14030065 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 21397 KRZICH PL CONTRACTOR:GREEN LEAF SOLAR& PERMIT NO: 14030065
ELECTRIC
OWNER'S NAME: SANTA GOPALKRISHNAN 667 N 12TH ST DATE ISSUED:03/10/2014
OWNER'S PHONE: 4087955695 SAN JOSE,CA 95112 PHONE NO:(408)691-4743
XF LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL E] COMMERCIAL F]! INSTALL 14 FLUSH ROOF MOUNTED PV PANELS(3.36
`l '
License Class E Licri �5 S 07 y KW)
Contractor �� rajua Soet y Dale '?
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000)of Division 3 of the Business&Professions
Codc and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued. Sq.Ft Floor Arca: Valuation:59072
d
lie and will maintain Worker's Compensation Insurance,as provided for by
"rection 3700 of the Labor Code,for the performance of the work for which this APN Number:36205037.00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct.1 agree to comply with all city and county ordinances and slate laws relating yyITIIIN 180 DAYS OF PERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FRO LED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the 3 to//
granting of this permit. Additionally,the applicant understands and will comply a e:
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18.
RE-ROOFS:
Signature Date � ~�" .
- All roofs shall be inspected prior to any roofing material being installed.If a roof is
installed without first obtaining an inspection,I agree to remove all new materials for
inspection.
D OWNER-BUILDER DECLARATION
[hereby affirm that I am exempt from the Contractor's License Law for one of Signature of Applicant: Date:
the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I,as owner of the properly,or my employees with waves as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. I will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
l have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the flay Area Air Quality Management District I
performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and
have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505,25533,and 25534.
Section 3700 of the Labor Code,for the performance of the work for which this r
Owner or authorized agent: =� Dat
permit is issued. e. P& (
I certify that in the performance of the work for which this permit is issned,I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of Califomia. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCV
become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked, work's for which this permit is issued(Sec.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct.1 agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save
indemnify and keep harmless the City of Cupertino against liabilities,judgments, ARCHITECT'S DECLARATION
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9.18.
Signature Date
f
ALTERNATIVE ENERGY PERMIT APPLICATION (��
COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION bO
10300 TORRE AVENUE•CUPERTINO, CA 95014-3255
CUPERTINO (408) 777-3228. FAX(408)777-3333•buildinaaa)cugerfino-org �O
PROJECT ADDRESS�+ APN M ^ 6 Z r O Q 3
OWNER NAME PHONE E-MAIL
71 �? V` r� 3LY400-c-ail
STREET AppRE55 3 CITY, STATE,ZIP FAX
�- Cu6A 9h,0141
CONTACT NAME U JJ PHONE E-MAIL
1 — .
STREETADDRESS CITY.STATE ZIP FAX
4--h
6 Ic
❑ OWNER ❑ OWNER-BUILDER ❑ OWNERAGENT %CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑TENAhT
CONTRACTOR NAMELICENSE NUMBER• LICENSE TYPE BUS.LIC 6�16 S
a C- - T
COMPANY 11 -MAIL FAX
STREET ADDRESS CITY,STATE,ZIPPHONE
6b:7 A/ �� s- i'� a s i �r-4 S
ARC)-nTECTIENGINEER NAME LICENSE NUMBER BUS.LIC a
kchAl L -
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
0l r - � j 17a.d C,
USE OF O�SFD or Duplex ❑ Multi-Family PROJECT IN WILOLANO PROJECT IN
s7RucruRE: ElCommercial 7 URBAN INTERFACE AREA ❑ Yes Wo FLOOD ZONE 13 Yes EANO
XSOLAR PANELS 13ELECTR[C VEHICLECHARGfNG STATION ElSOLAR WATER HEATIN•'G`` ❑ OTHER:
FOR SOLAR PANELTr NUMBER OF PANELSIUNITS: j M KILOWATTS: TOTAL VALUATION. 9-j>2,
f 3.36 I14) N6ge
C
DESCRIPTION OF WORK
7o 717 1164Ati1W J
r RE�ErVEDBY;
By my signature below,I certify to each of the following: 1 am the property owner or authorized agent to act on the property owner's beh . I have rea is
application and the information I have provided is correct I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to buiWin construction. I authorize representatives of Cupertino to enter the above-identified property for inspection purposes.
Signature of ApplicanUAgent: Date:
SUPT MENTAL INFORMATION REQUIRED OFFICE USE ONLY
U OVER-THE-COUNTER
r.
❑ EXPRESS
V
❑ STANDARD
- U
�
,, Cl-LARGE
Q' MAJOR
PYApp_2011.doc revised 06110112
CITY OF CUPERTINO
FEE ESTIMATOR-BUILDING DIVISION
ADDRESS: 21397 KIZICH PL DATE: 03110/2094 REVIEWED BY: MELISSA
APN: 362 05 037 BP#: �� 'VALUATION: $9,072
YPERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration 1 Repair
PRIMARY SFD or Duplex PENTAMATION SOLAR-RE
USE: PERMIT TYPE:
WORK INSTALL 14 FLUSH ROOF MOUNTED PV PANELS 3.36 kW
SCOPE
Meth. Plan Check Phunh Pluu Check Elea,Plan Check
7f,11-111,ermit Fee: Phnnh, Permit Fee. Eler. Pto? mir Fe
Offter dfech.InspE17- Other Plumb Imp. OtherOx Insp.
�llerh.limp. h'«t: Plumb. hop. Fejt: Elec.Ins)), Fc:r
NOTE.This estimate does not includefees due to other Depart►nents(i.e.Planning,Public Works,Fire,Sanitary Sewer District,School
District,etc.). Theseees are based on the prelinfinarjinformation available and are only an estimate. Contact the De t or arldn l in/b.
FEE ITEMS (Fee Resolution 11-053 Ff. 7/1/13) FEE QTY/FEE MISC ITEMS
Plan Check Fee: $0.00 # Alternative Energy System
Suppi. PC Fee: Q Reg. 0 OT 0.0 1 hrs $0.00 $229.00 /PHOTOYRES I Photovoltaic System
PME Plan Check: $0.00
Permit Fee: $0.00
Suppl. Insp. Fee:Q Reg. Q OT 0.0 1 hrs $0.00
PME Unit Fee: $0.00
PME Permit Fee: $0.00
Consovection Tint: 7T
Adtninistrcrrive Fir:
Work Without Permit? O Yes (D No $0.00 G
Advanced Planning Fee: $0,00 Select a Non-Residential E)
Travel Documcniation Fees: Building or Structure O
Strong Motion Fee: IBSEISMICR $0.91 Select an Administrative Item
Bldg Stds Commission Fee: IBCBSC $1.00
SUBTOTALS: $1.91 $229.00 TOTAL FEE: 1 $230.91
Revised: 07/15/2044
G R E E N LE.8.F CA Lie# C-10-8855672
� S 0 L Ak R San Jose Lie 9456612060
SOLAR PV SYSTEM INSTALLATION AGREEMENT
THIS INSTALLATION AGREEMENT ("Agreement") is entered into as
of February 22, 2014, by and between
The Client: Santa Gopalkrishnan, the homeowner at 21397 Krzich
Place , Cupertino, CA - 95014 (referred to as "Client" in this contract)
of the Solar PV System installation site
And
System Installer Green Leaf Solar & Electric, Inc., 667 N. 12th
Street, San Jose, CA 95112
SCOPE OF SERVICES
1. System Size and Location. This agreement is for the installation of a 3.36 kW STC
DC photovoltaic system (Talesun TP660P Modules 240W) as specified in the
Purchase Invoice between the Client and materials supplier detailed below.
2. Solar PV System will consist of following equipments:
14 x 240 watts STC DC-Talesun TP660P Panels
Enphase M215-60-2LL-S22-NA - Grid-Tied Micro Inverters
Necessary AC/DC disconnect required by the City/PGE
Balance of the System required for installation
3. Installation. Contractor shall ensure the System has been installed according to code,
and in accordance with industry standards. Contractor shall also ensure the proper
functioning of the system, including, without limitation, the interconnection with
Client's existing electric meter. Client shall allow Contractor access to all areas of the
building as may be necessary to complete the installation of the System.
4. Timing and Delays. The project paperwork for City permit procession and CSI
Rebate will commence one week from the date of contract signing. The installation of
the System shall be performed based on city permit approval or such other date as the
Contractor and Client may later agree upon. Failure of the contractor without lawful
excuse to substantially commerce work within 30 days from the approximate date
decided in the contract when work will begin is a violation of the Contractors License
Law. The Contractor shall be excused from any delay in the completion of the work
to be performed under this Agreement caused by acts of God, inclement weather, and
delays in approval of rebates from the California Solar Energy Initiative, City
667N 12`h Street,San Jose, CA 95112 Tel:408-429-4745 ticltauliannQmail.com Contract Agreement
Pg 1
looG R E E fel LEAF A F CA Lic#C-10-8855672
S O L A R San Tose Lic#456612060
building permit division, or other circurnstances or contingencies unforeseen by
Contractor and beyond Contractor's reasonable control.
SYSTEM COSTS
1. Systems Installation Cost. Solar PV Total System Installation Cost is $3360 (upfront
cost before any rebate or tax credits).
System Installation includes the following works ...
• Prepare &provide system design and engineering drawings
• Provide permits for the applicable jurisdiction
• Include all installation labor costs
• All required city permits and PG&E documentation
• include BoS including junction boxes, disconnects, wires, conduit, breakers etc.
• Deliver all ordered parts from warehouse to sites for installation
• Complete all required inspections and coordinate PG&E connection and bi-
directional meter installation for net metering
• Installation warranty for 10 years as mandated by the state of California
• Service all product warranties (typically 10 years) and performance warranties
(typically 25 years) as specified by the manufacturer
• Set up of Enphase Enlighten monitoring systems
• Provide 3 reference installations addresses to demonstrate quality of work
2. Construction time. Total project completion time is 60 working days from the date of
permit on hand.
1. Payment schedule. Payments to be made as on completion of installation and final
city inspection.
TERM: TERMINATION
1. Term. The Agreement shall continue from the date first above written until the
completion of the installation described in Section 1.2 above.
2. Termination. Either Client or Contractor may terminate this Agreement without
penalty or forfeiture at any time.
Client acknowledges that the C 'actor intends to apply faither
servation for a rebate
from the California Solar I ' ative Solar Rebate P'ogra Contractor or Client
shall have the right to t inate this Agreement wit t penalty or forfeiture at any time
prior to instaIlatio i (i) the reservation for the ate is not accepted, (ii) the Program is
discontinued, iii) the level of the Reb to ' reduced, provided, However, that notice of
667 N 12'h Street,San Jose, CA 95112 Tel:40$-429-4745 uchauhan@a gmait com Contract Agreement
Pg 2
G R E E ISI LEAF CA Lic # C-10-8855672
S 0 L A R San Jose Lic #456612060
an intent to terminate is given to the other party within 48 hours following notification by
the Program of the rejection or reduction of the Rebate request.
