Loading...
B-2017-2136 • CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO:B-2017-2136 10625 MORENGO DR CUPERTINO,CA 95014-3513(375 34 009) PROVOLTZ INC CAMPBELL,CA 95008 OWNER'S NAME: ROBINSON CHRISTOPHER S AND MARY-ANNE E M TR DATE ISSUED: 12/12/2017 • OWNER'S PHONE:408-341-5109 PHONE NO:(408)796-4450 • LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: • License Class SOLAR Lic.#919207 Contractor PROVOLTZ INC Date 11/30/2018 X BLDG _ELECT _PLUMB MECH X RESIDENTIAL_COMMERCIAL I hereby affirm that I am licensed under the provisions of Chapter 9(commencing . with Section 7000)of Division 3 of the Business&Professions Code and that my • license is in full force and effect. JOB DESCRIPTION: (N) I5-PANEL ROOF MOUNTED PV SYSTEM(5.17 KW) I hereby affirm under penalty of perjury one of the following two declarations: 1. I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. /02. I.have and will maintain Worker's Compensation Insurance,as provided for by //q�� Section 3700 of the Labor Code,for the performance of the work for which this /[4'1V permit is'issued. Sq.Ft Floor Area: Valuation:$17000.00 APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances APN Number: Occupancy Type: and state laws relating to building construction,and hereby authorize 375 34 009 representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save indemnify and keep harmless the City of Cupertino against Habil'' judgments,costs,and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue agains id ity'' onsequence of the granting of this permit. WITHIN 180 DAYS OF PERMIT ISSUANCE OR Additionally,the-applicant u,derst-.+s and will comply with all non-point source rralonslper the to ino r i , sal Code,Section 9.18. 180 DAYS FROM LAST CALLED INSPECTION. Signature' Date 12.12.17 Issued by:SEAN HATCH Date: 12/12/2017 • I hereby affirm that I am exempt from the Contractor's License Law for one of the RE-ROOFS: following two reasons: All roofs shall be inspected prior to any roofing material being installed.If a roof is 1. I,as owner of the property,or my employees with wages as their sole installed without first obtaining an inspection,I agree to remove all new materials for compensation,will do the work,and the structure is not intended or offered for inspection. sale(Sec17044,Business&Professions Code) 2. I,as owner of the property,am exclusively contracting with licensed Signature of Applicant: contractors to construct the project(Sec.7044,Business&Professions Code). Date:12.12.17 I 1 hereby affirm under penalty of perjury one of the following three declarations: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER 1. I have and will maintain a Certificate of Consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance,as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code,for the performance of the work for which this California Health&Safety Code,Sections 25505,25533,and 25534. I will permit is issued. maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the a. I certify that in the performance of the work for which this permit is issued,I Health&Safety Code,Section 25532(a)should I store or handle hazardous shall not employ any person in any manner so as to become subject to the material. Additionally,should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I Worker'sCompensation laws of California. If,after making this certificate of will maintain compliance with the Cupertino Munici.al Code,Chapter 9.12 and - exemption,I become subject to the Worker's Compensation provisions of the the Health&Safety Code,Se 'ons-25 'i''��a�d 25534. _ Labor Cdde,'I must forthwith comply with such provisions or this permit shall be deemed revoked. Owner or authorized ag nt: I APPLICANT CERTIFICATION Date:12.12.17 rF I certify that I�havelread this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws I hereby affirm that there is