Loading...
Plan Set_2.pdf Anat Shmariahu ADDITION AND REMODELING ANAV Design 408-206-5992 OWNER: � � == a. .. i L E G E N D SURVEYOR`S NOTE • FOUND 2.5' BRASS DISC IN MONUMENT WELL RCE 8718 ' HANDICAP RAMP THIS MAP CORRECTLY REPRESENTS A SURVEY DONE BY ME OR UNDER MY DIRECTION IN CONFORMANCE � O SET 5/8" REBAR WITH PLASTIC CAP LS 5571 � STORM DRAN MANFIOLE WITH THE REQUIREMENTS OF THE LAND SURVEYORS O SET NAL AND 3/4' BRASS TAG LS 5571 IN CONCRETE � DROP �ET ACT. THE BOUNDARY LINES SHOWN HEREON ARE , ❑ SET WOODEN HUB ON PROPERTY LI� OR AT OFFSET AS NOTED � pf{pp�E MANHOLE BASED ON A BOUNDARY SURVEY DONE BY WILSON ry, � FIRE HYDRANT LAND SURVEYS. �9s I � WATER VALVE OO SEWER MANHOLE � I Qc SEwER CIEANouT �����-- 3-22-2017 ---------------------------------- � WATER hETER —SS— GREEN PAINT- EVIDENCE OF UG SEWER LfJE KENNETH D. WILSON LS 5571 LOT 29 TRACT 4416 � JP � PARKfJG P£TER TRACT 4416 N o, �� � JOINT POLE 237 "M' 54-55 a, 237 "M" 54-55 � RAISED RED PAINT � � �N SITE BENCHMARK � I UTILITY POLE ry� S89'35�44"W � � E " � ELEVATIONS FOR THIS SURVEY ARE BASED ON ASSUMED ,� 9� � _yPHONE BOX TP TELEPHOPE POLE CONTROL PONT _ -- 9' � °C o • � � I I n b "^ —_--_—_�—_�w\ � d ELEVATION OF 500.00` AT CONTROL POINT tf1. � 9 6 "' ioo.is' 9a0 `', s f '` --� --_^��. I 11 � RAISED � GUYWIRE Y}c LAMP POST �� ' - _. —W— BLUE PANT- EVIDENCE OF UG WATER Lf�E 30" RW �; � Q e ,e' c�� _____ �, l-� �,� �� UTILITY BOX , ❑E ELECTRIC BOX •y �! p � WOODEN SHED ___�_ __�;GM EM ` � �n� I � ELECTRIC hETER WALL GENERAL NOTES 19�93 ` ,'^ ''A�� � � � __ ��a � 1 � ,---_.._..,,_ BRICK 18.28' �— i rWW_�_.1, f t ` - �----�c�-- � �,��`'J� I I � GAS METER � BOLLARD 1. TREE SIZES AND TYPES ARE APPROXIMATE AND WALL j j '�.,� II � � I � —O— WOOD FENCE SHOULD BE VERIFIED BY A CERTIFIED ARBORIST. �T�'� i i � LANTER MONTORfJG WELL 8.27��— i� �� L � � %a CONCRETE 2. FINISH FLOOR ELEVATIONS ARE TAKEN AT DOOR �� � GARAGE FlNISH�� i STONE j i FLOOR ELEVAl10N=499.26' I —G— YELLOW PANT, EVDENCE OF UG GAS LI� LO LIVE OAK THRESHOLDS. / �� �RIVEWAY wo WMTE OAK 3. BUILDING CORNERS WERE LOCATED AT FINISH �j -- , LANTER � I ❑P PHONE PEDESTAL LOCATIONS (STUCCO, BLOCK OR WOOD AS IT EXISTS IN I� g—�'� `� � - I RW REDWOOD i iSIEP ��_'� � TYP. TYPICAL THE FIELD). �� /- --- ''�� P PHONE BOX 20.04' �i'i___.• i�� �---------'. �r--�--- on ��'� PROPERTY LINE j � PFIOPE MANFIOLE " � ��-'�� � BUILDING �� � o-Aa'o ,� �� ��^�� ��K FE�� UNDERGROUND UTILITY NOTE '"-��� ;; � ;' ;; �`" ` � p h�' �^ E��- �, �, _,;�__,,�- � -�---- --------- �N —P— ORANGE PANT, EVIDENCE OF UG PHONE LI� P•U.E. PUBLIC UTLITY EASEhENT o;� � __� �_ I y��, � S.P.E. SLOPE PROTECTION EASEMENT UNDERGROUND UTILITY LINES, IF SHOWN, DEPICT OUR !,� !�,POND t,�,^. � FINISH FLOOR 19�9t � TRAFFIC SIONAL CONTROL BOX ESTIMATION OF WHERE THE ACTUAL LINES MAY BE ___�' �,. ' 3 �----kh � _--_� �o � DGE IOF PAVEMENT�� �'ryb � . `--- s------1 ELEVAT10N=501.01' � �$� 7REE !� :"r ' � �4" TR � BRIqCS LOCATED. THE LINES WERE DETERMINED BY CONNECTING i- -��+ '�r`���,�� � TRAFFIC SICNAL � VISIBLE UTILITY APPURTENANCES AND ALSO BY USING WOOD POST ? o�o'��� ;7�r%.';j � � I � PAINTED MARKINGS PLACED BY OTHERS. THE UNDERGROUND ��;--�,�"� �' - ,__ > _ I ti 28' 28� TV TV BOX ' , ,;% ,r,o ; e0 f-�-----�'� �, ❑ UTILITIES MAY OR MAY NOT BE AS DEPICTED ON THIS �i , •. , 9. � J� I w,`+� � � � �;'•� ��./ . k9: SURVEY. NO LIABILITY IS ACCEPTED FOR ANY o I� � J 12"a.�92EE DISCREPANCIES, OMMISSIONS OR ERRORS WITH REGARD TO ,cvi�; f_�'-��___`-,,, i � LOT 31 ����--�� /' I � FVIDENCE OF � —OH— OVEPo-IEAD LINE I I tiDeRGROUND SAID UNDERGROUND UTILITY DEPICTIONS ON THIS SURVEY. LOT 30 , � � y. I �GAS LINE —TV— ORANGE PAINT, EVIDENCE OF UG TV L.� �j �� "' '�"`- �ro �� iRACT 4416 237C M4 54-55 m �` �`�`,':�% % / 237 "M" 54-55 ,,,` I BASIS OF BEARINGS i�ll \;,h /' LOT AREA: .17 ACRES I $ .P' ^i i I I Q j I 7,514 SQ FT FOR THIS JOB IS NORTH 0'23'50" WEST BEING THE ;� �� ��,,__,� o°'� � I � � BEARING OF THE TWO FOUND MONUMENTS ON RIEDAL ; �`; --� �J I I J PLACE AT THE INTERSECTION OF WHEATON DRIVE AND AT J '�I Q �`^- �`;-__,__�%, � THE CENTER OF CUL-DE-SAC, PER 237 "M" 54-55. WA�� i+' - -�� '� ; FlNISH FLOOR I � e '� �00 ,A^� w �Np.