This Agreement shall terminate automatically if Green Leaf Solar determines that the
System cannot be installed as proposed because (i) it is impossible to obtain necessary
permits, (ii) the cost of obtaining those permits would be excessive, or (iii) an engineer
determines that installation of the System would violate applicable code requirements,
and/or necessitate substantial structural changes to the building. If Contractor terminates
before commencing work, amount paid shall be returned to Client.
ADDITIONAL PROVISIONS
1. Entire Agreement. This Agreement contains the entire understanding between the
Contractor and the Client with respect to the subject matter of this Agreement, and
supersedes any prior understanding, agreement or representation, written or oral,
relating the subject matter of this Agreement.
2. Warranty. Upon completion of System installation, the Contractor shall issue to the
Client a full ten-year warranty in the form required by the California Solar Initiative
rebate Program (CSI) which includes the replacement or repair of inverter and PV
modules from manufacturer at no additional cost for installation.
3. Voiding of Roof Warranty. Client acknowledges that System installation may void
existing roof warranty. Contractor shall not be responsible for repairs or damage of
roof not directly related to the System installation.
4. Assisznment. Contractor shall not assign this Agreement, its rights hereunder or any
interests herein, or delegate its obligations hereunder, without Client's prior written
consent.
5. Ownership of Work Product. After termination or expiration of this Agreement,
Client shall retain ownership of all equipment installed by Contractor pursuant to this
Agreement.
6. Severability. If any term or provision of this Agreement is found by a court of
competent jurisdiction to be invalid or unenforceable, then such provision shall be
served form this Agreement, and all other provisions of this Agreement shall remain
in full force and effect.
7. Notices. All notices and other communications relating to this Agreement will be in
writing and will be deemed to be effective when delivered, or if delivery is refused,
when delivery is attempted. Delivery may be made by first class mail,postage
667 N 12`x'Street, San Jose, CA 95112 Tel. 40$-429-4745 uchauhan(a pmai[com Contract Agreement
Pg 3
GFS E EN LEAF CA Lic # C-10-8855672
Q L San Jose Lic #456612060
prepaid, overnight courier, electronic mail or by facsimile transmission with
confirmation.
8. Successors, Assigns, and Agents. This Agreement shall be binding upon the parties
and their respective successors, assigns, employees, contractors, agents and legal
representatives.
9. Governing Law. All matters relating to the interpretation, construction, validity and
enforcement of this Agreement shall be governed by the internal laws of the state of
California, without giving effect to any choice of law provisions thereof.
10. Further Action. The parties agree to execute and deliver any further instruments or
perform any acts that are or may become necessary to effectuate the purposes of this
Agreement.
11. Mediation and Arbitration. In the event of any claim or controversy regarding the
rights and obligations of the parties hereunder, the parties shall first meet and confer
in a good faith effort to settle and resolve their differences. Prior to commencing any
action or proceeding arising under or relating to this Agreement, the parties shall
participate in a mediation of the matters which they have been unable to resolve. Any
controversy or claire arising out of or relating to this Agreement not settled by
mediation shall be settled by binding arbitration in San Francisco, California,U.S.A.,
in accordance with the Commercial Arbitration Rules of the American Arbitration
Association, and the judgment upon the award rendered by the arbitrator(s)may be
entered in any Court having jurisdiction thereof.
IN WITNESS WIIEREOF, Client and Contractor have executed this Agreement as of the
Date first above written.
2122114
--- - ---------------------------------- --------------------------
(Santa Gopalkrishnan) Date
2122114
For Green Leaf Solar &Electric, Inc. Date
Director Systems
Uttam Chauhan
667 N 12'Streel,San Jose, CA 95112 Tel:408-429-4745 uchauhan mail,com Contract Agreement
P9,4
1 Green Leaf Solar & Electric, Inc.,
2/24/2014
To Whom It May Concern:
Xianlei Ge has permission to pull Solar Electric and related permit for the City of
Cupertino to install Solar PV (Electric) System. He is authorized to sign all related
documents in order to process the permit application.
Project information:
Homeowner: Santa Gopalkrishnan
Site Address: 21379 Krzich Place, Cupertino, CA 95014
Sincerely,
Uri
� A�
Uttam C auhan
Director, Systems
Green Leaf Solar&Electric, Inc.
408-429-4745
842 Charcot Ave, San Jose, CA 95131 -Tel: 408-429-4745 uchauhan@gmail.com
3.36 KW DC PV SYSTEM
LEGEND SOLAR ROOF PROJECT
SLOPE ^ REVISION
�
I;VPANEL LAYOUT 21397 Krzich Place, DATE
METER I-1oos7o1a1sCupertino, CA 95014 02115/2014
SLOPE
' ACDISCONNET
w MSf� MAIN SERVICE PANEL SHEET INDES: --
C A-1 GENERAL NOTES,SHEET INDEX,BUILDING DATA,
<3 _ PROJECT DATA,SITE PLAN —
4—4
A-2 ROOF PLAN SOLAR PANEL LAYOUT
E-1 SINGLE LINE DIAGRAM
E-2 WARNING
ES
€-3 EQUIPMENTS:IPV MODULE SPECIFICATION SHEET _. ......._ _....._____... ..._.... _.. ........--
E-4 EQUIPMENTS:INVERTER SPECIFICATION
SLOPS S-1 ROOF STRUCTURE AND SOLAR RACK
UCEIVED
CONNECTION t a
S-2 EQUIPMENTS:RACK SPECIFICATION f
&INSTALLTION—QUICK MOUNT QMSFT
_ W ` doP� S-3 EQUIPMENTS:RACK SPECIFICATION
MAR 10.. 2014
&INSTALLTION—IRONRIDGE LIGHT RAIL SYST€M "
.. "" tePE S4 EQUIPMENTS:RACK SPECIFICATION
SLOPE &WSTALLTION--IRONRIDGE RAIL INTERGRATED
C 13Y GROUNDING
S-5 WEEK INSTALLATION GUIDE ioTO _
yl-
Se.oPE SLOPE
s 1 + CODE AUTHORITY. ,
4"
V
2013 CALIFORNIA BUILDING STANDARDS
SLOPE SLOPE �--- SLOPE ADMINISTRATIVE CODE
OPE PART 1,TITLE 24,CALIFORNIA CODE OF _ w
1 REGULATION `j
i RFEt.N L.E:..sA�'
2013 CALIFORNIA BUILDING CODE-PART'2,TITLE g E, �_ ��
M P } # ..A
SLOPE f 3 h t� ""�W'p" `+ -.., 24 GREEN LEAF
(2006 IBC AND 2007 CALIFORNIA AMENDMENTS)
SLOPE 2013 CALIFORNIA ELECTRICAL CODE-PART 3, SOLAR&ELECTRIC, INC.
TLE 24 e ea so are a +c.co one.
,., r TI 6 7 N 12th Street San.lose CA 95112
" ' • m Ph 406 429 4745
ki �(2Q0 NEC AND 2010 CALIFORNIA AMENDMENTS) 9re6nt f r I ctr
-- - 20JCALIFORNIA MECHANICAL CODE-PART 4,
TIS E 24
F
(26a(JIIIC AND 2007 CALIFORNIA AMENDMENTS) NO
26'-64" 200 CALIFORNIA PLUMBING CODE-PART 5,TITLE a
24 B s E
PV PANED:94 PIECES OF TALESUN TP680P-2417 (2006 UPC AND 2007 CALIFORNIA AMENDMENTS)
KIN G SOLA,RMAN, INC. }s
TOTAL CAPACITY:3.36KW DC(STC) 2013 CALIFORNIA FIRE CODE-PART 9,TITLE 24 4!89DQ h9ilrr ont D`ve,Fren ont;CA 94536
(2006 IFC AND 2007 CALIFORNIA AMENDMENTS) wwwTini-solarmarr,Eom,Phone',4083738800
_,.
PHOTOVOLTATIC NOTES: t
L AN INVERTER OR AN AC MODULE IN AN INTERACTIVE PHOTOVOLTAIC SYSTEM SHALL AUTOMATICALL DEVICINITY PLAN-ENERGIZE ITS OUTPUT TO THE CONNECTED PROD CT:
LE:NTS
ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL SCA
PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED.(NEC 690361) 3.36KW PV SYSTEM
2.ALL EXTERIOR ELECTRICAL METALLIC TUBING(EMT)CONDUIT FITTING SHALL BE RAINTIGHT THREADLESS COMPRESSION TYPE.
3.MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED
SOLAR ROOF PROJECT
4.NAMEPLATES SHALL BE PROVIDED FOR ALL CIRCUITS IN THE SERVICE DISTRIBUTION AND POWER DISTRIBUTION SWITCH BOARDS,PANEL BOARDS,
DISCONNECTING SWITCHES,TERMINAL CABINETS,ETC.ALL NAMEPLATES SHALL BE PERMANENTLY ATTACHED AND BE OF SUFFICIENT CAPACITY TO WITHSTAND PRO'ECTo EN
THE WEATHER.
5.JUNCTION BOX/COMBINER BOX HAVE TO USE COMPRESSION TYPE STRAIN RELIEF POSITIONED FOR APPROPRIATE WATER RUN OFF. Santa GOpaIlCrtshnan
6.CONDUIT RUNS SHALL BE PROVIDED WITH SUFFICIENT WEATHERPROOF PULL BOXES OF JUNCTION BOX/COMBINER
BOXES PER APPROPRIATE NEC REQUIREMENTS.
21397 Krzich Place,Cupertino,CA 95014
7.SEE PROVIDED CUT SHEETS FOR ADDITIONAL EQUIPMENT SPECIFICATIONS
ORaWiNG:
8.WIRING MATERIALS SHALL BE SUITABLE FOR THE SUN EXPOSURE AND WET LOCATIONS,FIELD APPLIED PROTECTIVE COATINGS ARE NOT ACCEPTABLE,
9,JUNCTION,PULL AND OUTLET BOXES LOCATED BEHIND MODULES SHALL BE SO INSTALLED THAT THE WIRING CONTAINED IN THEM CAN BE RENDERED A GENERAL NOTES,SH€ET INDEX,
ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF MODULE(S)SECURED BY REMOVABLE FASTENERS AND CONNECTED BY A FLEXIBLE WIRING SYSTEM.(NEC 690.34) BUILDING DATA,PROJECT DATA,
10.IN AN UNDERGROUND PHOTOVOLTAIC SYSTEM,THE POWER SOURCE SHALL BE LABELED WITH THE FOLLOWNIG WARNING AT EACH JUNCTION BOX,COMBINER _ SITE PLAN
BOX,DISCONNECT AND DEVICE WHERE THE UNGROUNDED CIRCUITS MAY BE EXPOSED DURING SERVICE:"WARNING-ELECTRIC SHOCK HAZARD.THE CURRENT
CIRCUIT CONDUCTORS OF THIS PHOTOVOLTAIC POWER SYSTEM ARE UNGROUNDED BUT MAY BE ENERGIZED WITH THE RESPECT TO GROUND DUE TO LEAKAGE
PATHS AND/OR GROUND FAULTS."(NECE 690.35(F))
11,ALL PHOTOVOLTAIC MODULES AND ASSOCIATED EQUIPMENT AND WIRING MATERIAL SHALL BE PROTECTED FROM
SEr:
ANY PHYSICAL DAMAGE.
