Sep 14 Protect Details: Page Number: 164 Main St., Los Altos,CA 94022 Equipment Type Manufacturers and Model Version: 1.0 Ph:650-308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper mum-mow Fax:650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 21 California State Lic: B984488 1 Inverter Used SolarEdge SE-10000A-US Drawn: Paul Sherer City: Cupertino,CA I a: _ I _`,ti Cab 1 r..- ?,fit.:. int; Fe'w'er Ovtn`i_er - "R ,• s •4 C AC 6SConda.dt •,As � Figure 14: Instrtmg the AC arK1 DC Condurta riput input - T Sk ut • Dca T r • P' - =-- -in-it - Connect to Mooule Figure 15: Invertef DC Terminals F,,gtwe 4: Rawer Optirritzer f7oiir1eCto(s s C D E A 13 � -onne-cto s Figure 16: In ierler AC Termir^ai 87.xks .- CUPRTIN f -luilding Departm t QEF 1 � 2U SEP 14 For Installation of the SolarEdge - : vir, ,:��; t-4-)R CODE GONiF'L'AN E Inverter and the SolarEdge Optimizer F' re 5: WarMver OptinvzJ-ts t_ c,)nrtected in Series X Please Reference these documents Slingshot Power,Contractor • Equipment in this Photovoltaic System slingshat. 10.29 kW PV System �ry Curved Tile Install Optimizer/Combiner: SolarEdge Date: 18-Sep-14 Project Details: Page Number: 164 Main St., Los Altos,CA 94022 Eauir ment Type Manufacturers and Model Version: 1.0 Ph:650308-9055 42 PV Panels Used Sunpower SPR-245NE-WHT-D Scale: None Client: May Topper Fax: 650-887-0345 42 Optimizers Used SolarEdge P350 Project: 0 Address: 22249 Hammond way 22 California State Lic: 6984488 1 Inverter Used SolarEdge SE-1000OA-US Drawn: Paul Sherer City: Cupertino,CA California State Fire Marshal California State Fire Marshal Information Bulletin 14-002 Information Bulletin 14-002 Issued: February 14, 2014 The requirements of the IBC Section 1509.7.2 will need careful examination in its application. The language of this section states that the fire classification of PV systems must match the minimum FIRE CLASSIFICATION FOR ROOF MOUNTED SOLAR PHOTOVOLTAIC required fire classification of the roof assembly over which they are mounted as required in IBC Section PANELS/MODULES [SYSTEMS] AND APPLICATION OF THE 2013 CALIFORNIA 1505. With any rooftop structure, the PV structure should not degrade the fire resistance properties of BUILDING STANDARDS CODE the roof, so as not to place the building and its inhabitants at an unanticipated risk. However, straightforward implementation of this requirement is not possible for the following reason(s). On January 1, 2014 the 2013 California Building Standards Code, California Code of Regulations (CCR), Title 24, became effective. As part of the 2013 California Building Standards Code, Part 2 and PV modules are a component of a rooftop mounted PV system and, although PV modules can receive a Part 2.5 provisions for the fire classification of roof mounted photovoltaic panels/modules[systems]were fire classification rating in accordance with UL 1703, there are currently no PV systems with a fire updated to comply with the most recent edition of Underwriters Laboratories Inc. (UL) 1703 Standard for classification rating. Thus, as currently written, Section 1509.7.2 refers to the fire classification rating of Flat-Plate Photovoltaic Modules and Panels published in October 2013. a system, and this exact approach is not yet achievable. The Office of the State Fire Marshal (OSFM)was recently informed by industry that presently there is an In the absence of a PV system fire rating, it may seem appropriate to substitute the PV module fire insufficient supply of UL 1703 compliant Class A, Class B or Class C fire rated tested and listed classification rating in order to achieve the desired result, which is the preservation of the roof photovoltaic panels/modules [systems] to meet present demand. This circumstance may prohibit the assembly's original fire classification. However, simply using the PV module fire classification rating may permitting of projects to install solar photovoltaic systems on roofs, which in turn curtails efforts to meet not provide the desired result in most cases. current sustainability goals. The issuance of the most recent edition of UL 1703 and its adoption into the Over the past five years, rigorous testing by UL and Solar ABCs revealed that the performance of a 2013 California Building Code (CBC), specifically Section 1505.9 and California Residential Code (CRC) system (which includes PV modules on standoff mounted racks)exposed to fire or flame is not the same Section R902.4 necessitates the need for guidance from the OSFM on this matter. These sections read as that of a module alone. Currently, modules receive a fire classification rating based on testing the in part: module alone, not as part of a PV system. The results of these tests show that actual performance of a `Rooftop mounted photovoltaic panels and modules[systems]shall be tested, listed rack-mounted PV system exposed to fire or flame is strongly dependent on the mounting geometry of and identified with a fire classification in accordance with UL 1703...' the PV array and properties of the components that make up the specific PV module type, but the results are not necessarily dependent on the fire classification rating of the module. (A summary of this research In view of the effective date of the building standards identified above, and to provide suitable time for is published in a Solar ABCs report available at: the testing and listing of photovoltaic panels/modules [systems) to meet the current UL 1703 standard, http://www.solarabcs.org/about/publications/reports/flammability-testing/index.html) the Office of the State Fire Marshal recommends that local authority having jurisdiction accept photovoltaic panels and modules having a Class C rating under the previous version of UL 1703 (2002 As a result of this testing and in consideration of the current requirements of IBC Section 1509.7.2, a edition with revisions through April 2008) or UL 790 (2004 edition with revisions through October 2008). working group composed of representatives from the PV industry, the roofing industry, standards This recommendation is based on the photovoltaic testing that was done during the past five years by development, the building and fire enforcement community, and government laboratory experts UL and Solar America Board for Codes and Standards (Solar ABCs) and is discussed in the developed and proposed a new test methodology to determine fire classification ratings for PV systems. "Background and Justification"section of this bulletin. The new test methodology was adopted by the ANSI/UL 1703 Standard Technical Panel, and was published October 25,2013. GUIPERT1 Background and Justification: The 2013 California Building and Residential Code as noted above are primarily based on national Proposed Emeraencv Reaulabons: sullrjinq @pfl P.nt model codes promulgated and published by the International Code Council and in turn adopted by The Office of the State Fire Marshal is presently developing emergency building standards to tempor*11y- reference into Title 24 Parts 2 and 2.5. The promulgation of these model codes provided the basis for stay the effective date of CBC Section 1505.9 and CRC Section R902.4 for 180 days. This proposed. � SEP 18 2014 the provisions relating to PV in the California Codes. The 2012 International Building Code (IBC) rulemaking is anticipated to be before the California Building Standards Commission for action at ft--- Section 1509.7.2 includes requirements for fire classification of rooftop mounted photovoltaic (PV) scheduled April 22, 2014 meeting. This information bulletin serves as an interim aitemative providing systems and the 2012 International Residential Code (IRC)Section M2302.2.1 includes requirements for guidance until such action can be accomplished. -ViEV'y Li 10 CUvE Of i '!,A CE noncombustible or fire-retardant materials. A key objective of the adopted code requirement is that the <;