� ey �'�� � �i i � ~�ELEVAilON=500.95' 9 � �$ TREE I 6 7R� �'b°�^ �o^ �i� � 10' PUBLIC UTILITY 56'� � �9 9 � y � C' i� � EASEMENT PER 9 I ' �°j� a°j^ "^ ��" ��� 1 237 "M" 54-55 / `t • °' ya `�_./i i"' �1 — / M U CONTROL POINTS n° �'� � '------.,_._ � / POINT NORhiING EASTING ELEVAPON DESCRIP�ION 7" �REE i i ' HOT '%i OOL ESUIPMENT ______________�� , ,y� 4 5049.1575 5286.2755 49�.60 CP MAGNAI —� i�l TUB �� N C , I � � 9?� oo � i i ------ / i a'4" TREE. w �" TREE p• I � ------_-' w - '�a t � `�...__ _ 9a � � A9 „a� .'� WOOD� x` . 9`L� o WALL N8935'37" 99�,�p,$g y �' o- (UNDER FE E) 80.19' `o "� 9^6 a ^ STONE� } WOOD� � I y0�'� WALL �,am \`/ALL ,� - n9 a"- �@�p #q �, TR -`` �14 �o,� _ �ee�0e^q�ae �3' TREE i4� ��? 0.n 001,� , Y Gy,� 9 0 � koi _ � ����� rS"T _— b--- r--____ --______ _ a ��r W -- �9a`---- �y _a „ 90 Q ---- --- ,� oe � � d RAISED � � � = UTIUTY BOX J � M m � I � WHEATON DRIVE p O _o �� � � — — — — — — — — — — "99 — — — — — "9�� — — �� — — — — — — — — — _ _ _ _ _ _ �h �� O � O M o a �Q o y s 6 {,��P #� �9e aa0 kee o- a9� 4� Email:kenwC�wilsonlandsurveys.com www.wilsonlandsurveys.com lCEN MlLSON LS 5571 WIL 0 N W � 261 CARLTON���+ 5��� TOPOGRAPHIC SURVEY LOS CATOS, CA 95032 408-540-7687 AS RE�UESTED BY: GRAPHIC SCALE TOM AI� LULU CFEN n,m�w�a�ea m m 0 5 30 20 h°fi""a't°f°"'Ac`T°'B'° °`�°�"°f�"s ad � LAND S LEGAL DESCRIPTION: LOT 31 237 "M" 55, CITY OF �ax�e�r«�o-„�u��nb ������ �� � qS�F'o CAL FORN q,COUNTY OF SANTA CLARA, STATE OF �l be uaed h whde a h pvt fa ary G .��` i O M,rm,lbn,A,rm her„n,hdl not � 0 G� '� ( IN FEET ) o�wolw��+���v v � 9 �', 1 inch = 10 ft. ot Mam Lmd Sways 2 Capy�i�t 2017 Kemeth D.Wlam Y O �"0^���"°�'"��^�° N0. 5571 Z APN: 316-21-061 ����•���� � DATE: MARCH 2O17 n�e Mo�motlon a,Ws mcp ahnLL �^�^"b��'T�� `�'T p* FILENAME: H-022 CHEN RIEDEL TOPO oa�to�e,oe,cn•wlsan Lmd s+veva Lon 9�.F �� � CAL�F� DRAWN BY: CALE: PROJECT: JOB NUMBER: SHEET: KTW 1"= 10' H-022 H-022 1 OF 1 �. .. � 9^6 h Landscape Plan & Tree Location Map #�-4ea.4��DBH �qs�, , � � Japanese maple � 10133 Rledel Place, Cupertlno ��� � � '� G ao RAI ED RED PAINT Q tO PHONE X I #1-11��DBH ryry , S89'35'44"W �y 9� E � � Scale 1"= 10' 0" - �°� �� � � __ — - 9 r �� a o� liquidambar ;� �,^ -- h s�� ��, - ---__ , � >> R�. -o Street Tree �; ¢ __ � �� ------ �„� - - - � � I �,f! �1 Y BOX i ,�o� �. WOODEN SHED __�;GM EM ` �n_I 19.93' ;� -- -- -- . , BRICK 18.28' r---- _ � - -- ---��-' ' ���Jl I I Tree Retain • WALL I I ,. �� ��;� (T�•) �� �� �LANTER , 18.27' i� ii � � � �i STONE ii I � Tree Remove � 09 �� r����' �-PLANTER r^ r� I � #2- 15��D$H �RIVEWAY #8 - 10",� ,�'DBH #10- 1�"DBH � �Is �'- Chinese istache zo.oa' �.�_ ;:���� ��__,___, �,���""� Japanese maple camphbr � Street Tr�ee _{_ � Jr�` BUILDING I ,� r4J yo�r.., , I � ------�-- ------1 � �`' �� Canopy Extents �,,� T o E; ;��, � �0�-�' i � i� � � w ����-- .'�WOND�,;; � _ ` �o� I __ �e ; �—" �� ��EDGE OF PAVEMENT�� + #9-9",6",5"DBH ' 9 �y�10�� .---Dfii,il � � .�REt � �e`� �4 =� WOOD POST i ' 7��%, S�lYUb PIaI1t1T1gS �EX1Stlilg� __+ ___.�' ,, _ Japanese maple � � 9 28, z €� � �;�e„ ��<<� , �� ., j � � �� U n��i - - �_ � FVIDE"�CE OP � . I tiD�RGh.;"+0 / / #14-13°DBH °D^' '�' . ` � New Entry 4��alkway i � � II �G..� LINE Turf (Existing) / , ',� _ _ � m �� � evergreen pear " �i Concrete Pavers � ' � w �� . I U i'i �',' ' I � I I I I � J � �, ��.�,,,, _ � � 15 -4",3",3"DBH - ---_ -- I� � T a Turf (New) ` J I J ` BRICK ��, �,� __ ._� apanese maple #1 -4"DBH I ,��h"` a 6 0 �wA�� ;� ����� � holly , � � � f�'� ��� y� #3- 11 DBH � #16-9"DBH �' / `` ,, f I �. � �I Chinese pistache u le leaf lum �{ ` %/ � #13-4",3",2"DBH #12- 7",7",6"DBH , TR�t � �9q. Mulched Area p � p '' 9" 9� "� Street Tree �-- �% ,/- , �--- � ; �� a r � � � apricot icot �- ,� � �� / _�y� , ��:�. . ; � J � � `;' _�_:�--'% �" .' , ; - ---- ✓- ,��� 4 ---- . � . _._ • _ � IREF ,E i�iHOT � _ -_ 00 �r�:��- ---------- �- .� L. � � , ' �� � TUB � N oo� � �' � ' � , � � ' J� rn TR ' � 6" i , E a #17- 1",1°DBH � I. Note: All trees and landscaping shown �ltrus �——� � - --- ' " - r�'_ -^ �`�"--�-- " r c ��< are existing. No new plantings (trees, — ��� 9 � � _ � ��� � ) / �o ""��� J WALL N8935'37 D a� / � �- -� -�'.