12.ALL ELECTRICAL DEVICES AND UTILIZATION EQUIPMENT SHALL BE LISTED BY AN APPROVED TESTING AGENCY. A-1
13.ALL WORK TO COMPLY WITH T1IE LASTEST EDITION OF CALIFORNIA ELECTRICAL CODE AS AMENDED AND
ADOPTED BY THE CITY OF EASTVALE.2010 C.E.C.
GENERAL NOTES:
ROOF PLAN SOLAR PANEL LAYOUT REVISION
SCALE: 1/4"=1'-0'l
1.OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED,
2.ALL SPECIFIED WIRING IS BASED ON THE USE OF COPPER.
DATE NO
3. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS AND SHALL
COORDINATE ALL INSPECTION, COMMISSIONING AND ACCEPTANCE 02/ 15/2014 Al
WITH THE CLIENT,UTILITY CO.AND CITY INSPECTORS AS NEEDED.
4. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS
D
SHALL BE AT THE OPTION OF THE CONTRACTOR UNLESS OTHERWISE
NOTED AND SHALL BE COORDINATED WITH OTHER TRADES.
LEGEND5, IF DISTANCES OF CABLE RUNS ARE DIFFERENT THAN SHOWN,THE
CONTRACTOR SHALL NOTIFY ELECTRICAL ENGINEER TO VALIDATE
THE WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED
PV PANEL LAYOUT AS APPROPRIATE.
6. WHENEVER A DISCREPANCY IN QUANTITY OF EQUIPMENT, ARISES
METER I-1006701419
ON THE DRAWINGS OR SPECIFICATIONS,THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND ............._J
AC_ AC AC INSCONNET SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE
DRAWINGS OR IN THE SPECIFICATIONS TO ENDURE COMPLETE
MSP MAIN SERVICE PANEL COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED ..........
BY THE ARCHITECT/ENGINEER.
T ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP`;
I
CUPER1,MR1.11"D
DRAWINGS, ETC. SHALL BE HANDED OVER TO THE OWNER,
8H
REPRESENTATIVE AT THE COMPLETION OR WORK-
(j;
8.ALL WIRING CONCEALED IN WALL AND CEILING SPACES SHALL BE IN'
METAL CONDUIT.
C 9.THE SEISMIC BRACING AND ANCHORAGE OF ELECTRICAL CONDUIT§�
SHALL BE IN ACCORDANCE WITH THE "SMACNA"-GUIDLINES FOR
SEISMIC RESTRAINS OF MECHANICAL SYSTEMS AND PLUMING PIPINb F(l),F� C,(1),,,,DE
SYSTEMS.
10. ALL OF THE LISTED SYSTEMS REQUIRED THAT THE SEISMIC ✓fav
- A- _y
LATERAL FORCE FINCLUDING CONSIDERATION OF aAP AND rAP BE
DETERMINED AT EACH LEVEL OF THE BUILDING SO T14AT BRACE
SPACING CAN BE CALCULATED.THE DISTRICT STRUCTURAL ENGINEER
CAN APPROVE THE SEISMIC LATERAL FORCE DETERMINATION
11. A COPY OF THE CHOSEN BRACING SYSTEM(S) INSTALLATION
LE
A R
GUIDE/MANUAL SHALL BE ON THE JOB SITE PRIOR TO STARTING THE
INSTALLING OF HANGERS AND/OR BRACES, GREEN LEAF
12-WFIEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER DRIVEN
SOLAR&ELECTRIC, INC.
PINS IN EXISTING NON-PRESTRESSED REINFORCED CONCRETE, USE
CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE 667 N 12th Street,San Jose,CA 95112
www.greenleafisolarelectric.com,Phone:408 429 4745 1
REINFORCED BARS . WHEN INSTALLING THEM INTO EXISTING
............
PRESTRESSED CONCRETE TENDONS BY USING A NON-DESTRUCTIVE
METHOD PRIOR TO INSTALLATION, EXERCISE EXTREME CARE AND
CAUTION TO AVOID CUTTING OR DAMAGING THE TENDONS DURING
B C. INSTALLATION. MAINTAIN A MINIMUM CLEARANCE OF ONE INCH B 03 WgS.Iwrqg�g
BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHOR.
13. THE WORKING CLEARANCES AROUND THE EXISTING ELECTRICAL KING SOLARMAN, INC.
EQUIPMENT AS WELL AS THE NEW ELECTRICAL EQUIPMENT WILL BE
48900 Milmont Drive,Fremont,CA 94538
MAINTAINED IN ACCORDANCE WITH NEC 110.26. www.king-solarman.com,Phone:408 3738800
14. SPACING MUST BE MAINTAINED BETWEEN ANY PLUMBING SEWER
VENTS EXTENDING THROUGH THE ROOF AND THE UNDERSIDE OF THE
is I':0. PHOTOVOLTAIC PANELS(6"MINIMUM RECOMMENDED).
15. SMOKE ALARMS SOLELY BATTERY OPERATED FOR THE
PHOTOVOLTAIC SYSTEM DOES NOT INVOLVE THE REMOVAL OF
16-5 L
INTERIOR WALL AND CEILING FINISHES INSIDE THE HOME.
3.36KW PV SYSTEM
16. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS
PV PANEL TOTAL: 14 PIECES 240W=3.36 KW DC SUNLIGHT RESISTANT.(NEC 300.6 01,310.8 D) SOLAR ROOF PROJECT
17. GROUNDING BUSHINGS ARE REQUIRED AROUND PRE-PUNCHED
SOLAR PANEL:TALESUN TP660P-240, SEE SHEET E-3 CONCENTRIC KNOCKOUTS ON THE DC SIDE OF THE SYSTEM. (NEC
INVERTER: EPHASE MICROINVERTER M215,SEE SHEET E-4 250,97)
18THE GROUNDING ELECTRODE CONDUCTOR MUST BE PROTECTED Santa Gopalkrishnan
RAIL WITH INTERGRATED GROUNDING, SEE SHEET S-4 FROM PHYSICAL DAMAGE IF SMALLER THAN 46 COPPER WIRE. (NEC 21397 Krzich Place,Cupertino,CA 95014
WEEB:WEEB INSTALLATION GUID, SEE SHEET S-5 250.64 B)
19. GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS,
RACKING: IRONRIDGE AND FLASH FOOT INSTALLATION GUID, SEE EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED A ROOF PLAN-SOLAR
SHEET S-2&S-3 EQUIPMENT,(NEC 250.64 C)
PANEL LAYOUT
20. RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE
ROOF STRUCTURE FRAM,SEE SHEET S-1 BONDED AT EACH END-(CEC 250.64(E)
21. SMOKE ALARMS AND CARBON MONOXIDE DETECTORS SHALL BE
f
LOCATED AS REQUIRED PER SECTIONS R314 & R315 WITHIN THE
CALIFORNIA RESIDENTIAL CODE(CRC).
A-2
{ REVISION
DATE NO
02 i 1512014 11�
D j
PV ARRAY SINGLE LINE DIAGRAM
I
j
�'! 1 2 3 4 5 6 7 8 9 10 11 12 13 14
EXISTING 200A MAIN SERVICE PANEL
SOLAR PANEL
30A AC DISCONNECT ENPHASE ( Z ) i�{�l i l d i n q � �
JUNCTION BOX
So-
ENPHASE
MICRO
-..� INVERTER e
�t
4
ENPHASE --CABLE: COPPER SAWG GROUND E �.�''o i}t L,"
(4) GRA EHWN-2
C..).t >'a„=S! `'4 Y,.✓ 4-'
12 AWG RATE 901C=30A
In TEMPERATURE DE-RATING@104 7--0.91
AMP=09AX 14X 1251A=15.75A
112"CONDUIT 30A x 0,91=27.3>15,75A
(3) 10AWGTHWN-2 OK TO INSTALL 12 AWGTHWN-2 ;___�.._---__-------_------_---- _
(1)8 AWG GROUND WIRE k nsr�e�ev�ea.�
10 AWG RATE 90'C=40A s o �- A a
TEMPERATURE DE-RATING@304"f=0.91 ' GREEN LEAF
AMP=0,91=6 x15.75,0 .75,0
40A x 0.92=36.4>15.75A g j �^ INC.OK TO INSTALL 10 AWG THWN-2 SOLAR&ELECTRIC, C
METER:IW6701419 667 N 12th Street,San,lose,CA 95192
NEW BREAKER 2P•20A TO BE www.greenteafsolarelectric.com,Phone:408 429 4745
INSTALLED AT END OF BUSBAR
KING SOLARMAN, INC.
48900 Milmont Drive,Fremont,CA 94538
www.l(ng-solarman.com,Phone:408 373 8800
)MODULE INFORMATION QiNVERTER RATING ENPHASE CABLE ®MAIN PANEL RATING
MFR:TALESUN TP66OP-240 STC24OW MICRO INVERTER:ENPHASE M215 Meter:1006701419 ...... ............... .."._............. _._.._-. ..._....._._.
ELECTRICAL DATA PER PANEL NOCT: MAX.DC INPUT VOLTAGE =45V TO SELECT THE VOLTAGE TYPE OF 240Yao Pao.recz
� SPLIT PHASE ENPHASE GABLE: MAIN PANEL BUS BAR RATING=200,0
Voc =36.90V MAX.INPUT POWER(STC) =260W BLACK-Lt MAIN PANEL MAIN BREAKER =200A
Vmp =29.70V APT RANGE =22V-36V RED-1.2 NEW SOLAR BREAKER 2P =20A
Ise =8.62A OPERATING RANGE =16V-36V WHITE-NEUTRAL. OUTPUT CALCULATION 3.36KW PV SYSTEM
Imp =8.08A MAX.INPUT DC CURRENT =10.5,0
GREEN-GROUND p� ,r^ �+
MAX.DC SHORT CIRCUIT CURRENT=15A MAX,CURRENT CARRYING CAPACITY OF THE PV SYSTEM MAX DC OUTPUT: 24OW x 14=3,36kw SOLAR ROOF PROJECT
MAX.OUTPUT POWER =215 W @240 Vac TRUNK CABLE=20A PV SYSTEM MAX AC CALCULATION USING PTC PMAX:
NOMINAL OUTPUT CURRENT =0.9A CABLE BUNDLE DIAMETEP,=0.525" PMAX PER MODULE=216.2W wzolecsowNea:
NOMINAL VOLTAGEIRANGE =240V 1211V•264V
EXTENDED VOLTAGE/RANGE =240V12p6V-269V 216.2W x 14- ..