a c' ' tion le d'i s -gency for the performance relating to buildinglconstruction,and hereby authorize representatives of this city of work's for which this perm -d --c.3097,Civ C.) to enter upon the above'mentioned property for inspection purposes. (We)agree Lender's Name to save indemnify and keep harmless the City of Cupertino against liabilities, judgments,costs,and expenses which may accrue against said City in Lender's Address consequence of the granting of this permit. Additionally,the applicant understands• • and will comply with all non-point source regulations per the Cupertino Municipal .ARCHITECT'S DECLARATION Code,Sectidni 9.18. I understand my plans shall be used as public records. :1 ,1I Signature ! Date 12.12.17 Licensed . Professional Prepared by Thomas Boulay - Sr Designer - Mobile - (408) 863-2770 ProVoltz Inc Lic # 919207 Class C-46 583 Division St Suite B Campbell, CA 95008 (408) 796-4450 Site Address 10625 Morengo Dr Cupertino, CA95014 Customer Name Chris Robinson Customer contact 1.408.341.5109 chris.robins1@gmail.com 1Drawn on: 6-28-17 Scale: NTS Title page Vicinity map Photovoltaic installation project Project description: Sheet index 2 Site layout 3 Single line drawing & wire 4 Solar module spec sheet 5 System grounding data 6 Roof Attachment data 7 Racking engineering data - 5.17 kW solar PV system using (`15) SunPower SPR-X21-345-D-AC panels on Invisimount racking - System is grid tied, no UPS, no batteries - Roof mounted system adding 2.94 lbs/sqft - Roof is composed of PVC/TPO with 2 x 4" rafters 24" O.C. - Roof is (2) story with 5/12 pitch - PV module ®re certi®cation: Class A (detail on pg. 4) - Racking ®re certi®cation: Class A (detail on pg. 7) Quick reference info Chris Robinson 10625 Morengo Dr Cupertino, CA 95014 Applicable Code: 2016 California Building Standards Code 2016 California Electrical Code (2014 NEC) - 5.17 kW roof mounted solar ACPV system valued at $ 16,000 General Liability Insurance Westchester Surplus Lines Insurance Policy Number: G24390548005 Phone: 1-916-630-8643 Exp.: 4/29/18 Workers Compensation Insurance ACE American Insurance Co. Policy Number: C49254519 Phone: 1-888-828-8365 Exp.: 10/01/18 Abby Ayende 12/12/17 12/12/17 B-2017-2136 Abby Ayende 2 Scale LayoutSite Address 10625 Morengo Dr Cupertino, CA95014 Customer Name Chris Robinson Customer contact 1.408.341.5109 chris.robins1@gmail.com Drawn on: 6-28-17 Scale: NTS NEMA 4, Outdoor Wet- location J-box NOTES: 1. MAX HORIZONTAL SPAN BETWEEN ATTACHMENT POINTS = 72” 2. MAX CANTILEVER OF RAIL PAST LAST ATTACHMENT POINT = 24” 3. RAILS TO BE MOUNTED SO RAILS ARE NO LESS THAN 6” AND NO MORE THAN 16” FROM TOP AND BOTTOM OF MODULE. 4. PANELS TO FOLLOW 2016 CALIFORNIA RESIDENTIAL CODE GUIDELINES FOR FIRE SETBACKS.36” Fire SetbackPrepared by Thomas Boulay - Sr Designer - Mobile - (408) 863-2770 ProVoltz Inc Lic # 919207 Class C-46 583 Division St Suite B Campbell, CA 95008 (408) 796-4450 3/4 EMT 200 A Main Service Panel Abby Ayende 12/12/17 ACPV Module ACPV Module ACPV Module ACPV Module ACPV Module ACPV Module ACPV Module ACPV Module ACPV Module ACPV Module ACPV Module ACPV Module ACPV Module ACPV Module ACPV Module 3 Single Line AC Solar panel speci®cations (SunPower SPR-X21-345-D-AC) Output @ 240 V (min/nom/max) 211/240/264 V Operating Frequency (min/nom/max) 59.3/60.0/60.5 Hz Output Power Factor (min) 0.99 AC Max Cont Output Current @ 240 V 1.33 A AC Max Cont Output Power 320 W Max Units Per Branch Circuit @ 240 V 12 Certi®cations UL 1741, including compliance with applicable requirements of IEEE 1547 and IEEE 1547.1 Fire rating Type 2, Class A Compliance Alternating Current (AC) Module designation enables installation in accordance with NEC 690.6 WARNING: THIS PANEL IS ALSO POWERED BY A SOLAR PHOTOVOLTAIC SYSTEM PV SOLAR BREAKER DO NOT RELOCATE THIS OVERCURRENT DEVICE SOLAR PHOTOVOLTAIC SYSTEM DISCONNECT AC