� --z� 1 / shrubs or groundcovers), are proposed. —, STONE�`' � W�o��' �` ^ f ;r ' i y0�'� WALL �_ P/ALL � Exception: new turf at entry area. o �o, _ �09,�0e� ��0� , �' TREE ���� 9�, � 0^1� �� TR �,� 0 A o kp�0 ko��- ' 0' CyySti_�b--_ � ____ L � �� __ b0 - � - ____ ______ v � �� �_—��_�__ #4- 15"Chinese pistache #18-6",5",4"DBH � l � � Street Tree Carolina laurel cherry � � � ��� `J � v - ' _ � --. „ .,,,,,,. � WHEATON DRIVE #5- 13"DBH • ��.lP� �'fll_1�8 #6- 14"DBH oak Chinese pistache Street Treee 6/28/2017 Street Tree 826 Manlerey Avenue Capetala,CA 95�10 631-359-36U7 kurlloutst�oulfook.corn LANDSCAPE PLAN&TREE LOCATION MAP 10133 RIEDEL PLACE,CUPERTINO PREPARED FOR-TOM&LULU CHEN APN-316-21-061 6/28/2017 Base map provided by:Wilson Land Surveys Los Gatos Anat Shmariahu ANAV Design 408-206-5992 55' - 11" 1 4 1/2"/ 1'-0" 4 1/2"/ 1'-0" ' ► z w WOOD ROOF SHINGLES = U � � Vo � � � J rn � B�XE r dOOr � � r ; J �'� FAMILY ROOM z 0 O WOOD ROOF SHINGLES � Z \ Q W � �� N J � � N � � c� � � � 13' - 1 1/2" 10' - 0 1/2" 18' - 3" �, J p � � � � � U � � � I I � DINING � �, u � MASTER BEDROOM � i - / � , N I BATH RO MASTER BATH � � � � � � � - o � - � WOOD ROOF SHINGLES � Q Z ao � � _ � � � N I WH�� � � ^ � � Z J � Z Q I..L o - ; � � � o o VJ VJ O � ENTRANCE BEDROOM 1 BEDROOM 3 o X � Q � N `� WIL � � � � —_ 9' - 8" � 9 - 7 1/2" 9' - 11 1/2" `�' 5' - 11 1/2" 10' - 0 1/2" � � - � � � � - — - � _ CLIENT S I �� � - = LI LULU & XI TOM � - � , � � � i nii�ir Rn� N CHEN � 4 1/2"/ 1'-0" 4 1/2"/ 1'-0" N � � J . � � WOOD ROOF SHINGLES � N 17-1 , � � o , � o � DATE N N � � AUGUST � 2017 WOOD ROOF SHINGLES REVISIONS 1 EXISTING FIRST FLOOR 2 EXISTING ROOF PLAN N � AO 1/4" = 1'-0" qp 1/4" = 1'-0" � N 1 /4" = 1 '-0" Anat Shmariahu ANAV Design 55' - 11�� ,� 408-206-5992 sa 4a 13' - 9 1/2" 28' - 0" 14' - 1 1/2" A8 As 2' - 8" 11' - 1 1/2" 14' - 1 1/2" 13' - 7" 28' - 6 1/2" 13' - 11 1/2" 14' - 8 1/2" 13' - 10" I � � W 2' - 4" ' - 41/ " � II = � 3 a 4 a -o�-2�� � I _ I U � � A8 A8 � � I � I G U O � II O Q � � � J ° � r� � � Q � � U I � � J N � o I � I II I I � (N) BEDROOM 1 _ � I O � � � W r �r-�i- n--ir-�i--r i Cfl � N � N I z Q 7 I II �I II II �I I I ' � � I � I I I I I I w L 13' - 1 1/2" ; ',', ;', ',', ',', ;', ', ', 28' - 3 1/2" 0' - 1/2" 13' - 5 1/2° T � r? � � �� �� �� � �� MAST R BEDROOM 2 I a �� �� �� �� � � � � ~ � ���� �� �� �� �� �� � ti � � � � � � � I � i ��_��i_ ii__�iL-�i--ii-� � I i i i i i i 13� - 2" I � C`7 w i �-_�+__�_��_�+__�_� 1 N �___===��I� - � r __ �_ ----� �---� I J � �______��� �a I --- -- � � � � — p � ���� _ as r� '-______ ���� 3' - 6 10' - 0 1/2" as _ � � _ J � C� � r------�i� �i �i I i ��u� � � --- -- N � � � � � � � � (E)MASTER �__----����� M �___ _�_ � � � ' � I � � , i i li i i i RFf)RnnM �__ - N I o � �----�- ----� L---J � � o I � I � � "' I --- - � ----- � 8' FLAT CEILING ___ __ � I N ______ N I " I � � I � (N) GREAT ROOM DOUBLE � � � �o�-o° I ! 9' CEILING I � I o � I ______ SPACE _ : --- -- I � ------ � I - - -- -- = ------ e o _ , N N , � � (E)MASTER _ (E)BATHROOM � BATH 3' - /2" � 8' - 0 1/ " � o MASTER � � BEDROOM 3 ° Q � I � MASTER w Q � N � _ BATH I � � � o0 0 � o 00 � z � �, � � � � � � O L.L , � � CV � � � r- � I MA TER U O Z � `�' °'-°" (N)KITCHEN � - I � T BA H � � � ~ � o I _ I N ' � i 9' CEILING � I _ � I O � w O Q � � ENTRANCE w � i � � o � � 11' - 11 1/2° 2' - 9" 5' - 0" 8' - 2" � I � _ (n J J � 11' - 1 1/2" � i �} � ' I � � I � �.L � �..L � ' ° o � � - - � o � c� I � � � I �r, � 8 FLAT CEILING = � � I � LAUNDRY � I I .-- _ , � a � ��� VAULTED � � R M ' I i � za I VAULTED CEILING � A$ � _ I CLIENT i � I � I � _ _ � 5' - 111/2" � 9' - 8" � � � � � I � oW a � � � L � � � � LI LULU & XI , TOM -o�-2�� � � o � i i i � - - � �1 � , i � i � � � - CHEN (N) FURNACE AND TANKLESS WH � I � 20' - 8" � I I !`,.,� I _ I - I : I I � I ' � � � � � JOB NO. � � � � � � N N I N I I � I � � -o�- ��° (E) GARGAE �I I � � � -,�-5�� i i 17-1 � � � f i 4 1/2"/ 1'-0�� 4 1/2"/ 1'-0" II II - II � � � i � � DATE , , i i i � i 14� - 2° � N i �i �i N ii AUGUST 0 i i i i 2017 i li li �i REVISIONS � i i i � i i i � i L � i " i _ i � i N : ; i i � � il � , i � � i � - - - - - - - - - - - - - - - - - - - - - - - - - J 2' - 8�� 5� �� 14' - 10" � 12' - 4" 7' - 9" 8' - 51/2" 14' - 10" 6' - 81/2" 13' - 1" 21' - 4" 13' - 7" 28' - 6 1/2" 13' - 11 1/2" N � � � N , 1 PROPOSED FIRST FLOOR 2 SECOND FLOOR � q� 1/4" = 1'-0" q� 1/4" = 1'-0" � 1 /4„ _ � �_0�� Anat Shmariahu 3a ANAV Design A8 4a 408-206-5992 A8 41' 9 1/2" 17' - 7 1/2" / 15' - 2" 30' - 8" 13' - 7" Z � � N_ _ � I I "' U � , I 1/2"/ 1'-0" 4 1/2"/ 1'-0"— I � � w O N I I � Q rn � � J � � � U � _' J � 0 w O I r� --------- -------------------------------------------------------�� I z 0 I 2� - 4 �2° 2� - 7 ��2° ; I a w � I � � � � I � J M w I COMPOSITION ; I � C� � SHINGLES- � J � I o � — O � FIRST FLOOR �� _� � I � a � � J � U A8 � i N i � � I � i I � � � ' � � I i I � i I I i i I o SKYLIGHTS � � I � I VELUX FCM � I � � � I N � 2446 � N � � c° � �� � � I ti I � � I N i i I I I i i COMPOSITION � I � z SHINGLES- - � � q � I SECONG FLOOR - � w Q I � I � � � I N I n � � I O 1..