3.026KWx96,3q=2.974KW-3.026KW
NOMINAL FREQUENCY/RANGE =60,0159.3.60.5
SUPPLY POWER=20A-200A=220A-_200Ax1.2=240A,OK
EXTENDED FREQUENCYIRANGE =60,0159.2-60,6 Santa GOpalkrfSllCtaC1
MAX.UNITES PER 20A BRANCH CIRCUIT=17 21397 Krztch Place,Cupertino,CA 95014
MAX.OUTPUT FAULT CURRENT =1,05 Arms,OVER 3 CYCLES,25.2
Apeak,1.74MS DURATION
PEAK INVERTER EFFICIENCY =96.3%
auwwc:
SINGLE LINE DIAGRAM
SHEET:
E-1
2 4
—
FDP REQUIREMENTS
ENPHASE MIC INVERTER
SEC. 5. MARKING, LABELS, AND WARNING
REVISION
**WARNING**
LO!aR PANEL
ELECTRIC SHOCK HAZARD SIGNS. DATE NO
DO NOT TOUCH TERMINALS
A.Purpose: Provides emergency responde.- 02/ 15/2014
TERMINALS ON BOTH THE LINE
AND LOAD SIDES MAY BE ENERGIZED appropriate warning and guidance with respect to
IN THE OPEN POSITION.
isolating the solar electrical system. this can
facilitate identifying energized electrical lines that
connect the solar panels to the inverter, as these i
"WARNING" should no be cut when venting for smoke removal.
• IF A GROUND FAULT IS INDICATED,
B.Main Service Disconnect:
THE NORMALLY GROUNDED
CONDUCTORS 1. Residential buildings - the marking may be
MAYBE ENERGIZED AND UNGROUNDED. placed within the main service disconnect. The
is r marking shall be placed on the outside over if the
main service disconnect is operable with the
service panel closed.
CAUTION:SOLAR CIRCUIT 2. Commercial buildings - the marking shall be;q,1 U REH R
placed adjacent to the main service disconnect
ji, r
clearly visible from the locatin where the lever is
operated.
3. Markings: Verbiage, Fomat, and Type of
R E V UQ!,`vPi Ifs. CE,-'
Material. Li
a. Verbiage: CAUTION: SOLAR ELECTRIC ',7-7,
<evlewed E�y
SYSTEM CONNECTED
b.Format:
0 L A R
1) White letter on a red background.
"DO NOT DISCONNECT UNDER LOAD" (2) Minimun 3/8 inches letter height, i GREEN LEAF
(3) All letters shall be capitalized. SOLAR&ELIECTRIC, INC.
667 N 12th Street,San Jose,CA 95112 1
"PHOTOVOLTAIC AC (4) Anal or similar font,non-bold. %1AW.9reenleafsolarelectric.com,Phone:408 429 4745
DISCONNECT FOR UTILITY
OPERATIONS" c.Material:
1) Reflective, weather resistant material suitable
for the environment (use UL-969 as standard for
131 B 1 (1&
weather rating) Durable adhesive materials meet
ire
this requirements. KING SOLARMAN, INC.
48900 Milmont Drive,Fremont,CA 94538
C.Marking Requirements on DC www.king-setamian.com,Phone:408 373 8800
W A 0
,:RNING"2 SOURCES OF POWER PVfAC I
SC:
0
"WARNING"
ADJCENT LOCATI Conduit, Raceways,Enclosures,
Cable Assemblies,DC Combiners,and Junction ........... ...........
Boxes: PROJECT:
1. Marking: Placements, Verbiage, Format, and i
3.36KW PV SYSTEM
Type of Material.
SOLAR ROOF PROJECT
a. Placement: Markings shall be placed every 10
PROJECT OWNER,,
feet on all interior and exterior DC conduits,
"WARNING-PHOTOVOLTAIC
CONNECTION,DO NOT THIS SERVICE ALSO SERVED BY A
raceways, enclosures, and cable assemblies, at Santa Gopalkrishnan
PHOTOVALTAIC SYSTEM"
RELOCATE THIS OVER CURRENT DEVICE'
turns above and/or below penetrations, all DC 21397 Krzich Place,Cupertino,CA 95014
1-7
on combiners,and junction boxes.
b.Verbiage:CAUTION:SOLAR CIRCUIT A WARNING NOTES
Note: The Format and Type of Material shall
adhere to"SEC.5.B-3b&c"of this Requirement.
D.Inverter: A warning label shall appear on the
ARRAY C&D WARNING NOTES utility-ineractive inverter or be applied by the Efj:
installer near the ground-fault indicator at visible E-2
location.
3 4-
7
REVISION
DATE NO
02/15/2014 �1
D
... PROD= SPECAMN � � � PROW W $P' O
SPEC.NM-. 'f'S-AT-`lid SPEC.
TS-AT-1,17,
TiTLE.v SpedfICA0 0 c f 060. — TITLE; Spa ffcatf6tt of. T'06t.00 ' - ---
fkffSfpNi A2 REYfSffaftff AZ=
EFECTTE f)ATf '18-2tf22GfStE'tfAf
A161 } , 4, 1
_ TY0,40 f leorftaf Chau: clesso" _ f»'f6Curves
Gb�sg sem..#esaP a3a0P �fisbr � "� uP rE�� 060p:t xpap �e -
'fyttlealType.
.��a _ ' fcleal P-tcrrlsce..
-220, -2a?s
zsa C It Ce ra!t r 4 } F P. 40
„f�tTax#JxcCmsPawer V4max„Ji .'vi/ ixfi::: 2i iia 225' 339 '$35 4k Z45. ,2S$ 255 g*W g
P g
fl;^+3 ¢"'+3 9 =a"
bperettug Uu3ta8z'tYmPot, V 38,7. 29,7 .6 24: 24.4 :39.3 2.4.7 30d 3 „4. 34
77 ,`'�`�' t:AD ",4j ff1i°nr° .'5a
mr: gni
€7pe✓agtR Cz[€teat�f'tmdVh3 ai ,?3d- 5.,99 T5s .?<li 7:$8:... ,},47 0$ 4,14 '8,25 8;34 SO „,: „ ',:
-:>•:a3pen[arr,«Ytygltgfl'6V.ao) U ,3,9:Q, A4. 3;. -& 3€,.b... 38..8 ;.38,11 37:1
xaax-�vucu�-vaka8e �iq� aaoa �'
%6711, as .
4a` sS. : MX zsT xs: x, `'s:8 x? _ .1Y5 Fre ,2 , y ,.:.ro _„. . ,.:
kap
.r dRle;>;fRfienty' .ham"# ' fs.z.: z'4s 1 ma 1.4:2 'B9, a ts;r �s. ; ,15.7 zs>. .,,„,, ,.., „_.,1 .. ............ ...............
,
r
[ s
E418"5ize -rra'Es - SSGXY.$ �9i'd .p '. a ..
t $t6Y, ;.f31am`ezer' ', nia�r_''##t.rso
'yPealG'b7rR,gtto,9 € �, :- '£tru€D F _
_.. ._.___._.. ...__
tAar<Ser9ea'&use A _ FGRE
EN LEAF
}rk+YTe�rpe+r.ture C9HlicJ'€rlt !3GT?
nt z a,_zEi
sali�mjYera'£«'Ire Cneiff9Teis' N +a:''s: _ ,;< I N - Art SOLAR&E ECTRIC, INC.
WOCY'{Niaminal'pperesrcg Leif _. $67 N 12th Street,San dose.CA 95112
www,greenleafsolarelectricxom,Phone:40842947451
_.._. .._........e
,
K
,
_-atrtss< t
Stnrage Temperetht— <. .", -4D"+85. 9: _.__._._...�...._. ...._....._._____._.....__,......_....v.
Certifiaaho`.,” ”- iEC&12Y5,f€E63Y3a', tir8sUt3za3. �, ," r, '�.
r,� �– 14 i
' '..✓ ., .
A f s. ;P£lTx7rsstEa�n ,
'IVA �� KING SOLARMAN, INC.
aRAe Ams*e - rr rt SS4flX 9s4X!0$34.63r39A t. cke;3: i I
48900 AAilmont Drive,Fremont,CA 94538
www.king-solarman,com,Phone:408 373 8800
t3ascaN'atron llete'sYrmaastan in0! sGaft38a Xah2('t`3sts3.s?G37,.timcftesl:. .s {' :3"r.c. ........_... ..._....__... ................. ...._.......
V4'etghtof maAule Za d4n R!&s.#- � 011---M
E`abt'a£eR�tlro 9'da(3S 9mrhesF
(I -94,3134;1 dt' `".. raa�ecr:
FFrxhfi G#ass,.TypcandThiclmas§- > H#r�i H€g9e Tra«serrt�staR,Iar.krar!>T2m�xrvlY fs9pss.'3:L+n#r"+¢ab#3frid'res1 s �r<, fd. '�
P�rkiRg.CoR#+fxurat6¢a _ 2Spxsztartal'<a�t«R,Pat _ 3.36KW PV SYSTEM
Fisc LCsfass i9'{eig(t£tpa8e€�' S9aKg)SZSkg,{t Ta2.8.71h�,.jl57,:4ISsl ,f, orE t3,6'SS; _ _.. _
SOLAR ROOF PROJECT
LuadhrgikapacifY t50grs13d#C,7DJTg<sjda#C '2.Thaxe errlumRs
. ( gIY@typicaf va#ues a#prwYe€ctton pexFoe�nansea'J'�stfa5'zezke�
PROJECT OWNER:
Santa Gopaikrishnan
21397 Krzich Place,Cupertino,CA 95014 '
Char£gkun 3ndtlst€+atPark, hajiab ltg Ftaun Chaza$st tx,5urtcosl,,lt n 9.c#Pridu rite,P Fk:Chifta ChlpgkUn Industrial Park;5haji r Tawrski I+ sFpit,Su hDtt,tangs t Prrovin&P.R;Chii10'
_ A EQUIPMENTS:PV MODULE
SPECIFICATION SHEET
SHEET:
E-3
REVISION
__._.._.DATE __ NO
02 1 15/2014
MI ROINVERTER TECHNICAL DATA
.............. ...........-----------
IN: I
f#eco€ meeaded maximum input,power(,%TC) 26aw
Maximum input DC voltage 4$V
(s
Peaicpowertracking range 221-36V
l �y� d� 2 �� 3� ly Ufaerat"tir�razX9e f6Yt-3ft11
PJi#n.f(v m slartvo'ttage 26.4vl45v
"F Max.!C,tliortcirezittcutrent 15A d e r r z
iEt.i�,xJnputc0nant 19:SA, t '9"!t f. ra f
.. rdaxfmgcstoutput Power A
Nominaloutputcurrem l.II � Ek9A
Nominal yoltage/range. 2d7$v.65 2;29Y.. .20l2?7V46 V „)�<, '�'r*'` .i .€;,'"
Extendedvoitagettange IOWA -232Y 240V12963 28917 � r
B.• {�
Nerrilnal frequencyjra6g6 S 60:fl159,3.6tt�5
X
Extendedfrequencylsange 60. '2 r tzfP.0IS0.2 (t;5'
Power factor 95 X0.95
Maxie;om gnitsper 20Abranth ciri utt 25tthreee^pha
17fs[n91e R asci. FaeEn LE
S C L A R
Maximum output fault current 1.06 Arms oyer 1,cycle s,25.2 ApeakI.44ms duration
szmmtriar.otu GREEN LEAF
SOLAR&ELECTRIC, INC.