OPERATING VOLTAGE: 240 V MAX AC OPERATING CURRENT: 24.9 A Drawn on: 6-28-17 Scale: NTS Site Address 10625 Morengo Dr Cupertino, CA95014 Customer Name Chris Robinson Customer contact 1.408.341.5109 chris.robins1@gmail.com AC wire size calculations: (E) 200 A Main Service Panel fed by 200 A breaker with (2) 2 pole 20 A breakers located opposite source (15) SunPower SPR-X21-345-D-AC modules in (1) string of (10) and (1) string of (5) For Each AC Module: 240 VAC 1.33 A Cont. Output NOTES: 1. A DC DISCONNECT IS NOT APPLICAPLE, AS ALL DC CONDUCTORS ARE FACTORY-WIRED TO EACH MICRO-INVERTER. 2. WIRE AND SIZES ARE AS INDICATED OR LARGER. 3. ALL EQUIPMENT IS BONDED BY MECHANICAL MEANS OR BY EQUIPMENT GROUNDING CONDUCTOR. 4. THE EQUIPMENT GROUNDING CONDUCTOR SHALL BE #10 AWG OR LARGER AND BONDED TO THE EXISTING GROUNDING ELECTRODE SYSTEM. 5. THE AC DISCONNECTING MEANS WILL BE LABELED WITH SIGNAGE SAYING: 6. THE ELECTRIC SERVICE PANEL WILL BE CLEARLY LABELED WITH SIGNAGE SAYING: Branch 1 (10 panels) Continuous Current = Imax x number of panels in string x 1.25 = 1.33 A x 12 x 1.25 = 16.6 A Derate Ampacity = 90 deg Rating of Conductor (10 AWG) (T-310.15(B)(16) x 122 deg Temp Correction Factor (T-310.15(B)(2)(a) = 40 A x .82 = 32.8 A So that, Derate Ampacity > Continuous Current = 32.8 A > 16.6 A >> OK And, Derate Ampacity > Overcurrent Protection Device Rating = 32.8 A > 20 A >> OK Total Source Calculation: Total Allowable Source = 120% busbar rating Max Total Sources Allowed = Busbar x 120% (705.12(D)(2) = 200 x 1.2 = 240 A Utility Source = 200 A PV source = 20 A Total Source = 200 + 20 = 220 A If total Source < Max Sources Allowed = 220 A < 240 A >> OK NEMA 4, Outdoor Wet- location combiner box main service panel M Prepared by Thomas Boulay - Sr Designer - Mobile - (408) 863-2770 ProVoltz Inc Lic # 919207 Class C-46 583 Division St Suite B Campbell, CA 95008 (408) 796-4450 RAPID SHUT DOWN (4) 10 AWG THWN-2 and (2) 10 AWG THWN-2 grounds in 3/4” EMT Abby Ayende 12/12/17 4 Module SpecsSite Address 10625 Morengo Dr Cupertino, CA95014 Customer Name Chris Robinson Customer contact 1.408.341.5109 chris.robins1@gmail.com Drawn on: 6-28-17 Scale: NTS Prepared by Thomas Boulay - Sr Designer - Mobile - (408) 863-2770 ProVoltz Inc Lic # 919207 Class C-46 583 Division St Suite B Campbell, CA 95008 (408) 796-4450                                                                                                                                                                                                                 Datasheet Optimize System and Installation Efficiency SunPower® AC Modules, which include a factory-integrated SunPower microinverter, provide a revolutionary combination of high efficiency, high reliability, and module-level DC-to-AC power conversion. Designed specifically for use with SunPower InvisiMount™ and the SunPower Monitoring System, SunPower AC Modules enable rapid installation, best-in-class system aesthetics, and intuitive visibility into system performance. All this comes with the best Combined Power and Product Warranty in the industry. Design-Driven Advantages ˜ #1 module aesthetics and efficiency¹ ˜ Unmatched module reliability2 ˜ No electrolytic capacitors ˜ 25-year Combined Power and Product Warranty Maximize Value for Roof ˜ Size system for roof, not string inverter ˜ Optimize performance of each module Expand Deployment Options ˜ Complex roofs and partial shading ˜ Small systems ˜ System expandability Simplify & Speed Installation ˜ Factory-integrated microinverter ˜ Robust, double-locking AC connectors ˜ Design flexibility offsite and onsite ˜ No DC string sizing process ˜ Fewer installation steps than competing systems ˜ Intuitive commissioning Component of Complete System ˜ Built for use with SunPower® InvisiMount™ and the SunPower Monitoring System ˜ Superior system reliability and aesthetics sunpower.com SunPower® X21-345-D-AC | Residential AC Module Series ¹Highest of over 3,200 silicon solar panels, Photon Module Survey, Feb. 2014 2#1 rank in "PV Module Durability Initiative Public Report," Fraunhofer CSE, Feb 2013. Five out of the top eight largest manufacturers were tested. Campeau, Z. et al. "SunPower Module Degradation Rate," SunPower white paper, Feb 2013. See www.sunpower.com/facts for details. 