� I I O I I � � i ; 2' - 5" � q � Q � I N I � I i N CV I � SKYLIGHTS , � I � �/ O VELUX FCM � � I 2446 � _' � � � I c� � i� co I � I � = ' - COMPOSITION 0o L------------ - -J � SHINGLES- I � 2a °' � FIRST FLOOR CLIENT A8 SKYLIGHTS I I � VELUX FCM I � � � 2446 � LI LULU & XI , TOM I M _� � •� � � CHEN � � � I 1' - 21/2" � 1' - 2" COMPOSITION I I I SHINGLES- COMPOSITION - I - JOB NO. I FIRST FLOOR � SHINGLES � I N � � I I N � , I I I � � 17-1 I I I � I I I a �i2°i ��-o° 4 1/2°� ��-o° I FIRST FLOOR WALL � DATE : I = � `;� SECOND FLOOR WALL ---------- - I I � I � AUGUST � ROOF LINE I I 2017 I I � � I I � � N I REVISIONS I � I � I � � - - - - - - J I I � , I I M � I I I I � - - - - - - - - - - - - - - - - - - � 15' - 2" 30' - 8" 13' - 7" 18' - 4 1/2" 16' - 3" 24' - 10" ALL EXISITNG ROOF AND NEW ROOF WILL BE REPLACED TO COOL ROOF COMPOSITION SHINGLES -, N 1 � PROPOSED ROOF PLAN A2 1/4" = 1'-0" 1 /4" = 1 '-0" Anat Shmariahu ANAV Design 408-206-5992 z w _ U � � Vo � J d� ~ � Q � JU zo0 Qw � � � � --- --- — -- — � � w I I J � � II I I J � U II II II II II II N II II H II ° II --_ - - - - - ==-JL---=------------------- Z � � -� � � II J � � - ------ - � � r------�1 �____ - _ � 0 ~ � I � � � � II � I � �, II � � i � � � ( wH � � 0 _==�.�J� - � �i =_�--��-------J �__�-- � _ �' i i w — J a i � —� �--- � � � o ii ii �-- , ii ii ` ii � i � ii ii =� ii ii � � / � � � � � 0 CLIENT � � � � � II �� IIII II � � , „ � � � � LI LULU & XI , TOM � � ; ; CHEN � � � � ❑ L�- - - - JOB NO. 17-1 DATE AUGUST 2017 REVISIONS 1 DEMOLITION FIRST FLOOR A3 1/4" = 1'-0" 1 /4" = 1 '-0" Anat Shmariahu ANAV Design 408-206-5992 z w w Y Y w = � Q Q z U � m � w v � � V � � o N a O J � � I WOOD SHINGLES a � � U � � � 0 w � z � Z I SECOND FLOOR Q _ � � _ I L.LJ — ' � 10' 0" I J � � I = Ceilin MM W � 4.LEVEL 5 SMOOTH STUCCO $� _ 0° � `,J � I � i cfl �n I J � � � � � I ' � I � , � � � J � � � � � � � ' � � I � �� -' STUCCo I � � , I � STUCCO �� � � I I � � , I � I ,' I FIRST F�OOR I ,' 0 0 0 0 0 0 0 _ 0 - _ _ _ _ _ _ _ _ _ _ _ _ _ _ GARAGE� -1' - 5" � � �. ��. � � � -. , ,� � . � � � � � � � , � � � � � - � �.. � � .� �. � 1 EXISTING RIGHT SIDE/NORTH ELEVATION � z 1/4" = 1'-0" � w O A4 Ur � � z O = Q � � ~ > � � w X � OJ W � Z W NEW COMPOSITION CLIENT w Y SHINGLES ROOF z U U LI LULU & XI , TOM J Q Q } � � NEW SKYLIGH U U � � � 2246 VELUX m m � a o N w w w CHEN o � � � � I I � o CEILING � O w � — — — — — — — — — — — — —i — -i — — — 18' - 0" � a � I � � � � I I � NEW FIXED I I I I ADDITON WINDOW I I � JOB NO. I I I OF SECOND _ _ FLOOR - - I I I � I I � STUCCO � � � � � ;� I I - � � � 17-1 I � - � I I � I I , N SECOND FLOOR DATE � I I 10 - 0 � I NEW COMPOSITION I Ceilin AUGUST � _ �� I � $ � 2017 � SHINGLES ROOF I I i I I I , , - � , \ I I REVISIONS , � � I I - � � � I I � EXISITNG STUCCO � � - � � � � , , � � � FIRST � �� -' � FLOOR �� � � STUCCO I I � � I , � � I GROUND I I I LEVEL GROUND � � LEVEL — — — — — ,' _ FIRST FLOOR� I -- _- - — �- 0�� 0 0 0 0 0 � GARAGE --------- I -1' 5"� ----------- � _ . _ -.- � - � -. � � � ���� : � � � �� - � _ � � � . � � � �. � - _ -� � � � � � �. ���. � � �. 