The Enphase Energy Microinverter System improves.energy harvest, CKwetghied eftdency, 9&0%
q�r.. + y (,{ ,,f 667 N 12th Street,San Jose,CA 95112
increases refrabijt,y; and dramatically simp9ifres design, installation and Peak in reri�t efficiency 963gb www.greenteafsolarelectriccom,Phone:408 429 4745
Static IPPTe Clency(weighted,reference EN 50530) 59.835
manageroent'c� solar ower systems. The Errphase Systern thdUdes the
r- DynamicMPPT efficiency(fast,irradiation changes,reference EN 507 301 99.4%
rnrGr rr verte , he EnvtDy. Corrir rurareatians f at *vvay, and f�rllHghterrr Night time power consumption 46mHV' _.._
B Enphase's:monitoring and analysis software.
B n f
01, _
Ambfenttgrnpereturerange 40°C`m KS°
KING SOLARMAN, INC
Maxithum energy pro uctr43rE Operating temperature rangeOntema!) -406Cto+861C
'r �t I� _i t� �r 48900 Milmont Drive,Fremont,CA 94538
ri' 11wy i v Resilient to dust,debris and shading f3finegs[ons txEfxLi t7.3<inx 15:4cm X2.Scm(5:8"X6:45"X1.f2°)"� www.king-solarman.com,Phone:40$3738800
Performance monitoring per module weight. Le,kg(3.ssb!�}, __ ._...__......... .._..-_.._.___...._.....................___..-----_.._...,.._____..;
Cooling Natural convection-no fans
o &t;to'sureenvitonmettalratin< L7utdopr-NEMA6
ggg}CR Lpp�pyp.y 5�ysternavailability re}at,e�rthY{an 9.81 - i,{�ti043 Cn4..11Fi4f, ra %. ._
ii is L3:.Ai&d" }syf3 single point of syste ailure PfttlJECT:
Compatibility Pairs with most6o--cell PV modules 3.$6KW PV SYSTEM
'Quick agat simple design, installation and management Catrttriunfcatiots Por arfirte
_� ` SOLAR ROOF PROJECT
:-2417 monitoring and analysis Vyazrartty 25i-year rimitedwatzanty
Cornpfiance f1L1 TA AME 1547,FCC Part 15Ciassf3_ QaaEcr ow Ea
CAWCS,A-022.3 NC,12 97,0,4-04,and 107:1-01
LOW voltage I)
SAFE
Deduced fire risk Enphase Energy,Inc. Santa GOpalkrishnan
21397 Krzich Place,Cupertino,CA 95014
.... 261 1$tStreet,Petatusna,CA X4932
C US 872.7974243 ww ,enphasst>earr d n°4 tai =rrmeyc fit mc, gnaw Nc
_ A EQUIPMENTS:
_ INVERTER
SPECIFICATION
srEEr:
E-
--G—tet _
7
ECTION VIEW AND ROOF FRAM -REvistoN
SCALE: 1 i;;=1#-�" DATENO
02J15J2014
D
Section - Flush Mount With Sloped Roof
Flush ount Array - Plan View
-2x4@24" Roof Framej i un; rrr
c1 c
r
Flush Mount Array -Elevation « reut8,,
LR
tA
H A L A R
GREEN LEAF
2 CONNEXTION DETAIL A CnNNEXTIUN DETAIL B� 4 CONNEXTION DETAIL C SC)LAR&ELECTRIC, INC.
j'y(''� /^+ �–/ {� �'''�� �'g 667 N 12th Street San Jose GA 95412 E
ROOFCONNECTION MID CLAMP E END D C LAM 1— www.greenteatsotaretectric.cnm Phone.408 429 4745..E
1 ...._._ .. ...._.___...._. _.._..... ._._. ..........___,
B?
Existing Roof Structure B
A KING SOLARMAN, INC.
48900 Milmont Dme,Fremont,CA 94538
Detail B - Mid Clamp to Rail g
www.kin-sotarman.com,Phone.408 373 8800
Detail A- Roof Connection
Detail C - End Clamp to Rail _.___.......__ ........_...__..__...._.._......._.._.___..._.........._...__
IPR_oje T
i
j 3.36KW PV SYSTEM
SOLAR ROOF PROJECT
IronRidge Rail SOLAR PANED gawear OWNER
I
i
i
I
SOLAR PANEL Santa Gopalkrishnan
L-Foot
21397 4SrZiCtt Piece,Cupertino,CA 95014
\ r.. aHnwar+o� j
At I ! A ROOF STRUCTURE AND SOLAR
RACK CONNECTION
MID CLAMP E`
- - -- -- _ MID CLAMP
QUICKMOUNT QMSFT SET:
S-1
w
REVISION
DATE _NO
Standard F l t Tile MountI € SI FT
02/ 15/2014 �
R snag . - " ckMountpV0
gvpt
>- .
'U6� Inst
a $tqndard
y
7.
v
_......_.,_._._....... ,. ..J
.__. ....,......
a
'A
I� ' 41rMIiT {
C � 'za woe STANGYRE2tATtLE £�tfNT (;
a
ram.^":..BAR se•': RaiYedie ile xs4of# ldcattofi lfsYu4 T, W*eandmarkorrtere4f,ra r. Vu tedce3iltlitLeasu`ra T, $ fivtiibct
EVE,/u x �<ecatrs
of fir, {kd C
ev�ewpd 8-
spse a."ecsr.a4xmmm�vF+! sa#vsnxrire,+i, `--r. ..
Aor
ssis
CaR6EN i-EAF ;
U
t GREEN LEAF
� SOLAR&ELECTRIC, INC.
667 N 12th Street,San Jose,CA 95112
wwwgreenlealsolarelectric com,Phone:408 429 4745
t¢vyotPANro `x;t wa3>ra."Qamz7wh`..n+sr ;�ismuafl.**nwm;nu"ru.+tsM', t "cCcnr ' k�'� :F+±aL,KaexW �.o'zt}gas ais5.r.rt_:4e: ,`. -
'sra,�a'�xr$xrAs ..............
_._._......, .__._.
ick
r t 414j§p 4110W over drifttwo the building T*c
xaft���e c�r"aELtf .. Lace ly ah kzerti n'itistail, ar&tn_�aquality installation.Wh€rnusincg
ick Mout i Viz;.pitgt hr ter Plea e�racie a�hdne:i�Zr1% a>; rnaYy llasf tt�in eithera ti?r iz��tse n2�hr�ti ar. tilde paR tneaftad tuz a P6�ce of e l wide
der CZ,6ase rn rte slat ttsrear i?sfnTang'up Lxg tsrTarlY�d 4za?er met_ 21,Apply tf tt!slid utrder the errors a&rw e ac d pver tha'frr
8 " " _ €6ase,ritsr rafter-on"m fliso s alat fi in thin shwa:of alt ug 4drt"d, + .oc€x sitar # r3tcru saf.t(ie nioftrsr: B t t st r
KING SOLARMAN, INC.
rl�shln�
1 f
� sit
---------- 48940 MHmont Drive,Fremont,CA 94538
www.king-solarmanxom,Phone:408 373 8800
Stondord flat Tile Mount I QMSf7 __.___._...._.__._..._._.._...._.._.--------- ._...._.___.. ..__._.'
Additional Dimensions
PROJECT:
_,.
3.36KW PV SYSTEM
SOLAR ROOF PROJECT
ju 4Ao,'... PRo-owttER: I
,
t"., _ Gutaha#etsrthetllerea cr dF�ttt aurae getC
;.....a.«r ? ..,...T RizPttatt,ii sa s�st iYseafant ftetepost.at�c",fi titn t t, ncf `FarCPPmsrr sfeEallscsra;und rfaynren;water-
Santa GO 31(f1SlrcrIixcit In-00fihg" _ nsemsi:Our yvelrsifk post thraugh etae tet llsc zhC r asc ,cr
aeASEPkuuart:Asrt�Hc ...._...Aso.. _...:!. ahElfiagCtetrultapkac>.iitstal[t}re.i8`.`xtu'ffashInf thegrn -frexrsu,retcher,e sur :r ih;ttZe`sa,lirn,` h ,p isr+aw,culckt a3nt vco tpvbcluts - .
trte.+rak. - 21397 Krzich Place,Cupertino,CA 95414
.....
_....... _. ai?Rll slant araund tiae'opetztn w asftex(icettt 8),In the inierim:before fcs ace to ueftva�s ile zsrt trat:hiritl
.. SkAll@t4. DRAWING:
1,25
ov�xssxmu err A EQUIPMENTS:RACK SPECIFICATION
3254 •UrrWuvgkitfltivstbi ,thfCrq€IickritutitpV.catr &ItdSTALITI(3N—QUICK MOUNT
Me c r,ckl c,tl ata 't 2700 Mita e I I r.,Bid 2 �WatnfJ �r�ek.,CA,94 9 �v aua��lev� QMSFT
....
} me
0MSTT:
STANClARD FLAT T(Lf MOUNT
or SE 4-raP VAd POST 11'em 3;.
__. S-2
2
AOLIRUNR C3GE re ;�� r
1a �a a
li2ONRIDGE >a hs+; IEit�hif2#�`?f��-: `q tr €
WAIN
REVISION
DATE NO
tnfrodu bion �bmpoaeroY Ust Assembly 02/ 15/2014
y+� ) 1 C /+� 1 t
The*wRe*�h*W`ssp mitants aaazxdshtw.,aaN mofa—t,ni*� f—Ww e.v kgio€�wphor—ft;M ',arra ds t�hrsabsym matcts..x»ctouaa':rnsaad. VG/ IJ I LQ 7Ft
stewz t}uewia,maiAaxddgadcartiymakew;aamaetr�dt»t,c+al:sae�d.¢unties.