3Standard Test Conditions (1000 W/m² irradiance, AM 1.5, 25° C). NREL calibration standard: SOMS current, LACCS FF and voltage. All DC voltage is fully contained within the module. 4Based on average of measured power values during production. Tested Operating Conditions Operating Temp. –40° F to +185° F (–40° C to +85° C) Max. Ambient Temp.122° F (50° C) Max. Load Wind: 62 psf, 3000 Pa, 305 kg/m² front & back Snow: 125 psf, 6000 Pa, 611 kg/m² front Impact Resistance 1 inch (25 mm) diameter hail at 52 mph (23 m/s) Warranties and Certifications Warranties ˜ 25-year limited power warranty ˜ 25-year limited product warranty Certifications UL listed to UL 1741, including: ˜ IEEE1547/1547a and IEEE1547.1/1547.1a Grid Support Utility Interactive, UL 1741 SA ˜ PV Rapid Shutdown Equipment ˜ Equipment Grounding ˜ UL 6703, UL 9703 Connectors and cables (load break disconnection) ˜ UL 1703 PV Modules (Type 2 fire rating) Enables installation in accordance with: ˜ NEC 690.6 ˜ NEC 690.12 Rapid Shutdown (inside and outside the array) ˜ NEC 690.15 AC Connectors, 690.33(A) – (E)(1) FCC and ICES-003 Class B When used with InvisiMount racking (UL 2703) ˜ Integrated grounding and bonding ˜ Class A fire rated PID Test Potential-induced degradation free [11.02 in] 280 mm 1558 mm [61.3 in] 1107 mm [43.6 in] 46 mm1046 mm [41.2 in] 30 mm [1.2 in] [1.8 in]Please read the safety and installation instructions for details. ©December 2016 SunPower Corporation. All rights reserved. SUNPOWER, the SUNPOWER logo, MAXEON and InvisiMount are trademarks or registered trademarks of SunPower Corporation in the U.S. and other countries as well. Specifications included in this datasheet are subject to change without notice. See www.sunpower.com/facts for more reference information. For more details, see extended datasheet: www.sunpower.com/datasheets. SunPower® X21-345-D-AC | Residential AC Module Series Power Data SPR-X21-345-D-AC SPR-X21-335-D-AC Nominal Power3 (Pnom) 345 W 335 W Power Tolerance +5/–0% +5/–0% Avg. Panel Efficiency4 21.5% 21.0% Temp. Coef. (Power) –0.29%/o C Shade Tolerance • Three bypass diodes • Integrated module-level maximum power point tracking AC Electrical Data Output @ 240 V (min./nom./max.) Output @ 208 V (min./nom./max.) 211/240/264 V 183/208/229 V Operating Frequency (min./nom./max.) 59.3/60.0/60.5 Hz Output Power Factor (min.) 0.99 AC Max. Continuous Output Current @ 240 V AC Max. Continuous Output Current @ 208 V 1.33 A 1.54 A AC Max. Cont. Output Power 320 VA DC/AC CEC Conversion Efficiency 96.0% Max. Units Per 20 A Branch Circuit @ 240 V Max. Units Per 20 A Branch Circuit @ 208 V No active phase balancing for 3 phase installations 12 (single phase) 10 (two pole) Mechanical Data Solar Cells 96 Monocrystalline Maxeon Gen III Front Glass High-transmission tempered glass with anti-reflective coating Environmental Rating Outdoor rated Frame Class 1 black anodized (highest AAMA rating) Weight 45.5 lbs (20.6 kg) Max. Recommended Module Spacing 1.3 in. (33 mm) Document # 518982 Rev A /LTR_US Abby Ayende 12/12/17 5 Inverter Specs UL and NRTL certi®ed equipment bond chain(from installation manual) Site Address 10625 Morengo Dr Cupertino, CA95014 Customer Name Chris Robinson Customer contact 1.408.341.5109 chris.robins1@gmail.com Drawn on: 6-28-17 Scale: NTS Prepared by Thomas Boulay - Sr Designer - Mobile - (408) 863-2770 ProVoltz Inc Lic # 919207 Class C-46 583 Division St Suite B Campbell, CA 95008 (408) 796-4450 The ground path