Loading...
B-2017-2163 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR. PERMIT NO•B-2017-2163 10163 PARK CIRCLE W CUPERTINO,CA 95014-1967(326 32 020) COSMOS ROOFING INC MOUNTAIN VIEW,CA 94043 OWNER'S NAME: WAI JOHN PAND JESSICAYU-LAN TRUSTEE DATE ISSUED:12/15/2017 OWNER'S PHONE.408-867-0878 PHONE NO:(650)969-7663 LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO' License Class C-39 Lic.#785441 Contractor COSMOS ROOFING INC Date 04/30/2019 X BLDG —ELECT —PLUMB I hereby affirm that I am licensed under the provisions of Chapter 9(commencing —MECH X RESIDENTIAL—COMMERCIAL with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. JOB DESCRIPTION RE-ROOF,TEAR-OFF,TAR AND GRAVEL-(21 SQ) I hereby affirm under penalty of perjury one of the following two declarations: 1. I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. 2. I have and will maintain Worker's Compensation Insurance,as provided for by (-- CR.) Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area. Valuation.$12490.00 APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances APN Number Occupancy Type: and state laws relating to building construction,and hereby authorize 326 32 020 representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments,costs,and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue against said City in stands consequence ll the hg othis WITHIN 180 DAYS OF PERMIT ISSUANCE OR Additionally,the a•-ican unde"�stands and will comply with all non-point source regulatio per the us-rtino Municipal Code,Section 9.18. 180 DAYS FROM LAST CALLED INSPECTION. -Signature `41W-1,----," Date 12/15/2017 Issued by•Jasmine Archbold Date: 12/15/2017 OWNER-BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the RE-ROOFS: following two reasons: All roofs shall be inspected prior to any roofing material being installed.If a roof is t. I,as owner of the property,or my employees with wages as their sole installed without first obtaininvf it sp-c,,op,I agree to remove all new materials for compensation,will do the work,and the structure is not intended or offered for inspE on. sale(Sec.7044,Business&Professions Code) - ,= A. 2. I,as owner of the property,am exclusively contracting with licensed (Signature of Applicant: 411.111 contractors to construct the project(Sec.7044,Business&Professions Code). 'Date:12/15/2017 I hereby affirm under penalty of perjury one of the following three declarations: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER i. I have and will maintain a Certificate of Consent to self-insure for Worker's - Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance,as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code,for the performance of the work for which this California Health&Safety Code,Sections 25505,25533,and 25534. I will permit is issued. maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the 3. I certify that in the performance of the work for which this permit is issued,I Health&Safety Code,Section 25532(a)should I store or handle hazardous shall not employ any person in any manner so as to become subject to the material. Additionally,should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I Worker's Compensation laws of California. If,after making this certificate of will maintain compliance with the CuperJi 1a Ma n' i•.al Code,Chapter 9.12 and exemption,I become subject to the Worker's Compensation provisions of the the Health&Safety Code Sections 2551: 25533,and 25534. Labor Code,I must forthwith comply with such provisions or this permit shall A. .� be deemed revoked. Ot wner or authorized agent: •. APPLICANT CERTIFICATION C Date:12/15/2017 _—..,—.. I certify that I have read this application and state that the above information is CONSTRUCTION LENDING AGENCY correct.I agree to comply with all city and county ordinances and state laws I hereby affirm that there is a construction lending agency for the performance relating to building construction,and hereby authorize representatives of this city of work's for which this permit is issued(Sec.3097 Civ C) to enter upon the above mentioned property for inspection purposes. (We)agree Lender's Name to save indemnify and keep harmless the City of Cupertino against liabilities, judgments,costs,and expenses which may accrue against said City in Lender's Address consequence of the granting of this permit. Additionally the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal ARCHITECT'S DECLARATION Code,Section 9.18. I understand my plans shall be used as public records. Licensed Signature Date 12/15/2017 Professional . CONSTRUCTION PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION to) 10300 TORRE AVENUE • CUPERTINO,CA 95014-3255 '4.y.I�,f 4. •44444 (408) 777-3228 • building@cupertino.org PEMIT#B- 1.D —1( - 2-1(0'3 CUP RTINO REV# DEF ❑ NEW CONSTRUCTION ❑ADDITION ❑ALTERATION ❑T.I. LI MEp ❑RE-ROOF ❑SWIMMING POOL/SPA PROJECT ADDRESS APN# OWNER NAME 011.