H.,
installer xe otlsi$tli
-a -�"�, ssa'buactHheteecs#;ewe ';4
� YY` Aepd,nstaztsemoraxAhme r d+ecxfnmvn raas .•.,,., mei�e+kesrtalutaa«ts:
Tba,n�k tam ePaRs tat: a tw Pon€ro,ae a�e o edann«rndn n D
w a ambg. t aa:oa emana7na aadRm
4 CaavPF3m4HidYaNa(pr eble 3oml:67haliHiai L4GWin}j<adC55,gidwjRy 3Rplhat May'Suget¢Cd4 tt�rtwmie7: t�N+UKeNarwatAhCYdLC%Y�h4
' •w,- rbaet4tRae(n3D WiflM
N: £n*t;�u+stnattzanxtdgr-astdotlKrtrcaductsa*eage�Wwis twH�Paakotac9msaaadmndett SaAasa mgimamcne
ir, fnaumthacausaucwrafwppotc:trait+€ts,tnritnstt+omoisrnn.;'agdemxezc.:er>3,un 4,tt`a`tAefu<Zratx4trazade , "�
N; sa+spas#NaaaY urnda�" ar'4s4-fmhsuaca+eidzWcme �. R .. ,
awes we(wadutgc Dkw� -. e9oa�'sre�cau.syaces'lgfioks
�a�,. uattamatchthc#roranaaG>c� .,
W. tJ n oWidntry"Pq($*kd'kr}W71ex-*0Kd Port a 50ctaed*1-RdV,Sub% i"ma may 4the Wartgv±V ,.
E' i
e fn»umgttmtaR2timnD dewaasinzluAiuq�9 screwshaez,'adawtr7wNowsthadaihcae Ptt3t;Csasinsxaaed;. F ° ;.z5 ,� 7: fH-ka*isottsin�uYczoct+cuts
t .�.wx"„.� .,. 5 .e'a::��,.,.,,.,...: �tz..r-
'vi, N.mratnksa+ew'ztemwofuitest4roezrrerinKnrrai.§g3pare os,eaoY,(ndvdrhsu�cmrctiaaamPvaia xashigi. aciacitestoak'ioot clamasthe'a.as,de enms o€a,e- aurz:mazfiat�coemrsa+�ds, ,
eiattdampaad r<: avtnaaurasiox+tuaiK. :.._._- ._._....._.__.__._.__._�___.._....._..._..._....._____i
vit$nsw4(gsM hsstalWHun ofeite4ectdcat aSPaais bft`ns�ay:and PtuaidevwPPoK ': �,�"�;
viiF..ffiraiRn4�raePYimodukA{UC.RrcEt64adattdved8€afioPRreYASadutr5 ., f
ppacrty£os>ras_+F�'Nicloac@6s}�4�Te#N�15{' ���, _ _
5rv5nprtaYaPd katmdue+�fomfm'af.taearit
.,,,.-._; #ter�ittoxxk koewid,h4arrge
a.&,att�nasoaecrardaa»roanxiePM,Rtererzarc nzr:fk.dce.*,dastna�trderi�rtaadmyuudtwt,es;rccs5� � i' st eautsreadct�eckramio�f g - ........._..- ..._.. .._._. ._....................... .. .._ ,.
histaHaGm+.PammetettfixfeaYumvh+adtrtq,tYir4dzTmd,ea(tsu++t4aM[epog'a.Pfticlat4wstwuid becanfitmedwt7Mtirc ...<
teca befit l+�t?aat axaumnseAY?xks,3onased��eatF�m't'n5hce<,x.aaetacdwam- - -
tosn'&a.
Customer Support
maueRa kd`o eaaYtvvnstaP.Uyw,needaaststancaM nnYPeiOtwit6p'avf iniaitatim»ar• _••» -.�:: :.._-..:..�,.,,.....,...,„...
MonRidgemakesevaryaHort ucasuee ng
„ ;:�i �i!•���r,,, r_ ,' ....:.... .:... ._,
... aGnrt+cMze saa«
i!1'rePobZaJtialn+aevsaddai rm&erra6e+qs'�eu"bilr'ehdkt.,'xoacskseecdwsfG&etniewaidmR n�EtHg+vaauttganhcx�6ail,CY:ste9msu.n 4wrcxmh Au�t:
awremb;.+,c<Ra:wtrntn,oaa«kddr1Ymxr'mn �� fictamt?saHx, Ed�esd.scotaa1tadnzDba�adritanbPsedidte+l+rd+atNoc,Pdcih}ec.taiaan: c 6bgs7ismtn�bvtz2fti5gtno'aaJx�^nnssbtaaaohKtuntkeNtsimm¢,llut�ooS�apenreaoat1�m=sp.a;sLodi�haEoAcsffter'b�*eu;ienlltysrat1T Too€s-R uieedforMsenibtT Ys &„(iSfq
�"rN2�Y N� ; I, WN
¢Ii6"' - 3lBtaA^ct+d dreWaand6ofts -
__.....
:
Torque Values For Dry Bolts � VIS VI/ ✓ ��� �� i� t to r;- �3NC
F
Slsa,xhafatbwmgaptq Yarux xszNsasxemWy ..
rsaH'" c�. z,� � .,...a �„�``�C.�w`�'� `�.ear::i.'..;a,r ` .�.,��r. �Y'. `�wlflt';i✓d�t� ti'k:r' �,.!r,�..-.' '�'”.
Ira-zcs rmma4a:.cdmt.loot,,.ms.inu,ssm-ttmsor„dnas�?E.`acocdyt ,,�'.,;. <"
�a, z, i��. `tu o ;�,: ` a ...;� ,. �� <gan�x ,.�. , ���''� �"`s•a e�� 3 � rt�3',^�,"ar."� -;?. ;,�,�.
SRCI�t_ AI-EAR i
,
GREEN LEAF
SOLAR&ELECTRIC, INC.
iRONRIDGE: kt9�at€iat� ? IR®NRIbGE tagllt tRQNRiDG r� 667 N 122h Street,San Jose,CA 95112
SOLuAt.naHta95.da SOep'a^ �a.,�. .i^ ScAlax:.(xsado5✓mcY¢• a .
r2,,.?x... � '+ "�°.,r,,;:. .,.,.�.;:: �:t•~ ��� SWuu.:q,2rAakt,;:P�.. �JdBt.�'ttt&ik( ;
„ ,,; z n� ,a ,,•-, r ., � vrvrn.greenieafsolaretectrio.com,Phone:A084294745 j
c,4Srzhrrairantip �s,4h ,_,,,
_ .....
"fie`3.c€atas rr�stothe ifi, t t, ...... ...,.__.._..... ..... .. ........_. .... ............
p,.,
mthe.ads, dempoanwo § YhcBeuwthcmiactamPs m ., ��4�
hxam rnxtzavm�'mthevaa ��#�' � c4t1ta4t wMYYttaedgescf bnS7vP,bek
p ttasoRrd ar�ad VPtoai xv
D sh+ee tat.uhes t the "SS taa(e:fa4 naralwdaasmmupxNe ,..,
tvrEsra+ama >uit!a:r�+!hwr 8 nmre;t»+ mf4rrton tlmruanze' $ r (fidrtgbasnn
#: s was, aasa'refr r l,yrPurnd✓ i(i3dY9 na fl#sNhdrdl(q -: Msta1lnttoxrvmnuatfatfiKy+Rfd k
iaGnrviea4crtntte r,ltraDPttbtca;rdu She-rad asdaswnz S f#ohCpbo<tWad1lp5aF'0
r�dn44dt0d�+iS7aP'rofcaPesasdUity�¢be
' pstt4ohPzaaadnhK4aS3Wbromlknd�dlbn+rt6FTmxatt�etism(BuamSs.')or- .
KING SOLARMANa INC.
sti t,oemaasny sftxrm,q 48900 Miimont Drive,Fremont,CA 94538
Nox:rwfmmRatibntrJibtvtiYuk hocked uve..tLevdaufthe ,.
ws«,ta„sw„�ax�.ref m madwe, ( www.king-soierman.00m,Phone:408 373 8800
w'tarEere�immuartoamarwutt.
__._..._._....._........_...._........_....__..__..._............_._.___._..._............_..._....
_...._.
'ImnFiJgetigh;"aod5tan.9ad5edef
$ailz"for proyrtkxNdlefeon yrpcedurex
CuY�kiY�•to i7Q4Cifs€td�t;lWafi36z;{'N�1. _
r68ymovingthzsaroMaail abR9 Yi.�4i;E PRaecr: ;
2{s fent g; mternal apt`X bp''
stibut4shPYdb r!>�cax;iyeir.me - �L'GcaigErse'#x ak^^4*�t .. . :,
firxrraltwxhmeraflsbmtwy �7a+onyensrc-bsshaen. ', .. _ ...
tawa a o4ama,. rise d as pmesibab t,ri� 3.36KW PV SYSTEM
iY.:PoxPeatwhhtlxotAaccsamp. p
SOLAR ROOF PROJECT
g aaaaek�a
' PROJECTQWNEiL
L YouAxo rdmaricoaaFy x�s*atY" �ll �aam6 ,,eSanta Gopalkrishnan
a oo,ob «irr�r. itxsirs�rhtorc>#h%s .Y sr£0a�aesa7Yemw°!°- 21397 Krzich Place,Cupertino,CA 95014 i
EQUIPMENTS:RACKSPECiEiGATION
son
�rlamPsbyPwtmga'dampbntM
buh,f.ff—.dbpthe ttan9a wt
&INSTALLTION--IRONRIDGE LIGHT
RAIL SYSTEM
SHEET:
,�.. .,s.3.,,..., '�aa..... „�.al ,D ea eY .s. .,,....,;. rns.*. .,.z.,.,.z. .au ,,.•y. :.,s•.+w .,v..
� .:F•.?max M,....; roa..:
.. ...v_ .:- x. ���,r,....._.pA.a..:.a,.,,.b,aa sr..,.....a.,�'�,,�2:., «•,.�.•�.'.��,�,,l.ti,a.....n:.s n`rn�k �,<..,.zF.;„ss.arai.:,w.,z.- �.-�`.��.�.r.���? :.,.,..a,,.�,r'�%,,..,.,<,,_.�.a.���.uc�"r,� 2:'i,-;^':,.:::,.., ,, a.��.�.::x`:s2ati..,.:z...fi'=r..�',F,..���.-?�a"r„'�'' a'!