from the transition cable to the module frame is as follows: - The transition cable's green conductor is connected to the EGC from the utility dedicated branch circuit. - All plugs have ground pins that are longer than the circuit pins. This extra length ensures that the ground is the ®rst to make contact when connecting modules and the last to break contact when disconnecting modules. - The AC ground wire inside the microinverter terminates on the microinverter chassis with a bolted connection, and is environmentally sealed. - The microinverter chassis is bonded to the module frame with stainless steel hardware to provide ground continuity to the module frame. SunPower’s AC Module includes an factory-integrated microinverter (MI) that does not require a neutral wire to be connected to it for operation or for compliance with IEEE 1547. Power produced is conducted on the L1–L2 240 VAC or 208 VAC grid connection. Utility interactive functions in the MI circuitry have been evaluated to IEEE 1547, and use the ground wire instead of the neutral to determine grid values. This functionality is part of its UL Listing. This product must only be connected to a single-phase system (L–L) of a premises with the neutral (N) bonded to ground at the service entrance per code. The MI does not reference the N to ground internally, therefore this reference must be accomplished only at the service entrance. Ensure that the installation site has a high-quality N-to-ground reference at the service. The MI determines L–N voltages based on measuring internally from L to the MI chassis, which is connected to the EGC. . The following are the grounding-related NEC Articles and applicability for SunPower AC Modules on rooftops: - 690.41 does not apply to AC modules. - 690.42 does not apply to AC modules. - 690.43 covers equipment grounding, which is the only required type of grounding for an AC module. - 690.45 speci®es that EGCs should be sized based on 250.122. - 690.46 modi®es 690.45 when the EGC is not protected within a raceway. - 690.47 does not apply to AC modules: - 690.47(A)does not apply when installing an AC system. The AC system”was already existing on the premises, and hence you are installing AC modules on the AC system. § ࡰ690.47(B)applies to DC systems ;it does not apply to AC modules. § ࡰ690.47(C)does not apply(see690.47(B)). § ࡰ690.47(D) only provides guidance for a “dc grounding electrode conductor.” Document #515791 RevA 26 SunPower Proprietary Abby Ayende 12/12/17 Invisimount integrated grounding details: Torque speci®cations L-foot to rail 375 in lbs Mid clamps 85 in lbs End clamps 85in lbs Splice screws 40 in lbs Structural & attachment details Square footage per module (41.4” x 61.5”) 17.7 sqft Total system square footage 201 sqft Total system weight (2.94 lbs sq/ft including mounting system)590.94 lbs Minimum quantity of attachments (each with 2 − 5/16” x 4 1/2” lag bolts with 2 1/2” minimum penetration)21 Dead load per attachment (total weight ÷ attachments) 28.1 lbs Pull out stregth per attachment 205 lbs Total pull out strength (205 x 21) 4305 Design wind load (-15.2 lbs/sq/ft uplift X 201 sq/ft) -578.9 lbs Corrected pull out strength (pull out strength minus wind load)3726.1 lbs Safety factor 6.3 times 6 Roof Attachments solar panel mounting rail structural attachment roo®ng material rafter SunPower SPR- X21-345-D-AC See detail bottom left See detail at top left PVC/TPO 4 x 4 24" O.C.Note: The module mid clamps serve as module to rail bonding L-foot and rail side pro®le E-Curb System Components • E-Curb exterior rings, straights, and corners. • M-1 Structural Adhesive/Sealant used for bonding the E-Curb components, sealing and priming the penetration. • 1-Part “moisture cure” pourable sealer, used to form a durable, water-tight seal around the roof penetration. E-Curb precast form components are composed of light weight nylon resin. The E-Curb is 2-inches high and is available in a variety of shapes and sizes. Sizes available include: bisected circular pieces having inside diameters of 3, 4, 6, or 9 inches. Corner pieces having a 2-inch radius, and 8-inch straight pieces are also available to create larger sizes. The outer surface is impervious to ice, corrosion, UV (ultraviolet) light and ponding water. M-1 Structural Adhesive/Sealant is a durable, self- fixturing moisture cure mastic. Cartridges of M-1 are supplied in each E-Curb Kit. Components are also sold separately. 