2 PROPOSED RIGHT SIDE/NORTH ELEVATION A4 1/4" = 1'-0" 1 /4" = 1 '-0" Anat Shmariahu ANAV Design 408-206-5992 W Y Z } m U Z ~ w Q J w � � � � Z o � cwn w w a � al 2 I � � V � al � wo I I U I O J a, I I I I � � v _ I WOOD SHINGLES WOOD SHINGLES I X J I \ I _ W "' Ceilin z � � $' _ p" N I � Z � � � � a � � I ' � � � � � c� w I � � STUCCO I J � RED CRICKS I I � RED CRICKS J � (� I I , FIRST FLOOR � � -- � 0' - p�� o �GARAGE o 0 0 — — — — — — — --1' - 5�� ���� EXISTI NG LEFT SI DE/SOUTH ELEVATION A5 1/4" = 1'-0" � � 0 z rI� w O z � � — � = Q � � ~ / O � w X � OJ w � cnw CLIENT Y NEW SKYLIGH NEW COMPOSITION Y U U 6 VELUX \ SHINGLES ROOF U U w w Q Q , Q Q z LI LULU & XI , TOM Z m m m m J w w NEW SKYLIGH w w } � � � 2246 VELUX cn cn � C H E N � � N STUCCO "' � w W I I N N � � — � — — — - — — — — - - — — — — — — I I CEILING � a � I 18' 0° a I I I — NEW FIXED I I � I WINDOW I I � JOB NO. ADDITON I OF SECOND _ _ I I I I FLOOR � NEW COMPOSITION I I � 17-� � � I _ � � SHINGLES ROOF I � � ti � - I I N - I � DATE � � SECOND FLOOR � � �o� - o° N � AUGUST Ceilin 2017 , _ „ � I I � s o � I I I REVISIONS EXISITNG I I I I FIRST STUCCO � FLOOR I � I GROUND I IGROUND I LEVEL LEVEL � I � _ o _ _ _ � FIRST FL�OO�R � �GARAGE 0 0 0 � -1' - 5" 2 PROPOSED LEFT SIDE/SOUTH ELEVATION A5 1/4" = 1'-0" 1 /4" = 1 '-0" Anat Shmariahu ANAV Design 408-206-5992 z . w � w z Q QI � _ J m ml � I U � � w wl � � wo w � � � I p � � N Ln I o � I ° � � J �' a I a � � U I I J I 0 w O I I I z � Z WOOD SHINGLES a � � I I � � I JMW i � � � � � SECOND FLOOR � – – – – – – – – – – – – – – – J � U � � _ �� I 10 0 WOOD SHINGLES � �, _ � Ceiling � � � g� _ p�� V � � r � � � I ' ' � � �o � C� � � � � � � I � � � � � � � � � I STUCCO � I ,' � � I FIRST FLOOR � - - I r 0' - p„ GARAG5 4�S Z � . � � � _ � � � . � � . , � � � � � . � � � � � � , � V � � � � � � — � - � � � � � � � Z � 1 EXISTING FRONT/EAST ELEVATION � O O � A6 1/4" = 1'-0" X � � J LLJ � LL LLI CLIENT ADDITON OF SECOND L I L U L U & X I TO M FLOOR CEDAR WOOD SIDING NEW SKYLIGH � � 2246 VELUX � � CHEN / Y W Z� U U � � � Q UI Z �I � � NEW COMPOSITION / � � �, w � I � � � � ROOF SHINGLES � � � � I w , w � I � cn w � N `� � � � `�' � CEILING JOB NO. - � - - - - T - T � - - - - - - �� I � / � \ � � d 18� - �° � I I / � \ � I I I - I _ � 17 1 STUCCO � NEW CASEMENT \ � ' � � I WINDOW � � � NEW COMPOSITION � - DATE � I � I I I i _ ROOF SHINGLES � � I � i � I � � AUGUST � 2017 i � � I NEW SKYLIGH `'' I I � � � SECOND FLOOR � � 2246 VELUX � � 0 10' - p„ �� I REVISIONS � �v Ceiling � fi g� _ p�� I I � � NEW FIXED STUCCO I � EXISITNG � I o FIRST STUCCO WINDOW I _' I FLOOR � I I I � I – ' GROUND LEVEL – – – – – – _ – _ _ _ _FIRST FLOOR � – �� _ 0�� GARAGE � -1' - 5" � � � � � � �. �.� � � � � . � � � � , � � � � �.� � � � �., � � .� �. � � � ` CEDAR WOOD SIDING 2 PROPOSED FRONT/EAST ELEVATION A6 1/4" = 1'-0" 1 /4" = 1 '-0" Anat Shmariahu ANAV Design 408-206-5992 Y U W w Q U Z J w m JI � � w �i N (n W � a o I � � � W I a � a = � I I U w � I � vo I � I Q rn I WOOD SHINGLES � � � � Q I SECOND FLOOR X J U I I � 10' - 0" 0 w O � = = I Ceilin a � Z � $, _ �„ � � � � cfl � i� � � I -� N � JML.L, co � , � I � � � � I � � � j � � I PAINTED J O N I � � WOOD I ( � � � SIDING I J � U � I _ � � I PAINTED WOOD SIDING I I II _ � FIRST FLOOR 0' - 0" � � GARAGE � — — — - — -1' - 5„ � � �, � . _ _ _ , � � .�� � �_ - : � .. � � � � � � � � � � � � - . -, � 1 �� EXISTI NG REAR/WEST ELEVATION A7 � 1/4" = 1'-0" � 0 z �I� w O z � � — � Q � � � / O Q w X � wJ W � � W NEW SKYLIGH � � 2246 VELUX z CLIENT � J � Q Q � � / Q U H � w w � NEWROOF , w � � LI LULU & XI , TOM � c� cn � COMPOSITION SHINGLES � cn w O o -� -� , � ' � , -� -� � C H E N � � � I CEILING � �� — — — � — I-ADDITON� — ��'� � — I — — � - � 18' - 0" � i � �OF SECOND � � I I � �FLOOR � � � �� � � I � � � � � i � � CEDAR SIDING � � � I � J BN � � I � � , I �� I I � � � � I � �� � i � I COMPOSITION SHINGLES I i` � 7-� � � I 0 ' = 0 I I � I � � � . N o SECOND FLOOR 0 �I— sTucco 0 o y - �o� - o° DATE NEw I I Ceilin AUGUST STUCCO g' - p" � ( 2017 o EXISITNG i � \ � � I NEW I I REVISIONS ' FIRST I I STUCCO I � I FLOOR � i � CEDAR SIDING I � � i � � I i I � � I � GROUND I I GROUND I LEVEL � i LEVEL FIRST FLOOR � — - �� _ 0�� GARAGE � � �� .� -1 5 2 PROPOSED REAR/WEST ELEVATION A7 1/4" = 1'-0" 1 /4" = 1 '-0" Anat Shmariahu ANAV Design 408-206-5992 , , CEILING CEILING � 18' - 0" N 18' - 0" �I � Z i � � � � w i � � � ' _ � (N) MASTER'S � N � U � � � BEDROOM 2 � _ � � � W � � oo VAULTED CEILING � - � (N) MASTER'S BEDROOM 3 V O � //� / / _' _ VAULTED CEILING � Q � � �o�-o° _ _ J - � � � M O � � c.