�v' �a
- `aNMI' S3
4 .. � � ,
! @tG . s ", iRONRIDGE �, IRQNR1Q 1r
,:>.... �/�+ /°�p�
' REVISION ,
CvmPcnenYLiYt. .. AssembfystQPs
DATE NO
ThxiitasHtaga'Standm?4aadEi9hfRa8=sgfGRn cithitiisy�.aicdWavt31g9tibStt;RRRtFuTadPrnvMc(jazris: z-'a - , i A
„ B: ftK3Sh7MdRffiCtrdjC4A07ngSUa£kjQ,pyffi}bMft{Bt{RGgm M$drYatf$4¢}own tr5dmk.
t�i4t�+ ":���..,°���� �
.F'5,.. ..6._,_.>'�" .,, 9asi+ta4<H9axcar»irm`xYaaewre Mia: 4 �mta!d�'ahemwndczn.�#tare4i�sew+damacho+fic,esao£i{raune�s'�+�w1h.?+�ra*?i�e N£��aw�ros�'aa�+M'w; '
02/15/2013 Al
AtYuhBXm t.•raM'arA' Amkldx riVcdUYaicasn@[Yfon. "'.....=t.'�"a'd1.R]zcE_1s'�ac^•,+x eau ey,t� �'ti SNIxwWvlityst.
e. M'a6"ro agtEeck$'petta Skpxadl4n#ht3rMiE J£(bcattzh usmge
prn}dpcstippart wficsscaRfptengxaHs slt6 d'tanSiAQ.xolc 7tre5ts4 taga<anateacimdtma�roduea!raaC� ^'�
$ttlre.C.S madut¢4, memhepauds asara(fx fF msid nr ooi•.ozs, § YeM�94ay3,pbw' i ,, v'5ta.Ed.,.,e(ixy
. Nio fa{t.gmamfw�t�xe: � t>~a es�tt `raq'�rccaecsv3s seixdrixn�Qevr
tart}« &vane maaftmanuYzcweeYsregnirenre:res. _r—'"` _
4awrczE12=
tteRrmxmaraemvx �:?Q'� j
+zoom':i:
-
m-t
xu� _ ...a�i,>5�:x;.��',.+e
.ro
YMtt'rt4elFfba'RIPN[n il1aYf!{laH drNpta[d k1Hfrt931B�hiiAv tli f�uYlYbn:caff§id@W'kd `^q 'S•>rda£R i "�''!"`.{ �6CCd.:pmfgga'""'•• •~~d C.s+d� •:, ;u!94<ffi$4ittkbY
sLPPeP.!LsreliY. � ta9%k`ltn
d+d§htaad raver axaretrtvd earqueaZfea A,+ taassinXhstareb, JT
'inoxesysmaxkrimrsaaeoro,ecvapsar>rm;e�aist«*�s« cir, Stgnliard.3w£! ij9Srtt2ai!
.tpQoxcoaeatfWsr. „...:�"
Ptof¢xttos3tng 'lftbLfeeAmaySePerto MLaf WS Mrtg rafNO, .
airFx arsra ensown nuns flffi Y€ 4�1k-
,.. NMa:Atw'N�r9'9saPtr�;9�^a�M`ma6u$stF�i�aRt9gesatzign Idr�47�nf:/PksartAl'F+5Li64/'!�$�D4'b+S�s�3°b+u+9s
.. ;. ',?'�s .^�� �z>xa3.s. n., 5,.�',,.:ry.,.>,rz. ,: 5eaiaxfiedtaax0}ra�Cn+wN+e!cwkoa '; aha�m+nec&me':sgmrzexae.eofaaesrtf+esmla ,gYc�z.
• ..... ..,., X'+ssesd+§p'n raMf4 aamtHwMfaMaraRndk Lt'
4 uresPYroodaraaffiraHs gjps,9,ffir'M,.mdaf.�ec�,ik #r4ha�:t'6'tktt&mYhm%�4i 'Mskr[MafSA�'SA'nd%YYd¢(BrtA�'ls.xl�g¢+tttY�awururferRNJVY�+dzW.+'li�a<km¢ta"✓ayY'8}Pnt i
m�cr�:dffigaau eF��#rtoamrt�re ama+.masattertartgaaitFrpweaar«rw i ,�mms,+ mspatet!7rai5++c�Xnsm,ar: v U
aaaprovkks4rou dhyta _ arylge�13`uwi:o#«no:.,. +ms 33+a�dra�4�i!axcaHil.<noimsuarstraaeRdcof:+ncsuaaazaaaiimouwantcre�l,canaA.amrnsmnm wWwmm' " ..
tlrex'drk ike�v.¢&A'ilic.Nzo of IYeMYieFi$fP}df. > 4Y/eCa Nurr+eateayertsdMF'Atbkbi#O+YeYzd;ff�a!taRatthn.GlEr�umtiaFlWfitj;?2Y,F1#h¢+Is<aut'kM�z?C�sW,Pr?;.f21fM1bZFU'k 4kM$Artltefa�mEyfiFl C�41teY�sfoi lnhwla{aAEl ilff3'1[a4aMtltYR7%tapr..£%ebW 85R MiWH} � ?.:>y a
ddHCtmRd<dd:.-. .BaRYFAaIk{adS3Cl ConnetNtirt: 6. ffi3PaN iNrNMm'Utt�fOAVIGsaftd<'u�yreS`5mu^ainro4 duc{+ng:rire.Tbtttu<ta 3q'mtbbn'lVkYif+u 3$ Rasfa•$A4YG;.ci 35 iia_ ,dY<N 5� o- z. 3 'S\G M
EdedapddiLKG; - .
t�,. 4,suetmramatsa' <iriiavmxai?i,n�eermspuceaiw naCdwmeanasc ?Y+tnsslrYiaj;ict ,mta;?:t?emeteas.. ;n. z ';ry ,t_,.!i`.,Ei?' ;
' 8. H+ay>AQB second.e�Y (A�ffiduwro wflfit+�dyeeregnoppe jeeear6Rftuocnt8ti95t(R. , ,r<a�
'' �" ,. E, ftepgetvxs cvMxirkfor Mfiy Raitml4dCa eeUanz S&acemuna»vsaa>ArR,!m•��c»'IKrw§sa=
ss�ccCu a��o .c<»cer+,d4 rrFrez :c ,>t`"'.�``�`.rr` a xkw:.'. A yaswasrter
_. {.'iii' : �""�a
(w terR+M a&ti2-A?i 52M'+AMaR£cfC4' LzAtt+M��m�.z-+b. ,✓,-✓"
L
vtarW}'sN:v $prSYayneF Tm*sa:<ttsataMai' Sf.�"'��,: [ � S'"�
tr¢:.�. �
t ,� C
cav+fnaiaR!<!R'�. - 3�.'ey-„ � � "z`" `,;,%.-.• "�fi,. ..a ..'�„�aPl„,... ~"�'-�� .r �,,..."to awe � ,sf .,- s -''r�yvesas+ntas. s
i
._. _..... ";. - r ! i,a_??�Itr?` r {_�
C..±.f r _`�,3..� '41 ,x.�,:,
k': -<5��='.-.,,,,,, any : -•., „ '' Yase:xrew raaue ._„ mxairo�o.rxaaawti. _.._._. _..._ .... ..._.f.... ....... s
«r
*�_ mstc Rpt tz x '"evlewved »S
. a'=:*irlsx t. � maaM,srr. smarm ar{r.:«,�t go S£@nddrdita£fl ughtR il, .. �.
... Standard Rm{ LrsJhCRmf
Y zap'* ., A a > `.>a '�raf k, a rz� ... w. �,",. ;•" z r :'?�z�zZ` _ :: �'""`
««b�a,�r« � � � ".� �mR,;��; ���p�w,m..,. .:�, . . .._„�� K y", >. 1e;'
�� u � ,„�k��"18�7,«�.L�*r�x���ua+
. .„.. � GREEt�I LE,4F �#
S C L A R
GREEN LEAF
SOLAR&ELECTRIC
'
iYefYF b<it'
._.t INC.
.N
...
r \[RthR ?G 667 N 12th Street&8n Jose CA 95112fwtRorSa �, www green ea£so ar!ec nc comPhone 448 429..4..7_4..5...
j,
.,.,
*'K' v ✓ 2, l
rgeearaa�. tz4c�,� EIe2�vrcaE,�orid�iro�a.
L. tnstaR 4rauri�$a+4e�`nznufuq,rFerY-rccomre lrarass[�Svrrbdegr:4smaetmi;T'n+?9ata�•;tandace.�aus$ � orsce�uefincY,'rmad+T amriarC.kote{z%;crohte{rerd*+Me and cmureiras'>nidsiampgcrirownbezovr ame:<roR�xtga3mrr4peg9(ssDan9L 9Ar4�+Y,�u+tkfaarkre�remsw9,thMca3�r#Growatoautusrboase�;reNrfkrYaaPud{
z„ Mztdfmkdm�Y:#,gAWGsdxi.._.a -rvfir.� Kx:4swle+ecmidPu maOwxaR¢pos7yAernc»eizd+;�c r»s sratdcu+sm ds«�Rw:wlw!dr+ta.s�ut?�e. sumodu�a�rn»se�em�rad.�verrG modaf�;r«mrAKen nxr�Janonrn�rr�rw,:,nne&�n>rorr�rzraacnan,a,e'erornaas�oe,� .-..... ._.. ............. .... ... ....___. _ ._.__._..__...... ,
?PFa Wmmtib+4inudlR'rL+4. �'auraNn4MW Cla?!W teCCixrcR4.mntetixhMksuM af:C±e YV aduiejiamesPsra Mr®TSCi£{s .
?roRe*$f@a5 dfilrsaR Tfiafr beeq�{1letedpyakhTerk Ycan.�A'mN�rt�r#d tirtdwuorsabz.mno-o<[ar aT%arF must(«nYl7u'rtnnl6taArMnls4ittuaffavt-
446¢a?t4h"ld?hePx'>; fmtvTbR{rArV+aCM!Ne&"pYbJdtdend'aafrtd'34aKdti�..tlixstsMr'Wbr+ttAatWdcbvYam '44'zoed asi>tlp Bls;AtrR'aSalFktGkufCodp
B - tte,sA, qv..w farwes F > ruepsi+Katunmm�P.mamarta.. df+Ec7s+>evanX rahoaatEte<M�u7'mv;umtansiaNst++t>s^{uLmceam'k�adosxrtrgrilFrron ` Y4itta7wazn., ,t�s,
Saxa5torindLeydi4$reM
F1 tadw sk.
.. zit KING SOLARMAN, INC.
£taetYasM€? A tmmQklge'GrauMUg W45xdwYee E(eetamks:tLC$w€tB6 Pb yprm:edf,bsewith+h�smSem, '
?,., r,�tnxBoxTkrt:tarn:ras .S` _.k`cr di„q r«cire2as�trr.xn s. rneR ffiRauiSetx�ca.�wcmn ernraar+swana ne omm�.:.ttng� d�aswsrirs awsgarsoerher«oeasrfu;aes 48900M££mont Drive,Fremont,CA 94538
www n Phone:.kmg-solamta.com,Pho :d08 373 8800
+,,,- 0• _n?iMrNum 9 .. 4. F!m+M9 ...3:. .ssh n 2. .__.................... .... _ _...._._...__.__..._-------------
Lonnautlon matlredndaca9r 1ks 5tM3aftlNsmmwat>
IX f aYt63c7`sFfQP9ar9t4m5�9C+Rzdr[Car`vatLa'useai3l royndtrB T asv S�PSo
YRWECL
P
g
sed a W�adae fianEW am re a=r abae. ,. _ g�y�
,ST{�tu?g:knsYa919`4ad+St ..,::i, ,.. 3. ,o.,•, .. .3' -�` P Aea a9 ecyis p ____.:_^a A _ _ Zi' _r.C3J=_ g .«a »». A ,.__..-.._
� 3.36KW PV SYSTEM
SOLAR ROOF PROJECT ..