®1_.. LI IA PHI`N J sic)* �T' EMAIL STREET ADDRESS CITY,STATE,ZIP -0'1 o? P-P-V- R.:��.,r, \ b"T (u TINO j c _ 06014 IM'CONTRACTOR NAME ❑OWNER-BUILDER COMPANY NAME LICENSE NUMBER LICENSE TYPE COsi o� i�C) E, - 5 1 C q STREET ADDRESS CITY,STATE,ZIP I 1°101 On MLOC EwUD `NA-1 1,��1T i I` iii E-MAIL ��- PHONE �- BUS.LIC# Cu^ a . 6` 9C? i1 `a'u' tC � C 5o 501a. ❑ARCHITECT 0 OWNER 0 OWNER AGENT 0 CONTRACTOR AGENT❑ENGINEER 0 DEVELOPER 0 TENANT CONTACT NAME E-MAIL STREET ADDRESS CITY,STATE,ZIP PHONE DESCRIPTON :—_ Qe CR,00 F : -Pow_ QF-- - i 6 ei -'rijei.„ . Puy OKI 4 P1 - r__ c )e ❑SINGLE-FAMILY/DUPLEX MI'MULTI-FAMILY 0 INDUSTRIAL 0 COMMERCIAL EXISTING USE EXISTING SF NEW FLOOR SF PORCH SF DECK SF DEMO SF STORIES# TOTAL NET SF USE TYPE OCC SQ.FT. VALUATION($) REMODEL REMODEL KITCHEN REMODEL OTHR GARAGE ❑ATTACHED ' BATHROOM SF SF SF SF 0 DETACHED " EXISING ❑YES EICHLER 0 YESSECOND STORY ADDITION ❑❑NO FIRE SPRINKLERS 0 NO 0 NO DWELLING SECOND DWELLING ❑YES ❑ATTACHED❑DETACHED OTHER UNITS# UNIT ADDITON: 0 NO S F POOLS) ❑FIBERGLASS ❑VINYL-LINED ❑GUNITE ❑PREFABRICATED POOL-SF SPA-SF SPA ATTACHED❑YES 0 NO I TOTAL-SF Wer64/ED BY: TOTAL VALUATION: Commercial or Multi-Family Buildings with Public Swimming Pools requires Department of Environmental Heath approval J h. ' / to.490 RE-ROOF'EXISTING ROOF TYPE: ®BUILT-UP ROOF❑ASPHALT SHINGLES❑WOOD SHAKES❑WOOD SHINGLES❑TILE OTHER(SPECIFY) REMOVE/REPLACE 0 NO IF NO PLYWOOD 01" ❑3/8" PLYWOOD TYPE: PITCH: ROOF CLASS II rS #OF LAYERS THICKNESS❑5/8" OTHER ❑OSB ❑CDX OTHER •12 A PROPOSED ROOF TYPE:.WILT-UP ROOF DASPHALT SHINGLES 0 WOOD SHAKES❑WOOD SHINGLES 0 OTHER *Provide a signed copy of the Cupertino's Tear-Off Policy SF id-SQUARES By my signature below I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this application and the information I have prpo,ed is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and ,tate la relating to building construction. I authorize representatives of Cupertino to enter the above-identified property for inspec.sods,_ .os-s. acknowledge and authorize all information contains on this application form to be made available for public record. qJ f r 19/(6 14- - Signature of Applicant/Agent: I Date: SUPPLEMENTAL INFORMATION REQUIRED *New SFD/Second Dwelling Units/Multifamily Dwellings:A Demolition permit is required prior to issuance of a building permit for all new construction. *Commercial Buildings: Provide a completed Hazardous Materials Disclosure form if any Hazardous Materials are being used as part of this project. *Copy of Planning Approval Letter or Meeting with Planning prior to submittal of Building Permit application. *HOA-Provide a letter of approval from the Home Owner's Association , BldgApp_2017.doc revised 08/01/17 of f REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION wstas� ALBERT SALVADOR, P.E., C.B.O.,BUILDING OFFICIAL 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 CUPERTINO (408)777-3228•FAX(408)777-3333•buildinq a(�.cuoertino.org PROJECT DRESS cpte om/ ���Z 1/V 4, APN# 32- 2 , '5 7 D 2 M OWNER NAME PHONE E-MAIL /-�/ GILL U N 040g) ' - R-s STREET ADDRES ,N p CITY, STATE,ZIP FAX 1 to {)W!' � SIV GtAMRTtiq CONTRAC OR NAMELICENSE NUMBER LICENSE q� BUS.LIC.# (we" AJ �G � *j CS3TY�P"l 403 j40 COMPAN AME E-MAIL Sl�.S Q l� 1'1 FAX ��" e�Srn�So �fi e� ST EET HONE hi 1931 OU RES u� ML 4LLD \JI . TAOU�.MTh(N VIEW (A Y,STATE,ZIP P Ha.) 3 5O I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2016 California Codes. 2. An inspection request can be scheduled up to one business day before the requested inspection date. \a To schedule inspections call (408) 777-3228 from 7:30-3:3Opm (Mon-Thurs) or 7:30-2:30pm (Friday) to schedule inspection. For Tear-Off and Nailing Inspections, you must also call on the day of the inspection only after that phase of the work is completed. The building inspector will be out to the job site within one hour. The hours for this service are: 7:30-10:30am and 12:30-3:30(Mon-Thurs) and 7:30-10:30am and 12:30-2:30 (Friday). Final Inspections will be given a two hour window. 3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked-down or removed prior to this inspection. 4. If plywood is installed, a plywood Nailing Inspection is required. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is completed. To receive a final sign-off, the following items will be verified: a. Flat roofs shall have a minimum of 1/"per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation,vents painted, gutter/downspouts installed, debris removed. 7. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be charged a re-inspection fee. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below,I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf.__I understand and agree to comply with the re-roof policy stated above. I also understand that smoke detectors and carbon monoxi 1 e Bete. oris are required to be installed in accordance with Sections R314 and R315 of the 2016 California Residentia e Signature of Applicant/Agent: ' I Date: , l I ,% ReroofPolicy_2014.doc revised 06/01/7