�� � _ _ SECOND FLOOR SECOND FLOOR � J � 10' - 0" 10' - 0" � 0 w � � 0 � _ _ _ _ _ _ Ceiling Ceilin g„ � a W Z \ 8 - 0 8 -�� � � � � O JM � GREAT ROOM � � � a � C� � (E)MASTER ' / \ - BEDROOM � (R)GREAT ROOM � (N) BEDROOM 1 � - � � � p — � (E)�,,, .., , " . � a� � � i o� ' `� J � (� _ � BEDROOM °O i � i � � i � o�-o° ' ��� � � FIRST FLOOR ENTRANCE — — (R)GREAT ROOM FIRST FLOO� �� - ��� GARAGE (E)PATIO 0' - 0"� " T II I -GARAGE„I� -1' _ 5��_ - - - - - - - - - - - - - I� I�-1' - 5"-'-�.� � � . - - - - II a � - � � � � �� � � � � � � � � , � � � � ,II iII - � - - a � � � � � � � � -. - � � - - � � _ � - � � � � � � � � � � - � . -- - IIIIIIIIIIII � � � � � �III III III� III� �IIIIII�IIIIII� - - - - - - - ,� �� - - - - - - - - - - �=, ��- - - - - - - - - - - _ _ - - _ _ �� � �� � I I I�� I I I �I I II I II I II I I_I I I_I I I I I I _I I I_I I I i ii ii i _ - - - - - - - - I II III III III III III III I III III I III III II I I II II III III II II III III III III III III III II I I II III III I III III III I III III I III - III III ��I I I I II II III III II II I I I II II III I II II III III I I III �III III III III III III III III III III III I II II III I III I I III III III II II II II I � � � _ _ _ _ _ � � _ � _ �_ _�I 1 Section 1A 3 Section 3A A8 1/4" = 1'-0" qg 1/4" = 1'-0" � z � SECOND FLOOR 10' - 0" � � Ceilin � U C'� 8' - 0" � W n! , � C�, , , , � , � , , , � ' ` �ii ' ' - ' ' o � ,� (R)KITCHEN � (E)MASTER'S i op BATH ROOM \� � O� � 0 � �o o V \� � (E)BEDROOM ` e � � ' ' �i C L I E N T � ENTRANCE � � � � � ` _FIRST FLOOR L� 0' - 0" u LI LULU & XI , TOM _ _ - _ _ - _ _ _ I 11�I 11- GARAG E I I _ "' - _ -� - 5 CHEN - _ � � - - � � , , � _ _ . _ ��� ���_ _ � ��'����������� - � ����� ��� ��� ��� ��� ��� � ��� ��� ��� ��� ���� ��� ��� ���� ���� ��� � � � � ��� ��� ���� ��� ����� ��� ��� ���� ��� ��� ��� ��� ��� ��� ��� � � ��� ��� ��� ��� ��� ��� �� - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - � - - - - - - -���-���-���- -� -���-���-���-���-���-���-��� ��� ��� ��� ��� ���-���-���-���-���-���-���- -���- ���-���-���-���-���-���- ��� ��� ��� ��� -���-���-���-��� ��� ��-���- �� ��� �� ����� "�i'�r��� ������������������������ ��� ��� ��� ��� ��� ��� ��� ��� ��� ��� ��� ��� � � ��� ��� ��� ��� ��� ��� ��� ��� ��� ��� ��� ��� ��� ��� ��� � � � � ��� ��� ��� ��� ��� ��� �� A8 1/4" = 1'-0" JOB NO. 17-1 CEILIN� DATE 18' - 0" 0 �; AUGUST N VAULT D CEI ING 2017 � � � REVISIONS , , ap (N)MASTER'S BEDROOM 2 ap VAULTED CEILING SECOND FLOOR � 10' - 0" � Ceilin 8' - 0" , � , � , � � , � , � , � , � , � o � iii � � iii � � ii � � � (R)KITCHEN e e �e I e o ,"� � ,o � , � , 0 (R)GREAT ROOM � � � � � FIRST FLOOR � j ill li� 0' - 0" _ = _ IIIIIIIII - - - - - - - - - - - - - - - - - GARAGE � _ -1' - 5" 1 IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIII IIII III III IIII Illllllllllllllllllllllillllllllllliiillli III IIII IIIIIIIIIIIIIIIII III III I III III III III III III III III III III III III 111= illl - - - - - - - - - - - - - - - - - - - - - - - I IIIIIIIIIIIIIII I III II II II III III III III III lil III III lii Ili III III III II I I II III III� III III iil III III ill �II �� �IIIIIIIIIIIIIIIIII III III III III III III III III III III III III III III I I III III II II I II III III III I II III III III III III III III III III III III III III III �il I'I III III III III III III III III III III III III III III III III I III III III III III III III III III III III III 111= i -ii�- ii iii-iii -iii-iir ii ii i iii iir-iii-iii-�ii-..i �-���-���-i ii iii iii-iii-iii iii iii iii iii iii -iii-iii-iii-iii ii-��i-���-���- ... i �-ii�- iii iii iii -iii-iii iii iii iii iii-iii-iii-iii iii-�ii-��i-���-... i ii ii�-ii 4 Section 4A A8 1/4" = 1'-0" 1 /4" = 1 '-0" Anat Shmariahu ANAV Design 408-206-5992 ======== Anat Shmariahu ADDITION AND REMODELING ANAV Design 408-206-5992 OWNER: � � == Anat Shmariahu _ — PROPEETY I 'I I REMOVING THIS PART OF THE (E) ANAV Desi I1 LINE FENCE TO BE 5' FROM PRPOERTY LINE Q � 13' - 11 1/2" 27' - 10" 14' - 3 1/2" 4�C7-2�6-5992 SETBACK 1 ST FLOOR � . . 5� - °�� 75.88' U S � e m e n a r �O � I I O � �. SETBACK � _ � PROPERTY LINE _ 410 SF 2ED FLOOR � w (E)6 HIGH WOOD FENCE �Qs z U �N � a ���, ��. W W � � w 92�2 �` � o T Q �� U � LL � o � Ar WOOD w w o °°.