A. wceU,cffiztw,muauS«snaaaluon o,.•u,�raJ rao-du�eaiwCdscaxnimvmosrs^teon..es+:4afrvt. X:.tumMYNes4£m3<aps:onwahtrznsortutiner n,.etl :
B. §ieat,zarasra6sd:4amRen raB agshAw;n,Hiwre End cfamp3a sMWrelYfiopked Wgi 4aPaf-asadidi. =LY p i3 .,..:.X S 1... t� _ O ,tl '. PROJECT OWNER:
G Pyysextwierecld[Smnp An M¢P4httrrii. ;� ( .•• •. r «».
xtx= �..,, `".',.... _"'"s•.a .. _ o _. .. o .. _ �.
Santa GQ�3Qera'raSlle'�Il
321397 Krzich Place,
A
- $, EQUIPMENTS:RACK SPECIFICATION
&INSTALLTION--IRONRIDGE RAIL
^�.e;.-� I ,�,w�:�'s �•" � �t�cur «P�9t�it�J
INTERGRATED GROUNDING
sneer:
01001
^m��;a*105.xCe�, � �
.,,.,. ...>.
. :
.Ci.tel•
�� i m WEED COMPATIBILITY TapDoemC9empatorUpped Modules WEEB COMPATIBILITY WEEB-DMO on Boxed Module Frames
The b1madng are a16 vA at on^.bE Ctpped solar madulee mwnted will
The WEEB famdg o£produdS can be—d lea bafxt atiad#xod aWminfomi. mvefted U-shaped clamps.Notice that the torae Which the mvettad.Or. Modula frames We 0—shown be.mayhave a ridge or tip an the. Certain module frames do not have enough obace of s*,,4*to
galvanized steef,sleet atag mihereleddaellycondtw#ive metal stnrebaes: bottom edge of the frame that would mevmat the WEEB teeth from fully withstand the'Wrte required to embed A WEEB.These,frames will REVISION
Y
.' ;.: Aft instaffations shat!bo is accordatx vrhh NEC rmgi6romet:{s§n the shapod clamp ezprtS6s in line with Nis YdEE6 ismtti omamddirtg. dein mad theratore nal aNaW sufftq'omptrretrefion of Nae WEEB temN+.
Washer,Electrical Equipment Send USA and with CSA 022A m tameda'.The WEEBs Ale for use mth � The 9enmud Yeyuifemente for i miimu2t module flame ftokness of
11Y GIw® medutes#hat have a maximum Soria.tufa rating ofless their 25A.. i boxed type module frames arm ilki5uatad'ocWw: ®ATE
9f#ad>ad TOP 4aWn txanrps NDIES.TFtAN Admin
(�
INSTALLAitCEI!i iPiSTRtf?'r`TiUNS:- Tf>B WEEti's used for t:wtdn,s N+a{'Y"rzfodmes tothe moucwng rays arc ; . .�1 I Ifo cYRErtzEfl R(nN es m
02/ 15/2014
For fronRidge Light&Standard Series Rails On edmpaaroie With va to s e oss masons of naautm lith es The wuoW ny
are examples of module flamer iia{are compatible,Notke that the
Please read carefully before installing. WEEB With are pasitfofaed tomptatehy older the maga of Na0 module
{ frame.
II 9uradymcomroands thatthe eetficteM ataiSa aEi6ainafal#s±lan 5e l ' "a SAatm hers is anexamPlo of a8pri�atvriu provent Ute. ello:K Sahmlt(adiu Nae ANd fbrapproval beforeany-workis started, r ;- �._ I�� t fttemLAW-Upped ModuleicompahThe WEEB-DMC w mat tomraeibi wAh high ilppeid rrodutes.Tile WEEB �WEE"5�4MCThin fatlawing is art mxarripim ofa mothat#.imrxnpatwithth0 WEEB..Tice WEEB#swift am toatd onlar.yunder theadgoof the modfrfedua{a tha"im on96e tap-doofthamodule. S`hawnh a >tsmWef 9a»wmat wiO Pmnerama -._ __...._.mam _._... witktheWEEB:.im ortant p t9ote-taapeet each nodule home used with a INEE34 tin ensure thatNfgh-Lipped Mndule. bottom trountt Nat,and that tore are alt .
Produats.aro tastmdfo UY.d87.,CANiCr`SA-P.222 No.4tU3J Canazb@nslaMPrds. i - '�, / ng edging WE flew f9
forsstaiY grovndtn3:a,'ut boifdngeguiPme+K ' wf f smut a rem
embedding WEER troth:do not use m modulo with a '
kerne that prevanta the WEEB teeth tram tutor.
ttp�4'fa;,a�� tbmneaAt ka+drikk9efWe4l3 e•:acil-_.aPtowiaac3 -e y3fw?*�p?e✓SFeafwAxNLteGWsM;9 i��� ,::
amP 5
E
Wiley w1
g w1key It ----
t
Waad3t �'a u -
aAPti+ G.gxSHii .,.1
-mks J n#'g s r,n_-, ?ast"c
SYSTEM OVERVIEW WEEB-DMC ASSEMBLY
Important WEEB-DMC LAYOUT
WEESs are tau SINGE USE ONLY!Do not torque fasteners dawn if
t.od.aE&DMGzb .- { hr erred tt s7M stamp :: L/ slmaPre, Clea poetton of solar awdutes is not anatfzad.Only agghNy tlgMon
maduta mo ��ratt \ � id thmP - EVEN NUMBER K7f MCOULES Of ROW -
URArIg �+;,(.-> Y Weombl,fGq o id�a.+np- #astertars fq keep tnWut in pingo.
a35ofibiy olio pavawn. 1
C l.,
� I E 3 ° ���..�`�
EIV
ani,-
wta p� arwLr as��
tkraFlza*t t ou f lelelp ro tea mi
ng gaPnto-r
sm:ie CompcuM Pnftaastls �
wEea-cncru`.� j r'r' X DW0TS$PLACESTO(H6TAL{.WeEl),DMC
r"-wWEES-DMC '
cxa.4xt
`y..\ Wee"MC Ngeo5o=C.X q>4 X Y=4 y Pra-assemble WEEB-OtJIC kp nt'si•elatpp assembly as shrmm. Pro-
assembling WEEB-OMC to mM clamp assmmbly wd(lohten the sm.11
MdiYkua9 ens,redacttg Wm possds'ttty,'a£Wsmg pads der IIIIO N{thtBEB OF MODULES IN 8(tW s O�aLeAp
L v;as
P vtg iffstaUaNan.. �.
I GREEN LEAF
YJA SOLAR&ELECTRIC INC.
cass�eci mPer{,.7 ;
' r 667 N 12th Street,San Jose,GA 95912 `
meataauyspYkad rams.
r sAghty fifesotu maftleaad seta ,� el
ttsa..WEEBLv9-6,?—mmalr'k �.i ._-WEEaDMGandmidd3mpaasemtrry www.greenteafsolareled+iG.wm.Phone:4084294745
19toPosRron WEf�t tktWpt �,'. XDENETTES ptA4E67n INSTALtwEEB.mrie
pa+raijfp e:.'rme=r sysiemm .._::. '+.�. -. � asatamaUemN7 be sG®'rad order the edge cXfl.�.SXi
mWipmanrgruandcondaator. of thb module When ff.mid ok,.il
Important rtota5 r asaamMyisWnegfpiaalaRad. �
important now
oldofamp to WEE&AMG NEEDED 10+.ff X 16+IX1>6
ti
i.{t gaaeeaS peryoaa enUwgetza eaeepountl art 4asteat?rlhreadswdtealaMakinq ,r � " tttanlrfaCbtret'S.spectrmation
WEEaa
a.Ths aEC aacHa,sew.asatahar"E%Ptlasd naa.a,;a:aaa amyiasinaiat Pam M' 9 Te sairadfY install mW slam awe!
}aadufa(agalat,bgeyala std WndaaWitperaaeraaakali be Pa bty,8rlafa'e fltetthpbeN to PaTPaodiCYtar �V. fie#a: ..............................................._._....._.............._...._..._,........_
a4 9rnundad fb l
to mounNngrat4 To tor[ad/ylaMOR WEES•OMCt enam,that both.Mcloo Whom rmytaatm9 a single.tauby mofino,rise ramavo the adfacoae modulo
Bseaai4Ana whti 2ro.iaaasaaoi�atAl toagaedraos:af YatraA4' "' wMeh eaatamia the Gama WEF.Bs ea'tna rauay Awdufe.Thf9.wNfeol—tat p
"` 4:WEEB.arointaadaeioe a3NGtEtS 4aLY.Fmorwaaary wisaot se /. As59mble oddN mPt ofthe aeu,to-okaea Ale oeom telypastfoned agatrlstthe mid-ciamp.'{9afer \ there ata.neveram9reandadmadti fn fte.":
guernefwa#,aeewa. mmo4,t.W..pea-V n is WEEB eompaubmay page for Illustrations. uafty
tnfans.visshack that WEER tib ,.
prapedy p."woae.
+ ➢.ogeao"x 4Aaa+ptaz p. tl 6lW�N.p�4a-t'tG. a }}dg%� r�a,�,exa.uR»a-.faa,ea�U+a(Ae1opwYl.t:-a... , :,
KING SOLARMAN, INC.$$$$ey WILey WILGY
y. Yxa..sda+ av�et>N;a
48900 Miimant Drive,Fremont,CA 94538
www.king-salarman.com,Phone:408 373 8800
WEESLUG ASSEMBLY GROUND CONDUCTOR ASSEMBLY WEEB BONDING JUMPER-6.7 ASSEMBLY LOW LIPPED MODULE INSTALLATION
f 0 �v _
Slide boltto dasiad' mer vela WEEB BaWfng".kiMper man ba ra?umsoonas milsPeessi+cwdpg __ —.,
WEES:teatht—dsra ._posiWan and sSiPbait exftan rMiMatmd'dXarentwayxshown hetox. fN20lECL -
•.• ll,a I WEEB§1
1 ie\, taS Ne nskig§a+farai.
�i WEE6 Baxtirg
meat 3.36KW PV SYSTEM
f aampanM.nitkptd3
� LEe�.7 SOLAR ROOF PROJECT
pRQ1E4T OWNER
f Santa Gopalkrishnan
29397 KrziGh Place,Cupertino,
CA 95014
- rgop eM''4 WEE88rnHrg 4AKN 1'ag 9pnatai ./`/i`�.., Tyhian t9 xo Rat tE BN'm uGeg `
9routM
•,,, y\orv.{�b -.. Pmpa9Pa dm!pmepaodse.r4i-setae 'ti. adp�r
�.^...'"".... f ,p�um-.»o*e-baado5atiauao
A hEStgEfY nd
i M Y 19RbftS aJd.
v'F Oa'a.,readuS tapadNm�.ifrd6ci2lem.cp
.fogom
pbUad A LWWAwE(NG:E
B INSTALLATION
Laye+ M-.dpr
GUIDEafimnyrebbasormriarym
t. W—pe that:eta under the Wghtem g to for SINGt.E'USE QNLYf
E.WEE
siNpn iacomect tefaaa tghtening. ca�tioafla wamOpPantaort
Z The WEEBLugSX may Ira uead wnh a maximum aquipmom 9raehe
ate AWG, t fNnderty;NN a2u53