1-Part is a highly flexible, self-leveling moisture cure pourable sealer that eliminates mixing. It is also 100% solid rubber, has a very low VOC content, will not melt or shrink, and is resistant to deterioration. It is supplied in 10.1-oz and 28-oz cartridges or 1/2 gallon pouches. Unused sealant can be capped and reused. Product Description E-Curb penetration seals replace old-style metal pitch pans with versatile, precast components and pourable sealants. CHEM LINK’s E-Curb system can usually be installed in under 15 minutes and never requires flashing or mechanical attachment. Special Characteristics • Rapid installation - “Slip-fit” light weight curb design reduces labor significantly. • Excellent adhesion to most roofing materials. • No flashing or mechanical attachment required. • Service Temperature -40°F to 200°F (-40°C to 93°C) • 1-Part® accommodates movement and is suggested for use on all granulated membranes and details with excessive movement. • For sloped roof applications, substitute DuraLink™ non-slump adhesive/sealant for 1-Part and M-1® E-Curbs are designed for use on granulated modified bitumen, asphalt and coal tar B.U.R. (built up roofing). E-Curbs are specified for PVC, EPDM, PIB, and TPO single ply roofing membranes. TPO Primer is required for use with TPO single-ply roof membrane. When installed properly, this system forms a durable, waterproof rubber seal around penetrations. An extended manufacture warranty against leaks is activated with submittal of a completed warranty card. Restrictions • Please contact customer service for application guidelines with temperatures below 32°F (0°C). • Do not apply if rain is anticipated within 4 hours • Do not use on Hypalon or smooth APP modified bitumen membrane. For smooth APP, torch down a target of granulated APP before installation. • TPO Primer must be used for TPO applications. • Do not prime bonding surfaces with asphalt primer. • Do not use asphalt cement as a “night sealant”. Use M-1 for this purpose. • E-Curb kits are designed to contain enough 1-Part to fill each curb with displacement in consideration. Refer to our penetration calculator under contractor resources at chemlink.com to verify volumes E-C URBTM SYSTEM SOLAR PENETRATION SEALS Site Address 10625 Morengo Dr Cupertino, CA95014 Customer Name Chris Robinson Customer contact 1.408.341.5109 chris.robins1@gmail.comDrawn on: 6-28-17 Scale: NTS Note: The splice screws serve as rail to rail bonding Note: The module mid clamps serve as module to rail bonding L-foot and rail side pro®le Prepared by Thomas Boulay - Sr Designer - Mobile - (408) 863-2770 ProVoltz Inc Lic # 919207 Class C-46 583 Division St Suite B Campbell, CA 95008 (408) 796-4450 4x4 rafter 3.5” stainless steel lag Standoff Invisimount racking Abby Ayende 12/12/17 SunPower® InvisiMount™ | Residential Mounting System InvisiMount Component Details Component Material Weight Mid Clamp Black oxide stainless steel AISI 304 63 g (2.2 oz) End Clamp Black anodized aluminum alloy 6063-T6 110 g (3.88 oz) Rail Black anodized aluminum alloy 6005-T6 830 g/m (9 oz/ft) Rail Splice Aluminum alloy 6005-T5 830 g/m (9 oz/ft) Ground Lug Assembly 304 stainless (A2-70 bolt; tin-plated copper lug)106.5 g/m (3.75 oz) End Cap Black acetal (POM) copolymer 10.4 g (0.37 oz) Roof Attachment