� 2% �_° _ p ea FENCE , � � o � � o� � Area I o w � �°� 2% �° � Z 1. THE CONTRACTOR SHALL THOROHLY EXAMINE THE PREMISSES AND SHALL 436 SF 815 p � w � �L o - o� � � w 561 SF - - ADDITION = _ BASE HIS BID UPON EXISTING CONDITIONS. ALL EXISING CONDITIONS SHALL BE _ N ti � � � Z �_ 9°� N � ��`' °' VERIFIED FOR COMPATIBILITY WITH NEW CONSTRUCTION SHOWN HERIN. IN THE EVENT N � ' � � `V �' THAT DISCREPENCIES ARE FOUND IN THE DRAWINGS, THE DESIGNER SHALL BE N p �, E N M SECOND FL I , � Z � " 4 w U W � N OTIFIED BEF ORE W ORK CAN PR O CEED. _� B _� M W I N D O W � I = � � (E) HOT , o PATONF ooR _ _ � V O M N P R I V A C Y P L A N � � � z TUB 2 0 R E A R S E T B A C K - F I R S T F L O R � 6 92� � Q � 2. THE CONTRACTOR SHALL FIELD INSPECT THE JOB SITE PRIOR TO � ' - ' J COMMECEMENT OF WORK AND SHALL ADHHERE TO ALL RULES GOVERNING _ � � I 6 — � U C O N S T R U C T I O N, B U I L D I N G A C C E S S, S A F E T Y A N D T H E U S E O F T H E F A C I L I T I E S A S c., � � � � � J . � 12.63' 25' REAR SETBACK - SECOND FLOO z Q W � SET BY THE BUILDING OWNER, BUILDING DEPARTMENT AND ALL OTHER LOCAL M z I --------- ---- -- - -- - - -- - - - -- - -- ------, � z 0 AGENCIES. , , I � '� � w Z 3. THE CONTRACTOR SHALL PROVIDE ALL WORK AND MATERIALS IN ACCORDANCE o � I z ', ', I � � Q — � WITH ALL FEDERAL , STATE AND LOCAL CODES PER INDUSTRY STANDARDS UNLESS 2' - 0 /2" 20' 2 1/2" � o , � I � ' ', w � � � NOTED OTHERWISE. ALL PRODUCTS SHALL BE USED PER : = = Q I - � I __ ----_-- � o a J M W MANUFACTURERS RECOMMENDATION. � PO A F � � W � � � I ', I `� � J � � Area _� 13 6 56 SF = I w o I �� - , a _ p � 4.ANY PORTION OF THE EXISTING BUILDING, SITE OR LANDSCAPING DAMAGED BY N N Q O N I - , li J � U THE CONTRACTOR OR HIS SUBCONTRACTORS SHALL BE RESTORED TO THE 287 SF � I po a I ' I � CONDITION PRIOR TO DAMAGE AT NO COST TO THE OWNER OR TENANT. _ � �� I , I � „ ', , 2 6 � 7 3 2 S F 2 N D F L O O R i � - $ ��� I r � C — i �ADDITION ' 5. NEITHER THE DESIGNER'S REVIEW OR APPROVAL OF SHOP DRAWINGS SHALL � PORCH ' , � , O � = � O REILIEVE THE CONTRACTOR FROM THE RESPONSIBILITY FOR DEVIATIONS FROM 5' HIGH WOOD ' � THE INTENT OF THE DRAWINGS AND SPECIFICATIONS UNLESS AGREED TO BY THE G- 451 SF o I � , � � , � DESIGNER IN WRITTEN FORM N GATE I �� � � I O � GARGAE ' � I � p �o I� � 6. T H E C O N T R A C T O R I S R E S P O N S I B L E F O R C O O R D I N A T E O F A L L W O R K I N T H E O I � p , z J O I � II FIELD TO ENSURE TIMELY COMPLETION OF THE PROJECT. � I � Q , v I� � I wo , 7. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK REQUIRED � I _� -, O J ' Y � I Q � LL I � U � m I T O C O M P L E T E T H E W O R K, I N C L U D I N G, B U T N O T L I M I T E D T O: � U Q � 1) ALL WORK REQUIRED TO PREPARE FOR NEW WORK. 15' - 0" 19' - 7" - , � � cwn n ; , m I w 2) THE REMOVAL OR RELOCTION OF ALL EXISTING PIPES, CONDUITS, WIRES EST. I Y I ' � � � � c� I z 3)THE TEMPORARY SHORING REQUIRED DURING CONSTRUCTION TO ALLOW FOR \ Q I ', U � O F�RNA�E , cwi� I� o NEW WORK. ( � o m I Q &TANKLESS I WH IN GARGAE I w 4) THE PROTECTION OF THE WORK FROM ANY DAMAGE DUE TO FIRE, WEATHER OR � I I w CONCRETE I�� � I � � � VADALISM. 2 F I RST F LOO R AREA P LAN D IAG EAM � � PATH � w I I � 20� _ $�� ', � 5' HIGH WOOD 5) THE REMOVAL OF ALL DEBIES AND ECESS MATERIAL AMD BROOM CLEANING P_� 1/8" - 1'-0" ,� � � I I p �� _ � GATE � E A C H A R E A A F T E R W O R K I S C O M P L E T E D. 28, _ $ ��2„ I r� � _ I u� , �, N N I i , O 8. Notes For Fire Department � � I �� T L A W N L A W N �� N I J � ', � a. Water Supply Requirments: Portable Water Supplies Shall Be i , `, _ � GAS METER Protected From 12.83 � � � _______ __ ____________J � ADDING 1" � � ----- � 0 25 FRONT SETBACK- SECOND FLOOR GAS LINE Contamination Caused By Fire Protection Water Suplies. It Is The � "�' (E)GARGAGE a Responsibility Of The Applicant And Any Contractors And Subcontractors � UPGRADE Yo Contact The Water Purveyor Supplying The Site Of Such Project, And ' I � i , 6 97, CLI ENT 200 AMP To Comply With The Requirments Of That Purveyor. Final Approval Of 20' FRONT SETBACK- FIRST FLOOR, ELECTRICAL The System Under Consideration Will Not Be Granted By The This Office _ 2 CARS PANEL ' o n il m li n Wi h R irm n f Thw W r P rv r f R r � DRIVEWAY U t Co a ce t e u e ts O ate u e o O eco d p q y ADDITION L I L U L U & X I TO M Are Documented By That Purveyor As Having Been Met By The �, ° � � Applicant. 2010 Cfc Sec 903.3.5 And Health And Safety Code 13114.7 S -732 SF N C H E N b. Address Idenification: New And Existing Building Have Approved Address Numbers Or Approved Building Identification Placed In Position Q`� , That Is Plainly Legible And Visible From The Street Or Road Fronting The �n Property,. These Numbers Shall Contrast With Their Background. ��� t7 ° Address Numbers Shall Be Arabic Numbers OrAlphabetical Letters. / ` 2O S9, JOB NO. Numbers Shall Be Min Of 4" High With A Min Stroke Width Of 0.5". � � . 2 - - � � - - — PROPERTY LINE �� Where Access Is By Means Of Private Road And The Building Cannot \ �7 0� ' 55 88� Be Viewed From The Public Way, A Monument, Pole Or Other Sign Or 3 S ECO N D F LOO R AREA P LAN D IAG RAM ��7� ■ 17-� Means Shall Be Used To Identify The Structure. , „ _ , „ \ - _ - - - Cfc Sec 505.1 P-1 1/8 - 1 -0 `�. LOT: 5829 SF � o � � DATE c. All construction site must comly with applicable provisions of the cfc a.P.N: 3as-ss-o�5 _ - - - - - - - - - _ F LOO R AREA AN D CO�/E RAG E ZONE: R�_�o - ca ter 33 and the standard detail and s ecification si 7. p p � AUGUST CALC U LAT I O N S & F LOO R AR EA EXISTING PROPOSED ALLOWED/ 2017 9. Contractor Shall Locate And Raise To Grade An Existing Property Line REQUIRED Clenout. Property Line Cleanout Must Be Within 5' Of The Property Line. �oT REVISIONS Cleanout Shall Be The Same Diameter As The Street Portion Of The EX I S I T N G P RO P O S E D COVERAGE 3035SF 3035 SF 3381.3 SF R I E D E L P L Service Lateral. Gravity Lateral Is 4" Diameter Min. O.C. 4101 40.3% 40.3% 45% • 10. District Ins ection Is Re uired Prior To Clearance For Cit Of San SECTION DIMENSIONS AREA SECTION DIMENSIONS AREA FLOORAREA � �ITC p� n A � � 8•28 p a y FLR 2625 F 3357 SF 3381.3 SF I C r /`11 V Jose Final Inspection. Owner To Call District At Least 48 Hours To FIRST FLOOR TOTAL /� /� 2�-��2° X 2�-���� 6 SF % 34.9% 44.6% 45% �/$�� _ ��-�° L A���NG SECON� Schedule District Inspection. District To Provide Building Department , „ , „ B+C+D+E+F 2155 SF P-1 / With Written Notification U on Com letion Of Ins ection.O.0 5104 B 13-11 1/2 x 31 -2 1/2 436 SF p p p C 15'-0" x 19'-1" 287 SF A 2'-1/2" x 6'-1/2" 6 SF N FLOOR � „ �� PO 4'-6" x 2'-10" 13 SF , „ , „ „ , „ , „ All Conditions, Requirments And Recomendations Are To Completed At D 27�-10 x��29-3�_ �� 815 SF GARAGE 12'-6"x 21' 0" 451 SF SETBACKS 36 - 9 5 - 8 - 1 17 - 0 9 - 4 1/2 PRIVACY PLAN The Owner'S Ex ense. E 14-3 1/2 x 39 2 1/2 561SF FRONT �sT 19.90' 19.90� Zo� p �� � �� SECOND FLOOR FRONT 2ED NO 2ED 47'-4" 25' Storm Water Surface Or Roof Drains, Other General Surface Runout F 20- 2 1/2 x 2-7 1/2 56 SF , „ , „ REAR 1ST 19.91 19.91' 20' S 28-8 1/2 x 25-6 732 SF Water Or Condensate From Anr Residential Havc E qi pment Shal Not Be PO 4'-6 1/2" x 2'-10" 13 SF REAR 2ED NO 2ED 2��-3�� 2s� B=11 SF Discha ed To The Sanita Sewer. GARAGE 21'-6"x 21' 0" 451 SF RIGHT �sT 6.97' 6.97� 5� C=3 F g � RIGHT 2ED NO 2ED 20'-8" 15' B OVERHANG 410 SF LEFT 1ST 12.83' 12.83' 12' TOTAL FLOOR AREA: HABITABLE FIRST& SECOND LEFT 2ED NO 2ED 26�-2�� 15� B C=3 F TOTAL FLOOR AREA: HABITABLE + NONHBITABL FLOOR+ NONHBITABLE TOTAL HABITABLE ( A+B+C+D+E+F)= 2161 SF TOTAL HABITABLE: (B+C+D+E+F)+S= C=3 F _ SF BREAKDOWN B � 6+436+287+815+561+56= 2161 2155 + 732 = 2,887 SF EXISTING CHANGE IN TOTAL PROPOSED ' TOTAL NONHABITABLE (PO+G)= 13+451=464 SF TOATAL NONHABITABLE (G+ PO+A)= 470 SF B o TOTAL FLOOR AREA 2161 + 464 - 2,625 SF TOTAL FLOOR AREA 2,887 SF + 470SF = 3,357 SF HABITABLE LIVING 2161 SF +732-6= 726 SF 2ss�sF A-624 SF D=142 SF E=340 SF F=188 SF N - + AREA �����95 B DRIVEWAY TOTAL COVERAGE 2161+ 464 + 410 - 3,035SF TOTAL COVERAGE: HABITABLR FIRST FLOOR NON HABITABLE AREA 464 SF +6 SF 470 SF <�. 20 9� B NONHABITABLE+ OVERHANG 2155 + 470+ 410= 3,035 SF `�7 �4� ��'' LOT CALCULATION: �7� B NET LOT AREA 7514 SF LOT SIZE : 7514 SF FRONT YARD 1406 SF MAX40% IMPREVIOUS ALLOWED=564.4 SF �7' - 5 1/2�� 55.88� MAX LOT COVERAGE: 45% 7514 = 3381.3 SF IMPREVIOUS 8XB+ E=88+340 =428 SF 37.5%<40°�0 19' - 3 1/2" 56' - 7 1/2" MAX F.A.R.: 45% 7514 = 3381.3 SF PREMEABLE A+8XC+D+F=624+24+142+188=978 SF 75' - 11�� � EXISTING LOT COVERAGE 3,035SF 40.3% PROPOSED LOT COVERAGE: 3,035 SF 40.3% 4 F RO NT YARD D IAG RAM EXISITNG F.A.R 2,625 SF 34.9% # The second to first floor area ratio is 732/2161=33.8% less than 66%. PROPOSED F.A.R. 3,357 SF 44.6% P-1 1/8" = 1'-0" � /��� __ � �-O��