Hardware Supported by InvisiMount System Design Tool Application • Composition Shingle Rafter Attachment • Composition Shingle Roof Decking Attachment • Curved and Flat Tile Roof Attachment • Universal Interface for Other Roof Attachments InvisiMount Operating Conditions Temperature −40° C to 90° C (−40° F to 194° F) Max. Load 2400 Pa uplift 5400 Pa downforce Roof Attachment Hardware Warranties Refer to roof attachment hardware manufacturer’s documentation InvisiMount Warranties And Certifications Warranties 25-year product warranty 5-year finish warranty Certifications UL 2703 Listed Class A fire rating when distance between roof surface and bottom of SunPower module frame is ≤ 3.5” *Module frame that is compatible with the InvisiMount system required for hardware interoperability. © 2015 SunPower Corporation. All Rights Reserved. SUNPOWER, the SUNPOWER logo, and INVISIMOUNT are trademarks or registered trademarks of SunPower Corporation. All other trademarks are the property of their respective owners. Specifications included in this datasheet are subject to change without notice. InvisiMount Component Images Module* / Mid Clamp and Rail Mid Clamp End Clamp Rail & Rail Splice Ground Lug Assembly End Cap Module* / End Clamp and Rail sunpower.com Document #509506 Rev B 9/15/15, 3:05 PMQIMS.E466981 - Mounting Systems, Mounting Devices, Clamping Deࡕ and Ground Lugs for Use with Photovoltaic Modules and Panels Page 1 of 1http://database.ul.com/cgi-bin/XYV/template/LISEXT/1FRAME/showࡕ73741824&version=versionless&parent_id=1081534547&sequence=1AC QIMS.E466981 Mounting Systems, Mounting Devices, Clamping Devices and Ground Lugs for Use with Photovoltaic Modules and Panels Page Bottom Mounting Systems, Mounting Devices, Clamping Devices and Ground Lugs for Use with Photovoltaic Modules and Panels See General Information for Mounting Systems, Mounting Devices, Clamping Devices and Ground Lugs for Use with Photovoltaic Modules and Panels SUNPOWER CORP E466981 77 RIO ROBLES SAN JOSE, CA 95134 USA Cat. No. Investigated for Bonding Investigated for Mechanical Loading System Fire Classification (A, B or C) Tested in Combination With Photovoltaic mounting system InvisiMount - consisting of the following components: L-Foot, Rail, Rail Splice, Mid Clamp, Ground Lug Assembly, End Clamp. Y Y A UL Listed PV Modules: Sunpower Corp: Models SPR-XYY-###, where YY represents numbers 18, 19, 20 or 21, and ### represents any number from 365 to 310 and 274 to 233; SPR-EYY-###, where YY represents numbers 18, 19, 20 or 21, and ### represents any number from 345 to 285 and 250 to 225. All models identified must have the Gen 5 frame and have a Type 2 module characterization. Y Y A NRTL Listed: SPR-XXXE/NE-WHT/BLK-U-YYYACPV and SPR-V- WW-XXX-Y-Z-G-AC, where "XXX" is the wattage of the panel and ranges from 250 to 225; and where "YYY" indicates the inverter voltage used in the module, and can be blank, 240 or 208/240. All models identified must have the Gen 5 frame and have a Type 2 module characterization. Last Updated on 2015-07-29 Questions? Print this page Terms of Use Page Top © 2015 UL LLC The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Certified and covered under UL's Follow-Up Service. Always look for the Mark on the product. UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Assemblies, Constructions, Designs, Systems, and/or Certifications (files) must be presented in their entirety and in a non- misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2015 UL LLC". 7 Racking EngineeringSite Address 10625 Morengo Dr Cupertino, CA95014 Customer Name Chris Robinson Customer contact 1.408.341.5109 chris.robins1@gmail.com Drawn on: 6-28-17 Scale: NTS Prepared by Thomas Boulay - Sr Designer - Mobile - (408) 863-2770 ProVoltz Inc Lic # 919207 Class C-46 583 Division St Suite B Campbell, CA 95008 (408) 796-4450 Abby Ayende 12/12/17